Interrogatory responses
Answers to questions 19 thru 32
Files20
CAE-020 Attachment 1.xlsx
Excel · 1.6 MBText searchable
Download CAE-020 Attachment 1.xlsxRead the text of CAE-020 Attachment 1.xlsx
CAE-027 Attachment 2.pdf
PDF · 1.2 MB · 7 pagesText searchable
Download CAE-027 Attachment 2.pdfRead the text of CAE-027 Attachment 2.pdf
CAE-032 Attachment 1.pdf
PDF · 483 KB · 35 pagesText searchable
Download CAE-032 Attachment 1.pdfRead the text of CAE-032 Attachment 1.pdf
CAE-032 Attachment 2.pdf
PDF · 1.1 MB · 36 pagesText searchable
Download CAE-032 Attachment 2.pdfRead the text of CAE-032 Attachment 2.pdf
CAE-020 Attachment 1.pdf
PDF · 5.6 MB · 75 pagesText searchable
Download CAE-020 Attachment 1.pdfRead the text of CAE-020 Attachment 1.pdf
CAE-027 Attachment 1.pdf
PDF · 18 MB · 245 pagesText searchable
Download CAE-027 Attachment 1.pdfRead the text of CAE-027 Attachment 1.pdf
Text of CAE-021.pdf
Extracted from the file · 1 page · 567 characters
Text of CAE-022.pdf
Extracted from the file · 3 pages · 6,575 characters
Text of CAE-023.pdf
Extracted from the file · 1 page · 757 characters
Text of CAE-024.pdf
Extracted from the file · 1 page · 2,191 characters
Text of CAE-025.pdf
Extracted from the file · 1 page · 1,125 characters
Text of CAE-026.pdf
Extracted from the file · 1 page · 2,757 characters
Text of CAE-027.pdf
Extracted from the file · 1 page · 1,054 characters
Text of CAE-027 Attachment 2.pdf
Extracted from the file · 7 pages · 23,401 characters
Text of CAE-028.pdf
Extracted from the file · 1 page · 714 characters
Text of CAE-029.pdf
Extracted from the file · 1 page · 1,362 characters
Text of CAE-030.pdf
Extracted from the file · 1 page · 1,728 characters
Text of CAE-031.pdf
Extracted from the file · 1 page · 1,654 characters
Text of CAE-032.pdf
Extracted from the file · 1 page · 1,689 characters
Text of CAE-032 Attachment 1.pdf
Extracted from the file · 35 pages · 69,136 characters
Text of CAE-032 Attachment 2.pdf
Extracted from the file · 36 pages · 33,759 characters
Text of CAE-020 Attachment 1.pdf
Extracted from the file · 75 pages · 742,810 characters
Page 93 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 93 of 245 FIGURE REN-8 Fish Springs Ranch Energy Storage Project Site A copy of the PPA can be found in Technical Appendix REN-9-FSR(a). The Companies’ due diligence summary for the Fish Springs Ranch Energy Storage project is included as Confidential Technical Appendix REN-9-FSR(b). Technical Appendix REN-9-FSR(c) contains detailed information about the Fish Springs Ranch Energy Storage project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. Key provisions of the Fish Springs Ranch Energy Storage PPA are summarized in Technical Appendix REN-9-FSR(d). Hot Pot Energy Center and Iron Point Energy Center The Companies present the Hot Pot Energy Center (“Hot Pot”) PPA and Iron Point Energy Center (“Iron Point”) PPA, together as part of sleeved PPAs associated with customer energy agreements. The Hot Pot Energy Center will consist of approximately 350 MW of solar PV generating capacity paired with 350 MW of BESS capacity with a four‑hour duration. The Iron Point Energy Center will consist of approximately 250 MW of solar PV generating capacity paired with 250 MW of BESS capacity with a four‑hour duration. The expected CODs for Hot Pot Energy Center and Iron Point Energy Center are October 31, 2029, and December 31, 2029, respectively. These PPAs 89 Page 93 of 245Page 94 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 94 of 245 represent the second iterations of the Hot Pot Energy Center and Iron Point Energy Center projects for the Commission’s review. The previous Hot Pot Energy Center and Iron Point Energy Center PPAs, as approved in Docket No. 21-06001, terminated on June 22, 2023, due to several issues encountered by the developer including global supply chain issues and significant cost increases for materials due to the Covid-19 pandemic. These projects were bid into the Companies’ 2024 RFP but were not selected due to a fatal flaw determination from a lack of firm available transmission capacity at the time the bid projects intended to reach their CODs. The counterparty to the sleeved PPA, Amazon Data Services, Inc. (“Amazon)”, then brought these projects forward to the Companies on a bilateral basis as a resource dedicated to serve their customer-specific load. Under the PPAs and their associated customer agreements, the project, and/or the counterparty to the sleeved PPA, will bear all risk associated with non-compensable transmission curtailments. 41 As a means to reduce the impact of potential non-delivery and to protect customers in the event of a development failure, the terms of the PPA require the developer to securitize the project through the posting of a development security prior to COD at escalating levels tied to key project milestones. Specifically for Hot Pot, the developer is required to post $21 million in development security upon execution of the PPA, which increases to $59.5 million upon receipt of PUCN approval of the PPA. Specifically for Iron Point, the developer is required to post $15 million in development security upon execution of the PPA, which increases to $42.5 million upon receipt of PUCN approval of the PPA. As discussed in this section’s Part B above, given the uncertainty to project development and timeline posed by the DOI Review Policy Memorandum, the Companies’ were challenged to contract with counterparties willing to bear the risk of losing the development security due to such unprecedented external factors preventing their projects from reaching the intended COD. To facilitate a viable transaction, the Companies negotiated terms of the PPAs that allow for the Companies to retain a portion of the development security if the PPA terminates due to the project’s failure to obtain Full Notice to Proceed (“FNTP”) authorization from the BLM prior to June 30, 2028. The retained security amount was tailored specific to the Hot Pot PPA and set equal to $21 million, and the retained security amount was tailored specific to the Iron Point PPA and set equal to $15 million. This balanced approach to development security structure is designed to strongly incentivize the developer to mitigate development risks and successfully deliver the project, while providing meaningful financial protection to customers in the event of contract nonperformance or termination. Furthermore, as these are sleeved PPAs associated with a customer agreement, the PPAs also contain a provision that in the event of non-receipt of PUCN approval of the customer agreement by the one year anniversary of receipt of PUCN approval of the PPAs, then the PPAs may terminate with no liability to either party. 41 Under the terms of the PPA, all curtailments that are not economic curtailments are non-compensable. 90 Page 94 of 245Page 95 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 95 of 245 Key Project Characteristics – Hot Pot Energy Center: The proposed Hot Pot Energy Center project is a utility‑scale solar PV and BESS facility located in Humboldt County, Nevada. The project is being developed by Hot Pot Solar, LLC, an affiliate of Primergy Solar, the developer of the Sleepy Orange project discussed above. The project is within Sierra’s service territory. The solar facility will utilize commercially proven PV modules mounted on single‑axis tracking systems to optimize energy production. Energy generated by the solar facility will be delivered to Sierra’s transmission system or stored in the co‑located BESS for later dispatch. The BESS component will utilize lithium‑ion technology and will be capable of providing dispatchable capacity, energy, and ancillary services. Project facilities will be located on approximately 2,200 acres of rural land, consisting primarily of privately held property secured under a long‑term lease arrangement, with limited easements across BLM land for access roads and a transmission line segment. All local land use approvals have been obtained, including issuance of a conditional use permit from Humboldt County. Environmental studies addressing biological, cultural, hydrological, and geotechnical conditions at the site have been completed, and no material environmental constraints have been identified that would preclude construction or operation of the facility. Remaining federal land use permits for access and a transmission line segment are in process. The Hot Pot Energy Center project will interconnect to Sierra’s transmission system at the Valmy Substation at 345 kV via a permitted generation tie‑line. An LGIA has been executed, and subsequent amendments are expected to confirm an in‑service date in 2029. The project is designed to operate compatibly with other resources interconnected at the Valmy Substation and will provide ancillary services to support system reliability. The Companies propose to execute a PPA with Hot Pot Solar, LLC for the output of the generating facility and the BESS facility for a 20‑year term, which will be dedicated to a customer through a sleeved PPA and associated customer agreement. Under the sleeved PPA and associated customer agreement, energy from the solar facility will be purchased at a fixed rate of $36.00 per MWh, and BESS capacity will be purchased at a fixed rate of $13,250 per MW‑month. The Companies calculated the hybrid LCOE as $105.31 per MWh. All costs associated with the customer agreement are proposed to be recovered through the sleeved PPA associated with the customer agreement. 42 As a sleeved PPA associated with a customer agreement, no costs associated with the PPA will be recovered through the respective Company’s fuel and purchased power BTER mechanisms as would be the case for PPAs serving noncustomer-specific loads.. 42 91 Page 95 of 245Page 96 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 96 of 245 According to estimates provided by the developer during construction, the project is expected to support several hundred jobs, with peak employment exceeding 500 workers of which an estimated 440 will be sourced locally from Nevada. The project will utilize union labor under executed work site agreements. Estimated salaries for the construction jobs are anticipated to be $139,360 annually, with a total annual payroll of $61.32 million. A long‑term increase in workforce for the operations and maintenance of the facility is an estimated four permanent positions at an estimated average salary of $135,200 annually and a total payroll of $13.52 million over 25 years. Figure REN-9 shows a map of the project site. FIGURE REN-9 Hot Pot Energy Center Project Site 92 Page 96 of 245Page 97 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 97 of 245 A copy of the PPA can be found in Technical Appendix REN-10-HPE(a). The Companies’ due diligence summary for the Hot Pot Energy Center project is included as Confidential Technical Appendix REN-10-HPE(b). Technical Appendix REN-10-HPE(c) contains detailed information about the Hot Pot Energy Center project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. Key provisions of the Hot Pot Energy Center PPA are summarized in Technical Appendix REN-10-HPE(d). Key Project Characteristics – Iron Point Energy Center: The proposed Iron Point Energy Center project is a utility‑scale solar PV and BESS facility located in Humboldt County, Nevada. The project is being developed by Iron Point Solar, LLC, an affiliate of Primergy Solar, the developer of the Sleepy Orange project discussed above. The project is within Sierra’s service territory. The solar facility will utilize commercially proven PV modules mounted on single‑axis tracking systems to maximize energy production. Energy generated by the facility will either be delivered directly to Sierra’s system or stored in the co‑located BESS for later dispatch. The BESS component will utilize lithium‑ion technology and will be capable of providing dispatchable capacity, energy, and ancillary services. Project facilities will be located on approximately 1,400 acres of rural land consisting primarily of privately held property secured under a long‑term lease arrangement, with limited BLM land crossings for access roads and a transmission line segment. All required local land use approvals have been obtained, including issuance of a conditional use permit from Humboldt County. Environmental studies addressing biological, cultural, hydrological, and geotechnical resources have been completed, and no material environmental constraints have been identified that would preclude construction or operation of the project. Remaining federal land use permits for access and transmission facilities are in process. The Iron Point Energy Center project will interconnect to Sierra’s transmission system at the Valmy Substation via a permitted generation tie‑line. An LGIA has been executed, and amendments are expected to confirm an in‑service date in 2029. The project is designed to provide ancillary services to support transmission system reliability. The Companies propose to execute a PPA with Iron Point Solar, LLC for the output of the generating facility and the BESS facility for a 20‑year term, which will be dedicated to a customer through a sleeved PPA associated with a customer agreement. Under the sleeved PPA and associated customer agreement, energy from the solar facility will be purchased at a fixed rate of $36.00 per MWh, and BESS capacity will be purchased at a fixed rate of $13,250 per MW‑month. The Companies calculated the hybrid LCOE as $106.05 per MWh. All costs associated with the 93 Page 97 of 245Page 98 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 98 of 245 customer agreement are proposed to be recovered through the sleeved PPA associated with the customer agreement. 43 According to estimates provided by the developer during construction, the project is expected to support several hundred jobs, including peak construction employment exceeding 400 workers of which an estimated 360 will be sourced locally from Nevada. The project will utilize union labor under negotiated work site agreements. Estimated salaries for the construction jobs are anticipated to be $139,360 annually, with a total annual payroll of $50.17 million. A long‑term increase in workforce for the operations and maintenance of the facility is an estimated four permanent positions at an estimated average salary of $135,200 annually and a total payroll of $10.8 million over 20 years. Figure REN-10 shows a map of the project site. 43 Id. 94 Page 98 of 245Page 99 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 99 of 245 FIGURE REN-10 Iron Point Energy Center Project Site A copy of the PPA can be found in Technical Appendix REN-11-IPE (a). The Companies’ due diligence summary for the Iron Point Energy Center project is included as Confidential Technical Appendix REN-11-IPE(b). Technical Appendix REN-11-IPE(c) contains detailed information about the Iron Point Energy Center project, including the information required by NAC § 704.8885, NAC § 704.8887 and § NRS 704.741. Key provisions of the Iron Point Energy Center PPA are summarized in Technical Appendix 95 Page 99 of 245Page 100 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 100 of 245 REN-11-IPE(d).Jersey Valley Solar and Storage The Companies present the Jersey Valley Solar and Storage PPA (“Jersey Valley”), a 67-MW solar PV facility paired with a 67-MW, four-hour BESS in Sierra’s system, with a targeted COD of January 10, 2028. The project was bid into the Companies’ 2024 RFP and selected based on several factors including the Companies’ due diligence assessment, system needs, and customer value. The project is one of the very few bids received in the 2024 RFP involving generating resources that are located entirely on private land, including site access roads and generation tieline routes. Thus, the risk of permitting delays associated with DOI Review Policy Memorandum impacts is eliminated, and the project is well positioned to reach COD in time to secure the available solar tax credits and pass the value on to Sierra’s customers for the contract term. The resource will add cost-competitive, dispatchable capacity to Sierra’s portfolio, helping address systemwide open capacity needs identified for the 2028 period and beyond. As discussed in the Economic Analysis Section of the Supply Plan Narrative, the near-term in-service date of this resource reduces reliability risk for Sierra. As discussed in the Transmission Section of the Supply Plan Narrative, the project requires minimal network upgrades. As a means to reduce the impact of potential non-delivery and to protect customers in the event of a development or performance failure, the terms of the PPA require the developer to securitize the project through the posting of a development security prior to COD at escalating levels tied to key project milestones. Specifically, the developer is required to post $4.03 million in development security upon execution of the PPA, which increases to $11.42 million upon receipt of PUCN approval of the PPA. Due to new local requirements faced by the developer resulting from Lander County’s issuance (and subsequent extension) of a temporary moratorium 44 on solar projects, the Companies’ were challenged to contract with the counterparty as they were not willing to bear the risk of losing the development security due to uncertainty in obtaining a Special Use Permit (“SUP”) from Lander County necessary for the project to reach its intended COD. To facilitate a viable transaction, the Companies negotiated terms of the PPA that allow for the Companies to retain a portion of the development security if the PPA terminates due to the project’s failure to obtain an SUP prior to June 25, 2027. The retained security amount was tailored specific to this PPA and set equal to $750,000. This balanced approach to development security structure is designed to strongly incentivize the developer to mitigate development risks and successfully deliver the project, while providing meaningful financial protection to customers in the event of contract non-performance or termination. Key Project Characteristics: 44 Lander County, NV, Board of Commissioners Meeting, July 24, 2025, available at https://cms1files.revize.com/landercounty25/07-24-25%20Packet%20(1).pdf 96 Page 100 of 245Page 101 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 101 of 245 The project is owned by ORNI 45, LLC, a subsidiary of Ormat Technologies, Inc. (“Ormat Technologies”), which will oversee the project’s development, construction, and operation. Ormat Technologies is a global renewable energy company with approximately 60 years of experience and established core competencies in engineering, procurement, and construction (“EPC”), operations and maintenance (“O&M”), and project finance. Through these capabilities, Ormat Technologies has developed, owns, and operates approximately 1.16 GW of geothermal, energy storage, solar PV, and recovered energy generation facilities worldwide. Ormat Technologies is headquartered in Reno, Nevada, with additional offices in Philadelphia, Pennsylvania, and in Israel. The Jersey Valley project will be located on approximately 470 acres of private land in Lander County, Nevada, within Sierra’s service territory, and will interconnect at the adjacent Bannock Substation at 120 kV. As discussed in the Transmission Section of the Supply Plan Narrative, the project requires minimal network upgrades. While the project has no federal nexus and therefore avoids BLM permitting risk, Lander County currently has a moratorium on solar development, and the developer continues to work with the county officials on obtaining necessary approvals to authorize the land use to enable the project to start construction. To mitigate the risk of nondelivery, the Companies negotiated a provision in the PPA that allows limited extension of critical project milestones if obtainment of the County special use permit is delayed. The solar facility will utilize commercially proven bifacial PV technology mounted on single‑axis tracking systems. The BESS will employ lithium‑ion technology in an AC‑coupled configuration. The combined facility is designed to deliver renewable energy, dispatchable capacity, and ancillary services. The project will use existing interconnection rights under a previously executed LGIA held by Ormat affiliates. The developer anticipates working through the transmission process to amend the LGIA to reassign unused geothermal interconnection capacity to the project. Under the agreement, energy from the solar generating facility would be purchased for a 25‑year term at a fixed price of $34.65 per MWh, and capacity from the BESS facility would be purchased for a 20‑year term at a fixed rate of $13,950 per MW‑month. The Companies calculated the hybrid LCOE as $106.05 per MWh. Based on the deliverability assurance attributes described in this project’s introductory paragraphs above, the project’s pricing assumes that it will qualify for tax credits, and, therefore, is best compared to pricing of other paired solar and BESS projects bid in the 2024 RFP that, based on their risk to reaching COD before the end of 2030, are assumed to not qualify for solar tax credits. For perspective, the Companies calculated the average LCOE of other solar and BESS project proposals from the 2024 RFP that were not selected using the submitted cap pricing of the solar energy and found that this project’s LCOE is 32 percent lower in comparison. A copy of the project LCOE comparison to average LCOE using solar cap pricing of non-selected solar and BESS project proposals is presented in Confidential Technical Appendix REN-24. All costs associated with the agreement will be recovered through Sierra’s fuel and purchased power BTER mechanisms. 97 Page 101 of 245Page 102 of 245
CL&P dba Eversource Energy Docket No. 26-06-0 Set PURA-02 Date Issued October 14, 2026 CAE-027, Attachment 1 Page 102 of 245 According to estimates provided by the developer, during the construction phase, the project is expected to support approximately 250 jobs, with an estimated 150 positions filled by Nevada residents, generating nearly $9 million in local payroll over one year. Once operational, the project will create seven permanent operations and maintenance positions with average annual salaries of approximately $80,000, resulting in more than $20 million in cumulative payroll over the project’s operating life. In addition to workforce impacts, the project will contribute ongoing property tax revenues to Lander County and generate sales tax revenue through the purchase of local goods and services. These economic impacts support local communities while contributing to Nevada’s renewable energy infrastructure and long-term economic development. Figure REN-11 shows a map of the project site. FIGURE REN-11 Jersey Valley Solar and Storage project Site A copy of the PPA can be found in Technical Appendix REN-12-JVS(a). The Companies’ due diligence summary for the Jersey Valley Solar and Storage project is included as Confidential Technical Appendix REN-12-JVS(b). Technical Appendix REN-12-JVS(c) contains detailed information about the Jersey Valley Solar and Storage project, including the information required 98 Page 102 of 245
As listed on the current system
Question(s) Answered 19 thru 32 (CL&P dba Eversource Energy) Date Filed: 10/28/2026