Written Comments
Filed by Avangrid1 file
Part of docket 26-06-04Files1
2026-10-02 UI Written Comments #26-06-04.pdf
PDF · 252 KB · 23 pagesText searchable
Download 2026-10-02 UI Written Comments #26-06-04.pdfRead the text of 2026-10-02 UI Written Comments #26-06-04.pdf
Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Page 3 of 23
UI further notes that the subsequent legislative and regulatory landscape surrounding FTM storage has evolved since the initiation of Docket No. 25-01-15. While prior proceedings contemplated a standalone FTM storage framework, subsequent legislative and regulatory developments have shifted focus toward implementation of successor renewable energy programs. As a result, MPF may represent a practical mechanism for encouraging paired solar and storage resources within the scope of this proceeding. UI notes that its prior comments in Docket No. 2501-15 generally supported storage frameworks that compensate resources based on measurable system benefits while minimizing jurisdictional complexity and administrative burden. Accordingly, if PURA elects to proceed with MPF, UI recommends that compensation remain tied to clearly defined and measurable services, that implementation requirements remain administratively feasible, and that PURA preserve flexibility to evaluate broader FTM storage policy, compensation, and market-design issues through a separate proceeding if additional review is warranted in the future. A. Per-kW Payment Level If PURA elects to adopt an MPF structure, UI recommends that any $/kW payment be established on a transparent, program-wide basis and reviewed periodically through future proceedings rather than adjusted on a project-specific basis. The payment should be tied to clearly defined and measurable system benefits, such as peak load reduction, reliability support, operational flexibility, or other services PURA determines to provide value to customers and the electric system. UI further recommends that PURA evaluate how any MPF compensation interacts with existing and future compensation opportunities available to storage resources, including participation in ISO-New England wholesale markets under FERC Order No. 2222, state incentive Page 3 of 23Page 4 of 23
programs, and other market-based revenue streams. PURA should clearly identify the specific service or attribute being compensated and demonstrate that such compensation reflects distinct and incremental customer or system benefits. To the extent storage resources are capable of receiving revenues from multiple sources, PURA should carefully consider whether the proposed MPF payment is necessary to encourage the desired behavior and avoid creating duplicative ratepayer-funded incentives for the same underlying service. B. Targeted Period The targeted period should be designed to align with the specific system need or operational objective that the MPF structure is intended to address. If the purpose of the framework is to encourage delivery of renewable generation and storage output during periods when customer demand remains elevated after solar production declines, the targeted period should reflect those conditions and be supported by objective system data. UI believes seasonality should be considered, as load shapes, renewable generation profiles, and system needs vary throughout the year. Any seasonal adjustments should be established on a program-wide basis and updated through periodic regulatory review. At the same time, PURA should balance potential operational benefits against additional administrative complexity and ensure that targeted periods remain transparent, predictable, and tied to clearly defined system objectives. C. kW Performance Measurement UI believes performance measurement should prioritize simplicity, transparency, consistency, and verifiability. The minimum one-hour average output methodology proposed by Eversource provides a straightforward and administratively practical approach that encourages sustained performance throughout the entire designated period rather than short-duration output Page 4 of 23Page 5 of 23
spikes. Regardless of the methodology ultimately selected, implementation will require clearly defined metering, settlement, verification, and reporting requirements. As UI previously noted, the scope of any required billing, metering, and administrative system modifications will depend heavily on the final performance measurement and settlement framework. Accordingly, PURA should fully establish performance measurement protocols before adopting an MPF compensation structure to ensure participants, administrators, and ratepayers have a clear understanding of how performance will be measured and compensation will be earned. D. PV Charging Requirement If PURA determines that MPF compensation is intended to support renewable energy delivered from paired solar and storage resources, a PV charging requirement may be appropriate to maintain eligibility for compensation associated with Class I renewable energy generation. Regardless of the charging requirement ultimately adopted, PURA should establish clear metering, accounting, telemetry, and verification requirements to support REC administration, eligibility determinations, and program settlement. Accurate verification of energy flows between the PV system, battery, customer load, electric vehicle charging infrastructure, and the distribution system will become increasingly important as solar and storage systems are integrated with residential, commercial, EV charging, and other distributed energy resource applications. PURA should also consider whether a strict PV-only charging requirement could limit operational flexibility, future DER aggregation opportunities, or wholesale market participation while increasing metering, telemetry, and compliance costs. E. Project Economics UI agrees that the proposed MPF framework would inherently favor paired solar and storage projects relative to standalone solar facilities. Under Eversource's proposal, solar-only Page 5 of 23Page 6 of 23
projects would continue receiving compensation through competitively determined $/MWh payments, while paired solar and storage projects could earn additional performance-based compensation by sustaining output during designated periods. While this outcome may be consistent with Connecticut's storage deployment objectives, PURA should ensure that any additional compensation appropriately reflects measurable customer and system benefits. PURA should avoid creating a framework that effectively excludes costeffective solar-only resources from participation while ensuring that storage compensation remains tied to clearly defined services and incremental value. The Company recommends that PURA evaluate how potential revenues available through wholesale market participation, DER aggregation, and other compensation mechanisms may affect project economics and the level of state-supported incentives necessary to encourage deployment. As discussed previously, PURA should clearly identify the specific attribute being compensated to avoid duplicative compensation and ensure that incentives remain aligned with demonstrated customer and system benefits. F. Bid Preferences The existing NRES and SCEF programs demonstrate that bid preferences can be effectively incorporated into competitive solicitations through predefined evaluation adjustments while maintaining objective project selection. UI recommends retaining this established approach, whereby any bid preference is applied solely for evaluation and ranking purposes, established in advance of the solicitation, applied consistently, and limited to a single preference per project. To avoid duplicative compensation, PURA should clearly distinguish between bid-ranking preferences and MPF compensation earned through actual project performance, with any performance-based payments remaining tied to verified performance outcomes. Page 6 of 23Page 7 of 23
G. EDC Discretion UI does not support broad discretion allowing EDCs to establish project-specific targeted periods. While project-level adjustments could theoretically improve alignment with localized system conditions, they would also increase program administration, settlement complexity, metering requirements, and implementation costs. Project-specific targeted periods could also create challenges for resources participating in wholesale markets or future DER aggregation frameworks by introducing potentially conflicting operational requirements. Accordingly, UI recommends that any targeted periods be established on a standardized program-wide basis and updated through periodic regulatory review rather than individualized project determinations. H. Other Jurisdictions UI recognizes that other jurisdictions, including Hawaii and Nevada, have implemented compensation structures intended to encourage deployment of paired solar and storage resources. A key lesson from these programs is that compensation can be designed to encourage delivery of renewable energy during targeted periods of system need rather than solely compensating total energy production. These frameworks have also been used to support broader storage deployment objectives by rewarding project designs that provide additional system value beyond energy production alone. At the same time, PURA should carefully evaluate differences between those jurisdictions and Connecticut, including market structures, renewable energy accounting requirements, interconnection processes, utility program administration, and available wholesale market opportunities. While Connecticut has established statewide energy storage deployment goals, the successor renewable energy programs remain distinct from a comprehensive front-of-the-meter Page 7 of 23Page 8 of 23
storage program. Accordingly, Connecticut should avoid adopting a compensation framework based solely on outcomes achieved elsewhere without fully evaluating the implications for local metering, telemetry, settlement processes, billing systems, and program administration. Any framework adopted in Connecticut should reflect the State's specific regulatory, operational, and market conditions. I. Additional Considerations UI recommends that PURA proceed cautiously when evaluating MPF implementation. As stated in the Company's response to Interrogatory CAE-003 UI Docket No. 26-06-04.pdf, UI has not independently evaluated the billing, metering, information technology, settlement, or program administration requirements associated with Eversource's proposed framework and therefore cannot provide a reliable implementation estimate based on the current record. The implementation requirements and associated costs of any MPF structure remain dependent upon multiple unresolved program design decisions, including performance measurement, targeted periods, eligibility requirements, metering configurations, and settlement methodologies. In particular, PURA should consider the metering, telemetry, and verification requirements necessary to support performance-based compensation; impacts on existing billing, settlement, reporting, and program administration systems; interactions with REC administration and renewable energy accounting requirements; and how MPF compensation may interact with wholesale market participation, DER aggregation opportunities, and other compensation mechanisms. PURA should also consider whether MPF compensation could duplicate revenues available through wholesale energy, capacity, ancillary services, or other market-based programs and whether storage resources could face conflicting obligations between state-administered incentive structures and future wholesale market participation opportunities. Page 8 of 23Page 9 of 23
Finally, UI continues to believe that many of the issues raised by the MPF proposal are fundamentally energy storage policy and market design questions. While MPF may provide a mechanism for encouraging paired solar and storage resources within the successor programs, it does not resolve the broader issues associated with front-of-the-meter storage deployment, including compensation design, interconnection, market participation, metering, and operational requirements. As previously stated in the Company’s response to CAE-003 in Docket No. 26-0604, to the extent PURA determines that these broader issues warrant additional consideration, PURA should preserve flexibility to evaluate them through a future proceeding rather than attempting to resolve all FTM storage considerations within the successor renewable energy program framework. 2. NRES SUCCESSOR PROGRAM NETTING TARIFF Public Act No. 26-127 requires the NRES successor program to offer eligible resources both a Buy-All tariff and a Netting tariff. PURA requests comments on instantaneous netting with exports compensated below the full retail rate and implementation within a continued competitive solicitation process. UI recommends retaining the existing NRES netting framework and existing competitive procurement structure to the greatest extent practicable while implementing any statutory changes required by Public Act 26-127. A. Export Compensation UI believes that retaining existing NRES netting, together with an export compensation rate below the full retail rate is conceptually feasible and could be implemented within a successor NRES framework. As stated in the Interrogatory OCC-007 in the above-referenced docket, the Company’s Advanced Metering Infrastructure (“AMI”) meters cannot perform instantaneous netting. However, the feasibility, implementation timeline, and cost using export compensation Page 9 of 23Page 10 of 23
rate below the full retail will depend upon the final program design, including the compensation methodology, settlement requirements, billing functionality, reporting obligations, metering requirements, and treatment of energy storage resources. The Company does not oppose modifications to the existing NRES framework if PURA determines that such changes are necessary to achieve the objectives of Public Act No. 26-127. However, UI notes that utilizing existing compensation structures, procurement mechanisms, customer classifications, and administrative processes including interconnection processes would provide significant implementation advantages. Building upon established program rules would reduce implementation complexity, minimize required system modifications, shorten deployment timelines, and avoid or substantially mitigate additional implementation costs that would ultimately be borne by ratepayers. UI Recommendation UI recommends that PURA adopt a successor NRES framework that achieves the policy objectives established by Public Act No. 26-127 while preserving existing NRES program netting and buy-all structures and administrative processes to the greatest extent practicable. Leveraging existing program infrastructure would facilitate timely implementation, reduce operational complexity, minimize implementation risk, and avoid unnecessary costs to ratepayers. To the extent program modifications are required, PURA should provide sufficient time for system design, vendor assessment, development, testing, and implementation prior to program launch. B. Competitive Solicitation UI believes that both the existing NRES netting methodology and any revised exportcompensation methodology should be implemented through the existing Small, Medium, and Large project categories under the NRES Successor Program. Page 10 of 23Page 11 of 23
For Small NRES successor program projects, which are currently selected on a non-competitive basis, implementation could be accomplished through an administratively established exportcompensation rate applicable to all eligible projects within that category. Participants would evaluate project economics based upon the applicable netting methodology and exportcompensation provisions approved by PURA. For Medium and Large projects, the existing competitive procurement structure could largely be maintained. Participants could continue submitting bids using the current solicitation process while excess generation would be compensated pursuant to the export-compensation framework adopted by PURA. Under this approach, competitive procurement would continue to focus on the bid value submitted by developers while the export-compensation methodology would apply consistently to all selected projects within a given program year. The Company does not oppose modifications to the NRES successor program if such changes are adopted by PURA. However, preserving existing procurement categories, solicitation methodologies, and administrative processes would significantly reduce implementation effort, maintain continuity for market participants, minimize customer confusion, and avoid unnecessary system-development costs. Moreover, retaining the existing program architecture would facilitate a timelier transition to the successor program while ensuring consistency for customers, developers, and program administrators. UI Recommendation The Company recommends that PURA retain the existing Small, Medium and Large project categories and maintain the current procurement structure to the extent practicable. PURA should seek to implement any required statutory changes within the existing framework rather than redesigning the program structure unless a demonstrated policy benefit justifies the additional Page 11 of 23Page 12 of 23
implementation complexity and cost. Preserving the existing NRES architecture would support timely deployment and reduce the potential for additional costs that would ultimately be recovered from ratepayers. C. Metering, Billing, and Administration UI currently utilizes production-meter data for a variety of operational, analytical, and regulatory purposes beyond direct administration of renewable energy programs. Such data supports trend analysis, monitoring of system performance, operational investigations, planning activities, energy-purchase activities, distribution-planning activities, regulatory reporting, and other internal business functions. The Company notes that its current billing and incentive-administration systems are designed around existing NRES and RRES program structures. Maintaining existing compensation methodologies, settlement conventions, administrative processes, and reporting mechanisms where feasible would significantly reduce the scope of required system modifications. Conversely, substantial departures from existing program structures may require additional changes to billing systems, customer-account functionality, settlement processes, reporting systems, payment-processing functionality, and related administrative controls. At this time, UI cannot provide a reliable estimate of implementation costs or timelines. Any estimate would be speculative until PURA establishes final program requirements and the Company has an opportunity to engage vendors and conduct a detailed requirements assessment and solution-design process. UI Recommendation UI recommends that PURA carefully evaluate whether proposed modifications require functionality beyond that currently supported by existing metering, billing, reporting, and Page 12 of 23
As listed on the current system
Written Comments - 10/02/2026 [26-06-04] (Avangrid)