Interrogatory responses
Answers to questions 19 thru 32
Files20
CAE-020 Attachment 1.xlsx
Excel · 1.6 MBText searchable
Download CAE-020 Attachment 1.xlsxRead the text of CAE-020 Attachment 1.xlsx
CAE-027 Attachment 2.pdf
PDF · 1.2 MB · 7 pagesText searchable
Download CAE-027 Attachment 2.pdfRead the text of CAE-027 Attachment 2.pdf
CAE-032 Attachment 1.pdf
PDF · 483 KB · 35 pagesText searchable
Download CAE-032 Attachment 1.pdfRead the text of CAE-032 Attachment 1.pdf
CAE-032 Attachment 2.pdf
PDF · 1.1 MB · 36 pagesText searchable
Download CAE-032 Attachment 2.pdfRead the text of CAE-032 Attachment 2.pdf
CAE-020 Attachment 1.pdf
PDF · 5.6 MB · 75 pagesText searchable
Download CAE-020 Attachment 1.pdfRead the text of CAE-020 Attachment 1.pdf
CAE-027 Attachment 1.pdf
PDF · 18 MB · 245 pagesText searchable
Download CAE-027 Attachment 1.pdfRead the text of CAE-027 Attachment 1.pdf
Text of CAE-021.pdf
Extracted from the file · 1 page · 567 characters
Text of CAE-022.pdf
Extracted from the file · 3 pages · 6,575 characters
Text of CAE-023.pdf
Extracted from the file · 1 page · 757 characters
Text of CAE-024.pdf
Extracted from the file · 1 page · 2,191 characters
Text of CAE-025.pdf
Extracted from the file · 1 page · 1,125 characters
Text of CAE-026.pdf
Extracted from the file · 1 page · 2,757 characters
Text of CAE-027.pdf
Extracted from the file · 1 page · 1,054 characters
Text of CAE-027 Attachment 2.pdf
Extracted from the file · 7 pages · 23,401 characters
Text of CAE-028.pdf
Extracted from the file · 1 page · 714 characters
Text of CAE-029.pdf
Extracted from the file · 1 page · 1,362 characters
Text of CAE-030.pdf
Extracted from the file · 1 page · 1,728 characters
Text of CAE-031.pdf
Extracted from the file · 1 page · 1,654 characters
Text of CAE-032.pdf
Extracted from the file · 1 page · 1,689 characters
Text of CAE-032 Attachment 1.pdf
Extracted from the file · 35 pages · 69,136 characters
Text of CAE-032 Attachment 2.pdf
Extracted from the file · 36 pages · 33,759 characters
Text of CAE-020 Attachment 1.pdf
Extracted from the file · 75 pages · 742,810 characters
Page 223 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 223 of 245 FIGURE TP-31 PROJECTED CASH FLOWS FOR NAVIGATOR SWITCHING STATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 36.50 0.50 5.00 1.00 10.00 16.00 20.00 HGIII SUBSTATION 525/230 KV 600 MVA TRANSFORMER A Rule 9 agreement for 375 MW (at Opal) which is expected to be executed before the PUCN issues a ruling on the 2026 IRP, which requires the 230 kV line terminals at HGIII for line to Opal. The 230 kV line is a section of the Sapphire-Opal-HGII described in Sapphire phase 5. The Companies request approval to construct a 230 kV line terminal to Opal, considered HGIII phase 1. A Rule 9 agreements for 432 MW (at Navigator) is expected to be executed before the PUCN issues a ruling on the 2026 IRP, requiring a 230 kV line terminals at HGIII, line fold of Harry Allen – Chuck Lenzi 525 kV line into HGIII and a new 525/230 kV 600 MVA transformer at HGIII. The 230 kV line is a section of the Sand Dune-Navigator-HGIII 230 kV line described above. The Companies request approval to construct a 230 kV line terminal to Navigator, a 230 kV line terminal to Navigator, the 525/230 kV 600 MVA transformer at HGIII and Harry AllenChuck Lenzi 525 kV line fold into HGIII, considered HGIII phase 2. Construction Scope: Construct the Harry Allen-Chuck Lenzi 525 kV line fold into HGIII, with 525 kV ring bus, with 525/230 kV 600 MVA transformer, two 230 kV line terminals, the 230 kV line to Navigator and 230 kV line to Opal, with associated line disconnect switches, breakers, metering, bus work, control house protection panels, communications, HVD lines and control equipment. 219 Page 223 of 245Page 224 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 224 of 245 FIGURE TP-32 ONE LINE DIAGRAM HGIII FOR THE NAVIGATOR 230 KV LINE TERMINALS AND 525/230 KV 600 MVA TRANSFORMER Budget and Cost Responsibility: The customers will provide funding as an ASTPR for the additions at HGIII substation. 220 Page 224 of 245Page 225 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 225 of 245 FIGURE TP-33 PROJECTED CASH FLOWS FOR HGIII SUBSTATION TWO (2) 230 KV LINE TERMINALS, 525/230 KV 600 MVA TRANSFORMERS Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 130.00 12.00 8.00 6.00 36.00 50.00 68.00 CHUKAR 345/120 KV 280 MVA TRANSFORMERS #1 AND 345/120 KV 400 MVA TRANSFORMER #2 It is now required to install the previously master planned Chukar 345/120 kV 400 MVA transformers #1 and #2, which are contingent facilities for a Network Integrated Transmission Service (NITS) customer, for the Naniwa, 600 MW, Designated Network Resource (DNR), Point Of Receipt (POR) at East Tracy 345 kV. The Companies DNR request for Hot Pot and Iron Point 600 MW at North Valmy also require the Chukar 345/120 kV transformer additions which are contingent facilities. The Companies DNR request for the Ft Churchill natural gas generation DNR for 1,223 MW, at its Walker River 345 kV point of interconnection, requires the Chukar 345/120 kV 400 MVA transformer additions as contingent facilities. Chukar 345/120 kV transformers were initially required to serve the current 120 kV Rule 9 HVD agreement load forecasts in the next five years. Both of the Chukar 345/120 kV 400 MVA transformers are contingent facilities for an executed Rule 9 agreement for 315 MW. It has been identified that the previously planned 280 MVA transformers will ultimately not be sufficient, to prevent the need to replace the transformers 400 MVA transformers will be used. The 345kV transmission system will be connected to Chukar by folding Lantern – Comstock Meadows 345 kV line. The Companies request approval to construct the Chukar 345/120 kV 400 MVA transformer #1 and 345/120 kV 400 MVA transformer #2. Construction Scope: Construct the Chukar 345/120 kV transformers #1 and #2, construct the Comstock Meadows – Chukar line section of Lantern – Comstock Meadows 345 kV line. Construct a four (4) 345 kV breaker ring bus convertible to breaker and a half, with associated line disconnect switches, breakers, bus work, control house protection panels, communications and control equipment. 221 Page 225 of 245Page 226 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 226 of 245 FIGURE TP-34 ONE LINE DIAGRAM OF THE CHUKAR SUBSTATION Budget and Cost Responsibility: The Companies will be responsible for the cost associated with the addition of the 345/120 kV transformer(s) at Chukar substation. 222 Page 226 of 245Page 227 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 227 of 245 FIGURE TP-35 PROJECTED CASH FLOWS FOR CHUKAR 345/120 KV 400 MVA TRANSFORMER #1 & #2 Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 83.90 3.00 2.80 31.80 46.10 80.70 0.20 VIKING 345 KV SWITCHING STATION The new Viking switching station will be connected to the 345 kV system by folding the Lantern – Comstock 345 kV line and is required to serve a Rule 9 customer with a signed HVD agreement for 461 MW. The Companies request approval to construct the Viking switching station and HVD lines. Construction Scope: Construct the new Viking switching station with a line fold of the Lantern – Comstock Meadows 345 kV line. Construct line terminals at Viking switching station with associated line disconnect switches, breakers, bus work, control house, protection panels, communications, HVD lines and control equipment. 223 Page 227 of 245Page 228 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 228 of 245 FIGURE TP-36 FUTURE ONE LINE DIAGRAM OF THE AREA WITH VIKING SWITCHING STATION Budget and Cost Responsibility: The customer has provided funding as an ASTPR for the construction of Viking switching station. FIGURE TP-37 PROJECTED CASH FLOWS FOR VIKING SWITCHING STATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 16.80 1.0 2.0 2.5 6.6 11.10 4.70 224 Page 228 of 245Page 229 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 229 of 245 VAQUERO 345/120 KV SUBSTATION The new Vaquero 345/120 kV substation is incorporated into the area transmission master plan with service to a customer with a Rule 9 agreement for 461 MW, which is expected to be executed before the PUCN issues a ruling on the 2026 IRP. The customer will take service from 120 kV HVD lines which will require the construction of two (2) 345/120 kV 280 MVA transformers, 345 kV ring bus and 120 kV breaker and a half bus. This large load will require the Lantern – Comstock Meadows 345 kV line to be folded into the new Vaquero 345 substation. The Vaquero location is located in Fernly; Vaquero’s construction opens up the ability to serve additional loads in the area on the 120 kV transmission system. The Companies request approval to construct the line fold of Lantern-Comstock 345 kV line into Vaquero substation, with the 345/120 kV 280 MVA transformers and HVD lines. Construction Scope: Construct the new Vaquero 345 substation to deliver 120 kV to the HVD customer, with a line fold of the Lantern – Comstock Meadows 345 kV line into Vaquero substation. Construct two 345/120 kV 280 MVA transformers, line terminals with associated line disconnect switches, breakers, bus work, control house protection panels, communications, HVD lines and control equipment. 225 Page 229 of 245Page 230 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 230 of 245 FIGURE TP-38 ONE LINE DIAGRAM OF THE AREA WITH VAQUERO SUBSTATION Budget and Cost Responsibility: The customer has provided funding as an ASTPR for the construction of Vaquero substation. 226 Page 230 of 245Page 231 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 231 of 245 FIGURE TP-39 PROJECTED CASH FLOWS FOR VAQUERO SUBSTATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 62.00 11.00 5.00 7.00 15.00 27.00 24.00 EAST TRACY 345 KV LINE TERMINALS It is now required to install two (2) 345 kV line terminals at East Tracy substation. These are required to serve a customer with a Rule 9 agreement for 300 MW, which is anticipated to be executed before the PUCN issues a ruling on the 2026 IRP. The lead time on breakers is now approximately three years. Therefore, it is necessary to order the breakers now. The customer will take delivery from two (2) HVD lines from East Tracy 345 kV bus. The Companies request approval to construct two (2) 345 kV HVD line terminals at East Tracy. Construction Scope: Construct the two (2) 345 kV line terminals with associated line disconnect switches, breakers, metering, bus work, control house protection panels, communications, HVD lines and control equipment. The customer is responsible for the redundant HVD line costs, including the new line terminal addition. 227 Page 231 of 245Page 232 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 232 of 245 FIGURE TP-40 ONE LINE DIAGRAM OF THE EAST TRACY SUBSTATION Budget and Cost Responsibility: The customer has provided funding as an ASTPR for the construction of East Tracy line terminals and HVD lines. FIGURE TP-41 PROJECTED CASH FLOWS FOR EAST TRACY 345 KV LINE TERMINAL Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 4.30 0.10 0.20 2.00 0.00 2.20 2.00 228 Page 232 of 245
As listed on the current system
Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026