  1. Page 13 of 23

    program-administration systems. Where feasible, maintaining existing compensation mechanisms, settlement practices, and administrative processes would reduce implementation risk, accelerate deployment, minimize system-development requirements, and avoid incremental costs to ratepayers. To the extent PURA adopts new requirements requiring system enhancements, UI should be provided sufficient time to design, develop, test, validate, and deploy the necessary functionality and should be permitted to recover prudently incurred implementation and ongoing administrative costs. UI supports PURA’s efforts to develop a successor NRES framework that satisfies the requirements of Public Act No. 26-127 while continuing to promote renewable-resource development and customer participation. The Company believes that existing NRES netting should be retained and export compensation below the full retail rate may be implemented within the successor program framework, subject to the establishment of clear program rules, billing requirements, metering standards, settlement procedures, customer protections, and implementation timelines. The Company does not oppose modifications to the existing NRES program if PURA determines that such changes are necessary to achieve statutory objectives. However, UI believes that preserving existing program categories, compensation mechanisms, procurement structures, customer classifications, and administrative processes wherever practical would provide meaningful benefits to customers, developers, administrators, and ratepayers. Leveraging existing infrastructure would facilitate a more efficient and timely implementation, reduce operational complexity, minimize implementation risk, mitigate Page 13 of 23
  2. Page 14 of 23

    implementation costs to ratepayers, and preserve continuity for customers, market participants, and program administrators. To the extent PURA adopts changes to netting methodologies, export-compensation structures, storage incentives, metering requirements, or settlement processes, UI believes that implementation should occur only after sufficient time has been provided for detailed requirements development, vendor assessment, system configuration, testing, validation, and customer communication activities. Accordingly, UI recommends that PURA: 1. Preserve the existing Small, Medium, and Large NRES project categories and existing procurement methodologies to the greatest extent practicable. 2. Implement statutory requirements within existing program structures whenever feasible. 3. Adopt a standardized export-compensation methodology applicable to similarly situated projects. 4. Coordinate any revised netting intervals with future time-varying and TOU ratedevelopment efforts. 5. Maintain program rules that provide transparency, predictability, and administrative simplicity. 6. Avoid unnecessary modifications that increase implementation complexity and cost without corresponding customer or policy benefits. 7. Provide adequate implementation time following issuance of a final decision. 8. Authorize recovery of prudently incurred implementation and administrative costs associated with successor program requirements. Page 14 of 23
  3. Page 15 of 23

    9. Ensure that the final program design balances renewable-energy objectives with administrative feasibility, customer understanding, and ratepayer impacts. By leveraging existing NRES program infrastructure to the maximum extent practicable, PURA can achieve the objectives of Public Act No. 26-127 while minimizing implementation costs, reducing operational risk, and facilitating a timely transition to the successor program. 3. RESIDENTIAL INCENTIVE ADDER IMPLEMENTATION PURA requests comments on fixed per-kW incentives and per-kWh incentives based on exports recorded at the revenue meter, including whether a fixed per-kW incentive should be administered monthly or through a one-time upfront payment. As discussed in the Company’s prior comments, production meters provide accurate, verifiable, and auditable generation data used to administer production-based charges, including applicable Low-Income and Distressed Municipality adders. The Company continues to believe that incentive structures should be supported by reliable and independently verifiable data sources. Reliance on estimated production values or inverter-reported data may present challenges related to data accuracy, consistency, oversight, customer communications, and REC accounting. Accordingly, any performance-based incentive should be designed to utilize objective and auditable data to promote transparency, consistency, and effective program administration. UI also identified operational, REC-accounting, customer-service, accuracy, and oversight concerns associated with estimates or inverter data. UI Recommendation UI recommends retaining production-based adders for the RRES program. Productionbased incentives directly link compensation payments to verified renewable energy generation, Page 15 of 23
  4. Page 16 of 23

    ensuring the greatest degree of accuracy, transparency, accountability, and alignment between incentive payments and actual system performance. Production meter data remains the most accurate, verifiable, and auditable source of generation information. Production meters provide an independent record of all renewable energy generated, supporting incentive administration, REC accounting, program reporting, regulatory oversight, and program integrity. Because the current RRES program already relies on this infrastructure and established administrative processes, production-meter data is the preferred basis for any production-based incentive or adder. Production-based incentives also promote equitable treatment by linking compensation to actual renewable energy generation. Systems that generate more renewable energy receive correspondingly greater incentives. By contrast, a fixed per-kW incentive compensates projects solely on installed capacity, regardless of actual output, and could provide identical payments to projects with materially different generation levels. A. Fixed per-kW Incentive Alternative UI acknowledges that a fixed per-kW incentive may offer customers greater simplicity and predictability because the incentive value can be established at enrollment without ongoing production-based calculations. However, such approach reduces the direct relationship between incentive payments and actual renewable energy generation and may therefore result in compensation that is not fully aligned with project performance. UI's existing systems and administrative processes are not configured to administer residential incentive adders as either one-time upfront payments based on installed capacity or recurring monthly capacity-based payments. Although a fixed-capacity structure may be feasible, implementation would require modifications to existing processes and supporting system Page 16 of 23
  5. Page 17 of 23

    functionality. If PURA retains an annual or quarterly payment cadence, UI could potentially administer the incentive through a modified semi-automated process similar to the current approach. However, this would increase administrative effort and operating costs. A recurring monthly per-kW payment structure would present substantially greater operational and system challenges. Existing processes are not designed to support monthly capacity-based calculations, validations, and payments over the life of the program. A sustainable framework would likely require a dedicated SAP project and additional automation, potentially affecting billing and incentive-management processes, customer account administration, payment processing, reporting, financial controls, program tracking, system interfaces, installed-capacity verification, eligibility validation, audits, and customer communications. If PURA adopts a fixed per-kW structure, UI recommends a yearly or one-time upfront payment rather than recurring monthly payments. An upfront incentive would reduce ongoing tracking and payment-processing requirements, minimize administrative burden, provide greater certainty to customers and developers, and avoid many of the operational and system complexities associated with monthly capacity-based payments. UI also recommends a mechanism to suspend, reduce, or discontinue incentives for projects that consistently perform below a defined production threshold. This safeguard would help align incentive levels with actual project performance, promote equitable treatment, and encourage proper system operation and maintenance. B. Export-based per-kWh Incentive Alternative An export-based per-kWh adder would utilize energy-export data recorded by the revenue meter to determine incentive payments. Because revenue-meter data is already collected for billing, this approach could reduce reliance on separate production-meter infrastructure and related Page 17 of 23
  6. Page 18 of 23

    installation, maintenance, and data-management activities. It would also retain a performancebased component because payments would vary with measured energy delivered to the grid and may be easier for customers to understand because the measurement would come from utilityowned and utility-maintained equipment. The main limitation is that exports do not equal total renewable energy production. A production meter records all energy the renewable energy system generates, while a revenue meter records only the portion exported after on-site consumption and operational losses. Export quantities therefore reflect not only system performance but also customer load profiles, appliance use, occupancy patterns, electrification decisions, and other site-specific factors. As a result, customers with identical systems and identical production could receive materially different incentive payments. A customer who uses more generation on-site for air conditioning, electric vehicles, heat pumps, or other loads would export less and receive a lower incentive than a similarly situated customer with lower on-site consumption. An export-based incentive could therefore compensate consumption behavior and load characteristics rather than renewable energy production, creating inequitable outcomes among participants with comparable systems. C. Battery Storage Considerations Battery energy storage further complicates an export-based structure. Customers may store renewable energy and export it later, allowing battery-dispatch decisions to affect export timing and quantity independently of contemporaneous renewable generation. If storage can also be charged from the grid, exported energy may not be directly attributable to renewable generation. As discussed in UI's Motion for Clarification in Docket No. 25-08-02, integrated solar-plus-storage configurations may make it difficult to distinguish renewable generation from other energy flows Page 18 of 23
  7. Page 19 of 23

    when generation and storage share equipment and metering pathways. These conditions could complicate incentive administration and verification of renewable-energy-related program benefits. D. REC Treatment and Program Objectives REC administration and according to NEEPOLL GIS rules, depends on verified renewable energy generation rather than exported energy. An export-based incentive could therefore create a difference between the quantity used to calculate incentive payments and the quantity used for REC creation, tracking, certification, and reporting. An export-based adder may also encourage customers to maximize exports rather than optimize self-consumption or overall system value. Depending on the incentive level, customers could adjust usage patterns or battery-dispatch strategies to increase exports and incentive revenues. Although increased exports may provide certain grid benefits, PURA should determine whether encouraging exports is an intended program objective. Customers who use renewable energy behind the meter to reduce household consumption may otherwise receive lower incentives despite comparable renewable energy production and environmental benefits. E. Implementation Considerations An export-based per-kWh incentive would require modifications to program administration, customer communications, billing processes, and reporting methodologies. PURA would need to establish clear definitions of eligible exports; treatment of storage charging and discharging; rules for hybrid solar-plus-storage systems; and coordination between export-based incentives and REC administration. Depending on the final program requirements, billing-system enhancements and data-management modifications may also be necessary. Page 19 of 23
  8. Page 20 of 23

    UI also notes broader challenges with incentive structures that rely on production information from third-party inverter systems rather than utility-grade metering. These may include inconsistent data formats, lack of standardized data-transfer processes, limited utility control over customer-owned equipment, and vendor-continuity concerns. UI should evaluate these factors when considering the long-term administration of incentives that depend on nonutility production-data sources. UI does not recommend replacing production-based adders with either a fixed per-kW incentive or an export-based per-kWh incentive. Although each alternative may offer certain administrative or customer-facing benefits, neither maintains the same direct, auditable relationship between incentive payments and total verified renewable energy generation. Accordingly, UI recommends retaining production-based adders for the RRES program. If PURA elects to pursue an alternative structure, UI recommends evaluating customer equity, project-performance safeguards, battery-storage operations, REC administration, billing and datamanagement systems, administrative costs, customer communications, and program oversight before implementation. 4. IMPLEMENTATION TIMELINE AND COST RECOVERY The Company recommends that PURA provide sufficient time following issuance of a Final Decision for the EDCs to evaluate requirements. Such a period should allow the electric distribution companies sufficient time to develop and obtain approval of program manuals, tariffs, requests for proposals, solicitation documents and rules, contracts, customer communications, and operating procedures; conduct necessary vendor assessments and procure required third-party services or system enhancements; implement required billing, metering, settlement, reporting, and other information-technology modifications; administer any required competitive solicitations; Page 20 of 23
  9. Page 21 of 23

    and complete testing, training, and operational-readiness activities prior to program launch. UI also recommends that PURA establish a successor-program implementation schedule that supports timely issuance of the initial procurement solicitation and avoids unnecessary delays between final program approval and market participation. To the extent possible, program design requirements should be finalized with sufficient lead time to allow the Electric Distribution Companies to develop and issue the initial solicitation on or before January 1, 2028. The Company further recommends that PURA authorize recovery of all prudently incurred implementation and ongoing administrative costs associated with the successor programs through the Company’s annual Rate Adjustment Mechanism proceeding. In addition, PURA should establish a process for addressing implementation issues, necessary clarifications, and unforeseen operational considerations identified during implementation. UI notes that implementation of the existing RRES, NRES, and SCEF Programs required significant investments in SAP billing, bid portal, metering processes, customer-enrollment procedures, settlement and payment systems, reporting capabilities, and related programadministration infrastructure. Consistent with PURA’s directives, these efforts required extensive information-technology development, vendor coordination, testing, validation, training, and ongoing support, resulting in substantial implementation costs and resources. Similarly, material changes adopted for the successor programs may require additional system enhancements, business-process modifications, and corresponding updates to program documentation, procurement activities, and operational procedures. Because these workstreams are interdependent, changes to program design may significantly affect implementation schedules, administrative complexity, and overall program costs. Page 21 of 23
  10. Page 22 of 23

    Accordingly, UI recommends that PURA leverage existing program structures, requirements, and administrative processes wherever practicable and carefully evaluate whether the benefits of any proposed modification justify the associated implementation costs, schedule impacts, and potential customer disruption. III. CONCLUSION The Company appreciates the opportunity to provide these Written Comments in response to the Notice issued by PURA. The Company looks forward to further discussing these issues with PURA and other participants and stakeholders in Docket No. 26-06-04. Respectfully submitted, THE UNITED ILLUMINATING COMPANY Alex E. Soter Alex E. Soter Counsel UIL Holdings Corporation 180 Marsh Hill Road Orange, CT 06477 Phone: [phone removed] E-Mail: [email removed] Page 22 of 23