Interrogatory responses
Answers to questions 19 thru 32
Files20
CAE-020 Attachment 1.xlsx
Excel · 1.6 MBText searchable
Download CAE-020 Attachment 1.xlsxRead the text of CAE-020 Attachment 1.xlsx
CAE-027 Attachment 2.pdf
PDF · 1.2 MB · 7 pagesText searchable
Download CAE-027 Attachment 2.pdfRead the text of CAE-027 Attachment 2.pdf
CAE-032 Attachment 1.pdf
PDF · 483 KB · 35 pagesText searchable
Download CAE-032 Attachment 1.pdfRead the text of CAE-032 Attachment 1.pdf
CAE-032 Attachment 2.pdf
PDF · 1.1 MB · 36 pagesText searchable
Download CAE-032 Attachment 2.pdfRead the text of CAE-032 Attachment 2.pdf
CAE-020 Attachment 1.pdf
PDF · 5.6 MB · 75 pagesText searchable
Download CAE-020 Attachment 1.pdfRead the text of CAE-020 Attachment 1.pdf
CAE-027 Attachment 1.pdf
PDF · 18 MB · 245 pagesText searchable
Download CAE-027 Attachment 1.pdfRead the text of CAE-027 Attachment 1.pdf
Text of CAE-021.pdf
Extracted from the file · 1 page · 567 characters
Text of CAE-022.pdf
Extracted from the file · 3 pages · 6,575 characters
Text of CAE-023.pdf
Extracted from the file · 1 page · 757 characters
Text of CAE-024.pdf
Extracted from the file · 1 page · 2,191 characters
Text of CAE-025.pdf
Extracted from the file · 1 page · 1,125 characters
Text of CAE-026.pdf
Extracted from the file · 1 page · 2,757 characters
Text of CAE-027.pdf
Extracted from the file · 1 page · 1,054 characters
Text of CAE-027 Attachment 2.pdf
Extracted from the file · 7 pages · 23,401 characters
Text of CAE-028.pdf
Extracted from the file · 1 page · 714 characters
Text of CAE-029.pdf
Extracted from the file · 1 page · 1,362 characters
Text of CAE-030.pdf
Extracted from the file · 1 page · 1,728 characters
Text of CAE-031.pdf
Extracted from the file · 1 page · 1,654 characters
Text of CAE-032.pdf
Extracted from the file · 1 page · 1,689 characters
Text of CAE-032 Attachment 1.pdf
Extracted from the file · 35 pages · 69,136 characters
Text of CAE-032 Attachment 2.pdf
Extracted from the file · 36 pages · 33,759 characters
Text of CAE-020 Attachment 1.pdf
Extracted from the file · 75 pages · 742,810 characters
Page 6 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 6 of 245 15) Castor Storage – A 310 MW eight-hour duration BESS paired with an existing resource in the south region with an in-service date of May 2029 16) Nevada Geothermal Portfolio (OKGP) – A 50 MW geothermal project associated with a customer agreement in the north region with an in-service date of December 2030 17) North Nevada Geothermal Portfolio – A 100 MW geothermal project associated with a customer agreement in the north region with an in-service date of December 2030 18) Iron Point Energy Center – A 250 MW PV system paired with 250 MW BESS associated with an ESA in the north region with an in-service date of December 2029 19) Hot Pot Energy Center – A 350 MW PV system paired with 350 MW BESS associated with an ESA in the north region with an in-service date of October 2029 20) Fort Churchill Additions 1 Project – 401 MW (nominal) new simple-cycle aeroderivative gas turbines (“Aeroderivative CTs”) at Fort Churchill Generating Station with an in-service date of June 2030 21) Fort Churchill Additions 2 Project – 401 MW (nominal) new Aeroderivative CTs at Fort Churchill Generating Station with an in-service date of June 2031 22) Fort Churchill Additions 3 Project – 421 MW (nominal) new simple-cycle frame gas turbines (“Frame CTs”) at Fort Churchill Generating Station with an in-service date of June 2032 23) Transmission infrastructure projects required for the above-listed renewable, storage, and thermal projects as well as those required to meet customers’ needs as presented in the Transmission Plan. 1 NV Energy evaluated a range of supply-side investments and alternatives to address the significant and rapid load growth projected to occur in Nevada and especially in northern Nevada. The Companies’ primary analysis considered five alternative plans to pursue in a long-term planning scenario. Substantial renewable resource needs exist in the face of growing and flattening load, an aggressive Renewable Portfolio Standard (“RPS”) ramp up in the next several years, resource cancellations, and current federal policy. Each plan addresses the state’s RPS requirement in addition to expected customer participation in the Nevada GreenEnergy Rider (“NGR”) program, to the extent possible. The analyzed plans are as follows: 1) Obsidian Plan: This plan combines every available renewable and stand-alone BESS project, including the eight-hour Castor Storage project. The plan adds eight Aeroderivative CTs in 2030 and eight more in 2031 and two Frame CTs in 2032. Importantly, the reduced thermal project capacity in this plan relative to the Wildhorse, Ward, and No Open Positions Plans results in reduced capital commitment and enables the Although not part of the Preferred Plan, the Companies are requesting approval of an amendment to the Libra PV/BESS power purchase agreement (“PPA”). This amendment would add 200 MW BESS paired with an existing resource in the north region with an in-service date of January 2048. 1 2 Page 6 of 245Page 7 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 7 of 245 most flexibility among the plans to pivot in future filings in response to potential changes in forecasted load, technology, and the economic and political environment. 2) Ward Plan: This plan combines every available renewable and stand-alone BESS project, including the eight-hour Castor Storage project, along with 12 Aeroderivative CTs in 2030 and two Frame CTs each in 2031 and 2032. The plan has a lower open position in 2030 than the Obsidian, Wildhorse, and No Open Position Plans, mitigating the perpetual risk of resource failures and cancellations, and provides more flexibility to pivot in future filings than the Wildhorse and No Open Position Plans, but less so than the Obsidian Plan. 3) Wildhorse Plan: This plan combines every available renewable and stand-alone BESS project, including the eight-hour version of Castor Storage. The plan also includes the addition of eight Aeroderivative CTs in 2030, four Frame CTs in 2031, and two Frame CTs in 2032. This plan adds more thermal project capacity than the Obsidian or Ward Plans. 4) Low Carbon Plan: Pursuant to NRS § 704.741(3)(c)(1) and NAC § 704.937(1), this plan is required to achieve by 2030 an 80 percent reduction in carbon emissions from the 2005 levels. To achieve this carbon reduction goal, this plan includes placeholder resources starting in 2027. While it is not realistic to expect that incremental renewable resources could be in service prior to 2031, such an assumption is required for the creation of this plan as prescribed by statute. Due to these unrealistically near-term placeholder resources, this plan is not viable. 5) No Open Position Plan: Pursuant to NRS § 704.741(3)(c)(2), this plan closes the Companies’ open capacity position by 2032 and requires no market capacity purchases from 2032 through 2050. This plan builds the same renewable, storage, and thermal projects as the Wildhorse Case but adds an incremental pair of Frame CTs (421 MW) in 2032. NV Energy selected the Obsidian Plan as its Preferred Plan and the Ward Plan as its Alternate Plan. Each of Obsidian, Ward, Wildhorse and the No Open Position Plans bolster clean energy generation in the state by adding 4,370 MW of new solar PV PPA projects, 5,405 MW of new paired and stand-alone BESS projects, and 180 MW of new geothermal projects. The Obsidian Plan relies on the least amount of thermal generation in the first five years of the study period, adding projects to serve the growing load but also leaving room to pivot in future filings as the load develops, technology advances, the economic environment changes, and federal and state policy evolves. The peaking turbine projects in this plan generally consist of smaller, aeroderivative models with shorter lead times. The Obsidian Plan add less total thermal capacity than the other viable plans. The Obsidian Plan also avoids the emerging execution risk associated with Frame CT additions in 2031.The Obsidian plan has the least capital commitment of the alternative plans. While it has the third lowest total Present Worth of Revenue Requirement (“PWRR”) and Present Worth of Societal Costs (“PWSC”) of the alternative plans in the 24-year period, it has the lowest capital cost PWRR in the 5-year horizon. Of the four viable plans 3 Page 7 of 245Page 8 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 8 of 245 (excluding the nonviable Low Carbon Plan), Obsidian has the lowest capital cost PWRR in the 10-year horizon as well. The Ward Plan has the second lowest total PWRR in the 5-, 10-, 20-, and 24-year study horizons and the second lowest PWSC. It has a lower open position in 2030 than Obsidian, mitigating the perpetual risk of resource failures and cancellations, but does not avoid the material execution risk of frame CTs in 2031. It provides more flexibility to pivot in future filings than the Wildhorse and No Open Position Plans, but less so than the Obsidian Plan. The Companies selected the Obsidian Plan as the Preferred Plan as it adds significant new generating and storage projects to serve the growing load and target renewable energy needs but also leaves room to pivot in future filings as circumstances change. It also mitigates the emerging execution risk associated with relying on Frame CTs in 2031. In the selection of the Preferred Plan in this 2026 Joint IRP, the Companies place emphasis on flexibility and executability. 4 Page 8 of 245Page 9 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 9 of 245 SECTION 2 – SUPPLY PLAN A. GENERATION 1. Existing Generation Together, Nevada Power and Sierra currently hold ownership interests in approximately 6,572.5 MW (total peak summer capacity) of thermal and solar generation from the following electric generating facilities (figures reflect summer peak capacities): • Brunswick Diesel Plant – Sierra: The Brunswick Diesel Plant is a 6 MW peaking plant, comprised of three reciprocating diesel fired engines located in Carson City, Nevada. This plant is operational and designated as Sierra’s black start capability. The plant is restricted to 1,098 operating hours and is used primarily for system emergencies and is not included in the L&R tables. • Chuck Lenzie Generating Station – Nevada Power: Chuck Lenzie Generating Station (“Lenzie”) provides 1,182 MW of total peak summer capacity. Lenzie is located approximately 24 miles northeast of Las Vegas, Nevada, and consists of two 2x1 natural gasfired combined-cycle units (591 MW per block). • Clark Generating Station – Nevada Power: Clark Generating Station (“Clark”) provides 1,162 MW of total peak summer capacity. Clark comprises two 2x1 natural gas-fired combinedcycle units (430 MW), one natural gas-fired combustion turbine unit (54 MW), and 12 natural gas-fired simple-cycle combustion turbines (678 MW). Clark is located in Las Vegas, Nevada. • Chukar Battery Energy Storage System: The Chukar Battery Energy Storage System (“Chukar”) is a 46 MWh energy storage system with a maximum discharge capability of 10 MW over a 4-hour period. Chukar is located in the Tahoe Regional Industrial Complex approximately 15 miles east of Reno, Nevada. • Clark Mountain Combustion Turbines – Sierra: Clark Mountain Combustion Turbines (“Clark Mountain”) consist of two dual-fuel (gas/diesel) combustion turbines with a peak summer capacity of 132 MW. Clark Mountain is co-located with the Tracy Station east of Reno, Nevada. • Fort Churchill Solar – Sierra: Fort Churchill Solar is a 19.5 MW concentrating PV solar plant located adjacent to the Fort Churchill Station near Yerington, Nevada. 5 Page 9 of 245Page 10 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 10 of 245 • Fort Churchill Generating Station – Sierra: Fort Churchill Generating Station (“Fort Churchill”) comprises two natural gas-fired steam boilers supplying steam turbine generators and is located 10 miles north of Yerington, Nevada. Fort Churchill’s total peak summer capacity is 196 MW. • Goodsprings Heat Recovery – Nevada Power: Goodsprings Heat Recovery (“Goodsprings”) provides 5 MW peak summer capacity located adjacent to the Kern River Goodsprings natural gas compressor station, 6 miles from Goodsprings, Nevada. Goodsprings captures waste heat from Kern River Gas’s natural gas-fueled compressors and uses a separate generator to produce electricity. • Harry Allen Generating Station – Nevada Power: Harry Allen Generating Station (“Harry Allen”) provides 672 MW of total peak summer capacity. Harry Allen is comprised of 510 MW of natural gas-fired combined-cycle units and 162 MW of natural gas-fired combustion turbine peak summer capacity generated by two gas-fired turbine units (81 MW each). Harry Allen is located 24 miles northeast of Las Vegas, Nevada. • Las Vegas Generating Station – Nevada Power: Las Vegas Generating Station provides 272 MW peak summer capacity. Formerly Las Vegas Cogen, the Las Vegas Generating Station comprises one (1x1) natural gas-fired aero derivative combined-cycle unit rated at 48 MW, and two (2x1) natural gas-fired aero-derivative combined-cycle units rated at 112 MW each. Las Vegas Generating Station is located in North Las Vegas, Nevada. • Nellis Solar PV II – Nevada Power: The Nellis Solar PV II plant is a single axis tracker, consisting of ten 1.5 MW blocks, for a total of 15 MW AC capacity. Nellis Solar PV II is located on the Nellis Air Force Base in North Las Vegas, Nevada. • North Valmy Generating Station – Sierra: North Valmy Generating Station (“Valmy”) consists of two natural gas-fired steam boilers supplying steam turbine generators with a peak summer capacity of 522 MW. Sierra owns 50 percent of Valmy, making its share of capacity from the two units at Valmy 261 MW. Valmy is located 19 miles west of Battle Mountain, Nevada. As of the date of the filing, Sierra is converting Valmy Unit 2 to natural gas fuel. • Reid Gardner Battery Energy Storage System: The Reid Gardner Battery Energy Storage System (“Reid Gardner BESS”) is a 506 MWh energy storage system with a maximum discharge capability of 220 MW over a 2-hour duration. Reid Gardner BESS is located approximately 50 miles northeast of Las Vegas, Nevada. 6 Page 10 of 245Page 11 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 11 of 245 • Silverhawk Generating Station – Nevada Power: Silverhawk Generating Station (“Silverhawk”) provides 1,030 MW of total peak summer capacity, including duct burners. Silverhawk consists of one 2x1 natural gas-fired combined-cycle unit (590 MW), two natural gas-fired simple-cycle units (440MW) and is located approximately 26 miles northeast of Las Vegas, Nevada. • Sun Peak Generating Station – Nevada Power: Sun Peak Generating Station (“Sun Peak”) provides 216 MW of summer peak capacity. Sun Peak consists of three dual fuel (natural gas and No. 2 fuel oil) simple-cycle combustion turbine units (each capable of producing 70 MW). Sun Peak is located in Las Vegas, Nevada. • Tracy Generating Station – Sierra: Tracy Generating Station (“Tracy”) provides 785 MW of total peak summer capacity. Tracy comprises one natural gas-fired steam boiler unit (92 MW), one natural gas-fired simple-cycle combustion turbine/duct burner (104 MW) and one natural gas-fired combined-cycle block (589 MW). Tracy is located approximately 15 miles east of Reno, Nevada. • Walter Higgins Generating Station –- Nevada Power: The Walter Higgins Generating Station (“Higgins”) provides 619 MW of total peak summer capacity including duct burners. Higgins consists of one 2x1 natural gas-fired combined-cycle unit and is located approximately 35 miles southwest of Las Vegas, Nevada. Figure GEN-1 summarizes Nevada Power’s and Sierra’s generating units and their respective operating characteristics including name plate ratings, winter and summer capacities, commercial operation dates, planning-based retirement dates, and fuel types. Additional unit-specific details, such as heat rates, can be found in the Confidential Technical Appendix GEN-1. 7 Page 11 of 245Page 12 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 12 of 245 8 Page 12 of 245Page 13 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 13 of 245 2. Other Generation Assets Nevada Power holds ownership or participant interests in two other retired and decommissioned generation sites: • Mohave Generating Station – Nevada Power: The Mohave site is located in Laughlin, Nevada and is the previous site of a 1,500 MW coal-fired generating plant. The site is coowned by Southern California Edison (“SCE”) (56%), the Salt River Project (20%), Nevada Power (14%), and Los Angeles Department of Water and Power (10%). SCE is the controlling partner of the facility. Mohave ceased operations January 1, 2006, and has been decommissioned. 5 In 2015, the co-owners agreed to proceed with selling most of the property through a public sale process. The property was listed by a nationwide commercial real estate firm in October 2016. No sales transactions have been executed at this time. • Navajo Generating Station – Nevada Power: The Navajo Generating Station is located near Page, Arizona and is the previous site of a 2,250 MW total net capacity coal-fired facility. Nevada Power has ownership rights to 11.3 percent of the Navajo Generating Station. The coal-fired facility ceased operation in November 2019 and has completed decommissioning and demolition of the generating units. The Navajo Project includes the generating station, transmission lines and interconnections, water, and rail facilities, and is co-owned by five parties as tenants-in-common, who together with the United States are “Participants” in the Navajo Project. The Participants’ relative interests in the nontransmission facilities are as follows: • • • • • 5 Salt River Project (“SRP”) (42.9%); U.S. Bureau of Reclamation (24.3%), whose share is owned by the SRP; Arizona Public Service (14%); Nevada Power (11.3%); and Tucson Electric Power (7.5%). As defined in NRS § 704.7332. 9 Page 13 of 245Page 14 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 14 of 245 3. Status of Previously Approved Generation Projects a. Valmy Natural Gas Conversion Project Project Overview Sierra requested and received approval to complete the conversion of the Valmy coal-fired Units 1 and 2 to operate on natural gas and complete the retirement of coal-fired operations at Valmy in the Fifth Amendment to the 2021 IRP, Docket No. 23-08015. The project costs and continued operation include Idaho Power Company’s continued participation in Valmy with its 50 percent ownership, sharing 50 percent of the output and cost. Valmy Unit 1’s conversion was completed in the fall of 2025, and the unit began operation on natural gas in December of 2025. The unit became commercially operational on January 7, 2026. Valmy Unit 2 began its conversion outage in January 2026 and is expected to be completed in May 2026. The project also assumes requirements to install additional pollution control equipment for the reduction of nitrogen oxides (“NOx”) emissions on both units under the Regional Haze Rule. Idaho Power Company Participation Idaho Power Company has received acknowledgement of their participation in the gas conversion projects by the Idaho Public Utility Commission. Idaho Power Company submitted and received a Certificate of Public Convenience from the Idaho Public Utility Commission and will continue its full 50 percent participation in the converted units. Project Costs The current estimates place total expenditures for the natural gas conversion at $96.2 million total cost ($48.1 million Sierra’s share), excluding NOx controls installation. The Commission also approved Sierra’s share of the project for $50.43 million ($100.846 million total project), which included the estimated cost for NOx controls. The cash flow projections submitted in the Action Plan budget were based on assumptions outlined in the Fifth Amendment to the 2021 Joint IRP, Docket No. 23-08015, which incorporated these capital improvement projects. The Commission did not approve inclusion of $64.15 million in capital expenditures for improvement projects deemed necessary to ensure the continued operation of the Valmy generating units. Therefore, the Action Plan’s budgeted cash flows include both the gas conversion and capital improvement projects which exceed the Commission-approved estimate of $50.43 million for Sierra’s share. Installation of NOx controls will occur following U.S. Environmental Protection Agency (“EPA”) approval of the 2025 Nevada Regional Haze State Implementation Plan (“SIP”) revision for Valmy 10 Page 14 of 245Page 15 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 15 of 245 Units 1 and 2, which was finalized by the Nevada Division of Environmental Protection (“NDEP”) and submitted to the EPA in May 2025. For Valmy Units 1 and 2, additional cost effective NOx reductions while firing natural gas were determined to be to a control level equivalent to Selective Non-Catalytic Reduction (“SNCR”) performance. Sierra and the NDEP also preserved flexibility to meet these limits using either Flue Gas Recirculation (“FGR”) or Selective Catalytic Reduction (“SCR”). This flexibility also supports compliance with other federal requirements that may take effect, including the federal Good Neighbor Plan. Installation of NOx controls would be implemented within 36 months following EPA approval of the 2025 Nevada Regional Haze SIP revision for Valmy Units 1 and 2. Section 5 - Environmental Regulation Updates - provides more information on the federal Regional Haze Rule status. Sierra’s share of the NOx controls cost after EPA’s approval for Valmy Units 1 and 2 is expected to be between $14.1 and $42.7 million, depending on NOx control selected based on final regulatory determinations. The original cost estimate to install NOx controls that was submitted in the 2021 Joint IRP was based on budgetary quotes from an earlier estimate. The installation of NOx controls is not included in the aforementioned current estimate of total expenditure. b. Lenzie Thermal Storage Project Project Overview The Commission approved the Lenzie Thermal Storage Project in Docket No. 22-03024. This thermal energy storage project will allow the chillers to be turned off up to six (6) hours a day during peak periods and utilize chilled water made during the off-peak hours when chillers are not needed. Removing the chillers from service during peak hours will reduce the plant auxiliary load by 18 MW. Since the Lenzie Generating Station is the only combined-cycle plant that currently has chillers, it is the only plant currently being considered for this type of efficiency enhancement. The project consists of installing new thermal storage tanks, piping and pumping systems that use the existing plant chillers to produce and store chilled water during off-peak hours. Then during the peak hours, the chillers would be taken out of service, and the chilled water would be taken from the storage tanks and used in place of the chillers. This would reduce the auxiliary electrical load during up to six peak hours by 18 MW while maintaining the plant capacity. Reducing auxiliary electrical load results in a corresponding increase in peak capacity. Project Costs The Commission approved the project with an estimated cost of $13 million. Initially, Nevada Power planned to complete the project by June 2024. Unit outage schedules and the need to relocate natural gas lines feeding the units delayed the project, which now is expected to be in 11 Page 15 of 245
As listed on the current system
Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026