Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf

Text of CAE-032 Attachment 1.pdf

Extracted from the file · 35 pages · 69,136 characters

Text of CAE-032 Attachment 2.pdf

Extracted from the file · 36 pages · 33,759 characters

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

15 pages match
  1. Page 73 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 73 of 245 FIGURE REN-2 Amargosa Energy Center Project Site (South Parcel) A copy of the two PPAs can be found in Technical Appendices REN-3-AEC(a)(1) and REN-3AEC(a)(2). The Companies’ due diligence summary for the Amargosa Energy Center project is included as Confidential Technical Appendix REN-3-AEC(b). Technical Appendix REN-3AEC(c) contains detailed information about the Amargosa Energy Center project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. Key provisions of the Amargosa Energy Center PPA are summarized in Technical Appendices REN-3-AEC(d)(1) and REN-3-AEC(d)(2). 69 Page 73 of 245
  2. Page 74 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 74 of 245 Boulder Solar III The Companies present the Boulder Solar III PPA (“Boulder Solar III”) that will consist of a 127.9MW PV solar and 127.9-MW BESS resource in Nevada Power’s system with a COD of June 30, 2028. This project was not bid into the Companies’ 2024 RFP but rather resulted from bilateral discussions between the Companies and the developer 28. This PPA represents the third iteration of the Boulder Solar III project for the Commission’s review. 29 The most recent Boulder Solar III PPA, as approved in the 2024 Joint IRP, Docket No. 24-0541, was terminated on March 20, 2026, due to several issues encountered by the developer, including the following: 1) schedule shift due to BLM permitting delays attributed to the DOI Review Policy Memorandum, and associated costs such as EPC re-pricing associated with the construction delays, 2) tariffs and trade impacts affecting major equipment costs, 3) higher cost of capital in debt, tax equity, and project sponsor equity markets for renewable energy, and 4) land carrying costs for additional lease payments to maintain site control due to construction delays. These issues, primarily affecting cost and schedule, have been mitigated by the developer, with the BLM having granted the necessary Rightof-Way as of January 23, 2026, authorizing the project to begin physical construction. Boulder Solar III utilizes existing infrastructure, sharing a generation tie line and interconnection facilities with the Boulder Solar II and Boulder Solar I projects, which translates to lower network upgrade costs and reduced schedule risk stemming from interconnection delays. Lastly, the project is mature in its design, with the Generator Step-Up (“GSU”) transformer already installed and long-lead, high-voltage equipment procured. Given the proposed COD in mid-2028, the project is well-positioned to secure the tax credits and lock in that value for the term. As a means to reduce the impact of potential non-delivery and to protect customers in the event of a development or performance failure, the terms of the PPAs require the developer to securitize the project through the posting of a development security prior to COD at escalating levels tied to key project milestones. While the Companies’ recent experience with the developer has not shown delivery assurance, the current PPA requested for approval requires double the amount of development security compared to the previous Boulder Solar III PPA. 30 Specifically, the developer is required to post $7.67 million in development security upon execution of the PPA, which increases to $35.8 million upon receipt of PUCN approval of the PPA. This increased security amount was tailored specific to this project, and ensures that the developer is highly incentivized to mitigate development risks and deliver the project, while also protecting customers against further non- The previous iteration of the Boulder Solar III PPA, approved in Docket No. 24-05041, originated from the Companies’ 2023 Open Resource RFP. The first iteration of the Boulder Solar III PPA, approved in Docket No. 2007023, originated from bilateral discussions between the Companies and the project developer. 29 The first iteration of the Boulder Solar III PPA was originally approved in Docket No. 20-07023. 30 The post-PUCN approval development security requirement of the previous Boulder Solar III PPA approved in Docket No. 24-05041 was equal to $17.9 million. 28 70 Page 74 of 245
  3. Page 75 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 75 of 245 delivery of the project. 31 Lastly, the PPA is substantially similar to the previous Boulder Solar III PPA approved by the Commission in Docket No. 24-0541, excluding the price and COD which were renegotiated based on current facts and circumstances, as the counterparty has agreed to maintain and carry forward all other previously-negotiated contractual terms and obligations in the new PPA. Key Project Characteristics: The proposed Boulder Solar III project is a utility‑scale solar PV and BESS facility located in Boulder City, Clark County, Nevada, within the Eldorado Valley Energy Zone. The project is being developed by Boulder Solar III, LLC, a subsidiary of parent company Hanwha Renewables, LLC. 32 Hanwha Renewables has extensive, direct experience developing, constructing, financing, and operating large-scale solar projects in Nevada, with a proven track record in Clark County and NV Energy’s service territory. Most notably, Hanwha Renewables and its affiliates developed and constructed the Techren Solar I–V projects, also in the Eldorado Valley Energy Zone near Boulder City, totaling approximately 400 MW of utility-scale solar capacity placed into service between 2018 and 2020. These projects demonstrate successful execution under Nevada’s permitting, labor, environmental, and interconnection frameworks, including long-term operations within the Companies’ transmission system. Boulder Solar III will utilize commercially-proven PV modules mounted on single‑axis tracking systems to optimize energy production. Energy produced by the solar facility will be delivered to Nevada Power’s system or stored in the co‑located BESS for later dispatch. The battery system will be a four‑hour BESS, providing approximately 511 MWh of BESS storage capacity, and will employ lithium‑ion technology with integrated monitoring, control, cooling, and safety systems, providing flexible and dispatchable capacity to support system reliability. Project facilities will be located on approximately 1,050 acres of land leased from the City of Boulder City, for which the developer has secured full site control. The project is sited within an area specifically designated for large‑scale energy development and is adjacent to existing renewable generation facilities. Environmental review for the Boulder Solar complex has been completed through prior federal and state permitting actions, and the project has secured the necessary BLM right‑of‑way approvals to support access and internal utility corridors including Any liquidated damage or settlement payments received by the Companies in connection with non-performance or the termination of a power purchase agreement, respectively, are credited to customers by reducing purchased power costs through the applicable fuel and purchased power cost recovery mechanisms. 32 On January 1, 2026, Hanwha Energy USA Holdings unified its 174 Power Global and Hanwha Renewables development platforms, now operating under the Hanwha Renewables brand. See Hanwha Energy, Press Release, January 1, 2026, available at https://hanwha-energy-pr.my.canva.site/hanwha-energy-announcement 31 71 Page 75 of 245
  4. Page 76 of 245Match

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 76 of 245 approvals subject to the DOI Review Policy Memorandum as mentioned above. The project does not require new generation tie‑line construction. Boulder Solar III will interconnect at the Nevada Solar One Substation at 230 kV via an existing, operational 230-kV generation tie‑line shared with the Boulder Solar I and II facilities. An LGIA is in place. No material network upgrades are required to deliver the full project capacity. The Companies’ propose to execute a new PPA with Boulder Solar III, LLC for the output of the solar facility for a 25‑year term and the BESS facility for a 25‑year term; however, the guaranteed capacity of the BESS will reduce from 128 MW to 32 MW in contract years 21-25 33. Under the agreement, solar energy will be purchased at a fixed price of $49.95 per MWh, and battery capacity will be purchased at a fixed rate of $15,460 per MW‑month. The Companies calculated the hybrid LCOE of the project as $125.22 per MWh. Based on the deliverability assurance attributes described in this project’s introductory paragraphs above, the project’s pricing assumes that it will qualify for tax credits, and, therefore, is best compared to pricing of paired solar and BESS projects bid in the 2024 RFP that, based on their risk to reaching COD before the end of 2030, are assumed to not qualify for solar tax credits 34. For perspective, the Companies calculated the average LCOE of solar and BESS project proposals from the 2024 RFP that were not selected using the submitted cap pricing of the solar energy and found that this project’s LCOE is 20 percent lower in comparison. A copy of the project LCOE comparison to average LCOE using solar cap pricing of non-selected solar and BESS project proposals is presented in Confidential Technical Appendix REN-24. All costs associated with the PPA will be recovered through Nevada Power’s fuel and purchased power mechanisms. According to estimates provided by the developer, during construction, the project is expected to support approximately 240 direct jobs, of which an estimated 180 positions will be sourced locally from Nevada at an estimated average salary of $121,680 annually, equaling a total estimated payroll of $21,902,400 over one construction year. Following commercial operation, the project is expected to provide a permanent long-term increase in the workforce for the operation and maintenance of the facility with an estimated four positions at an estimated average salary of $99,840 annually and a total payroll in excess of $9,984,000 million over 25 years. Figure REN-3 shows a map of the project site. 33 The availability of the BESS in contract years 21-25 involves an operating scheme that includes light depth of charge and rotational cycling of the available BESS to guarantee 32 MW of capacity. 34 The list of projects that were used as a basis for comparison include all paired solar and BESS resources bid into the 2024 RFP that were not selected but were otherwise not eliminated from consideration (i.e. due to a fatal flaw such as lack of available transmission capacity by the project’s intended COD). 72 Page 76 of 245
  5. Page 77 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 77 of 245 FIGURE REN-3 Boulder Solar III project Site A copy of the PPA can be found in Technical Appendix REN-4-BS3(a). The Companies’ due diligence summary for the Boulder Solar III project is included as Confidential Technical Appendix REN-4-BS3(b). Technical Appendix REN-4-BS3(c) contains detailed information about the Boulder Solar III project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. Key provisions of the Boulder Solar III PPA are summarized in Technical Appendix REN-4-BS3(d). Castor Storage The Companies present the Castor Storage PPA (“Castor Storage”) that will consist of a standalone BESS with approximately 310 MW of output capacity with an eight‑hour duration and approximately 2,480 MWh of usable stored energy capacity, making it the Companies’ first longduration BESS project. This project was bid into the Companies’ 2024 RFP and was selected based on several factors including the Companies’ due diligence assessment, system needs, and customer value. The project is located in Clark County, Nevada, sited adjacent to the existing Gemini Solar facility, enabling efficient use of previously developed site control, interconnection capacity, and permitting approvals. With an expected COD of May 31, 2029, the project is capable of adding significant capacity a year earlier than any thermal units as discussed in the Economic Analysis Section of the Supply Plan Narrative. The PPA includes minimal changes from the Companies’ pro forma agreement, ensuring elevated customer protections from non-delivery and poor performance. The project will qualify for the ITC, which is reflected in the pricing, passing the value on to Nevada Power’s customers for the contract term. 73 Page 77 of 245
  6. Page 78 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 78 of 245 As a means to reduce the impact of potential non-delivery and to protect customers in the event of a development or performance failure, the terms of the PPA require the developer to securitize the project through the posting of a development security prior to COD at escalating levels tied to key project milestones. Specifically, the developer is required to post $9.3 million in development security upon execution of the PPA, which increases to $26.35 million upon receipt of PUCN approval of the PPA. Due to complicated financing requirements faced by the developer resulting from the project sharing facilities (e.g. interconnection agreement) with the separately-financed Gemini Solar facility, the Companies’ were challenged to contract with the counterparty as they were not willing to bear the risk of losing the development security due to uncertainty in obtaining a shared facilities agreement with the Gemini Solar facility necessary for the project to reach its intended COD. To facilitate a viable transaction, the Companies negotiated terms of the PPA that allow for the Companies to retain a portion of the development security if the PPA terminates due to the project’s failure to submit a plan to obtain a shared facilities approval, a Shared Facilities Approval Plan (“SFAP”) prior to January 31, 2027. The retained security amount under this scenario was tailored specific to this PPA and set equal to $1.25 million. Following achievement and acceptance of the SFAP, the PPA further allows that the Companies may retain a portion of the development security if the PPA terminates due to the project’s failure obtain requisite Shared Facilities Approvals (“SFAs”) by July 31, 2027. The retained security amount under this scenario was tailored specific to this PPA and set equal to $9.3 million. This balanced approach to development security structure is designed to strongly incentivize the developer to mitigate development risks and successfully deliver the project, while providing meaningful financial protection to customers in the event of contract non-performance or termination. Key Project Characteristics: The Castor Storage project is being developed by Castor Storage, LLC, an affiliate of Primergy Solar, the developer of the Sleepy Orange project discussed above. 35 The facility will employ commercially proven lithium‑ion battery technology in an AC‑coupled configuration, with integrated power conversion systems, transformers, control systems, and safety equipment. The BESS will be capable of charging from and discharging to the Companies’ transmission system to provide dispatchable energy and capacity, as well as ancillary services in support of grid reliability. Project facilities will be located on approximately 30 acres of land within the existing Gemini Solar facility footprint, for which full site control has been secured through previously approved federal land rights. The project is located on BLM land covered under an existing right‑of‑way granted for the Gemini Solar and Storage project, and modifications to existing permits are anticipated to accommodate the additional BESS facilities. Environmental diligence, including 35 The project was bid into the Companies’ 2024 RFP as the “Gemini BESS” project. 74 Page 78 of 245
  7. Page 79 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 79 of 245 biological, cultural, and geotechnical studies, has been completed for the site, and no material environmental constraints have been identified that would preclude development. Castor Storage will interconnect to the Companies’ transmission system at the Crystal Substation at 230 kV using the existing generation tie line associated with the Gemini Solar facility 36. An executed LGIA is in place for the Gemini Solar facility, and a material modification request has been submitted to incorporate the additional BESS capacity from the Castor Storage project. No new generation tie‑line construction is required, as the project will utilize available interconnection capacity at the existing point of interconnection. The Companies propose to execute a new PPA with Castor Storage LLC for the output of the BESS facility for a 20‑year term. Under the agreement, BESS capacity will be purchased at a fixed rate of $18,950 per MW‑month. The Companies calculated the LCOS as $103.21 per MWh. When comparing the LCOS of this resource to the Dodge Flat BESS Addition, which was the most recent standalone BESS resource approved by the Commission in 2024 Joint IRPA, Docket No. 25‑10028, the proposed project’s LCOS is lower by approximately 38 percent. While this resource has a higher cost per MW-month than the Dodge Flat BESS Addition, the LCOS calculation factors in the fact that the BESS provides capacity for an 8-hour duration, rather than the 4-hour duration of the Dodge Flat BESS addition. A comparison of the LCOS for all standalone BESS projects presented for approval in this filing, relative to the Dodge Flat BESS Addition, is provided in REN‑23: Standalone BESS LCOS Comparison Summary. All costs associated with the agreement will be recovered through Nevada Power’s fuel and purchased power BTER mechanisms. According to estimates provided by the developer, during construction, the project is expected to support approximately 200 jobs at peak activity, with an average salary of $124,800 annually, equating to a total estimated payroll of $18.72 million over one construction year, with one permanent operation and maintenance position following commercial operation at an estimated average salary of $114,400 annually, and a total payroll of $2.29 million over 20 years. The developer intends to utilize union labor and execute work site agreements consistent with the Companies’ requirements. Figure REN-4 shows a map of the project site. The project will be located within Overton Power District No. 5’s electric service territory but will connect to Nevada Power’s transmission system and serve Nevada Power customers. 36 75 Page 79 of 245
  8. Page 80 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 80 of 245 FIGURE REN-4 Castor Storage project Site A copy of the PPA can be found in Technical Appendix REN-5-CS(a). The Companies’ due diligence summary for the Castor Storage project is included as Confidential Technical Appendix REN-5-CS(b). Technical Appendix REN-5-CS(c) contains detailed information about the Castor Storage project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. Key provisions of the Castor Storage PPA are summarized in Technical Appendix REN-5-CS(d). Commerce Station Energy Storage The Companies present the Commerce Station Energy Storage PPA (“Commerce Station”) that will provide a 100-MW, four-hour standalone battery resource in Nevada Power’s system with a COD of May 29, 2028. This project was bid into the Companies’ 2024 RFP and was selected based 76 Page 80 of 245
  9. Page 81 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 81 of 245 on several factors including the Companies’ due diligence assessment, system needs, and customer value. The facilities will be located on private land in Clark County which does not require BLM or other federal approvals subject to the DOI Review Policy Memorandum approval process, thereby mitigating schedule risk due to permitting. The PPA includes minimal changes from the Companies’ pro forma agreement 37, ensuring elevated customer protections from non-delivery and poor performance. The project will qualify for the ITC, which is reflected in the pricing, passing the value on to Nevada Power’s customers for the contract term. As discussed in the Transmission Section of the Supply Plan Narrative, the project requires minimal network upgrades. As a means to reduce the impact of potential non-delivery and to protect customers in the event of a development failure, the terms of the PPA require the developer to securitize the project through the posting of a development security prior to COD at escalating levels tied to key project milestones. Specifically, the developer is required to post $3 million in development security upon execution of the PPA, which increases to $8.5 million upon receipt of PUCN approval of the PPA. This development security structure is designed to strongly incentivize the developer to mitigate development risks and successfully deliver the project, while providing meaningful financial protection to customers in the event of contract non-performance or termination. Key Project Characteristics: Commerce Station is a new-build, utility-scale, grid charged standalone battery energy storage project being developed by BayWa r.e., the parent organization to the project entity. BayWa r.e. and its affiliates bring extensive expertise in developing, constructing, and operating renewable energy and battery storage projects, with a global portfolio spanning over 4.5 GW developed and more than 12 GW under management. Their experience includes a robust pipeline of standalone battery energy storage systems, with 299 MW reaching commercial operation in 2025 and 3.1 GW in various stages of development. The project will interconnect to Nevada Power’s Miller Substation at 138 kV via an executed LGIA. The proposed point of interconnection is located approximately one-quarter mile from the project site, resulting in limited interconnection infrastructure requirements and low network upgrade costs. The project is located on a 0.06 acre site in southern Nevada within property zoned General Industrial (M-2) in the City of North Las Vegas. Battery energy storage facilities are a permitted The pro forma agreements for respective technology types are the Companies’ standardized power purchase contracts that were included in the solicitation documents provided to parties participating in the Companies’ 2024 RFP. 37 77 Page 81 of 245
  10. Page 82 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 82 of 245 use by right within this zoning designation. Given the urban and previously disturbed nature of the site, permitting risk is minimal. No federal or state environmental permits are required for the project. Environmental due diligence, including Phase I environmental site assessment, threatened and endangered species review, aquatic resources assessment, and cultural resources analysis, identified no environmental constraints that would materially affect development or operation. Commerce Station will utilize Tesla Megapack 2XL lithium-ion battery technology, a proven, Tier 1 solution that has been widely deployed in utility-scale applications across the United States. The project is designed as a fully integrated system, including inverters, energy management systems, and supervisory control and data acquisition capability. The battery system will be supported by a long-term service agreement with the equipment supplier, which provides contractual performance guarantees and ensures consistent operation throughout the 20-year term of the PPA. The system is designed with planned augmentation to maintain contracted capacity over the life of the agreement. The PPA is with Nevada Power for a 20-year term at a flat capacity price of $13,950 per MWmonth for the term. The PPA includes options for Nevada Power to purchase the asset at periodic intervals after commercial operation and at the end of the term. The Companies calculated the LCOS of this resource as $139.81 per MWh. When comparing the LCOS of this resource to the Dodge Flat BESS Addition, which was the most recent standalone BESS resource approved by the Commission in the Companies’ Amendment to the Triennial 2024 Joint Integrated Resource Plan (“2024 Joint IRPA”), Docket No. 25‑10028, the proposed project’s LCOS is lower by approximately 16 percent. A comparison of the LCOS for all standalone battery storage projects presented for approval in this filing, relative to the Dodge Flat BESS Addition, is provided in REN‑23: Standalone BESS LCOS Comparison Summary. All costs associated with the agreement are proposed to be recovered through Nevada Power’s fuel and purchased power BTER mechanism. According to estimates provided by the developer, during construction the project is expected to employ about 45 workers, with most jobs filled locally and performed using union labor. Engineering and permitting services are also planned to be sourced from Nevada-based firms. Construction is expected to generate approximately $3.9 million in labor income, $4.6 million in gross regional product, and $5.8 million in total economic output during the construction year. Annual operations and maintenance spending of about $0.8 million in Nevada is projected to support approximately 4 total jobs in Clark County, including direct and secondary employment. Ongoing operations are expected to generate about $0.8 million in labor income and roughly $0.5 million in gross regional product per year over the project’s operating life. Figure REN-5 shows a map of the project site. 78 Page 82 of 245

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026

This filing on the current system (opens in a new tab)