Interrogatory responses
Answers to questions 19 thru 32
Files20
CAE-020 Attachment 1.xlsx
Excel · 1.6 MBText searchable
Download CAE-020 Attachment 1.xlsxRead the text of CAE-020 Attachment 1.xlsx
CAE-027 Attachment 2.pdf
PDF · 1.2 MB · 7 pagesText searchable
Download CAE-027 Attachment 2.pdfRead the text of CAE-027 Attachment 2.pdf
CAE-032 Attachment 1.pdf
PDF · 483 KB · 35 pagesText searchable
Download CAE-032 Attachment 1.pdfRead the text of CAE-032 Attachment 1.pdf
CAE-032 Attachment 2.pdf
PDF · 1.1 MB · 36 pagesText searchable
Download CAE-032 Attachment 2.pdfRead the text of CAE-032 Attachment 2.pdf
CAE-020 Attachment 1.pdf
PDF · 5.6 MB · 75 pagesText searchable
Download CAE-020 Attachment 1.pdfRead the text of CAE-020 Attachment 1.pdf
CAE-027 Attachment 1.pdf
PDF · 18 MB · 245 pagesText searchable
Download CAE-027 Attachment 1.pdfRead the text of CAE-027 Attachment 1.pdf
Text of CAE-021.pdf
Extracted from the file · 1 page · 567 characters
Text of CAE-022.pdf
Extracted from the file · 3 pages · 6,575 characters
Text of CAE-023.pdf
Extracted from the file · 1 page · 757 characters
Text of CAE-024.pdf
Extracted from the file · 1 page · 2,191 characters
Text of CAE-025.pdf
Extracted from the file · 1 page · 1,125 characters
Text of CAE-026.pdf
Extracted from the file · 1 page · 2,757 characters
Text of CAE-027.pdf
Extracted from the file · 1 page · 1,054 characters
Text of CAE-027 Attachment 2.pdf
Extracted from the file · 7 pages · 23,401 characters
Text of CAE-028.pdf
Extracted from the file · 1 page · 714 characters
Text of CAE-029.pdf
Extracted from the file · 1 page · 1,362 characters
Text of CAE-030.pdf
Extracted from the file · 1 page · 1,728 characters
Text of CAE-031.pdf
Extracted from the file · 1 page · 1,654 characters
Text of CAE-032.pdf
Extracted from the file · 1 page · 1,689 characters
Text of CAE-032 Attachment 1.pdf
Extracted from the file · 35 pages · 69,136 characters
Text of CAE-032 Attachment 2.pdf
Extracted from the file · 36 pages · 33,759 characters
Text of CAE-020 Attachment 1.pdf
Extracted from the file · 75 pages · 742,810 characters
Page 39 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 39 of 245 With Valmy Units 1 and 2 converted to natural gas, the 2012 MATS rule no longer applies to Nevada Power and Sierra generation operations. 6. Hydrogen Fuel and Carbon Capture The Companies continue to monitor the availability and commercial application of hydrogen as a fuel source for its generating units and carbon capture technologies for the capture and storage of CO2. These technologies are not included in the existing or proposed generating units in this filing. The Companies commissioned a review of the status of these technologies, Carbon Capture & Storage and Hydrogen Fuel Assessment by E3, which is included as Technical Appendix GEN-4 of this filing. At this time, these technologies are not commercially feasible for the Companies’ generating fleet, but the Companies will continue to monitor the commercial feasibility of these technologies for their current and future generating units. 35 Page 39 of 245Page 40 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 40 of 245 B. LONG-TERM POWER PURCHASE AGREEMENTS The Companies meet customer’s energy demand with company-owned and controlled generation, as well as with a combination of long-term power purchase agreements (“PPAs”) and short-term energy transactions. Similarly, the Companies meet the requirements of Nevada’s Renewable Portfolio Standard (“RPS”) through a combination of company-owned generation, Commission-approved long-term PPAs with renewable energy resources, and agreements for purchase of portfolio energy credits (“PCs”). Figure CON-1 lists all of Nevada Power’s renewable and non-renewable long-term PPAs, PC only, and sales agreements. Figure CON-2 lists all of Sierra’s renewable and non-renewable long-term PPAs, PC-only, and sales agreements. 36 Page 40 of 245Page 41 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 41 of 245 FIGURE CON-1 NEVADA POWER’S LONG-TERM POWER PURCHASE AGREEMENTS Contract Name Renewable Purchase Agreements PPAs (Commercial) ACE SearchlightQF APEX Landfill Docket Number Contract Type 09-08020 SolarS Methane 17.5 12/16/14 12.0 03/01/12 12/31/2032 SolarS Hydro 100.0 237.6 12/09/16 10/01/17 12/31/2036 09/30/2067 09-08020 QF Commercial Capacity Operation BESS Termination Date (MW) Date Termination Date 12/31/2034 Copper Mountain 5EWG 15-07003 18-06003 Desert Peak 2QF 02-11040 SolarS Geothermal 250.0 25.0 07/23/21 04/17/07 12/31/2046 12/31/2027 Eagle Shadow MountainEWG 18-06003 SolarS 300.0 FRV SpectrumQF 11-03014 SolarS 30.0 05/10/23 09/23/13 12/31/2048 12/31/2038 Gemini SolarEWG 19-06039 03/25/24 12/31/2049 06-10021 SolarS,X=380 (3.7 hrs) 3 Geothermal 690.0 Jersey ValleyQF 22.5 08/30/11 12/31/2031 McGinness HillsQF 10-02009 Geothermal 96.0 06/20/12 12/31/2032 Moapa (Arrow Canyon) SolarEWG 19-06039 SolarS,X=74 (5 hrs) 3 Mountain ViewEWG 11-03014 SolarS 200.0 20.0 12/08/23 01/05/14 12/31/2048 12/31/2039 Nevada Solar One (NPC)QF 02-11040 06/27/07 12/31/2027 06-10021 SolarT,X Geothermal 46.9 NGP Blue MountainQF 49.5 11/20/09 12/31/2029 RV Apex QF 10-02009 20.0 07/21/12 12/31/2037 Salt WellsQF 07-02015 SolarS Geothermal 23.6 09/18/09 12/31/2029 Silver State EWG 10-03022 52.0 04/25/12 12/31/2037 Spring ValleyEWG 10-02009 SolarF Wind 151.8 08/16/12 12/31/2032 Stillwater Geothermal 1,QF 07-02015 Geothermal 47.2 10/10/09 12/31/20294 07-02015 SolarF 22.0 03/05/12 Switch Station 1 15-07003 S 100.0 08/08/17 12/31/20294 12/31/2037 Switch Station 2 (NPC) EWG 15-11029 SolarS 0.0 10/11/17 12/31/2037 Techren IEWG 16-08026 SolarS 100.0 03/11/19 12/31/2044 Techren IIIQF 17-11004 SolarS 25.0 10/07/20 12/31/2045 Techren V EWG 18-06003 TuscaroraQF 10-03022 SolarS Geothermal 50.0 32.0 12/31/20 01/11/12 12/31/2045 12/31/2032 WM Renewable Energy-LockwoodQF 10-03022 Methane 3.2 2723.8 04/01/12 12/31/2032 Geothermal 2.3 10/30/09 12/31/2028 Solar Solar 13.2 3.0 18.5 12/15/07 04/20/06 12/31/2027 12/31/2026 Boulder Solar IEWG Colorado River Commission-Hoover Stillwater PV 1,QF EWG Solar Total PC Purchase Agreements Sierra Pacific Power QF Nellis I (Solar Star) SunPower (LVVWD) 09-08018 & 0908020 07-01035 04-11033 Total 24-05041 SolarS,X=200(4hrs) Libra Solar 24-05041 SolarS,X=700(4hrs) Total 12/31/2048 200.0 Estimated BESS Termination Termination Date COD Date 12/01/26 12/31/2051 12/31/2046 700.0 12/01/27 PPAs (Pre-Commercial)2 Dry Lake East 12/31/2049 12/31/2052 12/31/2047 900.0 Non-Renewable Purchase Agreements Renewable and Non-Renewable Sales Switch NGR (Switch Station 1) 15-08005 NGR Agreement (Sale of PCs) 100.0 08/08/17 12/31/2037 Switch NGR-NPC (Switch Station 2) 15-11028 NGR Agreement (Sale of PCs) 0.0 10/11/17 12/31/2037 Notes: 1. The geothermal and solar facilities are combined into one PPA. 2. Facilities are either under development or construction (the dates shown are expected dates). 3. Storage reflects current MW based on annual storage capacity test 4. NPC has an option to extend the Stillwater Geothermal/Solar PPA for a period of 3, 4 or 5 years upon the termination date. QF=Qualifying Facility, EWG=Exempt Wholesale Generator, S=Single Axis Tracking, T=Solar Thermal (Tracking), F=Fixed Tilt, X=Storage 37 Page 41 of 245Page 42 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 42 of 245 FIGURE CON-2 SIERRA’S LONG-TERM POWER PURCHASE AGREEMENTS Contract Name Capacity Commercial Termination BESS Termination (MW) Operation Date Date Date Docket Number Contract Type Battle MountainEWG 18-06003 SolarS,X=24.2MW (4 hrs) 6 101.0 6/23/2021 12/31/2046 Boulder Solar IIEWG 15-11029 50.0 1/27/2017 12/31/2037 Burdette QF 04-08004 SolarS Geothermal 26.0 2/28/2006 12/31/2026 Dodge FlatEWG 18-06003 SolarS,X=50MW (4 hrs) 6 200.0 3/2/2022 12/31/2047 12/31/2037 Fish Springs RanchEWG 18-06003 SolarS,X=24.91MW (4 hrs) 6 Geothermal 100.0 26.5 3/15/2022 2/21/2008 12/31/2047 12/31/2028 12/31/2037 Renewable Energy PPAs (Commercial) QF 06-05040 1,QF QF-Legacy Hydro 0.75 6/23/2016 12/31/2040 - Hydro 0.175 9/19/2011 12/31/2040 12/31/2040 Galena 3 Hooper Kingston1 - Hydro 0.037 9/1/2011 Nevada Solar One (SPPC)QF 02-12039 SolarT 22.1 6/27/2007 12/31/2027 QF 22-03024 25 20.0 4/26/2023 12/31/2048 22-11032 Geothermal Geothermal - Hydro Mill Creek 1 North Valley OWGP Beowawe QF RO Ranch1,2 Techren II 1/10/2025 12/31/2053 0 3/15/2011 12/31/2040 S 15-11029 Solar 79.0 10/11/2017 12/31/2037 EWG 17-02007 S Solar 200.0 10/4/2019 12/31/2044 QF 17-11003 07-01036 07-01036 07-01036 17-11003 11-08010 S 25.0 2.4 2.4 2.5 50.0 11.75 944.6 10/7/2020 5/16/2008 5/15/2009 7/25/2008 12/4/2020 5/25/2012 12/31/2045 6/1/2028 6/1/2029 6/1/2028 12/31/2045 12/31/2037 0.8 9/9/2005 9/1/2026 Switch Station 2 (SPPC) EWG Techren IV TMWA Fleish TMWA Verdi TMWA Washoe Turquoise EWG USG San EmidioQF Solar Hydro Hydro Hydro SolarF Geothermal Total PC Purchase Agreement TMWRF PPAs (Pre-Commercial) 06-04030 Methane 12/31/2031 Termination Estimated COD Date 3 Ormat Western Geothermal Portfolio (OWGP) 5 OWGP PintoQF OWGP Galena 1 QF QF OWGP Desert Peak 2 OWGP Lone Mountain QF QF OWGP Galena 3 OWGP TBD Corsac Generating Station 2 LLC 22-11032 Geothermal 15.0 1/1/2027 12/31/2053 22-11032 Geothermal 15.0 2/1/2027 12/31/2053 22-11032 Geothermal 10.0 2/1/2028 12/31/2053 22-11032 Geothermal 15.0 10/1/2028 12/31/2053 22-11032 22-11032 24-05041 Geothermal Geothermal Geothermal 1/1/2029 TBD 2/1/2030 12/31/2053 12/31/2053 12/31/2045 Total 15.0 30.0 115.0 215.0 Solar & Grid Tied BESS 150 MW (4 hrs) Total 0.0 0.0 7/1/2027 12.0 1/1/2011 Storage Only (Pre-Commercial)3 Dodge Flat Energy Storage Non-Renewable Purchase Agreements Liberty (CalPeco) EBSA7 25-10028 09-12002 & 1007003 Diesel Total Renewable & Non-Renewable Sales Agreements Liberty (CalPeco) NPC-SPPC 09-08018 & 0908020 13-07002 15-11025 15-11025 17-02008 17-11002 12/31/2047 12/31/2031 12.0 Full Requirements (Capacity/Energy/PCs) See Note 4 12/30/2020 5/31/2027 Sale of PCs (Geothermal) 2.3 10/30/2009 12/31/2028 Apple NGR (Fort Churchill Solar) NGR Agreement (Sale of PCs) 19.5 8/5/2015 8/4/2040 Apple NGR (Boulder Solar II) NGR Agreement (Sale of PCs) 50.0 1/27/2017 12/31/2037 Switch NGR-SPPC (Switch Station 2) NGR Agreement (Sale of PCs) 79.0 10/11/2017 12/31/2037 Apple NGR (Techren II) NGR Agreement (Sale of PCs) 200.0 10/4/2019 6/20/2044 Apple NGR (Turquoise) NGR Agreement (Sale of PCs) 50.0 12/4/2020 4/30/2045 Notes: 1. The illustrative termination date shown is subject to certain conditions, which may result in termination before or after December 31, 2040. 2. RO Ranch Hydro facility is shut down indefinitely (the PPA is still active). 3. Facilities are either under development or construction (the dates shown are expected dates). 4. The current monthly contract demand ranges from approximately 70 MW (June) to 140 MW (December). Contract extension pending FERC approval. 5. Portfolio consists of multiple facilites under one Power Purchase Agreement 6. Storage reflects current MW based on annual storage capacity test 7. Emergency backup service agreement for King's Beach Diesels QF=Qualifying Facility, EWG=Exempt Wholesale Generator, S=Single Axis Tracking, T=Solar Thermal (Tracking), F=Fixed Tilt, X=Storage 38 Page 42 of 245Page 43 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 43 of 245 1. RENEWABLE PPAs Nevada Power has executed twenty-seven long-term renewable PPAs representing a total nameplate capacity of approximately 2,723.8 MW (see Figure CON-1 above). Projects in development include Dry Lake East with an estimated commercial operations date (“COD”) of December 1, 2026, and Libra Solar with an estimated COD of December 1, 2027. Nevada Power has three PC-only purchase agreements as represented in CON-1. Nevada Power’s renewable PPAs secure a renewable energy portfolio that is a mix of solar, geothermal, hydro, methane, and wind resources. Sierra has executed twenty-one long-term renewable PPAs, representing a total nameplate capacity of approximately 944.6 MW (see Figure CON-2 above). The latest commercial addition to the portfolio is the Ormat Western Geothermal Portfolio’s Beowawe project, added in January 2025. Projects in development include other Ormat Western Geothermal Portfolio projects with contractual CODs of January 2027 through January 2029, Corsac Generating Station 2, with an estimated COD of February 1, 2030, and Dodge Flat BESS Addition, with an estimated COD of July 1, 2027. Sierra has executed one long-term PC-only purchase agreement, as represented in Figure CON-2. Sierra’s renewable PPAs secure a renewable energy portfolio that is made up of a mix of solar, geothermal, and hydro resources. Additional information regarding both Nevada Power’s and Sierra’s portfolio of renewable energy PPAs is set forth below. 2. NON-RENEWABLE PPAs Figure CON-2 (above) also lists non-renewable PPAs at Sierra. Sierra has executed one longterm non-renewable agreement with Liberty Utilities (“Liberty”), pursuant to which Sierra purchases 12 MW of capacity from Liberty’s Kings Beach diesel units for emergency backup service purposes. This agreement expires December 31, 2031. Nevada Power has no nonrenewable PPAs, as shown in Figure CON-1. 3. RENEWABLE AND NON-RENEWABLE SALES AGREEMENTS Also listed in Figures CON-1 and CON-2 are long-term renewable and non-renewable sales agreements, pursuant to which Nevada Power and Sierra sell either energy, PCs, or both, to third parties. Nevada Power currently has NV GreenEnergy Rider (“NGR”) agreements pursuant to which it sells PCs to Switch Ltd. (associated with the full output of the Switch Station 1 solar facility). Sierra has executed long-term agreements under the NGR program for the sale of PCs to Apple (associated with the full output of the Fort Churchill Solar Array, Boulder Solar II project, Techren Solar II project, and the Turquoise Solar project) and an agreement with Switch Ltd. 39 Page 43 of 245Page 44 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 44 of 245 (associated with the full output of the Switch Station 2 project). Sierra has also executed one long-term agreement for the sale of PCs to Nevada Power. This PC-only sale agreement expires December 31, 2028. In addition, Sierra has executed a full requirements agreement with Liberty whereby Sierra sells capacity, energy, and certain PCs to meet the needs of Liberty retail customers in California. The current monthly contract demand ranges from approximately 70 MW (June) to 140 MW (December). The agreement commenced December 30, 2020, and terminates on the latter of May 31, 2027, or upon the completion of facilities that will provide Liberty with sufficient capacity to transition to taking Network Integration Transmission Service for its entire Network Load pursuant to its executed Network Integration Transmission Service Agreement. 1 Third amended and restated service agreement between Sierra Pacific Power Company and Liberty Utilities LLC, executed on October 31, 2025, filed in FERC Docket No. ER26-534-000. 1 40 Page 44 of 245Page 45 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 45 of 245 C. FUEL SUPPLY 1. CURRENT PHYSICAL GAS SUPPLY AND PROPOSED PIPELINE EXPANSION The Companies are well poised to access the supply basins serving the Pacific Northwest and the Desert Southwest per their firm gas transportation assets. These basins are the Rocky Mountain Basin, the Permian Basin, the San Juan Basin, British Columbia, Western Canada Sedimentary Basins, as well as California gas supply. The gas transportation facilities that are available to move gas from the supply basins to the Companies’ respective service territories are shown in Figures GAS-1 and GAS-2. Nevada Power takes delivery of natural gas from interstate pipeline Kern River, which connects with several major gas producing regions including the Permian, San Juan, and the Rocky Mountain supply basins, as well as California gas supply. The largest producing region with the best connectivity into and through Nevada Power’s service territory is the Rocky Mountain supply basin. Sierra takes delivery of natural gas from three interstate pipelines: Great Basin, Tuscarora, and Ruby Pipeline (“Ruby”). Great Basin receives gas supplies upstream from Northwest Pipeline (“NWPL”), which sources its gas supplies from British Columbia, the San Juan Basin, and the Rocky Mountain region of Wyoming, Utah and Colorado. Tuscarora receives gas supplies from Gas Transmission Northwest (“GTN”) pipeline, near Malin, Oregon, which is connected to the gas producing regions of Western Canada Sedimentary Basin Alberta through TC Energy’s system. The gas supply source for Malin gas is predominantly in Alberta, Canada. TC Energy’s Alberta pipeline system carries gas from the Alberta Energy Company (“AECO”) producing areas to the Alberta/British Columbia border. There, TC Energy’s Alberta system interconnects with TC Energy’s Foothills system, which transports gas to TC Energy’s GTN system at the U.S./Canadian border near Kingsgate, Idaho. Toward the end of 2025, Sierra began taking firm transportation from Ruby to serve Valmy. 41 Page 45 of 245Page 46 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 46 of 245 FIGURE GAS-1 NEVADA POWER PIPELINE ROUTES 42 Page 46 of 245Page 47 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 47 of 245 FIGURE GAS-2 SIERRA PIPELINE ROUTES Figures GAS-3 and GAS-4 list Nevada Power’s and Sierra’s existing gas transportation service agreements, respectively. 43 Page 47 of 245Page 48 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 48 of 245 FIGURE GAS-3 NEVADA POWER NATURAL GAS TRANSPORTATION CONTRACTS Nevada Power Company d/b/a NV Energy Gas Transportation Agreements Contract Type Counterparty TSA TSA TSA TSA TSA TSA TSA Facilities TSA TSA TSA Kern River Kern River Kern River Kern River Kern River Kern River Kern River Kern River SW Gas SW Gas SW Gas Contract # 20027 20028 20023 20012 20013 1830 1617 Higgins Facility Charge 21016 21011 21088 Termination Date (as of 2/1/2026) 4/30/2028 Maximum Daily Quantity (MMBTUs) Annual Winter Summer 75,000 4/30/2028 4/30/2032 9/30/2031 9/30/2031 9/30/2031 9/30/2031 12,500 10,350 11,075 266,000 134,000 50,000 Forward haul Back haul No Volume 12/31/2039 4/30/2027 Month to Month 7/31/2027 288,000 45,000 Comments 5,200 Nevada Power currently holds year-round contracts for firm forward haul gas transportation rights on Kern River totalling 374,925 MMBtu/day, with an additional 50,000 MMBtu/day in the summer that increases the maximum daily quantity to 424,925 MMBtu/day from April through October to serve most of its overall daily natural gas needs. Nevada Power holds rollover rights under the Kern River tariff, provided Nevada Power is willing to continue under the terms and conditions specified therein. In addition, Nevada Power has a long-term agreement with Kern River for back haul capacity of 134,000 MMBtu/day. Nevada Power may procure Topock-sourced gas for re-delivery into Kern River at Daggett, California. Gas supplies for Nevada Power’s Harry Allen, Chuck Lenzie, Higgins and Silverhawk plants are delivered directly by Kern River. The gas-fired units at Clark Generating Station and Sun Peak Generating Station receive gas delivered under a 288,000 MMBtu/day transportation service agreement with Southwest Gas Corporation (“Southwest”). The transportation agreement with Southwest provides for receipt of Kern River supplies, as well as limited quantities of gas from sellers off the El Paso Natural Gas Company (“El Paso”) and/or Transwestern Pipeline Company (“Transwestern”) pipelines south of Las Vegas (if Southwest is not using its capacity rights to serve its own requirements). As part of the acquisition of Las Vegas Generating Station in 2014, Nevada Power retained the gas transportation service agreements (LV Station Unit 1 45,000 MMBtu/day and LV Station Unit 2 5,200 MMBtu/day) with Southwest. Nevada Power meets at least once a year with Kern River to review the prior year’s operations, discuss upcoming maintenance plans, and review potential expansions. The last meeting with Kern River was on May 26, 2025. The next meeting is scheduled for May 26, 2026. 44 Page 48 of 245
As listed on the current system
Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026