Utility Dockets and Filings

Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf

Text of CAE-032 Attachment 1.pdf

Extracted from the file · 35 pages · 69,136 characters

Text of CAE-032 Attachment 2.pdf

Extracted from the file · 36 pages · 33,759 characters

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

15 pages match
  1. Page 219 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 219 of 245 FIGURE TP-26 ONE LINE DIAGRAM SAND DUNE PHASE 3 Budget and Cost Responsibility: The customers have provided funding as an ASTPR for the construction of Sand Dune switching station for Phase 1, Phase 2 and Phase 3. FIGURE TP-27 PROJECTED CASH FLOWS FOR SAND DUNE SWITCHING STATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 75.20 4.00 4.50 34.60 28.50 67.60 3.60 OPAL 230 KV SWITCHING STATION It is now required to construct Opal (originally called Belcher) switching station near Basin substation in Apex. This new switching station is required to serve a Rule 9 customer 375 MW HVD agreement, which is anticipated to be executed before the PUCN issues a ruling on the 2026 IRP. The customer will take redundant power delivery from two (2) 230 kV HVD lines from Opal. Opal will be connected to the existing transmission system by constructing HGIII-Opal-Sapphire 230 kV line. The Companies request approval to construct the Opal switching station, HVD lines and to construct HGIII – Opal – Sapphire 230 kV line. 215 Page 219 of 245
  2. Page 220 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 220 of 245 Construction Scope: Construct the new Opal switching station by first constructing the HGIIIOpal 230 kV line and Opal-Sapphire 230 kV line with associated line disconnect switches, breakers, metering, bus work, control house protection panels, communications, HVD lines and control equipment. This requires a new 230 kV line terminal at HGIII and Sapphire, with associated line disconnect switches, breakers, metering, bus work, control house protection panels, communications, protection and control equipment. The Sapphire 230 kV line terminal to Opal was discussed previously. The HGIII line terminal is discussed below. Opal will be built to accommodate future 230/12 kV 37 MVA transformers and 230 kV transmission needs. FIGURE TP-28 ONE LINE DIAGRAM OF THE OPAL 230 KV SWITCHING STATION 216 Page 220 of 245
  3. Page 221 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 221 of 245 Budget and Cost Responsibility: The customer will have provided funding as an ASTPR for the construction of Opal switching station. FIGURE TP-29 PROJECTED CASH FLOWS FOR OPAL SUBSTATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 61.80 0.10 1.20 4.00 10.00 15.20 46.50 NAVIGATOR 230 KV SWITCHING STATION The Navigator switching station is required to provide service to a customer with a Rule 9 agreement for 432 MW, which is expected to be executed before the PUCN issues a ruling on the 2026 IRP. The new Navigator 230 kV switching station is located south of HGIII and north of Sand Dune in the Apex area. Navigator will be connected to the 230 kV transmission by constructing HGIII-Navigator-Sand Dune 230 kV line. The additional 230 kV load also requires additional 230 kV transmission capacity be added by constructing the 525/230 kV 600 MVA transformer at HGIII, which also requires the Harry Allen – Chuck Lenzie 525 kV line to be folded into HGIII, which is described and requested below. The Companies request approval to construct the Navigator switching station, HGIII-Navigator-Sand Dune 230 kV line. Construction Scope: Construct the new Navigator 230 kV switching station, with a line fold of the HGIII-Sand Dune 230 kV line. Construct line terminals with associated line disconnect switches, breakers, bus work, control house protection panels, communications, HVD lines and control equipment. 217 Page 221 of 245
  4. Page 222 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 222 of 245 FIGURE TP-30 ONE LINE DIAGRAM NAVIGATOR 230 KV SWITCHING STATION Budget and Cost Responsibility: The customer will provide funding as an ASTPR for the construction of Navigator 230 kV switching station. 218 Page 222 of 245
  5. Page 223 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 223 of 245 FIGURE TP-31 PROJECTED CASH FLOWS FOR NAVIGATOR SWITCHING STATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 36.50 0.50 5.00 1.00 10.00 16.00 20.00 HGIII SUBSTATION 525/230 KV 600 MVA TRANSFORMER A Rule 9 agreement for 375 MW (at Opal) which is expected to be executed before the PUCN issues a ruling on the 2026 IRP, which requires the 230 kV line terminals at HGIII for line to Opal. The 230 kV line is a section of the Sapphire-Opal-HGII described in Sapphire phase 5. The Companies request approval to construct a 230 kV line terminal to Opal, considered HGIII phase 1. A Rule 9 agreements for 432 MW (at Navigator) is expected to be executed before the PUCN issues a ruling on the 2026 IRP, requiring a 230 kV line terminals at HGIII, line fold of Harry Allen – Chuck Lenzi 525 kV line into HGIII and a new 525/230 kV 600 MVA transformer at HGIII. The 230 kV line is a section of the Sand Dune-Navigator-HGIII 230 kV line described above. The Companies request approval to construct a 230 kV line terminal to Navigator, a 230 kV line terminal to Navigator, the 525/230 kV 600 MVA transformer at HGIII and Harry AllenChuck Lenzi 525 kV line fold into HGIII, considered HGIII phase 2. Construction Scope: Construct the Harry Allen-Chuck Lenzi 525 kV line fold into HGIII, with 525 kV ring bus, with 525/230 kV 600 MVA transformer, two 230 kV line terminals, the 230 kV line to Navigator and 230 kV line to Opal, with associated line disconnect switches, breakers, metering, bus work, control house protection panels, communications, HVD lines and control equipment. 219 Page 223 of 245
  6. Page 224 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 224 of 245 FIGURE TP-32 ONE LINE DIAGRAM HGIII FOR THE NAVIGATOR 230 KV LINE TERMINALS AND 525/230 KV 600 MVA TRANSFORMER Budget and Cost Responsibility: The customers will provide funding as an ASTPR for the additions at HGIII substation. 220 Page 224 of 245
  7. Page 225 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 225 of 245 FIGURE TP-33 PROJECTED CASH FLOWS FOR HGIII SUBSTATION TWO (2) 230 KV LINE TERMINALS, 525/230 KV 600 MVA TRANSFORMERS Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 130.00 12.00 8.00 6.00 36.00 50.00 68.00 CHUKAR 345/120 KV 280 MVA TRANSFORMERS #1 AND 345/120 KV 400 MVA TRANSFORMER #2 It is now required to install the previously master planned Chukar 345/120 kV 400 MVA transformers #1 and #2, which are contingent facilities for a Network Integrated Transmission Service (NITS) customer, for the Naniwa, 600 MW, Designated Network Resource (DNR), Point Of Receipt (POR) at East Tracy 345 kV. The Companies DNR request for Hot Pot and Iron Point 600 MW at North Valmy also require the Chukar 345/120 kV transformer additions which are contingent facilities. The Companies DNR request for the Ft Churchill natural gas generation DNR for 1,223 MW, at its Walker River 345 kV point of interconnection, requires the Chukar 345/120 kV 400 MVA transformer additions as contingent facilities. Chukar 345/120 kV transformers were initially required to serve the current 120 kV Rule 9 HVD agreement load forecasts in the next five years. Both of the Chukar 345/120 kV 400 MVA transformers are contingent facilities for an executed Rule 9 agreement for 315 MW. It has been identified that the previously planned 280 MVA transformers will ultimately not be sufficient, to prevent the need to replace the transformers 400 MVA transformers will be used. The 345kV transmission system will be connected to Chukar by folding Lantern – Comstock Meadows 345 kV line. The Companies request approval to construct the Chukar 345/120 kV 400 MVA transformer #1 and 345/120 kV 400 MVA transformer #2. Construction Scope: Construct the Chukar 345/120 kV transformers #1 and #2, construct the Comstock Meadows – Chukar line section of Lantern – Comstock Meadows 345 kV line. Construct a four (4) 345 kV breaker ring bus convertible to breaker and a half, with associated line disconnect switches, breakers, bus work, control house protection panels, communications and control equipment. 221 Page 225 of 245
  8. Page 226 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 226 of 245 FIGURE TP-34 ONE LINE DIAGRAM OF THE CHUKAR SUBSTATION Budget and Cost Responsibility: The Companies will be responsible for the cost associated with the addition of the 345/120 kV transformer(s) at Chukar substation. 222 Page 226 of 245
  9. Page 227 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 227 of 245 FIGURE TP-35 PROJECTED CASH FLOWS FOR CHUKAR 345/120 KV 400 MVA TRANSFORMER #1 & #2 Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 83.90 3.00 2.80 31.80 46.10 80.70 0.20 VIKING 345 KV SWITCHING STATION The new Viking switching station will be connected to the 345 kV system by folding the Lantern – Comstock 345 kV line and is required to serve a Rule 9 customer with a signed HVD agreement for 461 MW. The Companies request approval to construct the Viking switching station and HVD lines. Construction Scope: Construct the new Viking switching station with a line fold of the Lantern – Comstock Meadows 345 kV line. Construct line terminals at Viking switching station with associated line disconnect switches, breakers, bus work, control house, protection panels, communications, HVD lines and control equipment. 223 Page 227 of 245
  10. Page 228 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 228 of 245 FIGURE TP-36 FUTURE ONE LINE DIAGRAM OF THE AREA WITH VIKING SWITCHING STATION Budget and Cost Responsibility: The customer has provided funding as an ASTPR for the construction of Viking switching station. FIGURE TP-37 PROJECTED CASH FLOWS FOR VIKING SWITCHING STATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 16.80 1.0 2.0 2.5 6.6 11.10 4.70 224 Page 228 of 245

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026

This filing on the current system (opens in a new tab)