Interrogatory responses
Answers to questions 19 thru 32
Files20
CAE-020 Attachment 1.xlsx
Excel · 1.6 MBText searchable
Download CAE-020 Attachment 1.xlsxRead the text of CAE-020 Attachment 1.xlsx
CAE-027 Attachment 2.pdf
PDF · 1.2 MB · 7 pagesText searchable
Download CAE-027 Attachment 2.pdfRead the text of CAE-027 Attachment 2.pdf
CAE-032 Attachment 1.pdf
PDF · 483 KB · 35 pagesText searchable
Download CAE-032 Attachment 1.pdfRead the text of CAE-032 Attachment 1.pdf
CAE-032 Attachment 2.pdf
PDF · 1.1 MB · 36 pagesText searchable
Download CAE-032 Attachment 2.pdfRead the text of CAE-032 Attachment 2.pdf
CAE-020 Attachment 1.pdf
PDF · 5.6 MB · 75 pagesText searchable
Download CAE-020 Attachment 1.pdfRead the text of CAE-020 Attachment 1.pdf
CAE-027 Attachment 1.pdf
PDF · 18 MB · 245 pagesText searchable
Download CAE-027 Attachment 1.pdfRead the text of CAE-027 Attachment 1.pdf
Text of CAE-021.pdf
Extracted from the file · 1 page · 567 characters
Text of CAE-022.pdf
Extracted from the file · 3 pages · 6,575 characters
Text of CAE-023.pdf
Extracted from the file · 1 page · 757 characters
Text of CAE-024.pdf
Extracted from the file · 1 page · 2,191 characters
Text of CAE-025.pdf
Extracted from the file · 1 page · 1,125 characters
Text of CAE-026.pdf
Extracted from the file · 1 page · 2,757 characters
Text of CAE-027.pdf
Extracted from the file · 1 page · 1,054 characters
Text of CAE-027 Attachment 2.pdf
Extracted from the file · 7 pages · 23,401 characters
Text of CAE-028.pdf
Extracted from the file · 1 page · 714 characters
Text of CAE-029.pdf
Extracted from the file · 1 page · 1,362 characters
Text of CAE-030.pdf
Extracted from the file · 1 page · 1,728 characters
Text of CAE-031.pdf
Extracted from the file · 1 page · 1,654 characters
Text of CAE-032.pdf
Extracted from the file · 1 page · 1,689 characters
Text of CAE-032 Attachment 1.pdf
Extracted from the file · 35 pages · 69,136 characters
Text of CAE-032 Attachment 2.pdf
Extracted from the file · 36 pages · 33,759 characters
Text of CAE-020 Attachment 1.pdf
Extracted from the file · 75 pages · 742,810 characters
Page 26 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 26 of 245 The aeroderivative generating units for the Fort Churchill Additions 2 Project are highly efficient, state-of the-art, combustion turbines. To reduce emissions, a combination of dry low-NOx combustion systems, selective catalytic reduction and carbon monoxide catalyst will be incorporated into the design. It is not certain that these units will meet the GHG Emissions Standards CO2 emissions limit for intermediate-load operation (capacity factor between 20 and 40 percent) under all operating scenarios and are, therefore, were conservatively considered as low-utilization resources (capacity factor of up to 20 percent) for planning purposes. Section 5 - Environmental Regulation Updates - provides more information on the GHG Emissions Standards status. The aeroderivative gas turbine can reliably produce approximately 50 MW within 5 minutes. The unit can also balance renewable resources by load-following at 50 MW/min ramp rates while maintaining emissions compliance. Natural Gas Supply See the discussion of the Fort Churchill natural gas expansion above. Project Costs The total cost of the Fort Churchill Additions 2 Plant is approximately $2.048 billion (2031$) (without AFUDC). Table GEN-5 shows the construction costs by year, and Table GEN-6 shows the line-item detail of the project cost. There is always a risk that material, equipment, and labor costs can increase or decrease between the time of the cost estimates and the time of contract award and procurement. Increases in construction costs in the past few years have been dramatic; however, Sierra has developed estimated costs for major contracts, based on costs seen for the Silverhawk Peaker Plant and the Valmy Simple-Cycle Plant project, and believes that the costs to construct the Fort Churchill Additions 2 Project reasonable. Sierra has not yet made commitments for the turbines and generators but will be required to make down payments prior to Commission Approval. 22 Page 26 of 245Page 27 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 27 of 245 REDACTED PUBLIC VERSION TABLE GEN-5 FORT CHURCHILL ADDITIONS 2 PROJECT ESTIMATED ESCALATED ANNUAL CONSTRUCTION COSTS EXCLUDING AFUDC In thousands Year Amount 2026 $ 154,101 2027 $ 44,194 2028 $ 354,890 2029 $ 253,383 2030 $ 804,409 2031 $ 437,286 Total (2031$) $2,048,263 TABLE GEN-6 FORT CHURCHILL ADDITIONS 2 PROJECT ESTIMATED ESCALATED CONSTRUCTION COSTS BY MAJOR CATEGORY (EXCLUDING AFUDC) (REDACTED) 23 Page 27 of 245Page 28 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 28 of 245 24 Page 28 of 245Page 29 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 29 of 245 c. Fort Churchill Additions 3 Project Project Overview The Fort Churchill Additions 3 Project is planned to be commercially operational in 2032 and is made up of two ~200 MW simple-cycle frame generating units, designed for peaking service in Sierra’s service territory. The simple-cycle generating unit for the Fort Churchill Additions 3 Project is a highly efficient, state-of-the-art, combustion turbines. To reduce emissions, a combination of dry low-NOx combustion systems, selective catalytic reduction and carbon monoxide catalyst will be incorporated into the design. It is not expected that these units will meet the GHG Emissions Standards CO2 emissions limit for intermediate-load operation (capacity factor between 20 and 40 percent) under all operating scenarios and are, therefore, were conservatively considered as low-utilization resources (capacity factor of up to 20 percent) for planning purposes. Section 5 - Environmental Regulation Updates - provides more information on the GHG Emissions Standards status. The simple-cycle frame gas turbine can reliably produce approximately 200 MW within 10 minutes and can reach full load in under 11 minutes. The unit can also balance renewable resources by load-following at 40 MW/min ramp rates while maintaining emissions compliance. Natural Gas Supply See the discussion of the Fort Churchill gas expansion above. Because frame units operate with lower gas pressure, the Companies will regulate pressure down to acceptable operating parameters through on-site equipment. Project Costs The total cost of the Fort Churchill Additions 3 Project is approximately $978 million (2032$) (without AFUDC). Table GEN-8 shows the construction costs by year, and Table GEN-9 shows the line-item detail of the project cost. There is always a risk that material, equipment, and labor costs can increase or decrease between the time of the cost estimates and the time of contract award and procurement. Increases in construction costs in the past few years have been dramatic; however, Sierra has developed estimated costs for major contracts, based on costs seen for the Silverhawk Peaker Project and the Valmy Simple-Cycle Plant, and believes that the costs to construct a Fort Churchill Additions 3 Project are reasonable. Sierra has not yet made commitments for the turbines and generators but will be required to make down payments prior to Commission approval. 25 Page 29 of 245Page 30 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 30 of 245 REDACTED PUBLIC VERSION TABLE GEN-8 FORT CHURCHILL ADDITIONS 3 PROJECT ESTIMATED ESCALATED ANNUAL CONSTRUCTION COSTS EXCLUDING AFUDC In thousands Year Amount 2026 $101,831 2027 $41,304 2028 $87,724 2029 $175,275 2030 $260,587 2031 $205,110 2032 $106,398 Total (2032$) $978,229 TABLE GEN-9 FORT CHURCHILL ADDITIONS 3 PROJECT ESTIMATED ESCALATED CONSTRUCTION COSTS BY MAJOR CATEGORY (EXCLUDING AFUDC) (REDACTED) 26 Page 30 of 245Page 31 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 31 of 245 27 Page 31 of 245Page 32 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 32 of 245 d. Early Investment in Future Placeholder Thermal Projects To support the early development and preliminary design engineering of a future combustion turbine resource (anticipated in 2034 under the Base Load Forecast), the Companies are requesting early development funding to initiate preliminary engineering and project development activities. This work would occur after the Companies identify the site and select the combustion turbine technology configuration. The requested early investment is intended to improve project definition, enhance estimate accuracy, reduce execution risk, and provide the Commission and stakeholders with a more reliable basis for evaluating the future project. As part of this preliminary work, the Companies may engage an Engineer of Record (“EOR”) firm to advance the project to approximately thirty percent engineering design. This level of design development would include preliminary equipment arrangements, site layout, major balance-ofplant scope, and key design interfaces. Advancing the design to this stage would allow the Companies to mature the technical definition of the project, identify key scope drivers and site‑specific constraints, and reduce uncertainty prior to committing to full project execution before making larger capital commitments. Following completion of the preliminary engineering work, the Companies may then engage an EPC contractor to perform a constructability review based on the thirty percent design package. This constructability effort would help validate execution assumptions, identify potential construction constraints, assess labor and site logistics, and confirm that the proposed design can be efficiently and safely built at the selected location. In addition, this work is expected to support development of a preliminary schedule of values (“SOV”), which would provide a more detailed cost estimate and improved visibility into major cost components, project phasing, and execution risks. In addition to preliminary engineering and constructability review activities, the requested early development funding includes related early‑stage activities such as NV Energy labor and overheads, owner’s engineering and consulting support, environmental and permitting support, geotechnical survey work, escalation, and contingency. Collectively, these activities would allow the Companies to move beyond planning‑level assumptions and establish a more reliable basis for future cost, schedule, permitting, and execution‑risk evaluations. Importantly, these early development costs are expected to contribute directly to the future project if it is approved. They are not expected to be sunk costs, as the engineering design, constructability review, surveys, permitting support, and estimate development would become part of the project development record and support future project execution. 28 Page 32 of 245Page 33 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 33 of 245 REDACTED PUBLIC VERSION The estimated prelimimuy development costs for these early-stage activities are shown in Tables GEN-11 and GEN-12 for the simple-cycle 2034 placeholder project. TABLE GEN-11 EARLY INVESTMENT FOR FUTURE 2034 THERMAL PROJECT ESTIMATED ESCALATED PRELIMINARY DEVELOPMENT COSTS EXCLUDING AFUDC In thousands Year Amount 2027 $12,025 2028 $1,016 Total (2028$) $13,041 TABLE GEN-12 EARLY INVESTMENT FOR FUTURE 2034 THERMAL PROJECT ESTIMATED ESCALATED PRELIMINARY DEVELOPMENT COSTS (EXCLUDING AFUDC) (REDACTED) Table GEN-13 shows a prelimina1y development schedule for early investment act1v1hes associated with the future placeholder 2034 the1mal projects. This schedule reflects the anticipated sequence of activities to advance preliminaiy engineering, obtain contractor input, and develop a more detailed basis for project cost and execution planning. The schedule is not strictly sequential, 29 Page 33 of 245Page 34 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 34 of 245 30 Page 34 of 245Page 35 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 35 of 245 Regional Haze Rule Since March 2024, 10 Sierra has worked with the NDEP to evaluate the Regional Haze Rule for the Second Decadal (Second Implementation) Planning Period (2018-2028) requirements applicable to Valmy Units 1 and 2 (following natural gas conversion) and Tracy 4/5. For Valmy Units 1 and 2, additional NOx reductions while firing natural gas were determined to be cost-effective through 2049, to a control level equivalent to SNCR performance. Sierra and the NDEP also preserved flexibility to meet these limits using either FGR or SCR. This approach also supports compliance with other federal requirements that may take effect, including the federal Good Neighbor Plan (see update below). For Tracy 4/5, SCR was determined to be cost-effective through 2049. The NDEP has worked with the EPA and federal land management agencies to revise Nevada’s Regional Haze SIP. This work included drafting state regulations to make Regional Haze requirements for Valmy Units 1 and 2 and Tracy 4/5 legally enforceable and conducting public outreach. 11 The state regulation sets the NOx emission levels, identifies control technologies, and establishes a compliance deadline. Under the state regulation, NOx controls must be installed within 36 months of EPA approval of Nevada’s Regional Haze SIP for these units. The NDEP submitted the SIP revision for North Valmy Units 1 and 2 and Tracy 4/5 to the EPA in May 2025 (“2025 Regional Haze SIP Revision”). As part of a separate July 2024 consent decree between the EPA and the Sierra Club, National Parks Conservation Association, and Environmental Integrity Project required the EPA to approve or deny Nevada’s Regional Haze SIP by December 15, 2025. 12 On October 23, 2025, the EPA published a proposed action and opened a 30-day public comment period that closed on November 24, 2025. The EPA issued its final action on February 6, 2026; this timing complied with the consent decree, with additional time allowed due to the government shutdown. In the final action, the EPA approved portions of the 2022 Nevada Regional Haze SIP, including the July 2023 withdrawal of proposed retirement determinations for Tracy 4/5 and Valmy Units 1 and 2, and portions of the 2025 Nevada Regional Haze SIP Revision. 13 The EPA did not act on the revised reasonable progress determinations or the proposed NOx emission controls for Tracy 4/5 and Valmy Units 1 and 2 included in the 2025 Regional Haze SIP Revision, because those revisions were submitted after the July 2024 consent decree. 10 Docket No. 23-08015, April 9, 2024, Order approved Sierra’s requests to proceed with the Valmy Units 1 and 2 coal-to-gas conversion and Tracy 4/5 projects. 11 NAC Chapter 445B, as amended by regulation adopted by the Nevada State Environmental Commission in 2024, establishing source-specific Regional Haze requirements for NV Energy’s North Valmy Generating Station (Units 1 and 2) and Tracy Generating Station (Units 4 and 5). 12 Sierra Club, et al. v. U.S. Environmental Protection Agency, No. 1:23-cv-01744-JDB (D.D.C.), Consent Decree entered July 12, 2024, establishing deadlines for EPA action on Regional Haze State Implementation Plans, including plans submitted by Nevada. 13 90 Fed. Reg. 48,481 (Oct. 23, 2025) (proposed rule) and 91 Fed. Reg. 5321 (Feb. 6, 2026), the EPA refers to the Nevada SIP filings as the “2022 Nevada Regional Haze Plan” and the “2025 SIP Supplement.” 31 Page 35 of 245
As listed on the current system
Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026