Interrogatory responses
Answers to questions 19 thru 32
Files20
CAE-020 Attachment 1.xlsx
Excel · 1.6 MBText searchable
Download CAE-020 Attachment 1.xlsxRead the text of CAE-020 Attachment 1.xlsx
CAE-027 Attachment 2.pdf
PDF · 1.2 MB · 7 pagesText searchable
Download CAE-027 Attachment 2.pdfRead the text of CAE-027 Attachment 2.pdf
CAE-032 Attachment 1.pdf
PDF · 483 KB · 35 pagesText searchable
Download CAE-032 Attachment 1.pdfRead the text of CAE-032 Attachment 1.pdf
CAE-032 Attachment 2.pdf
PDF · 1.1 MB · 36 pagesText searchable
Download CAE-032 Attachment 2.pdfRead the text of CAE-032 Attachment 2.pdf
CAE-020 Attachment 1.pdf
PDF · 5.6 MB · 75 pagesText searchable
Download CAE-020 Attachment 1.pdfRead the text of CAE-020 Attachment 1.pdf
CAE-027 Attachment 1.pdf
PDF · 18 MB · 245 pagesText searchable
Download CAE-027 Attachment 1.pdfRead the text of CAE-027 Attachment 1.pdf
Text of CAE-021.pdf
Extracted from the file · 1 page · 567 characters
Text of CAE-022.pdf
Extracted from the file · 3 pages · 6,575 characters
Text of CAE-023.pdf
Extracted from the file · 1 page · 757 characters
Text of CAE-024.pdf
Extracted from the file · 1 page · 2,191 characters
Text of CAE-025.pdf
Extracted from the file · 1 page · 1,125 characters
Text of CAE-026.pdf
Extracted from the file · 1 page · 2,757 characters
Text of CAE-027.pdf
Extracted from the file · 1 page · 1,054 characters
Text of CAE-027 Attachment 2.pdf
Extracted from the file · 7 pages · 23,401 characters
Text of CAE-028.pdf
Extracted from the file · 1 page · 714 characters
Text of CAE-029.pdf
Extracted from the file · 1 page · 1,362 characters
Text of CAE-030.pdf
Extracted from the file · 1 page · 1,728 characters
Text of CAE-031.pdf
Extracted from the file · 1 page · 1,654 characters
Text of CAE-032.pdf
Extracted from the file · 1 page · 1,689 characters
Text of CAE-032 Attachment 1.pdf
Extracted from the file · 35 pages · 69,136 characters
Text of CAE-032 Attachment 2.pdf
Extracted from the file · 36 pages · 33,759 characters
Text of CAE-020 Attachment 1.pdf
Extracted from the file · 75 pages · 742,810 characters
Page 30 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 30 of 245 REDACTED PUBLIC VERSION TABLE GEN-8 FORT CHURCHILL ADDITIONS 3 PROJECT ESTIMATED ESCALATED ANNUAL CONSTRUCTION COSTS EXCLUDING AFUDC In thousands Year Amount 2026 $101,831 2027 $41,304 2028 $87,724 2029 $175,275 2030 $260,587 2031 $205,110 2032 $106,398 Total (2032$) $978,229 TABLE GEN-9 FORT CHURCHILL ADDITIONS 3 PROJECT ESTIMATED ESCALATED CONSTRUCTION COSTS BY MAJOR CATEGORY (EXCLUDING AFUDC) (REDACTED) 26 Page 30 of 245Page 31 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 31 of 245 27 Page 31 of 245Page 32 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 32 of 245 d. Early Investment in Future Placeholder Thermal Projects To support the early development and preliminary design engineering of a future combustion turbine resource (anticipated in 2034 under the Base Load Forecast), the Companies are requesting early development funding to initiate preliminary engineering and project development activities. This work would occur after the Companies identify the site and select the combustion turbine technology configuration. The requested early investment is intended to improve project definition, enhance estimate accuracy, reduce execution risk, and provide the Commission and stakeholders with a more reliable basis for evaluating the future project. As part of this preliminary work, the Companies may engage an Engineer of Record (“EOR”) firm to advance the project to approximately thirty percent engineering design. This level of design development would include preliminary equipment arrangements, site layout, major balance-ofplant scope, and key design interfaces. Advancing the design to this stage would allow the Companies to mature the technical definition of the project, identify key scope drivers and site‑specific constraints, and reduce uncertainty prior to committing to full project execution before making larger capital commitments. Following completion of the preliminary engineering work, the Companies may then engage an EPC contractor to perform a constructability review based on the thirty percent design package. This constructability effort would help validate execution assumptions, identify potential construction constraints, assess labor and site logistics, and confirm that the proposed design can be efficiently and safely built at the selected location. In addition, this work is expected to support development of a preliminary schedule of values (“SOV”), which would provide a more detailed cost estimate and improved visibility into major cost components, project phasing, and execution risks. In addition to preliminary engineering and constructability review activities, the requested early development funding includes related early‑stage activities such as NV Energy labor and overheads, owner’s engineering and consulting support, environmental and permitting support, geotechnical survey work, escalation, and contingency. Collectively, these activities would allow the Companies to move beyond planning‑level assumptions and establish a more reliable basis for future cost, schedule, permitting, and execution‑risk evaluations. Importantly, these early development costs are expected to contribute directly to the future project if it is approved. They are not expected to be sunk costs, as the engineering design, constructability review, surveys, permitting support, and estimate development would become part of the project development record and support future project execution. 28 Page 32 of 245Page 33 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 33 of 245 REDACTED PUBLIC VERSION The estimated prelimimuy development costs for these early-stage activities are shown in Tables GEN-11 and GEN-12 for the simple-cycle 2034 placeholder project. TABLE GEN-11 EARLY INVESTMENT FOR FUTURE 2034 THERMAL PROJECT ESTIMATED ESCALATED PRELIMINARY DEVELOPMENT COSTS EXCLUDING AFUDC In thousands Year Amount 2027 $12,025 2028 $1,016 Total (2028$) $13,041 TABLE GEN-12 EARLY INVESTMENT FOR FUTURE 2034 THERMAL PROJECT ESTIMATED ESCALATED PRELIMINARY DEVELOPMENT COSTS (EXCLUDING AFUDC) (REDACTED) Table GEN-13 shows a prelimina1y development schedule for early investment act1v1hes associated with the future placeholder 2034 the1mal projects. This schedule reflects the anticipated sequence of activities to advance preliminaiy engineering, obtain contractor input, and develop a more detailed basis for project cost and execution planning. The schedule is not strictly sequential, 29 Page 33 of 245Page 34 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 34 of 245 30 Page 34 of 245Page 35 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 35 of 245 Regional Haze Rule Since March 2024, 10 Sierra has worked with the NDEP to evaluate the Regional Haze Rule for the Second Decadal (Second Implementation) Planning Period (2018-2028) requirements applicable to Valmy Units 1 and 2 (following natural gas conversion) and Tracy 4/5. For Valmy Units 1 and 2, additional NOx reductions while firing natural gas were determined to be cost-effective through 2049, to a control level equivalent to SNCR performance. Sierra and the NDEP also preserved flexibility to meet these limits using either FGR or SCR. This approach also supports compliance with other federal requirements that may take effect, including the federal Good Neighbor Plan (see update below). For Tracy 4/5, SCR was determined to be cost-effective through 2049. The NDEP has worked with the EPA and federal land management agencies to revise Nevada’s Regional Haze SIP. This work included drafting state regulations to make Regional Haze requirements for Valmy Units 1 and 2 and Tracy 4/5 legally enforceable and conducting public outreach. 11 The state regulation sets the NOx emission levels, identifies control technologies, and establishes a compliance deadline. Under the state regulation, NOx controls must be installed within 36 months of EPA approval of Nevada’s Regional Haze SIP for these units. The NDEP submitted the SIP revision for North Valmy Units 1 and 2 and Tracy 4/5 to the EPA in May 2025 (“2025 Regional Haze SIP Revision”). As part of a separate July 2024 consent decree between the EPA and the Sierra Club, National Parks Conservation Association, and Environmental Integrity Project required the EPA to approve or deny Nevada’s Regional Haze SIP by December 15, 2025. 12 On October 23, 2025, the EPA published a proposed action and opened a 30-day public comment period that closed on November 24, 2025. The EPA issued its final action on February 6, 2026; this timing complied with the consent decree, with additional time allowed due to the government shutdown. In the final action, the EPA approved portions of the 2022 Nevada Regional Haze SIP, including the July 2023 withdrawal of proposed retirement determinations for Tracy 4/5 and Valmy Units 1 and 2, and portions of the 2025 Nevada Regional Haze SIP Revision. 13 The EPA did not act on the revised reasonable progress determinations or the proposed NOx emission controls for Tracy 4/5 and Valmy Units 1 and 2 included in the 2025 Regional Haze SIP Revision, because those revisions were submitted after the July 2024 consent decree. 10 Docket No. 23-08015, April 9, 2024, Order approved Sierra’s requests to proceed with the Valmy Units 1 and 2 coal-to-gas conversion and Tracy 4/5 projects. 11 NAC Chapter 445B, as amended by regulation adopted by the Nevada State Environmental Commission in 2024, establishing source-specific Regional Haze requirements for NV Energy’s North Valmy Generating Station (Units 1 and 2) and Tracy Generating Station (Units 4 and 5). 12 Sierra Club, et al. v. U.S. Environmental Protection Agency, No. 1:23-cv-01744-JDB (D.D.C.), Consent Decree entered July 12, 2024, establishing deadlines for EPA action on Regional Haze State Implementation Plans, including plans submitted by Nevada. 13 90 Fed. Reg. 48,481 (Oct. 23, 2025) (proposed rule) and 91 Fed. Reg. 5321 (Feb. 6, 2026), the EPA refers to the Nevada SIP filings as the “2022 Nevada Regional Haze Plan” and the “2025 SIP Supplement.” 31 Page 35 of 245Page 36 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 36 of 245 The EPA is expected to evaluate the proposed NOx controls for Valmy Units 1 and 2 and Tracy 4/5 included in the 2025 Regional Haze SIP Revision through a separate action. The EPA has not provided a schedule for that evaluation; however, for planning purposes, Sierra anticipates the EPA may act later in 2026. Under the state regulation, NOx controls must be installed within 36 months following EPA approval of the proposed NOx controls for Tracy 4/5 and Valmy Units 1 and 2. Good Neighbor Plan The federal “Good Neighbor Plan” for the 2015 Ozone National Ambient Air Quality Standards (“NAAQS”) became effective on August 4, 2023, and was intended to take effect for 22 states, including Nevada. 14 The rule has been subject to litigation since issuance and is currently stayed in effective states, including Nevada. If it were to take effect, the Good Neighbor Plan would require upwind states to reduce emissions of the ozone precursor NOx from electric generating units (“EGUs”) and certain stationary industrial sources. For EGUs, the program sets statewide ozone-season NOx emissions budgets and allocates emissions allowances to individual EGUs for May–September through a market-based trading program. On January 30, 2026, the EPA proposed Phase 1 of its reconsideration of the federal Good Neighbor Plan. 15 Under this reconsideration, the EPA intends to withdraw its February 12, 2023 disapproval and approve Nevada’s September 28, 2018 Good Neighbor SIP submission. The EPA acknowledges that Nevada applied the four-step interstate transport framework (the “Framework”) and determined that Nevada sources do not contribute more than 1% of the NAAQS to any nonattainment or maintenance receptor. If the EPA’s reconsideration is finalized as proposed, Nevada would not be required to adopt any new permanent, enforceable emission control measures under Nevada’s Good Neighbor SIP. If the federal Good Neighbor Plan were to ultimately take effect and Nevada was included, the program would have affected Valmy Units 1 and 2 while operating on coal. Emission allowances would have been constrained based on NOx emission rates achievable with SCR controls under coal-fired operation. Given uncertainty in the litigation outcome and potential applicability to Nevada, the 2025 Nevada Regional Haze SIP revision and related state regulation incorporated flexibility in the NOx control approach for Valmy. This flexibility allows consideration of SCR (if ultimately needed after conversion to natural gas) to support compliance and provide sufficient ozone-season allowances under the Good Neighbor Plan. No other EGUs would have been required to install NOx controls. Nevada’s annual EGU allowance budget would be set through a “dynamic” budgeting process based on recent operations and associated emissions, further limiting ozone-season NOx emissions. 14 15 88 Fed. Reg. 36,654 (June 5, 2023). 91 Fed. Reg. 4,026 (Jan. 30, 2026). 32 Page 36 of 245Page 37 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 37 of 245 Greenhouse Gas Emissions Standards On May 9, 2024, the EPA published a final rule for federal GHG Emissions Standards for fossil fuel-fired electric generating unit. 16 The GHG Emissions Standards became effective on July 8, 2024. Litigation commenced following publication. However, the GHG Emissions Standards remain in effect as published. On June 17, 2025, the EPA proposed repealing the GHG Emissions Standards in its entirety. 17 The EPA is also proposing, as an alternative, to repeal a narrower set of requirements that includes the emission guidelines for existing fossil fuel-fired steam generating units, the carbon capture and sequestration/storage (“CCS”)-based standards for coal-fired steam generating units undertaking a large modification, and the CCS-based standards for new baseload stationary combustion turbines. On February 27, 2026, the EPA submitted a status report to the U.S. Court of Appeals for the District of Columbia Circuit indicating that the proposed rulemaking process is ongoing and that the agency continues to analyze and gather information from a variety of sources. 18 In that report, the EPA stated it intended to send a draft final rule to the Office of Management and Budget in early spring 2026. The next EPA status report to the court is due on May 29, 2026. The GHG Emissions Standards currently in effect establishes the final best system of emissions reduction (“BSER”) and resulting performance standards for new gas-fired combustion turbines, existing coal-fired steam generating units, and existing oil- and gas-fired steam generating units. The final rule did not establish performance standards for existing gas-fired combustion turbines. For existing oil- or natural gas-fired steam generating units, the GHG Emissions Standards do not require installation of CCS if the unit maintains routine efficient operation and achieves a CO2 emission rate below 1,400 lb. CO2/MWh (if the capacity factor is 45 percent or greater) or below 1,600 lb. CO2/MWh (if the capacity factor is less than 45 percent), beginning January 1, 2030. For new gas units, the final standards use capacity factor thresholds to differentiate between baseload units (capacity factors greater than 40 percent), intermediate-load units (capacity factors between 20 and 40 percent), and low-utilization units (capacity factors of 20 percent or less). Capacity factors for these categories are measured on a 12-month rolling average. • For new baseload units, the BSER is achieved in two phases. Phase 1 requires highly efficient operation, achieving a performance standard of 800 lb. CO2/MWh through 2031. Phase 2 requires CCS at a 90 percent capture rate, or an emissions rate of 100 lb. CO2/MWh, starting in 2032. 16 New Source Performance Standards for Greenhouse Gas Emissions from New, Modified, and Reconstructed Fossil Fuel-Fired Electric Generating Units; Emission Guidelines for Greenhouse Gas Emissions from Existing Fossil FuelFired Electric Generating Units; and Repeal of the Affordable Clean Energy Rule, 89 Fed. Reg. 39,798 (May 9, 2024). 17 90 Fed. Reg. 25,752 (June 17, 2025). 18 U.S. Environmental Protection Agency, Status Report to the U.S. Court of Appeals for the District of Columbia Circuit (Feb. 27, 2026), Case No. 24-1120. 33 Page 37 of 245Page 38 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 38 of 245 • For new intermediate-load units, the BSER is efficient operation resulting in an emissions limitation of 1,170 lb. CO2/MWh, effective upon the start of operation. • For new low-utilization units, the BSER requires the use of clean fuels (i.e., natural gas, Nos. 1 and 2 fuel oil), with a resulting standard of 120–160 lb. CO2/MMBtu, depending on unit-specific characteristics. These GHG Emissions Standards, currently in effect, result in the following considerations for and the Companies fleet: • Valmy Units 1 and 2 (converted to natural gas operation), Fort Churchill units, and Tracy Unit 3 would be regulated as existing gas-fired steam units. These units would be required to maintain routine efficient operation and achieve CO2 emission rates between 1,400 and 1,600 lb. CO2/MWh depending on capacity factor. Valmy Units 1 and 2 operating on natural gas will also meet these CO2 emission rates. • The constructed Silverhawk Peaker Project, approved Valmy Simple-Cycle Plant, and proposed Fort Churchill 1, 2, and 3 additions (simple-cycle units that would likely be operated as low-utilization units (up to a 20 percent capacity factor)) with no CO2 emission rate requirement. If these units were capable of operating as intermediate-load units (20 to 40 percent capacity factor), they would need to meet a CO2 emission rate of 1,170 lb. CO2/MWh on a 12-month rolling average while operating on natural gas. • The remaining existing Companies units are not impacted by the current GHG Emissions Standards. Mercury and Air Toxics Standards On May 7, 2024, the EPA finalized amendments to the Mercury and Air Toxics Standards (“MATS”) to strengthen the National Emission Standards for Hazardous Air Pollutants for coaland oil-fired electric utility steam generating units. 19 The amendments would have applied to Valmy Units 1 and 2 only if they continued operating on coal. Historical emissions test data indicate the units generally would have met the revised limit; however, compliance would have required adding particulate matter (“PM”) continuous emissions monitoring system (“CEMS”) capability and integrating it into existing facility systems. On February 19, 2026, the EPA finalized the repeal of the 2024 amendments. 20 19 20 89 Fed. Reg. 38,508 (May 7, 2024). 91 Fed. Reg. 9,088 (Feb. 24, 2026). 34 Page 38 of 245Page 39 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 39 of 245 With Valmy Units 1 and 2 converted to natural gas, the 2012 MATS rule no longer applies to Nevada Power and Sierra generation operations. 6. Hydrogen Fuel and Carbon Capture The Companies continue to monitor the availability and commercial application of hydrogen as a fuel source for its generating units and carbon capture technologies for the capture and storage of CO2. These technologies are not included in the existing or proposed generating units in this filing. The Companies commissioned a review of the status of these technologies, Carbon Capture & Storage and Hydrogen Fuel Assessment by E3, which is included as Technical Appendix GEN-4 of this filing. At this time, these technologies are not commercially feasible for the Companies’ generating fleet, but the Companies will continue to monitor the commercial feasibility of these technologies for their current and future generating units. 35 Page 39 of 245
As listed on the current system
Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026