Utility Dockets and Filings

Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf

Text of CAE-032 Attachment 1.pdf

Extracted from the file · 35 pages · 69,136 characters

Text of CAE-032 Attachment 2.pdf

Extracted from the file · 36 pages · 33,759 characters

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

15 pages match
  1. Page 229 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 229 of 245 VAQUERO 345/120 KV SUBSTATION The new Vaquero 345/120 kV substation is incorporated into the area transmission master plan with service to a customer with a Rule 9 agreement for 461 MW, which is expected to be executed before the PUCN issues a ruling on the 2026 IRP. The customer will take service from 120 kV HVD lines which will require the construction of two (2) 345/120 kV 280 MVA transformers, 345 kV ring bus and 120 kV breaker and a half bus. This large load will require the Lantern – Comstock Meadows 345 kV line to be folded into the new Vaquero 345 substation. The Vaquero location is located in Fernly; Vaquero’s construction opens up the ability to serve additional loads in the area on the 120 kV transmission system. The Companies request approval to construct the line fold of Lantern-Comstock 345 kV line into Vaquero substation, with the 345/120 kV 280 MVA transformers and HVD lines. Construction Scope: Construct the new Vaquero 345 substation to deliver 120 kV to the HVD customer, with a line fold of the Lantern – Comstock Meadows 345 kV line into Vaquero substation. Construct two 345/120 kV 280 MVA transformers, line terminals with associated line disconnect switches, breakers, bus work, control house protection panels, communications, HVD lines and control equipment. 225 Page 229 of 245
  2. Page 230 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 230 of 245 FIGURE TP-38 ONE LINE DIAGRAM OF THE AREA WITH VAQUERO SUBSTATION Budget and Cost Responsibility: The customer has provided funding as an ASTPR for the construction of Vaquero substation. 226 Page 230 of 245
  3. Page 231 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 231 of 245 FIGURE TP-39 PROJECTED CASH FLOWS FOR VAQUERO SUBSTATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 62.00 11.00 5.00 7.00 15.00 27.00 24.00 EAST TRACY 345 KV LINE TERMINALS It is now required to install two (2) 345 kV line terminals at East Tracy substation. These are required to serve a customer with a Rule 9 agreement for 300 MW, which is anticipated to be executed before the PUCN issues a ruling on the 2026 IRP. The lead time on breakers is now approximately three years. Therefore, it is necessary to order the breakers now. The customer will take delivery from two (2) HVD lines from East Tracy 345 kV bus. The Companies request approval to construct two (2) 345 kV HVD line terminals at East Tracy. Construction Scope: Construct the two (2) 345 kV line terminals with associated line disconnect switches, breakers, metering, bus work, control house protection panels, communications, HVD lines and control equipment. The customer is responsible for the redundant HVD line costs, including the new line terminal addition. 227 Page 231 of 245
  4. Page 232 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 232 of 245 FIGURE TP-40 ONE LINE DIAGRAM OF THE EAST TRACY SUBSTATION Budget and Cost Responsibility: The customer has provided funding as an ASTPR for the construction of East Tracy line terminals and HVD lines. FIGURE TP-41 PROJECTED CASH FLOWS FOR EAST TRACY 345 KV LINE TERMINAL Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 4.30 0.10 0.20 2.00 0.00 2.20 2.00 228 Page 232 of 245
  5. Page 233 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 233 of 245 PETROGLYPH 345 KV SWITCHING STATION It is now required to install the Petroglyph switching station to serve a new Rule 9 agreement for 450 MW. Petroglyph is connected to the 345 kV system by folding the new West Tracy-Comstock Meadows 345 kV line. The customer will take redundant power delivery from two (2) 345 kV HVD lines from Petroglyph. The Companies request approval to construct the Petroglyph switching station, 345 kV line fold, and HVD lines. Construction Scope: Construct the Petroglyph switching station by constructing a 345 kV ring bus convertible to breaker and a half with associated line disconnect switches, breakers, metering, bus work, control house, protection panels, communications, HVD lines and control equipment. A fold of the West Tracy - Comstock Meadows 345 kV line will also be required. FIGURE TP-42 ONE LINE DIAGRAM OF THE PETROGLYPH SWITCHING STATION Budget and Cost Responsibility: The customer will provide funding as an ASTPR for the construction of Petroglyph switching station. 229 Page 233 of 245
  6. Page 234 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 234 of 245 FIGURE TP-43 PROJECTED CASH FLOWS FOR PETROGLYPH 345 KV SWITCHING STATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 28.80 8.00 2.80 8.00 10.00 20.80 0.00 MALLARD 525/345 KV SUBSTATION It is now required to install the Mallard 525/345 kV substation. This new substation is required to serve a Rule 9 customers 1050 MW MPC Master Planned Community agreement, and for who’s HVD customers are expected to execute their Rule 9 agreements, before the PUCN issues a ruling on the 2026 IRP. To serve this large load and maintain the system voltage limits described in NERC standard for transmission reliability requirements TPL-001-5.1 a shunt capacitor bank with three stages of 200 MVAR, for a total of 600 MVAR, is required (3x200 MVAR) and two (2) 525/345 kV 1,500 MVA transformers. Mallard will be connected to the system by folding the Mackay-Goose 525 kV section of the Walker River-Goose-Mackay-Walker River 525 kV line, which is described below. Alternatively, Mallard could be connected from the Walker River – Grayskull-Mackay-Mallard 525 kV line if necessary. The customer will take redundant power delivery from two (2) 345 kV HVD lines from Mallard. The Companies request approval to construct the Mallard 525/345 kV substation with associated line fold of the Mackay-Goose 525 kV line, two (2) 525/345 kV 1,500 MVA transformers, with three stage voltage switched 600 MVAR shunt capacitor bank and two (2) HVD lines. Construction Scope: Construct the Mallard 525/345 kV substation by folding the proposed Walker River – Goose – Mackay – Walker River 525 kV line. Mallard will include a 525 kV and 345 kV ring bus convertible to breaker and a half, and two (2) 525/345 kV 1,500 MVA transformer banks, associated line disconnect switches, breakers, metering, shunt capacitors, bus work, control house protection panels, communications, HVD lines and control equipment. 230 Page 234 of 245
  7. Page 235 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 235 of 245 FIGURE TP-44 ONE LINE DIAGRAM OF THE MALLARD SUBSTATION Budget and Cost Responsibility: The customer has provided funding as an ASTPR for the construction of this project. FIGURE TP-45 PROJECTED CASH FLOWS FOR MALLARD SUBSTATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 270.00 13.00 18.00 18.00 37.00 73.00 184.00 GOOSE 525/345 KV SUBSTATION It is now required to install the Goose 525/345 kV substation. This new substation is required to serve a Rule 9 applicant SHVD agreement for 360 MW, which is expected to be executed before the PUCN issues a ruling on the 2026 IRP. The Goose substation is connected to the 345 kV system by folding the Gosling-Comstock Meadows 345 kV line and the construction of the Walker RiverGoose-Mackay-Walker River 525 kV line which is described and requested below. The large load requires a set of two (2) 525/345 kV 1,500 MVA transformers banks, and the applicant requires redundant power delivery for future HVD customers via 345 kV HVD lines from Goose. The 231 Page 235 of 245
  8. Page 236 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 236 of 245 Companies request approval to construct the Goose 525/345 kV substation with the 345 kV line fold, two (2) 525/345 kV 1,500 MVA transformer banks, 525 kV ring bus, and 525 kV line terminals. Construction Scope: Construct the Goose 525/345 kV substation with a breaker and a half configuration for the 525 kV and 345 kV buses. Install two (2) 525/345 kV 1,500 MVA transformers banks with associated line disconnect switches, breakers, bus work, control house, protection panels, communications, and control equipment. A fold of the Gosling - Comstock 345 kV line into Goose, will be required in addition to approximately 90 miles of the new 525 kV line from Walker River – Goose – Mackay – Walker River. New 525 kV terminals at Walker River will also be required. FIGURE TP-46 ONE LINE DIAGRAM OF THE GOOSE 525/345 KV SUBSTATION 232 Page 236 of 245
  9. Page 237 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 237 of 245 Budget and Cost Responsibility: The customer has provided funding as an ASTPR for the construction of the Goose substation project. FIGURE TP-47 PROJECTED CASH FLOWS FOR GOOSE SUBSTATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 210.00 13.00 13.00 13.00 27.00 53.00 144.00 MACKAY 525/345 KV SUBSTATION The new Mackay 525/345 kV substation is incorporated into the area transmission master plan. Mackay is required to provide service to a customer with a Rule 9 agreement Master Planned Community (MPC) signed for 1,215 MW, of whose HVD customers are expected to execute their rule 9 agreements prior to the PUCN making a ruling on the 2026 IRP. The Mackay was previously approved and now it is required to construct three (3) 525/345 kV 600 MVA transformers to accommodate the load additions. The need for additional transmission capacity will require the Walker River – Goose – Mackay – Walker River 525 kV lines described below. The Companies request approval to construct the Mackay Substation three (3) 525/345 kV 600 MVA transformers, 525 kV line terminals, and HVD lines. Construction Scope: Construct the new Mackay substation three (3) 525/345 kV 600 MVA transformers, 345 kV HVD lines. Construct 525 kV and 345 kV line terminals with associated line disconnect switches, breakers, bus work, control house, protection panels, communications, HVD lines and control equipment. 233 Page 237 of 245
  10. Page 238 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 238 of 245 FIGURE TP-48 ONE LINE DIAGRAM OF THE MACKAY SUBSTATION Budget and Cost Responsibility: The customer will have provided funding as an ASTPR for the construction of Mackay substation additions. FIGURE TP-49 PROJECTED CASH FLOWS FOR MACKAY SUBSTATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 170.00 11.00 11.00 11.00 22.00 44.00 115.00 234 Page 238 of 245

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026

This filing on the current system (opens in a new tab)