Interrogatory responses
Answers to questions 19 thru 32
Files20
CAE-020 Attachment 1.xlsx
Excel · 1.6 MBText searchable
Download CAE-020 Attachment 1.xlsxRead the text of CAE-020 Attachment 1.xlsx
CAE-027 Attachment 2.pdf
PDF · 1.2 MB · 7 pagesText searchable
Download CAE-027 Attachment 2.pdfRead the text of CAE-027 Attachment 2.pdf
CAE-032 Attachment 1.pdf
PDF · 483 KB · 35 pagesText searchable
Download CAE-032 Attachment 1.pdfRead the text of CAE-032 Attachment 1.pdf
CAE-032 Attachment 2.pdf
PDF · 1.1 MB · 36 pagesText searchable
Download CAE-032 Attachment 2.pdfRead the text of CAE-032 Attachment 2.pdf
CAE-020 Attachment 1.pdf
PDF · 5.6 MB · 75 pagesText searchable
Download CAE-020 Attachment 1.pdfRead the text of CAE-020 Attachment 1.pdf
CAE-027 Attachment 1.pdf
PDF · 18 MB · 245 pagesText searchable
Download CAE-027 Attachment 1.pdfRead the text of CAE-027 Attachment 1.pdf
Text of CAE-021.pdf
Extracted from the file · 1 page · 567 characters
Text of CAE-022.pdf
Extracted from the file · 3 pages · 6,575 characters
Text of CAE-023.pdf
Extracted from the file · 1 page · 757 characters
Text of CAE-024.pdf
Extracted from the file · 1 page · 2,191 characters
Text of CAE-025.pdf
Extracted from the file · 1 page · 1,125 characters
Text of CAE-026.pdf
Extracted from the file · 1 page · 2,757 characters
Text of CAE-027.pdf
Extracted from the file · 1 page · 1,054 characters
Text of CAE-027 Attachment 2.pdf
Extracted from the file · 7 pages · 23,401 characters
Text of CAE-028.pdf
Extracted from the file · 1 page · 714 characters
Text of CAE-029.pdf
Extracted from the file · 1 page · 1,362 characters
Text of CAE-030.pdf
Extracted from the file · 1 page · 1,728 characters
Text of CAE-031.pdf
Extracted from the file · 1 page · 1,654 characters
Text of CAE-032.pdf
Extracted from the file · 1 page · 1,689 characters
Text of CAE-032 Attachment 1.pdf
Extracted from the file · 35 pages · 69,136 characters
Text of CAE-032 Attachment 2.pdf
Extracted from the file · 36 pages · 33,759 characters
Text of CAE-020 Attachment 1.pdf
Extracted from the file · 75 pages · 742,810 characters
Page 216 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 216 of 245 FIGURE TP-23 ONE LINE DIAGRAM OF BASIN PHASE 2 Budget and Cost Responsibility: The customers have provided funding as an ASTPR for the construction of Basin substation. FIGURE TP-24 PROJECTED CASH FLOWS FOR BASIN SUBSTATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 163.60 16.00 10.00 8.50 46.10 64.60 83.00 SAND DUNE 230 KV SWITCHING STATION South of the Apex area, a fold of the Harry Allen – Pecos 230 kV line #2 into the new Sand Dune switching station is required to serve a Rule 9 customer with a signed 550 MW HVD agreement. The addition of this load causes overloads on the Harry Allen – Pecos #1 230 kV line so that the existing line from Harry Allen to Sand Dune must be reconductored to bundled 1026 ACCC. The 212 Page 216 of 245Page 217 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 217 of 245 Companies request approval to construct the Sand Dune switching station and reconductor a portion of the Harry Allen – Pecos 230 kV line #1 and two HVD 230 kV lines, considered Sand Dune phase 1. A second Rule 9 agreement for 340 MW has been executed, requiring a 230 kV terminal as well as the reconductor of a portion of the existing Harry Allen – Pecos #1 230 kV line, from Sand Dune to Pecos must be reconductored to bundled 1026 ACCC. The addition of two (2) stage voltage controlled 48 MVAR capacitors are necessary to maintain transmission system voltage. The Companies request approval to construct a 230 kV terminal at Sand Dune switching station, reconductor a portion of the Harry Allen – Pecos 230 kV line #1 and one HVD 230 kV line, considered Sand Dune phase 2. A third customer Rule 9 agreement for 432 MW, which is anticipated to be executed before the PUCN issues a ruling on the 2026 IRP. The customer requires a 230 kV line terminal at Sand Dune to connect the 230 kV line to Navigator switching station, creating Sand Dune-NavigatorHGIII 230 kV line. Navigator is described and requested below. The customer will take delivery from two HVD lines from Navigator switching station, which is described and requested below. The Companies request approval to construct a 230 kV terminal at Sapphire for the Sand Dune – Navigator – HGIII 230 kV line, considered Sand Dune phase 3. Construction Scope: Construct new Sand Dune switching station by folding Harry Allen-Pecos 230 kV line #1. Sand Dune switching station includes 230 kV breaker and a half bus with associated line disconnect switches, breakers, bus work, control house protection panels, communications, three HVD 230 kV lines and control equipment. Reconductor Harry Allen to Pecos 230 kV line #1 with double bundled 1026 ACCC. Install 230 kV two (2) stage voltage controlled capacitor bank. Construct Sand Dune-Navigator-HGIII 230 kV line with associated 230 kV line terminals at Navigator and HGII and Sand Dune. 213 Page 217 of 245Page 218 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 218 of 245 FIGURE TP-25 ONE LINE DIAGRAM OF SAND DUNE SWITCHING STATION PHASE 1 AND PHASE 2 214 Page 218 of 245Page 219 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 219 of 245 FIGURE TP-26 ONE LINE DIAGRAM SAND DUNE PHASE 3 Budget and Cost Responsibility: The customers have provided funding as an ASTPR for the construction of Sand Dune switching station for Phase 1, Phase 2 and Phase 3. FIGURE TP-27 PROJECTED CASH FLOWS FOR SAND DUNE SWITCHING STATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 75.20 4.00 4.50 34.60 28.50 67.60 3.60 OPAL 230 KV SWITCHING STATION It is now required to construct Opal (originally called Belcher) switching station near Basin substation in Apex. This new switching station is required to serve a Rule 9 customer 375 MW HVD agreement, which is anticipated to be executed before the PUCN issues a ruling on the 2026 IRP. The customer will take redundant power delivery from two (2) 230 kV HVD lines from Opal. Opal will be connected to the existing transmission system by constructing HGIII-Opal-Sapphire 230 kV line. The Companies request approval to construct the Opal switching station, HVD lines and to construct HGIII – Opal – Sapphire 230 kV line. 215 Page 219 of 245Page 220 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 220 of 245 Construction Scope: Construct the new Opal switching station by first constructing the HGIIIOpal 230 kV line and Opal-Sapphire 230 kV line with associated line disconnect switches, breakers, metering, bus work, control house protection panels, communications, HVD lines and control equipment. This requires a new 230 kV line terminal at HGIII and Sapphire, with associated line disconnect switches, breakers, metering, bus work, control house protection panels, communications, protection and control equipment. The Sapphire 230 kV line terminal to Opal was discussed previously. The HGIII line terminal is discussed below. Opal will be built to accommodate future 230/12 kV 37 MVA transformers and 230 kV transmission needs. FIGURE TP-28 ONE LINE DIAGRAM OF THE OPAL 230 KV SWITCHING STATION 216 Page 220 of 245Page 221 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 221 of 245 Budget and Cost Responsibility: The customer will have provided funding as an ASTPR for the construction of Opal switching station. FIGURE TP-29 PROJECTED CASH FLOWS FOR OPAL SUBSTATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 61.80 0.10 1.20 4.00 10.00 15.20 46.50 NAVIGATOR 230 KV SWITCHING STATION The Navigator switching station is required to provide service to a customer with a Rule 9 agreement for 432 MW, which is expected to be executed before the PUCN issues a ruling on the 2026 IRP. The new Navigator 230 kV switching station is located south of HGIII and north of Sand Dune in the Apex area. Navigator will be connected to the 230 kV transmission by constructing HGIII-Navigator-Sand Dune 230 kV line. The additional 230 kV load also requires additional 230 kV transmission capacity be added by constructing the 525/230 kV 600 MVA transformer at HGIII, which also requires the Harry Allen – Chuck Lenzie 525 kV line to be folded into HGIII, which is described and requested below. The Companies request approval to construct the Navigator switching station, HGIII-Navigator-Sand Dune 230 kV line. Construction Scope: Construct the new Navigator 230 kV switching station, with a line fold of the HGIII-Sand Dune 230 kV line. Construct line terminals with associated line disconnect switches, breakers, bus work, control house protection panels, communications, HVD lines and control equipment. 217 Page 221 of 245Page 222 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 222 of 245 FIGURE TP-30 ONE LINE DIAGRAM NAVIGATOR 230 KV SWITCHING STATION Budget and Cost Responsibility: The customer will provide funding as an ASTPR for the construction of Navigator 230 kV switching station. 218 Page 222 of 245Page 223 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 223 of 245 FIGURE TP-31 PROJECTED CASH FLOWS FOR NAVIGATOR SWITCHING STATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 36.50 0.50 5.00 1.00 10.00 16.00 20.00 HGIII SUBSTATION 525/230 KV 600 MVA TRANSFORMER A Rule 9 agreement for 375 MW (at Opal) which is expected to be executed before the PUCN issues a ruling on the 2026 IRP, which requires the 230 kV line terminals at HGIII for line to Opal. The 230 kV line is a section of the Sapphire-Opal-HGII described in Sapphire phase 5. The Companies request approval to construct a 230 kV line terminal to Opal, considered HGIII phase 1. A Rule 9 agreements for 432 MW (at Navigator) is expected to be executed before the PUCN issues a ruling on the 2026 IRP, requiring a 230 kV line terminals at HGIII, line fold of Harry Allen – Chuck Lenzi 525 kV line into HGIII and a new 525/230 kV 600 MVA transformer at HGIII. The 230 kV line is a section of the Sand Dune-Navigator-HGIII 230 kV line described above. The Companies request approval to construct a 230 kV line terminal to Navigator, a 230 kV line terminal to Navigator, the 525/230 kV 600 MVA transformer at HGIII and Harry AllenChuck Lenzi 525 kV line fold into HGIII, considered HGIII phase 2. Construction Scope: Construct the Harry Allen-Chuck Lenzi 525 kV line fold into HGIII, with 525 kV ring bus, with 525/230 kV 600 MVA transformer, two 230 kV line terminals, the 230 kV line to Navigator and 230 kV line to Opal, with associated line disconnect switches, breakers, metering, bus work, control house protection panels, communications, HVD lines and control equipment. 219 Page 223 of 245Page 224 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 224 of 245 FIGURE TP-32 ONE LINE DIAGRAM HGIII FOR THE NAVIGATOR 230 KV LINE TERMINALS AND 525/230 KV 600 MVA TRANSFORMER Budget and Cost Responsibility: The customers will provide funding as an ASTPR for the additions at HGIII substation. 220 Page 224 of 245Page 225 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 225 of 245 FIGURE TP-33 PROJECTED CASH FLOWS FOR HGIII SUBSTATION TWO (2) 230 KV LINE TERMINALS, 525/230 KV 600 MVA TRANSFORMERS Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 130.00 12.00 8.00 6.00 36.00 50.00 68.00 CHUKAR 345/120 KV 280 MVA TRANSFORMERS #1 AND 345/120 KV 400 MVA TRANSFORMER #2 It is now required to install the previously master planned Chukar 345/120 kV 400 MVA transformers #1 and #2, which are contingent facilities for a Network Integrated Transmission Service (NITS) customer, for the Naniwa, 600 MW, Designated Network Resource (DNR), Point Of Receipt (POR) at East Tracy 345 kV. The Companies DNR request for Hot Pot and Iron Point 600 MW at North Valmy also require the Chukar 345/120 kV transformer additions which are contingent facilities. The Companies DNR request for the Ft Churchill natural gas generation DNR for 1,223 MW, at its Walker River 345 kV point of interconnection, requires the Chukar 345/120 kV 400 MVA transformer additions as contingent facilities. Chukar 345/120 kV transformers were initially required to serve the current 120 kV Rule 9 HVD agreement load forecasts in the next five years. Both of the Chukar 345/120 kV 400 MVA transformers are contingent facilities for an executed Rule 9 agreement for 315 MW. It has been identified that the previously planned 280 MVA transformers will ultimately not be sufficient, to prevent the need to replace the transformers 400 MVA transformers will be used. The 345kV transmission system will be connected to Chukar by folding Lantern – Comstock Meadows 345 kV line. The Companies request approval to construct the Chukar 345/120 kV 400 MVA transformer #1 and 345/120 kV 400 MVA transformer #2. Construction Scope: Construct the Chukar 345/120 kV transformers #1 and #2, construct the Comstock Meadows – Chukar line section of Lantern – Comstock Meadows 345 kV line. Construct a four (4) 345 kV breaker ring bus convertible to breaker and a half, with associated line disconnect switches, breakers, bus work, control house protection panels, communications and control equipment. 221 Page 225 of 245
As listed on the current system
Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026