Interrogatory responses
Answers to questions 19 thru 32
Files20
CAE-020 Attachment 1.xlsx
Excel · 1.6 MBText searchable
Download CAE-020 Attachment 1.xlsxRead the text of CAE-020 Attachment 1.xlsx
CAE-027 Attachment 2.pdf
PDF · 1.2 MB · 7 pagesText searchable
Download CAE-027 Attachment 2.pdfRead the text of CAE-027 Attachment 2.pdf
CAE-032 Attachment 1.pdf
PDF · 483 KB · 35 pagesText searchable
Download CAE-032 Attachment 1.pdfRead the text of CAE-032 Attachment 1.pdf
CAE-032 Attachment 2.pdf
PDF · 1.1 MB · 36 pagesText searchable
Download CAE-032 Attachment 2.pdfRead the text of CAE-032 Attachment 2.pdf
CAE-020 Attachment 1.pdf
PDF · 5.6 MB · 75 pagesText searchable
Download CAE-020 Attachment 1.pdfRead the text of CAE-020 Attachment 1.pdf
CAE-027 Attachment 1.pdf
PDF · 18 MB · 245 pagesText searchable
Download CAE-027 Attachment 1.pdfRead the text of CAE-027 Attachment 1.pdf
Text of CAE-021.pdf
Extracted from the file · 1 page · 567 characters
Text of CAE-022.pdf
Extracted from the file · 3 pages · 6,575 characters
Text of CAE-023.pdf
Extracted from the file · 1 page · 757 characters
Text of CAE-024.pdf
Extracted from the file · 1 page · 2,191 characters
Text of CAE-025.pdf
Extracted from the file · 1 page · 1,125 characters
Text of CAE-026.pdf
Extracted from the file · 1 page · 2,757 characters
Text of CAE-027.pdf
Extracted from the file · 1 page · 1,054 characters
Text of CAE-027 Attachment 2.pdf
Extracted from the file · 7 pages · 23,401 characters
Text of CAE-028.pdf
Extracted from the file · 1 page · 714 characters
Text of CAE-029.pdf
Extracted from the file · 1 page · 1,362 characters
Text of CAE-030.pdf
Extracted from the file · 1 page · 1,728 characters
Text of CAE-031.pdf
Extracted from the file · 1 page · 1,654 characters
Text of CAE-032.pdf
Extracted from the file · 1 page · 1,689 characters
Text of CAE-032 Attachment 1.pdf
Extracted from the file · 35 pages · 69,136 characters
Text of CAE-032 Attachment 2.pdf
Extracted from the file · 36 pages · 33,759 characters
Text of CAE-020 Attachment 1.pdf
Extracted from the file · 75 pages · 742,810 characters
Page 230 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 230 of 245 FIGURE TP-38 ONE LINE DIAGRAM OF THE AREA WITH VAQUERO SUBSTATION Budget and Cost Responsibility: The customer has provided funding as an ASTPR for the construction of Vaquero substation. 226 Page 230 of 245Page 231 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 231 of 245 FIGURE TP-39 PROJECTED CASH FLOWS FOR VAQUERO SUBSTATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 62.00 11.00 5.00 7.00 15.00 27.00 24.00 EAST TRACY 345 KV LINE TERMINALS It is now required to install two (2) 345 kV line terminals at East Tracy substation. These are required to serve a customer with a Rule 9 agreement for 300 MW, which is anticipated to be executed before the PUCN issues a ruling on the 2026 IRP. The lead time on breakers is now approximately three years. Therefore, it is necessary to order the breakers now. The customer will take delivery from two (2) HVD lines from East Tracy 345 kV bus. The Companies request approval to construct two (2) 345 kV HVD line terminals at East Tracy. Construction Scope: Construct the two (2) 345 kV line terminals with associated line disconnect switches, breakers, metering, bus work, control house protection panels, communications, HVD lines and control equipment. The customer is responsible for the redundant HVD line costs, including the new line terminal addition. 227 Page 231 of 245Page 232 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 232 of 245 FIGURE TP-40 ONE LINE DIAGRAM OF THE EAST TRACY SUBSTATION Budget and Cost Responsibility: The customer has provided funding as an ASTPR for the construction of East Tracy line terminals and HVD lines. FIGURE TP-41 PROJECTED CASH FLOWS FOR EAST TRACY 345 KV LINE TERMINAL Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 4.30 0.10 0.20 2.00 0.00 2.20 2.00 228 Page 232 of 245Page 233 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 233 of 245 PETROGLYPH 345 KV SWITCHING STATION It is now required to install the Petroglyph switching station to serve a new Rule 9 agreement for 450 MW. Petroglyph is connected to the 345 kV system by folding the new West Tracy-Comstock Meadows 345 kV line. The customer will take redundant power delivery from two (2) 345 kV HVD lines from Petroglyph. The Companies request approval to construct the Petroglyph switching station, 345 kV line fold, and HVD lines. Construction Scope: Construct the Petroglyph switching station by constructing a 345 kV ring bus convertible to breaker and a half with associated line disconnect switches, breakers, metering, bus work, control house, protection panels, communications, HVD lines and control equipment. A fold of the West Tracy - Comstock Meadows 345 kV line will also be required. FIGURE TP-42 ONE LINE DIAGRAM OF THE PETROGLYPH SWITCHING STATION Budget and Cost Responsibility: The customer will provide funding as an ASTPR for the construction of Petroglyph switching station. 229 Page 233 of 245Page 234 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 234 of 245 FIGURE TP-43 PROJECTED CASH FLOWS FOR PETROGLYPH 345 KV SWITCHING STATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 28.80 8.00 2.80 8.00 10.00 20.80 0.00 MALLARD 525/345 KV SUBSTATION It is now required to install the Mallard 525/345 kV substation. This new substation is required to serve a Rule 9 customers 1050 MW MPC Master Planned Community agreement, and for who’s HVD customers are expected to execute their Rule 9 agreements, before the PUCN issues a ruling on the 2026 IRP. To serve this large load and maintain the system voltage limits described in NERC standard for transmission reliability requirements TPL-001-5.1 a shunt capacitor bank with three stages of 200 MVAR, for a total of 600 MVAR, is required (3x200 MVAR) and two (2) 525/345 kV 1,500 MVA transformers. Mallard will be connected to the system by folding the Mackay-Goose 525 kV section of the Walker River-Goose-Mackay-Walker River 525 kV line, which is described below. Alternatively, Mallard could be connected from the Walker River – Grayskull-Mackay-Mallard 525 kV line if necessary. The customer will take redundant power delivery from two (2) 345 kV HVD lines from Mallard. The Companies request approval to construct the Mallard 525/345 kV substation with associated line fold of the Mackay-Goose 525 kV line, two (2) 525/345 kV 1,500 MVA transformers, with three stage voltage switched 600 MVAR shunt capacitor bank and two (2) HVD lines. Construction Scope: Construct the Mallard 525/345 kV substation by folding the proposed Walker River – Goose – Mackay – Walker River 525 kV line. Mallard will include a 525 kV and 345 kV ring bus convertible to breaker and a half, and two (2) 525/345 kV 1,500 MVA transformer banks, associated line disconnect switches, breakers, metering, shunt capacitors, bus work, control house protection panels, communications, HVD lines and control equipment. 230 Page 234 of 245Page 235 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 235 of 245 FIGURE TP-44 ONE LINE DIAGRAM OF THE MALLARD SUBSTATION Budget and Cost Responsibility: The customer has provided funding as an ASTPR for the construction of this project. FIGURE TP-45 PROJECTED CASH FLOWS FOR MALLARD SUBSTATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 270.00 13.00 18.00 18.00 37.00 73.00 184.00 GOOSE 525/345 KV SUBSTATION It is now required to install the Goose 525/345 kV substation. This new substation is required to serve a Rule 9 applicant SHVD agreement for 360 MW, which is expected to be executed before the PUCN issues a ruling on the 2026 IRP. The Goose substation is connected to the 345 kV system by folding the Gosling-Comstock Meadows 345 kV line and the construction of the Walker RiverGoose-Mackay-Walker River 525 kV line which is described and requested below. The large load requires a set of two (2) 525/345 kV 1,500 MVA transformers banks, and the applicant requires redundant power delivery for future HVD customers via 345 kV HVD lines from Goose. The 231 Page 235 of 245Page 236 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 236 of 245 Companies request approval to construct the Goose 525/345 kV substation with the 345 kV line fold, two (2) 525/345 kV 1,500 MVA transformer banks, 525 kV ring bus, and 525 kV line terminals. Construction Scope: Construct the Goose 525/345 kV substation with a breaker and a half configuration for the 525 kV and 345 kV buses. Install two (2) 525/345 kV 1,500 MVA transformers banks with associated line disconnect switches, breakers, bus work, control house, protection panels, communications, and control equipment. A fold of the Gosling - Comstock 345 kV line into Goose, will be required in addition to approximately 90 miles of the new 525 kV line from Walker River – Goose – Mackay – Walker River. New 525 kV terminals at Walker River will also be required. FIGURE TP-46 ONE LINE DIAGRAM OF THE GOOSE 525/345 KV SUBSTATION 232 Page 236 of 245Page 237 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 237 of 245 Budget and Cost Responsibility: The customer has provided funding as an ASTPR for the construction of the Goose substation project. FIGURE TP-47 PROJECTED CASH FLOWS FOR GOOSE SUBSTATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 210.00 13.00 13.00 13.00 27.00 53.00 144.00 MACKAY 525/345 KV SUBSTATION The new Mackay 525/345 kV substation is incorporated into the area transmission master plan. Mackay is required to provide service to a customer with a Rule 9 agreement Master Planned Community (MPC) signed for 1,215 MW, of whose HVD customers are expected to execute their rule 9 agreements prior to the PUCN making a ruling on the 2026 IRP. The Mackay was previously approved and now it is required to construct three (3) 525/345 kV 600 MVA transformers to accommodate the load additions. The need for additional transmission capacity will require the Walker River – Goose – Mackay – Walker River 525 kV lines described below. The Companies request approval to construct the Mackay Substation three (3) 525/345 kV 600 MVA transformers, 525 kV line terminals, and HVD lines. Construction Scope: Construct the new Mackay substation three (3) 525/345 kV 600 MVA transformers, 345 kV HVD lines. Construct 525 kV and 345 kV line terminals with associated line disconnect switches, breakers, bus work, control house, protection panels, communications, HVD lines and control equipment. 233 Page 237 of 245Page 238 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 238 of 245 FIGURE TP-48 ONE LINE DIAGRAM OF THE MACKAY SUBSTATION Budget and Cost Responsibility: The customer will have provided funding as an ASTPR for the construction of Mackay substation additions. FIGURE TP-49 PROJECTED CASH FLOWS FOR MACKAY SUBSTATION Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 170.00 11.00 11.00 11.00 22.00 44.00 115.00 234 Page 238 of 245Page 239 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 239 of 245 WALKER RIVER – GOOSE – MACKAY – WALKER RIVER 525 KV LINES The new Mackay and Goose 525/345 kV substations loads are so large that they require redundant 525 kV transmission because the underlying 345 kV system is not sufficient in N-1 scenarios. Mackay and Goose are required to provide service to a customer with a Rule 9 agreement Master Planned Community (MPC), signed for the combined total of 2,025 MW. This large load will require the Walker River – Goose – Mackay – Walker River 525 kV lines be constructed. The Companies request approval to construct the Walker River – Goose – Mackay – Walker River 525 kV lines. Construction Scope: Construct the new Walker River – Goose – Mackay – Walker River 525 kV lines with line 525 kV line terminals at Walker River. Construct line terminals with associated line disconnect switches, breakers, bus work, control house protection panels, communications, approximately 80 miles of 525 kV lines and control equipment. 43.6 miles from Walker River to Goose, 10 miles from Goose to Mackay and 35 miles from Mackay back to Walker River. Budget and Cost Responsibility: The customer will have provided funding as an ASTPR for the construction of Walker River – Goose – Mackay – Walker River 525 kV lines. FIGURE TP-50 PROJECTED CASH FLOWS FOR WALKER RIVER – GOOSE – MACKAY – WALKER RIVER 525 KV LINES Cash Flow ($MM) Project Total Pre-2027 2027 2028 2029 3 Year Total Post 2029 405.00 25.00 3.00 6.00 9.00 18.00 362.00 SPRING CANYON 230/12 KV SUBSTATION Spring Canyon Substation with three 230/12 kV 37 MVA transformers is required in summer 2028. Spring Canyon 230/12 kV Substation is an area upgrade project to source several Master Planned Community agreements (MPC) in the Eldorado Valley area. The Eldorado Valley is a growing commercial and industrial center in southern Henderson. The Companies have received requests totaling 74.1 MVA for service in Eldorado Valley from warehousing, manufacturing, data centers, and mixed development customers. The Eldorado Valley area is currently being served from the 69/12 kV 88 MVA Mission Substation, which is fully contracted, with no available capacity. Greenway Substation can support approximately 30 MVA of load growth but is eight miles from the proposed Spring Canyon site, which creates an entry barrier for customers due to line extension cost and feeder route permitting time. Active projects justifying construction of Spring Canyon Substation include 3010885444 – Eldorado Industrial, requested in-service date: 235 Page 239 of 245
As listed on the current system
Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026