Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 19 thru 32

ResponseFiled by CL&P dba Eversource Energy20 files
Part of docket 26-06-04Open
  • Electric
Implementation of Clean Energy Successor Programs

Files20

Search terms highlighted
Eversource rate increase is on 22 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CAE-021.pdf

Extracted from the file · 1 page · 567 characters

Words on different pagesRead the text of CAE-021.pdf

Text of CAE-022.pdf

Extracted from the file · 3 pages · 6,575 characters

Text of CAE-023.pdf

Extracted from the file · 1 page · 757 characters

Words on different pagesRead the text of CAE-023.pdf

Text of CAE-024.pdf

Extracted from the file · 1 page · 2,191 characters

Words on different pagesRead the text of CAE-024.pdf

Text of CAE-025.pdf

Extracted from the file · 1 page · 1,125 characters

Words on different pagesRead the text of CAE-025.pdf

Text of CAE-026.pdf

Extracted from the file · 1 page · 2,757 characters

Words on different pagesRead the text of CAE-026.pdf

Text of CAE-027.pdf

Extracted from the file · 1 page · 1,054 characters

Words on different pagesRead the text of CAE-027.pdf

Text of CAE-027 Attachment 2.pdf

Extracted from the file · 7 pages · 23,401 characters

Text of CAE-028.pdf

Extracted from the file · 1 page · 714 characters

Words on different pagesRead the text of CAE-028.pdf

Text of CAE-029.pdf

Extracted from the file · 1 page · 1,362 characters

Words on different pagesRead the text of CAE-029.pdf

Text of CAE-030.pdf

Extracted from the file · 1 page · 1,728 characters

Words on different pagesRead the text of CAE-030.pdf

Text of CAE-031.pdf

Extracted from the file · 1 page · 1,654 characters

Text of CAE-032.pdf

Extracted from the file · 1 page · 1,689 characters

Words on different pagesRead the text of CAE-032.pdf

Text of CAE-032 Attachment 1.pdf

Extracted from the file · 35 pages · 69,136 characters

Text of CAE-032 Attachment 2.pdf

Extracted from the file · 36 pages · 33,759 characters

Text of CAE-020 Attachment 1.pdf

Extracted from the file · 75 pages · 742,810 characters

15 pages match
  1. Page 86 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 86 of 245 Based on the deliverability assurance attributes described in this project’s introductory paragraphs above, the project’s pricing assumes that it will qualify for tax credits, and, therefore, is best compared to pricing of other paired solar and BESS projects bid in the 2024 RFP that, based on their risk to reaching COD before the end of 2030, are assumed to not qualify for solar tax credits. For perspective, the Companies calculated the average LCOE of other solar and BESS project proposals from the 2024 RFP that were not selected using the submitted cap pricing of the solar energy and found that this project’s LCOE is 31 percent lower in comparison. A copy of the project LCOE comparison to average LCOE using solar cap pricing of non-selected solar and BESS project proposals is presented in Confidential Technical Appendix REN-24. All costs associated with the agreement will be recovered through Nevada Power’s fuel and purchased power BTER mechanisms. According to estimates provided by the developer, construction of the project is expected to support several hundred construction jobs, with a peak workforce of up to approximately 400 workers with an estimated average salary of $164,000 annually, equaling a total estimated payroll of $98 million. The project will create an estimated eight permanent operations and maintenance positions following commercial operation with an estimated average salary of $123,500 annually, equaling a total estimated payroll of $49 million over 25 years. Figure REN-6 shows a map of the project site. 82 Page 86 of 245
  2. Page 87 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 87 of 245 FIGURE REN-6 Coyote Energy 1 Project Site A copy of the PPA can be found in Technical Appendix REN-7-CE1(a). The Companies’ due diligence summary for the Coyote Energy 1 project is included as Confidential Technical Appendix REN-7-CE1(b). Technical Appendix REN-7-CE1(c) contains detailed information about the Coyote Energy 1 project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. Key provisions of the Coyote Energy 1 PPA are summarized in Technical Appendix REN-7-CE1(d). Dry Lake East Energy Storage II The Companies present the Dry Lake East Energy Storage II PPA (“Dry Lake East Energy Storage II”) that will provide for a 150-MW, 4-hour BESS resource in Nevada Power’s system with a COD of December 31, 2027. This project was bid into the Companies’ 2024 RFP and was selected based on several factors including the Companies’ due diligence assessment, system needs, and customer 83 Page 87 of 245
  3. Page 88 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 88 of 245 value. The project will be located adjacent to the Dry Lake East facility, a 200-MW solar and 200MW BESS facility with a COD of December 2026 that was approved in the 2024 Joint IRP and is under contract with Nevada Power, but will be independently connected to Nevada Power’s transmission system and will operate as a fully grid-charging standalone BESS resource. Dry Lake East Energy Storage II does not require any BLM or federal approvals subject to the DOI Review Policy Memorandum review process, thereby mitigating schedule risk due to permitting. The project will qualify for the ITC, including the additional Energy Community Tax Credit Bonus of 10 percent for projects meeting the eligibility criteria (e.g. being located in communities near coalfired power plants that retired after December 31, 2029), which is reflected in the pricing, passing the value on to Nevada Power’s customers for the contract term. As a means to reduce the impact of potential non-delivery and to protect customers in the event of a development failure, the terms of the PPA require the developer to securitize the project through the posting of a development security prior to COD at escalating levels tied to key project milestones. Specifically, the developer is required to post $4.5 million in development security upon execution of the PPA, which increases to $12.75 million upon receipt of PUCN approval of the PPA. This development security structure is designed to strongly incentivize the developer to mitigate development risks and successfully deliver the project, while providing meaningful financial protection to customers in the event of contract non-performance or termination. Key Project Characteristics: The proposed Dry Lake East Energy Storage II project is a utility‑scale BESS facility located in Clark County, Nevada, approximately 20 miles northeast of Las Vegas and adjacent to Interstate 15. The project is being developed by Dry Lake East Energy Storage II, LLC, an affiliate of NextEra Energy Resources, LLC (“NEER”), a leading renewable energy developer with extensive experience owning and operating utility‑scale energy storage resources in Nevada and throughout North America 39. The facility will utilize commercially proven lithium‑ion battery technology in an AC‑coupled configuration, including integrated power conversion systems, transformers, control equipment, and safety systems. The BESS will be capable of charging from and discharging to the Companies’ system to provide dispatchable capacity, energy, and ancillary services, including frequency response and voltage support. Project facilities will be located on approximately 48 acres of public lands administered by the BLM. The developer has secured site control through a successful BLM auction and holds an executed lease for the project area, as well as a right‑of‑way grant for access and collection 39 The Companies have several active PPAs with affiliates of NEER, including Dodge Flat Solar Energy Center, Dodge Flat Energy Storage, Dry Lake East, and Fish Springs Ranch Energy Center. 84 Page 88 of 245
  4. Page 89 of 245Match

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 89 of 245 facilities. Environmental diligence is well advanced, including completion of required environmental studies and preparation of an environmental plan, with no identified conditions that would preclude development. Dry Lake East Energy Storage II will interconnect to the Companies’ transmission system at the Harry Allen Substation at 230 kV via an approximately 3.5‑mile generation tie‑line. An LGIA has been executed, providing for 150 MW of interconnection capacity. Certain facilities, including the substation and gen‑tie infrastructure, will be shared with the Dry Lake East facility, reducing development risk and improving overall infrastructure efficiency. Under the agreement, BESS capacity will be purchased at a fixed rate of $13,930 per MW‑month for a 20‑year term. The Companies calculated the LCOS of this resource as $146.13 per MWh. When comparing the LCOS of this resource to the Dodge Flat BESS Addition, which was the most recent standalone BESS resource approved by the Commission in the 2024 Joint IRPA, Docket No. 25‑10028, the proposed project’s LCOS is lower by approximately 12 percent. A comparison of the LCOS for all standalone BESS projects presented for approval in this filing, relative to the Dodge Flat BESS Addition, is provided in REN‑23: Standalone BESS LCOS Comparison Summary. All costs associated with the agreement will be recovered through Nevada Power’s fuel and purchased power BTER mechanisms. According to estimates provided by the developer, during construction, the project is expected to support approximately 40 jobs on average, with opportunities for local labor and vendors at an estimated average salary of $123,240 annually, equaling a total estimated payroll of $4.93 million over one construction year. Following commercial operation, the project will support a permanent long-term increase in the workforce for the operation and maintenance of the facility with an estimated three positions at an estimated average salary of $82,000 annually and a total payroll of $8.61 million over its operating life. Figure REN-7 shows a map of the project site. 85 Page 89 of 245
  5. Page 90 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 90 of 245 FIGURE REN-7 Dry Lake East Energy Storage II Project Site A copy of the PPA can be found in Technical Appendix REN-8-DLE2(a). The Companies’ due diligence summary for the Dry Lake East Energy Storage II project is included as Confidential Technical Appendix REN-8-DLE2(b). Technical Appendix REN-8-DLE2(c) contains detailed information about the Dry Lake East Energy Storage II project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. Key provisions of the Dry Lake East Energy Storage II PPA are summarized in Technical Appendix REN-8-DLE2(d) 86 Page 90 of 245
  6. Page 91 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 91 of 245 Fish Springs Ranch Energy Storage The Companies present the Fish Springs Ranch Energy Storage PPA (“Fish Springs Ranch Energy Storage”) that will provide for an additional 75-MW, 4-hour BESS resource in Sierra’s system with a COD of December 31, 2027. This project was not bid into the Companies’ 2024 RFP, but rather was the result of bilateral discussions with the developer’s parent organization, NEER. As discussed in the Economic Analysis Section of the Supply Plan Narrative, the near-term in service date of this resource reduces reliability risk for Sierra. The project will be located at the existing Fish Springs Ranch Solar Energy Center facility, a 100MW solar and 25-MW BESS facility, also under contract with Sierra. 40 With the addition of the 75-MW BESS, the total facility will reach a 1:1 solar to BESS ratio. The BESS will utilize existing infrastructure from the Fish Springs Ranch Solar Energy Center facility, resulting in minimal interconnection costs and mitigation of schedule risk due to permitting delays. The project will qualify for the ITC, which is reflected in the pricing, passing the value on to Sierra’s customers for the contract term. As a means to reduce the impact of potential non-delivery and to protect customers in the event of a development failure, the terms of the PPA require the developer to securitize the project through the posting of a development security prior to COD at escalating levels tied to key project milestones. Specifically, the developer is required to post $2.25 million in development security upon execution of the PPA, which increases to $6.38 million upon receipt of PUCN approval of the PPA. This development security structure is designed to strongly incentivize the developer to mitigate development risks and successfully deliver the project, while providing meaningful financial protection to customers in the event of contract non-performance or termination. Key Project Characteristics: The proposed Fish Springs Ranch Energy Storage project is a utility‑scale BESS facility located in unincorporated Washoe County, Nevada, north of Reno and co‑located with the operating Fish Springs Ranch Solar facility. The project is being developed by Fish Springs Ranch Energy Storage, LLC, an affiliate of NEER, discussed above. The facility will utilize commercially proven lithium‑ion battery technology in an AC‑coupled configuration, including integrated inverters, transformers, control systems, and safety equipment. The BESS facility will be capable of charging from and discharging to the Companies’ transmission system to provide dispatchable capacity, energy, and ancillary services. Project facilities will be located on approximately 8.5 acres of private land within the same parcel as the existing Fish Springs Ranch Solar Energy Center facility. Site control is secured through an 40 Approved in the 2018 Integrated Resource Plan, Docket No. 18-06003. 87 Page 91 of 245
  7. Page 92 of 245Match

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 92 of 245 executed lease agreement with the landowner, with an amendment in progress to incorporate the additional area required for the BESS facilities. The project will utilize and share existing infrastructure, including access roads, easements, water access, and the on‑site collector substation, thereby minimizing incremental land disturbance and development risk. The project is located entirely on private land and does not require federal permits or rights‑of‑way. Required state and local permits include a special use permit, grading permit, building permit, hazardous materials storage permit, and air quality permits, all of which are administrative in nature. Environmental reviews previously completed for the existing solar facility identified no conditions that would preclude development, and no material environmental constraints are anticipated for the BESS addition. Fish Springs Ranch Energy Storage will interconnect to the Companies’ transmission system at the Fort Sage Substation at 345 kV through an existing generation tie‑line of approximately 700 feet. An LGIA is currently in place for the Fish Springs Ranch Solar Energy Center facility, and the BESS project will utilize surplus BESS capacity available under the existing interconnection agreement through a proposed material modification. No transmission network upgrades or additional interconnection facilities are anticipated to be required. Under the agreement, BESS capacity will be purchased at a fixed rate of $16,550 per MW‑month for a 20‑year term. The Companies calculated the LCOS of this resource as $162.79 per MWh. When comparing the LCOS of this resource to the Dodge Flat BESS Addition, which was the most recent standalone BESS resource approved by the Commission in the 2024 Joint IRPA, Docket No. 25‑10028, the proposed project’s LCOS is lower by over 2 percent. A comparison of the LCOS for all standalone BESS projects presented for approval in this filing, relative to the Dodge Flat BESS Addition, is provided in Technical Appendix REN‑23: Standalone BESS LCOS Comparison Summary. All costs associated with the agreement are proposed to be recovered through Sierra’s fuel and purchased power BTER mechanisms. According to estimates provided by the developer, during construction, the project is expected to support a temporary increase in workforce of an estimated 35 positions at an estimated average salary of $123,240 annually, equaling a total estimated payroll of $4.31 million over one construction year. Following commercial operation, the project will support a permanent longterm increase in the workforce for the operation and maintenance of the facility with an estimated two positions at an estimated average salary of $82,000 annually and a total payroll of $5.74 million over its operating life. Figure REN-8 shows a map of the project site. 88 Page 92 of 245
  8. Page 93 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 93 of 245 FIGURE REN-8 Fish Springs Ranch Energy Storage Project Site A copy of the PPA can be found in Technical Appendix REN-9-FSR(a). The Companies’ due diligence summary for the Fish Springs Ranch Energy Storage project is included as Confidential Technical Appendix REN-9-FSR(b). Technical Appendix REN-9-FSR(c) contains detailed information about the Fish Springs Ranch Energy Storage project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. Key provisions of the Fish Springs Ranch Energy Storage PPA are summarized in Technical Appendix REN-9-FSR(d). Hot Pot Energy Center and Iron Point Energy Center The Companies present the Hot Pot Energy Center (“Hot Pot”) PPA and Iron Point Energy Center (“Iron Point”) PPA, together as part of sleeved PPAs associated with customer energy agreements. The Hot Pot Energy Center will consist of approximately 350 MW of solar PV generating capacity paired with 350 MW of BESS capacity with a four‑hour duration. The Iron Point Energy Center will consist of approximately 250 MW of solar PV generating capacity paired with 250 MW of BESS capacity with a four‑hour duration. The expected CODs for Hot Pot Energy Center and Iron Point Energy Center are October 31, 2029, and December 31, 2029, respectively. These PPAs 89 Page 93 of 245
  9. Page 94 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 94 of 245 represent the second iterations of the Hot Pot Energy Center and Iron Point Energy Center projects for the Commission’s review. The previous Hot Pot Energy Center and Iron Point Energy Center PPAs, as approved in Docket No. 21-06001, terminated on June 22, 2023, due to several issues encountered by the developer including global supply chain issues and significant cost increases for materials due to the Covid-19 pandemic. These projects were bid into the Companies’ 2024 RFP but were not selected due to a fatal flaw determination from a lack of firm available transmission capacity at the time the bid projects intended to reach their CODs. The counterparty to the sleeved PPA, Amazon Data Services, Inc. (“Amazon)”, then brought these projects forward to the Companies on a bilateral basis as a resource dedicated to serve their customer-specific load. Under the PPAs and their associated customer agreements, the project, and/or the counterparty to the sleeved PPA, will bear all risk associated with non-compensable transmission curtailments. 41 As a means to reduce the impact of potential non-delivery and to protect customers in the event of a development failure, the terms of the PPA require the developer to securitize the project through the posting of a development security prior to COD at escalating levels tied to key project milestones. Specifically for Hot Pot, the developer is required to post $21 million in development security upon execution of the PPA, which increases to $59.5 million upon receipt of PUCN approval of the PPA. Specifically for Iron Point, the developer is required to post $15 million in development security upon execution of the PPA, which increases to $42.5 million upon receipt of PUCN approval of the PPA. As discussed in this section’s Part B above, given the uncertainty to project development and timeline posed by the DOI Review Policy Memorandum, the Companies’ were challenged to contract with counterparties willing to bear the risk of losing the development security due to such unprecedented external factors preventing their projects from reaching the intended COD. To facilitate a viable transaction, the Companies negotiated terms of the PPAs that allow for the Companies to retain a portion of the development security if the PPA terminates due to the project’s failure to obtain Full Notice to Proceed (“FNTP”) authorization from the BLM prior to June 30, 2028. The retained security amount was tailored specific to the Hot Pot PPA and set equal to $21 million, and the retained security amount was tailored specific to the Iron Point PPA and set equal to $15 million. This balanced approach to development security structure is designed to strongly incentivize the developer to mitigate development risks and successfully deliver the project, while providing meaningful financial protection to customers in the event of contract nonperformance or termination. Furthermore, as these are sleeved PPAs associated with a customer agreement, the PPAs also contain a provision that in the event of non-receipt of PUCN approval of the customer agreement by the one year anniversary of receipt of PUCN approval of the PPAs, then the PPAs may terminate with no liability to either party. 41 Under the terms of the PPA, all curtailments that are not economic curtailments are non-compensable. 90 Page 94 of 245
  10. Page 95 of 245

    CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 95 of 245 Key Project Characteristics – Hot Pot Energy Center: The proposed Hot Pot Energy Center project is a utility‑scale solar PV and BESS facility located in Humboldt County, Nevada. The project is being developed by Hot Pot Solar, LLC, an affiliate of Primergy Solar, the developer of the Sleepy Orange project discussed above. The project is within Sierra’s service territory. The solar facility will utilize commercially proven PV modules mounted on single‑axis tracking systems to optimize energy production. Energy generated by the solar facility will be delivered to Sierra’s transmission system or stored in the co‑located BESS for later dispatch. The BESS component will utilize lithium‑ion technology and will be capable of providing dispatchable capacity, energy, and ancillary services. Project facilities will be located on approximately 2,200 acres of rural land, consisting primarily of privately held property secured under a long‑term lease arrangement, with limited easements across BLM land for access roads and a transmission line segment. All local land use approvals have been obtained, including issuance of a conditional use permit from Humboldt County. Environmental studies addressing biological, cultural, hydrological, and geotechnical conditions at the site have been completed, and no material environmental constraints have been identified that would preclude construction or operation of the facility. Remaining federal land use permits for access and a transmission line segment are in process. The Hot Pot Energy Center project will interconnect to Sierra’s transmission system at the Valmy Substation at 345 kV via a permitted generation tie‑line. An LGIA has been executed, and subsequent amendments are expected to confirm an in‑service date in 2029. The project is designed to operate compatibly with other resources interconnected at the Valmy Substation and will provide ancillary services to support system reliability. The Companies propose to execute a PPA with Hot Pot Solar, LLC for the output of the generating facility and the BESS facility for a 20‑year term, which will be dedicated to a customer through a sleeved PPA and associated customer agreement. Under the sleeved PPA and associated customer agreement, energy from the solar facility will be purchased at a fixed rate of $36.00 per MWh, and BESS capacity will be purchased at a fixed rate of $13,250 per MW‑month. The Companies calculated the hybrid LCOE as $105.31 per MWh. All costs associated with the customer agreement are proposed to be recovered through the sleeved PPA associated with the customer agreement. 42 As a sleeved PPA associated with a customer agreement, no costs associated with the PPA will be recovered through the respective Company’s fuel and purchased power BTER mechanisms as would be the case for PPAs serving noncustomer-specific loads.. 42 91 Page 95 of 245

As listed on the current system

Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026

This filing on the current system (opens in a new tab)