Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf

Text of CAE-032 Attachment 1.pdf

Extracted from the file · 35 pages · 69,136 characters

Text of CAE-032 Attachment 2.pdf

Extracted from the file · 36 pages · 33,759 characters

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

15 pages match
  1. Page 42 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 42 of 245 FIGURE CON-2 SIERRA’S LONG-TERM POWER PURCHASE AGREEMENTS Contract Name Capacity Commercial Termination BESS Termination (MW) Operation Date Date Date Docket Number Contract Type Battle MountainEWG 18-06003 SolarS,X=24.2MW (4 hrs) 6 101.0 6/23/2021 12/31/2046 Boulder Solar IIEWG 15-11029 50.0 1/27/2017 12/31/2037 Burdette QF 04-08004 SolarS Geothermal 26.0 2/28/2006 12/31/2026 Dodge FlatEWG 18-06003 SolarS,X=50MW (4 hrs) 6 200.0 3/2/2022 12/31/2047 12/31/2037 Fish Springs RanchEWG 18-06003 SolarS,X=24.91MW (4 hrs) 6 Geothermal 100.0 26.5 3/15/2022 2/21/2008 12/31/2047 12/31/2028 12/31/2037 Renewable Energy PPAs (Commercial) QF 06-05040 1,QF QF-Legacy Hydro 0.75 6/23/2016 12/31/2040 - Hydro 0.175 9/19/2011 12/31/2040 12/31/2040 Galena 3 Hooper Kingston1 - Hydro 0.037 9/1/2011 Nevada Solar One (SPPC)QF 02-12039 SolarT 22.1 6/27/2007 12/31/2027 QF 22-03024 25 20.0 4/26/2023 12/31/2048 22-11032 Geothermal Geothermal - Hydro Mill Creek 1 North Valley OWGP Beowawe QF RO Ranch1,2 Techren II 1/10/2025 12/31/2053 0 3/15/2011 12/31/2040 S 15-11029 Solar 79.0 10/11/2017 12/31/2037 EWG 17-02007 S Solar 200.0 10/4/2019 12/31/2044 QF 17-11003 07-01036 07-01036 07-01036 17-11003 11-08010 S 25.0 2.4 2.4 2.5 50.0 11.75 944.6 10/7/2020 5/16/2008 5/15/2009 7/25/2008 12/4/2020 5/25/2012 12/31/2045 6/1/2028 6/1/2029 6/1/2028 12/31/2045 12/31/2037 0.8 9/9/2005 9/1/2026 Switch Station 2 (SPPC) EWG Techren IV TMWA Fleish TMWA Verdi TMWA Washoe Turquoise EWG USG San EmidioQF Solar Hydro Hydro Hydro SolarF Geothermal Total PC Purchase Agreement TMWRF PPAs (Pre-Commercial) 06-04030 Methane 12/31/2031 Termination Estimated COD Date 3 Ormat Western Geothermal Portfolio (OWGP) 5 OWGP PintoQF OWGP Galena 1 QF QF OWGP Desert Peak 2 OWGP Lone Mountain QF QF OWGP Galena 3 OWGP TBD Corsac Generating Station 2 LLC 22-11032 Geothermal 15.0 1/1/2027 12/31/2053 22-11032 Geothermal 15.0 2/1/2027 12/31/2053 22-11032 Geothermal 10.0 2/1/2028 12/31/2053 22-11032 Geothermal 15.0 10/1/2028 12/31/2053 22-11032 22-11032 24-05041 Geothermal Geothermal Geothermal 1/1/2029 TBD 2/1/2030 12/31/2053 12/31/2053 12/31/2045 Total 15.0 30.0 115.0 215.0 Solar & Grid Tied BESS 150 MW (4 hrs) Total 0.0 0.0 7/1/2027 12.0 1/1/2011 Storage Only (Pre-Commercial)3 Dodge Flat Energy Storage Non-Renewable Purchase Agreements Liberty (CalPeco) EBSA7 25-10028 09-12002 & 1007003 Diesel Total Renewable & Non-Renewable Sales Agreements Liberty (CalPeco) NPC-SPPC 09-08018 & 0908020 13-07002 15-11025 15-11025 17-02008 17-11002 12/31/2047 12/31/2031 12.0 Full Requirements (Capacity/Energy/PCs) See Note 4 12/30/2020 5/31/2027 Sale of PCs (Geothermal) 2.3 10/30/2009 12/31/2028 Apple NGR (Fort Churchill Solar) NGR Agreement (Sale of PCs) 19.5 8/5/2015 8/4/2040 Apple NGR (Boulder Solar II) NGR Agreement (Sale of PCs) 50.0 1/27/2017 12/31/2037 Switch NGR-SPPC (Switch Station 2) NGR Agreement (Sale of PCs) 79.0 10/11/2017 12/31/2037 Apple NGR (Techren II) NGR Agreement (Sale of PCs) 200.0 10/4/2019 6/20/2044 Apple NGR (Turquoise) NGR Agreement (Sale of PCs) 50.0 12/4/2020 4/30/2045 Notes: 1. The illustrative termination date shown is subject to certain conditions, which may result in termination before or after December 31, 2040. 2. RO Ranch Hydro facility is shut down indefinitely (the PPA is still active). 3. Facilities are either under development or construction (the dates shown are expected dates). 4. The current monthly contract demand ranges from approximately 70 MW (June) to 140 MW (December). Contract extension pending FERC approval. 5. Portfolio consists of multiple facilites under one Power Purchase Agreement 6. Storage reflects current MW based on annual storage capacity test 7. Emergency backup service agreement for King's Beach Diesels QF=Qualifying Facility, EWG=Exempt Wholesale Generator, S=Single Axis Tracking, T=Solar Thermal (Tracking), F=Fixed Tilt, X=Storage 38 Page 42 of 245
  2. Page 43 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 43 of 245 1. RENEWABLE PPAs Nevada Power has executed twenty-seven long-term renewable PPAs representing a total nameplate capacity of approximately 2,723.8 MW (see Figure CON-1 above). Projects in development include Dry Lake East with an estimated commercial operations date (“COD”) of December 1, 2026, and Libra Solar with an estimated COD of December 1, 2027. Nevada Power has three PC-only purchase agreements as represented in CON-1. Nevada Power’s renewable PPAs secure a renewable energy portfolio that is a mix of solar, geothermal, hydro, methane, and wind resources. Sierra has executed twenty-one long-term renewable PPAs, representing a total nameplate capacity of approximately 944.6 MW (see Figure CON-2 above). The latest commercial addition to the portfolio is the Ormat Western Geothermal Portfolio’s Beowawe project, added in January 2025. Projects in development include other Ormat Western Geothermal Portfolio projects with contractual CODs of January 2027 through January 2029, Corsac Generating Station 2, with an estimated COD of February 1, 2030, and Dodge Flat BESS Addition, with an estimated COD of July 1, 2027. Sierra has executed one long-term PC-only purchase agreement, as represented in Figure CON-2. Sierra’s renewable PPAs secure a renewable energy portfolio that is made up of a mix of solar, geothermal, and hydro resources. Additional information regarding both Nevada Power’s and Sierra’s portfolio of renewable energy PPAs is set forth below. 2. NON-RENEWABLE PPAs Figure CON-2 (above) also lists non-renewable PPAs at Sierra. Sierra has executed one longterm non-renewable agreement with Liberty Utilities (“Liberty”), pursuant to which Sierra purchases 12 MW of capacity from Liberty’s Kings Beach diesel units for emergency backup service purposes. This agreement expires December 31, 2031. Nevada Power has no nonrenewable PPAs, as shown in Figure CON-1. 3. RENEWABLE AND NON-RENEWABLE SALES AGREEMENTS Also listed in Figures CON-1 and CON-2 are long-term renewable and non-renewable sales agreements, pursuant to which Nevada Power and Sierra sell either energy, PCs, or both, to third parties. Nevada Power currently has NV GreenEnergy Rider (“NGR”) agreements pursuant to which it sells PCs to Switch Ltd. (associated with the full output of the Switch Station 1 solar facility). Sierra has executed long-term agreements under the NGR program for the sale of PCs to Apple (associated with the full output of the Fort Churchill Solar Array, Boulder Solar II project, Techren Solar II project, and the Turquoise Solar project) and an agreement with Switch Ltd. 39 Page 43 of 245
  3. Page 44 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 44 of 245 (associated with the full output of the Switch Station 2 project). Sierra has also executed one long-term agreement for the sale of PCs to Nevada Power. This PC-only sale agreement expires December 31, 2028. In addition, Sierra has executed a full requirements agreement with Liberty whereby Sierra sells capacity, energy, and certain PCs to meet the needs of Liberty retail customers in California. The current monthly contract demand ranges from approximately 70 MW (June) to 140 MW (December). The agreement commenced December 30, 2020, and terminates on the latter of May 31, 2027, or upon the completion of facilities that will provide Liberty with sufficient capacity to transition to taking Network Integration Transmission Service for its entire Network Load pursuant to its executed Network Integration Transmission Service Agreement. 1 Third amended and restated service agreement between Sierra Pacific Power Company and Liberty Utilities LLC, executed on October 31, 2025, filed in FERC Docket No. ER26-534-000. 1 40 Page 44 of 245
  4. Page 45 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 45 of 245 C. FUEL SUPPLY 1. CURRENT PHYSICAL GAS SUPPLY AND PROPOSED PIPELINE EXPANSION The Companies are well poised to access the supply basins serving the Pacific Northwest and the Desert Southwest per their firm gas transportation assets. These basins are the Rocky Mountain Basin, the Permian Basin, the San Juan Basin, British Columbia, Western Canada Sedimentary Basins, as well as California gas supply. The gas transportation facilities that are available to move gas from the supply basins to the Companies’ respective service territories are shown in Figures GAS-1 and GAS-2. Nevada Power takes delivery of natural gas from interstate pipeline Kern River, which connects with several major gas producing regions including the Permian, San Juan, and the Rocky Mountain supply basins, as well as California gas supply. The largest producing region with the best connectivity into and through Nevada Power’s service territory is the Rocky Mountain supply basin. Sierra takes delivery of natural gas from three interstate pipelines: Great Basin, Tuscarora, and Ruby Pipeline (“Ruby”). Great Basin receives gas supplies upstream from Northwest Pipeline (“NWPL”), which sources its gas supplies from British Columbia, the San Juan Basin, and the Rocky Mountain region of Wyoming, Utah and Colorado. Tuscarora receives gas supplies from Gas Transmission Northwest (“GTN”) pipeline, near Malin, Oregon, which is connected to the gas producing regions of Western Canada Sedimentary Basin Alberta through TC Energy’s system. The gas supply source for Malin gas is predominantly in Alberta, Canada. TC Energy’s Alberta pipeline system carries gas from the Alberta Energy Company (“AECO”) producing areas to the Alberta/British Columbia border. There, TC Energy’s Alberta system interconnects with TC Energy’s Foothills system, which transports gas to TC Energy’s GTN system at the U.S./Canadian border near Kingsgate, Idaho. Toward the end of 2025, Sierra began taking firm transportation from Ruby to serve Valmy. 41 Page 45 of 245
  5. Page 46 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 46 of 245 FIGURE GAS-1 NEVADA POWER PIPELINE ROUTES 42 Page 46 of 245
  6. Page 47 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 47 of 245 FIGURE GAS-2 SIERRA PIPELINE ROUTES Figures GAS-3 and GAS-4 list Nevada Power’s and Sierra’s existing gas transportation service agreements, respectively. 43 Page 47 of 245
  7. Page 48 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 48 of 245 FIGURE GAS-3 NEVADA POWER NATURAL GAS TRANSPORTATION CONTRACTS Nevada Power Company d/b/a NV Energy Gas Transportation Agreements Contract Type Counterparty TSA TSA TSA TSA TSA TSA TSA Facilities TSA TSA TSA Kern River Kern River Kern River Kern River Kern River Kern River Kern River Kern River SW Gas SW Gas SW Gas Contract # 20027 20028 20023 20012 20013 1830 1617 Higgins Facility Charge 21016 21011 21088 Termination Date (as of 2/1/2026) 4/30/2028 Maximum Daily Quantity (MMBTUs) Annual Winter Summer 75,000 4/30/2028 4/30/2032 9/30/2031 9/30/2031 9/30/2031 9/30/2031 12,500 10,350 11,075 266,000 134,000 50,000 Forward haul Back haul No Volume 12/31/2039 4/30/2027 Month to Month 7/31/2027 288,000 45,000 Comments 5,200 Nevada Power currently holds year-round contracts for firm forward haul gas transportation rights on Kern River totalling 374,925 MMBtu/day, with an additional 50,000 MMBtu/day in the summer that increases the maximum daily quantity to 424,925 MMBtu/day from April through October to serve most of its overall daily natural gas needs. Nevada Power holds rollover rights under the Kern River tariff, provided Nevada Power is willing to continue under the terms and conditions specified therein. In addition, Nevada Power has a long-term agreement with Kern River for back haul capacity of 134,000 MMBtu/day. Nevada Power may procure Topock-sourced gas for re-delivery into Kern River at Daggett, California. Gas supplies for Nevada Power’s Harry Allen, Chuck Lenzie, Higgins and Silverhawk plants are delivered directly by Kern River. The gas-fired units at Clark Generating Station and Sun Peak Generating Station receive gas delivered under a 288,000 MMBtu/day transportation service agreement with Southwest Gas Corporation (“Southwest”). The transportation agreement with Southwest provides for receipt of Kern River supplies, as well as limited quantities of gas from sellers off the El Paso Natural Gas Company (“El Paso”) and/or Transwestern Pipeline Company (“Transwestern”) pipelines south of Las Vegas (if Southwest is not using its capacity rights to serve its own requirements). As part of the acquisition of Las Vegas Generating Station in 2014, Nevada Power retained the gas transportation service agreements (LV Station Unit 1 45,000 MMBtu/day and LV Station Unit 2 5,200 MMBtu/day) with Southwest. Nevada Power meets at least once a year with Kern River to review the prior year’s operations, discuss upcoming maintenance plans, and review potential expansions. The last meeting with Kern River was on May 26, 2025. The next meeting is scheduled for May 26, 2026. 44 Page 48 of 245
  8. Page 49 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 49 of 245 Nevada Power is seeking approval to maintain its current natural gas transportation portfolio through the Companies’ Energy Supply Plan. Nevada Power’s daily gas usage requirements during July and August exceed the current contracted capacity with Kern River. Nevada Power has adequately closed prior firm gas transportation open positions by purchasing delivered natural gas and proposes to continue this strategy. Nevada Power will continue to evaluate whether there is a need to acquire new firm transportation capacity and may revisit this strategy in a future filing. Alternatively, the Companies may evaluate the possibility of deviating from an approved ESP or ESP update “to the extent necessary to respond adequately to any significant change in circumstances not contemplated by the energy supply plan” pursuant to NAC § 704.9504, should conditions warrant such an action. 45 Page 49 of 245
  9. Page 50 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 50 of 245 FIGURE GAS-4 SIERRA NATURAL GAS TRANSPORTATION CONTRACTS Sierra Pacific Power Company d/b/a NV Energy Gas Transportation and Storage Agreements Contract Type TSA Counterparty TC Energy - Alberta System TC Energy - Foothills System TC Energy - GTN Northwest Pipeline Great Basin Gas Transmission Tallgrass Energy - Ruby Pipeline Tallgrass Energy - Pinyon Pipeline TC Energy - Tuscarora Storage Northwest Pipeline Great Basin Gas Transmission Contract # Termination Date (as of 4/1/2026) Units 2010-447962 2010-447963 2010-447964 10/31/2027 10/31/2027 10/31/2027 GJ/Day GJ/Day GJ/Day 18,583 92,918 25,993 137,494 SIER - 9976 SIER - 9987 SIER - 9988 SIER - 9994 SIER - 9999 SIER - 10009 SIER - 9991 SIER - 10000 SIER - 10001 SIER - 10002 10/31/2027 10/31/2027 10/31/2027 10/31/2027 10/31/2027 10/31/2027 10/31/2027 10/31/2027 10/31/2027 10/31/2027 GJ/Day GJ/Day GJ/Day GJ/Day GJ/Day GJ/Day GJ/Day GJ/Day GJ/Day GJ/Day 32,444 2,143 5,572 16,220 10,920 866 26,233 10,000 15,826 15,807 136,031 F-02842 F-02843 F-07027 F-07328 F-07370 F-07371 F-07567 10/31/2029 10/31/2029 4/30/2031 10/31/2029 10/31/2035 10/31/2035 10/31/2035 MMBTU/Day MMBTU/Day MMBTU/Day MMBTU/Day MMBTU/Day MMBTU/Day MMBTU/Day 10046 10061 6/30/2026 3/31/2027 MMBTU/Day MMBTU/Day F-29 F-32 11/30/2029 3/31/2030 MMBTU/Day MMBTU/Day 961921 12/31/2049 MMBTU/Day 39,000 962402 12/31/2049 MMBTU/Day 39,000 F001 F019 F024 F025 F030 F097 369 12/31/2032 12/31/2032 12/31/2032 12/31/2032 12/31/2032 9/30/2030 9/30/2030 MMBTU/Day MMBTU/Day MMBTU/Day MMBTU/Day MMBTU/Day MMBTU/Day MMBTU/Day 105,750 10,000 5,661 5,690 5,722 40,000 760 173,583 126544 Storage Capacity 126544 Storage Withdraw 3/31/2046 3/31/2046 MMBTU MMBTU/Day 281,242 12,687 S-6 LNG Stor Cap S-6 LNG Daily Del Cap 3/31/2030 3/31/2030 MMBTU MMBTU/Day 303,604 46 Maximum Daily Quantity Annual Winter Summer 14,000 15,000 10,099 800 39,899 60,000 20,270 20,000 30,000 10,000 100,270 40,000 59,696 9,000 68,696 68,696 23,000 91,696 61,044 61,044 23,000 Page 50 of 245
  10. Page 51 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 51 of 245 Sierra has storage assets along both Great Basin and NWPL. The NWPL storage is located at the Jackson Prairie facility and allows for unlimited injection/withdrawal cycles subject to thencurrent mainline pipeline operating conditions. Sierra’s total firm storage rights at Jackson Prairie are just over 281,000 MMBtu and come with about 12,600 MMBtu of firm daily injection/withdrawal rights. Additionally, Sierra will evaluate opportunities to enter into an asset management agreement with an energy management company to further optimize these assets. Sierra similarly holds rights on Great Basin of approximately 304,000 MMBtu of LNG storage capacity that comes with up to 23,000 MMBtu of firm daily withdrawal rights, including firm transport to the LDC service territory; however, the LNG supply is only available during the winter season. Gas Transportation into Tuscarora. In Canada, Sierra currently holds year-round firm transportation contracts on TC Energy’s Alberta system totaling 130,218 MMBtu/day. 1 Downstream from TC Energy Alberta, Sierra holds year-round firm transportation contracts on TC Energy’s Foothills system totaling 128,883 MMBtu/day. Downstream from TC Energy Foothills, Sierra holds both year-round and seasonal firm transportation contracts on TC Energy’s GTN pipeline for 80,000 MMBtu/day and 140,000 MMBtu/day, respectively. Sierra holds 173,583 MMBtu/day of year-round firm transportation contracts on TC Energy – Tuscarora. Gas Transportation into Great Basin. Sierra holds year-round firm transportation contracts on Northwest Pipeline totaling 68,696 MMBtu/day. On Great Basin, Sierra holds seasonal firm transportation contracts. The winter totals 91,696 MMBtu/day and the summer totals 61,044 MMBtu/day. Gas Transportation to Valmy. Sierra holds a one-year-round firm transportation contract on Ruby Pipeline with a maximum daily quantity of 39,000 MMBtu/day. Sierra also holds a yearround firm transportation contract on Pinyon Pipeline with a maximum daily quantity of 39,000 MMBtu/day. Both contracts became effective January 7, 2026. Sierra meets at least once a year with all the interstate pipeline companies from which it purchases firm transportation service. The intent of the meetings is to review the prior year’s operations, discuss upcoming maintenance plans, and review potential expansions. Storage projects are included in discussions with both NWPL and Great Basin. Many of Sierra’s contracts have evergreen clauses and can be renewed for successive one-year extension periods. Given the results of the PLEXOS ST analysis described in Section 2.E of the 2026 Energy Supply Plan and the requirement in NAC § 704.9099(3) to maximize the reliability Generally, Canadian and international contracts specify capacity in terms of gigajoules of energy delivered per day or GJ/day. Sierra’s TC Alberta contracts total 137,494 GJ/day. One GJ is equal to 0.94708 MMBtu. 1 47 Page 51 of 245

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026

This filing on the current system (opens in a new tab)