Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf

Text of CAE-032 Attachment 1.pdf

Extracted from the file · 35 pages · 69,136 characters

Text of CAE-032 Attachment 2.pdf

Extracted from the file · 36 pages · 33,759 characters

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

15 pages match
  1. Page 66 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 66 of 245 Amargosa and have established the facility as a Designated Network Resource (“DNR”) , 15 3) its value has been vetted through a competitive solicitation open to all developers to participate in bidding a proposal for the Amargosa project, and 4) the project details and risks are known to the Companies—common risks such as site control, community support, cost and length of generation tie line, environmental permitting scope, extent of grading due to site topography, and available transmission capacity 16 are already sufficiently mitigated—requiring minimal due diligence review. The solicitation outlined a proposal to develop up to 1200-MW solar PV and 1200-MW BESS with a COD of December 31, 2030. At its maximum size, the Amargosa project is poised to become the largest solar and BESS project in the U.S, 50 MW larger than the currently largest planned solar and BESS project, the Darden Clean Energy project, a 1,150-MW solar PV and 1,150-MWh BESS project that will be located in California. 17 The Amargosa project assets currently owned by Nevada Power, which would be transferred through the terms of the APA, include the two land leases secured from the U.S. Bureau of Land Management (“BLM”)land auction as described in Docket No. 23-08015, two 600-MW solar PV and BESS interconnection positions, Geographic Information System (“GIS”) data, and preliminary design documentation. Because the network upgrade costs were not known at the time of the solicitation, multiple pricing proposals corresponding to various network upgrade cost scenarios were also part of the solicitation. 18 In response to its solicitation in the 2024 RFP, the Companies received proposals from five bidders for options to develop Amargosa, including four bidders proposing PPA options and one bidder proposing a BTA option. Due to higher LCOE and projected capital constraints on the time horizon necessary for making payments under a BTA, the Companies focused on the PPA options for pursuing the Amargosa project development. The project size and COD of the Amargosa Solar project phases as presented in the Named Placeholder discussion in the Companies’ 2024 Joint IRP filing were made under different assumptions applicable at the time. 19 Given the current changes in circumstance, including A Designated Network Resource is specific resource that the Companies’ have formally designated under the Open Access Transmission Tariff, ensuring transmission capacity is available to serve the Companies’ native load using firm network transmission service. 16 The Companies have reserved 1200 MW of transmission service for the full output of Amargosa with delivery to Nevada Power’s system, as well as 685 MW of transmission service with delivery to Sierra’s system, through executed Network Integration Transmission Service Agreement (“NITSA”). . 17 California Energy Commission, Darden Clean Energy Project, March 26, 2026, available at https://www.energy.ca.gov/powerplant/solar-photovoltaic-pv-battery-energy-storage/darden-clean-energy-project. 18 Bidders were asked to provide pricing for the solar PV and the BESS at various increments of network upgrade cost assumptions, from $0 up to $600 million. As the actual network upgrade cost estimates were anticipated to be received during the evaluation period, the Companies were able to proactively acquire the corresponding pricing proposals to use as a factor of consideration when evaluating the bids. 19 Docket No. 24-05041, Volume 8 at 90 of 393. 15 62 Page 66 of 245
  2. Page 67 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 67 of 245 increased projected load growth, the change from Company-owned to third-party development of the resource, and the need to place solar projects in service prior to the end of 2030 in order to secure tax credits, the highest value of the Amargosa project is realized at its maximum size of 1200-MW solar PV and 1200-MW BESS with a COD on or before December 31, 2030. As mentioned in the 2024 RFP overview above, the Companies solicited a “cap pricing” for Amargosa project proposals. Cap pricing was used to evaluate Amargosa project proposals because the project’s timeline does not translate to certainty with regards to tax credit eligibility. The Amargosa site’s entire 7,226 acre project area is located on BLM land, and, unlike the Sleepy Orange project discussed further below, Amargosa had not “safe harbored” equipment prior to the passage of the OBBBA that would facilitate a 10-year eligibility runway for the tax credits. Therefore, the scope and extent of federal permitting necessary prior to the start of construction, coupled with the uncertainty in federal permitting processing times due to the DOI Review Policy Memorandum, add COD schedule risk. Even if the BLM permitting delays are mitigated, the project is of such a massive scale that the sheer logistics of equipment deliveries, construction manpower, and commissioning coordination activities increase COD schedule risk for the project to reach all 1200 MW of solar PV and 1200 MW of BESS capacities by December 31, 2030. For these reasons, to address delivery assurance concerns, the evaluation of Amargosa project proposals assumes a worst-case scenario that the tax credits for solar are not available when the project reaches its COD, while at the same time, to protect customer value, the PPAs contain provisions that allow for a downward price adjustment mechanism to pass through the tax credit savings if the project is ultimately able to qualify for and claim the PTC. 20 This approach ensures a balance of delivery assurance and customer value. A comparison of the Amargosa bid proposals to the Amargosa Energy Center PPA (“Amargosa Energy Center”) selected as the solicitation winner, is presented in Table REN-2 below. 20 If the solar facility is placed in service on or prior to December 31, 2030, then the PPA price of the solar PV energy will reduce to $35.47 per MWh. In addition, if the solar facility is placed in service after December 31, 2030, but is able to otherwise qualify for any available tax credits pursuant to the law in effect as of that date, then the solar PV PPA price shall be decreased by an amount as determined by an independent accounting firm per the terms specified in sections (B)(1) through (B)(3) of Exhibit 2A of the respective agreements. 63 Page 67 of 245
  3. Page 68 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 68 of 245 Page 68 of 245
  4. Page 69 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 69 of 245 the posting of a development security 21 prior to COD at escalating levels tied to key project milestones. Specifically, the developer is required to post $12 million ($6 million per PPA) in development security upon execution of the PPAs, which increases to $24 million ($12 million per PPA) on January 1, 2027, $48 million ($24 million per PPA) on January 1, 2028, $72 million ($36 million per PPA) on January 1, 2029, and notwithstanding the aforementioned dates, $204 million ($102 million per PPA) upon the date that both the APA has closed and the Companies have received PUCN approval of the PPAs. As discussed in this section’s Part B above, given the uncertainty to project development and timeline posed by the DOI Review Policy Memorandum, the Companies were challenged to contract with counterparties willing to bear the risk of losing the development security due to such unprecedented external factors preventing their projects from reaching the intended COD. To facilitate a viable transaction, the Companies negotiated terms of these PPAs that allow for the Companies to retain a portion of the development security if the PPAs terminate due to the project’s failure to obtain Notice to Proceed (“NTP”) authorization from the BLM prior to June 30, 2030. The retained security amount was tailored specific to these PPAs and set equal to $12 million ($6 million per PPA). This balanced approach to development security structure is designed to strongly incentivize the developer to mitigate development risks and successfully deliver the project, while providing meaningful financial protection to customers in the event of contract non-performance or termination. 22 Key Project Characteristics: Amargosa Energy Center is a proposed utility‑scale solar PV generation facility with co‑located BESS to be located on federal land administered by the BLM in Nye County, Nevada, connecting to the Companies’ transmission system. The project is being developed by Longroad Energy (“Longroad”) and would be owned and operated by a Longroad affiliate, AV Energy Center, LLC (“AV Energy Center”). Longroad is a Boston-based developer, owner, and operator of renewable energy projects. Longroad has raised $15.3 billion in capital and has developed 5.1 GW of wind, solar, and storage projects across the United States. The project will be developed by Longroad in two phases, with each phase having its own PPA. Under the terms of the PPA, the development security is a milestone-based security that must be provided by the developer through the posting of either a letter of credit or a cash deposit, ensuring the Companies can easily and quickly draw on these amounts when applicable. 22 Any liquidated damage or settlement payments received by the Companies in connection with non-performance or the termination of a power purchase agreement, respectively, are credited to customers by reducing purchased power costs through the applicable fuel and purchased power cost recovery mechanisms. 21 65 Page 69 of 245
  5. Page 70 of 245Match

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 70 of 245 The BESS is designed for four‑hour duration and configured to support delivery of energy, capacity, and ancillary services. The solar and BESS facilities will utilize commercially proven technologies from Tier‑1 equipment manufacturers. The project is located within the BLM-designated Amargosa Valley Solar Energy Zone (“SEZ”) 23 located in the Amargosa Desert in Nye County, Nevada. Environmental studies and baseline surveys are ongoing, and no fatal flaws have been identified to date. Land control for the project area is assigned through long‑term BLM leases currently held by Nevada Power 24 and intended to be transferred to AV Energy Center, subject to BLM approval and APA contractual requirements. Development and construction of the project are contingent upon receipt of required federal approvals, including issuance of a BLM Right‑of‑Way and anNTP following completion of National Environmental Policy Act (“NEPA”) review, which are subject to the DOI Review Policy Memorandum review process. The project will interconnect to the Companies’ transmission system along Greenlink West at the Sagebrush Substation (previously referred to as the Amargosa Substation’s expansion related to Greenlink Nevada Transmission projects) at the voltage level of 525 kilovolts (“kV”). Two Large Generator Interconnection Agreements (“LGIAs”)of 600 MW each have been secured, which will also be transferred to AV Energy Center upon closing pursuant to the consummation of the transaction contemplated by the APA. Interconnection service is subject to completion of required network upgrades 25. Under the terms of the proposed Amargosa Energy Center PPA agreement, energy from the solar generating facility would be purchased for a 25‑year term at a rate of $68.47 per megawatt-hour (“MWh”), and capacity from the battery energy storage facility would be purchased for a 20‑year term at a rate of $12,340 per megawatt‑month (“MW-month”). The price of the solar PV incorporates the OBBBA’s increase in applicable fees for solar generation projects located on public lands 26, but more impactfully the pricing conservatively assumes that no tax credits for the solar PV facility are available when the facility reaches COD. This is the only PPA in the filing The Amargosa Valley Solar Energy Zone (SEZ) is a designated leasing area (“DLA”) located in Nevada in the Amargosa Desert in a semiarid basin on undeveloped scrubland. The SEZ is located on BLM-administered land within the Southern Nevada District. See U.S. Bureau of Land Management, Amargosa Valley, within Solar Energy Zones (providing a full description of the Amargosa Valley SEZ), available at https://blmsolar.anl.gov/solarpeis/sez/nv/amargosa-valley/. 24 See U.S. Bureau of Land Management Press Release, BLM issues leases for Amargosa Valley Solar Energy Zone parcels in Nevada, Sep. 13, 2023, available at https://www.blm.gov/press-release/blm-issues-leases-amargosa-valleysolar-energy-zone-parcels-nevada. 25 While the Interconnection Agreements contemplate the project interconnecting to a collector substation near the Sagebrush Substation, the Companies have identified a viable path to interconnect the project using Provisional Interconnection Service, which eliminates the need for construction of the collector substation to initiate interconnection service, thereby improving project development efficiency and schedule risk. 26 Section 50302 of the OBBBA established a mandatory statutory framework for BLM acreage rent and capacity fees for solar and wind projects on public lands, including a revenue-based capacity fee equal to 3.9 percent of gross electricity sales, replacing prior discretionary and MW-based fee structures. 23 66 Page 70 of 245
  6. Page 71 of 245Match

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 71 of 245 that assumes the cap pricing, which, as discussed above, will allow the project to continue its development if external factors prevent it from reaching its planned COD. However, as discussed above, if either or both phases of the project achieve COD on or prior to December 31, 2030, the price of the solar energy will be automatically decreased to $35.47 per MWh. 27 Furthermore, if either or both phases achieve COD after December 31, 2030, but are still otherwise able to qualify for any tax credits, then the solar energy price will be reduced pursuant to an assessment provided by an independent accounting firm. As a conservative and worst-case scenario, the Companies calculated the hybrid LCOE of the project as $130.76 per MWh, which assumes the $68.47 per MWh solar cap pricing and thus could be further reduced if the solar tax credits are realized. As shown in Table REN-2 above, this PPA represents the lowest LCOE of all the viable Amargosa project bids. All costs associated with the PPA will be recovered through Nevada Power’s fuel and purchased power base tariff energy rate (“BTER”) mechanisms. According to estimates provided by Longroad, during peak construction the Amargosa Energy Center project is expected to support approximately 500-750 jobs, of which an estimated 250 to 375 positions will be sourced locally from Nevada at an estimated average salary of $125,000 annually, equaling a total estimated payroll of $31.2 to $46.8 million over one construction year. Following commercial operation of both phases, the Amargosa Energy Center project is expected to provide a permanent long-term increase in the workforce for the operation and maintenance of the facility with an estimated 10 positions at an estimated average salary of $128,000 annually, and a total payroll in excess of $3.8 million per year over the 25 years. The final number of hours will be determined by installed equipment requirements, and the paid wage will be in compliance with federal laws up to and including the use of prevailing wage. Figures REN-1 and REN-2 show a map of the project site. 27 See supra note 48. 67 Page 71 of 245
  7. Page 72 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 72 of 245 FIGURE REN-1 Amargosa Energy Center Project Site (North Parcel) 68 Page 72 of 245
  8. Page 73 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 73 of 245 FIGURE REN-2 Amargosa Energy Center Project Site (South Parcel) A copy of the two PPAs can be found in Technical Appendices REN-3-AEC(a)(1) and REN-3AEC(a)(2). The Companies’ due diligence summary for the Amargosa Energy Center project is included as Confidential Technical Appendix REN-3-AEC(b). Technical Appendix REN-3AEC(c) contains detailed information about the Amargosa Energy Center project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. Key provisions of the Amargosa Energy Center PPA are summarized in Technical Appendices REN-3-AEC(d)(1) and REN-3-AEC(d)(2). 69 Page 73 of 245
  9. Page 74 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 74 of 245 Boulder Solar III The Companies present the Boulder Solar III PPA (“Boulder Solar III”) that will consist of a 127.9MW PV solar and 127.9-MW BESS resource in Nevada Power’s system with a COD of June 30, 2028. This project was not bid into the Companies’ 2024 RFP but rather resulted from bilateral discussions between the Companies and the developer 28. This PPA represents the third iteration of the Boulder Solar III project for the Commission’s review. 29 The most recent Boulder Solar III PPA, as approved in the 2024 Joint IRP, Docket No. 24-0541, was terminated on March 20, 2026, due to several issues encountered by the developer, including the following: 1) schedule shift due to BLM permitting delays attributed to the DOI Review Policy Memorandum, and associated costs such as EPC re-pricing associated with the construction delays, 2) tariffs and trade impacts affecting major equipment costs, 3) higher cost of capital in debt, tax equity, and project sponsor equity markets for renewable energy, and 4) land carrying costs for additional lease payments to maintain site control due to construction delays. These issues, primarily affecting cost and schedule, have been mitigated by the developer, with the BLM having granted the necessary Rightof-Way as of January 23, 2026, authorizing the project to begin physical construction. Boulder Solar III utilizes existing infrastructure, sharing a generation tie line and interconnection facilities with the Boulder Solar II and Boulder Solar I projects, which translates to lower network upgrade costs and reduced schedule risk stemming from interconnection delays. Lastly, the project is mature in its design, with the Generator Step-Up (“GSU”) transformer already installed and long-lead, high-voltage equipment procured. Given the proposed COD in mid-2028, the project is well-positioned to secure the tax credits and lock in that value for the term. As a means to reduce the impact of potential non-delivery and to protect customers in the event of a development or performance failure, the terms of the PPAs require the developer to securitize the project through the posting of a development security prior to COD at escalating levels tied to key project milestones. While the Companies’ recent experience with the developer has not shown delivery assurance, the current PPA requested for approval requires double the amount of development security compared to the previous Boulder Solar III PPA. 30 Specifically, the developer is required to post $7.67 million in development security upon execution of the PPA, which increases to $35.8 million upon receipt of PUCN approval of the PPA. This increased security amount was tailored specific to this project, and ensures that the developer is highly incentivized to mitigate development risks and deliver the project, while also protecting customers against further non- The previous iteration of the Boulder Solar III PPA, approved in Docket No. 24-05041, originated from the Companies’ 2023 Open Resource RFP. The first iteration of the Boulder Solar III PPA, approved in Docket No. 2007023, originated from bilateral discussions between the Companies and the project developer. 29 The first iteration of the Boulder Solar III PPA was originally approved in Docket No. 20-07023. 30 The post-PUCN approval development security requirement of the previous Boulder Solar III PPA approved in Docket No. 24-05041 was equal to $17.9 million. 28 70 Page 74 of 245
  10. Page 75 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 75 of 245 delivery of the project. 31 Lastly, the PPA is substantially similar to the previous Boulder Solar III PPA approved by the Commission in Docket No. 24-0541, excluding the price and COD which were renegotiated based on current facts and circumstances, as the counterparty has agreed to maintain and carry forward all other previously-negotiated contractual terms and obligations in the new PPA. Key Project Characteristics: The proposed Boulder Solar III project is a utility‑scale solar PV and BESS facility located in Boulder City, Clark County, Nevada, within the Eldorado Valley Energy Zone. The project is being developed by Boulder Solar III, LLC, a subsidiary of parent company Hanwha Renewables, LLC. 32 Hanwha Renewables has extensive, direct experience developing, constructing, financing, and operating large-scale solar projects in Nevada, with a proven track record in Clark County and NV Energy’s service territory. Most notably, Hanwha Renewables and its affiliates developed and constructed the Techren Solar I–V projects, also in the Eldorado Valley Energy Zone near Boulder City, totaling approximately 400 MW of utility-scale solar capacity placed into service between 2018 and 2020. These projects demonstrate successful execution under Nevada’s permitting, labor, environmental, and interconnection frameworks, including long-term operations within the Companies’ transmission system. Boulder Solar III will utilize commercially-proven PV modules mounted on single‑axis tracking systems to optimize energy production. Energy produced by the solar facility will be delivered to Nevada Power’s system or stored in the co‑located BESS for later dispatch. The battery system will be a four‑hour BESS, providing approximately 511 MWh of BESS storage capacity, and will employ lithium‑ion technology with integrated monitoring, control, cooling, and safety systems, providing flexible and dispatchable capacity to support system reliability. Project facilities will be located on approximately 1,050 acres of land leased from the City of Boulder City, for which the developer has secured full site control. The project is sited within an area specifically designated for large‑scale energy development and is adjacent to existing renewable generation facilities. Environmental review for the Boulder Solar complex has been completed through prior federal and state permitting actions, and the project has secured the necessary BLM right‑of‑way approvals to support access and internal utility corridors including Any liquidated damage or settlement payments received by the Companies in connection with non-performance or the termination of a power purchase agreement, respectively, are credited to customers by reducing purchased power costs through the applicable fuel and purchased power cost recovery mechanisms. 32 On January 1, 2026, Hanwha Energy USA Holdings unified its 174 Power Global and Hanwha Renewables development platforms, now operating under the Hanwha Renewables brand. See Hanwha Energy, Press Release, January 1, 2026, available at https://hanwha-energy-pr.my.canva.site/hanwha-energy-announcement 31 71 Page 75 of 245

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026

This filing on the current system (opens in a new tab)