Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Written Comments

Files1

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
  1. Page 9 of 23

    Finally, UI continues to believe that many of the issues raised by the MPF proposal are fundamentally energy storage policy and market design questions. While MPF may provide a mechanism for encouraging paired solar and storage resources within the successor programs, it does not resolve the broader issues associated with front-of-the-meter storage deployment, including compensation design, interconnection, market participation, metering, and operational requirements. As previously stated in the Company’s response to CAE-003 in Docket No. 26-0604, to the extent PURA determines that these broader issues warrant additional consideration, PURA should preserve flexibility to evaluate them through a future proceeding rather than attempting to resolve all FTM storage considerations within the successor renewable energy program framework. 2. NRES SUCCESSOR PROGRAM NETTING TARIFF Public Act No. 26-127 requires the NRES successor program to offer eligible resources both a Buy-All tariff and a Netting tariff. PURA requests comments on instantaneous netting with exports compensated below the full retail rate and implementation within a continued competitive solicitation process. UI recommends retaining the existing NRES netting framework and existing competitive procurement structure to the greatest extent practicable while implementing any statutory changes required by Public Act 26-127. A. Export Compensation UI believes that retaining existing NRES netting, together with an export compensation rate below the full retail rate is conceptually feasible and could be implemented within a successor NRES framework. As stated in the Interrogatory OCC-007 in the above-referenced docket, the Company’s Advanced Metering Infrastructure (“AMI”) meters cannot perform instantaneous netting. However, the feasibility, implementation timeline, and cost using export compensation Page 9 of 23
  2. Page 10 of 23

    rate below the full retail will depend upon the final program design, including the compensation methodology, settlement requirements, billing functionality, reporting obligations, metering requirements, and treatment of energy storage resources. The Company does not oppose modifications to the existing NRES framework if PURA determines that such changes are necessary to achieve the objectives of Public Act No. 26-127. However, UI notes that utilizing existing compensation structures, procurement mechanisms, customer classifications, and administrative processes including interconnection processes would provide significant implementation advantages. Building upon established program rules would reduce implementation complexity, minimize required system modifications, shorten deployment timelines, and avoid or substantially mitigate additional implementation costs that would ultimately be borne by ratepayers. UI Recommendation UI recommends that PURA adopt a successor NRES framework that achieves the policy objectives established by Public Act No. 26-127 while preserving existing NRES program netting and buy-all structures and administrative processes to the greatest extent practicable. Leveraging existing program infrastructure would facilitate timely implementation, reduce operational complexity, minimize implementation risk, and avoid unnecessary costs to ratepayers. To the extent program modifications are required, PURA should provide sufficient time for system design, vendor assessment, development, testing, and implementation prior to program launch. B. Competitive Solicitation UI believes that both the existing NRES netting methodology and any revised exportcompensation methodology should be implemented through the existing Small, Medium, and Large project categories under the NRES Successor Program. Page 10 of 23
  3. Page 11 of 23

    For Small NRES successor program projects, which are currently selected on a non-competitive basis, implementation could be accomplished through an administratively established exportcompensation rate applicable to all eligible projects within that category. Participants would evaluate project economics based upon the applicable netting methodology and exportcompensation provisions approved by PURA. For Medium and Large projects, the existing competitive procurement structure could largely be maintained. Participants could continue submitting bids using the current solicitation process while excess generation would be compensated pursuant to the export-compensation framework adopted by PURA. Under this approach, competitive procurement would continue to focus on the bid value submitted by developers while the export-compensation methodology would apply consistently to all selected projects within a given program year. The Company does not oppose modifications to the NRES successor program if such changes are adopted by PURA. However, preserving existing procurement categories, solicitation methodologies, and administrative processes would significantly reduce implementation effort, maintain continuity for market participants, minimize customer confusion, and avoid unnecessary system-development costs. Moreover, retaining the existing program architecture would facilitate a timelier transition to the successor program while ensuring consistency for customers, developers, and program administrators. UI Recommendation The Company recommends that PURA retain the existing Small, Medium and Large project categories and maintain the current procurement structure to the extent practicable. PURA should seek to implement any required statutory changes within the existing framework rather than redesigning the program structure unless a demonstrated policy benefit justifies the additional Page 11 of 23
  4. Page 12 of 23

    implementation complexity and cost. Preserving the existing NRES architecture would support timely deployment and reduce the potential for additional costs that would ultimately be recovered from ratepayers. C. Metering, Billing, and Administration UI currently utilizes production-meter data for a variety of operational, analytical, and regulatory purposes beyond direct administration of renewable energy programs. Such data supports trend analysis, monitoring of system performance, operational investigations, planning activities, energy-purchase activities, distribution-planning activities, regulatory reporting, and other internal business functions. The Company notes that its current billing and incentive-administration systems are designed around existing NRES and RRES program structures. Maintaining existing compensation methodologies, settlement conventions, administrative processes, and reporting mechanisms where feasible would significantly reduce the scope of required system modifications. Conversely, substantial departures from existing program structures may require additional changes to billing systems, customer-account functionality, settlement processes, reporting systems, payment-processing functionality, and related administrative controls. At this time, UI cannot provide a reliable estimate of implementation costs or timelines. Any estimate would be speculative until PURA establishes final program requirements and the Company has an opportunity to engage vendors and conduct a detailed requirements assessment and solution-design process. UI Recommendation UI recommends that PURA carefully evaluate whether proposed modifications require functionality beyond that currently supported by existing metering, billing, reporting, and Page 12 of 23
  5. Page 13 of 23

    program-administration systems. Where feasible, maintaining existing compensation mechanisms, settlement practices, and administrative processes would reduce implementation risk, accelerate deployment, minimize system-development requirements, and avoid incremental costs to ratepayers. To the extent PURA adopts new requirements requiring system enhancements, UI should be provided sufficient time to design, develop, test, validate, and deploy the necessary functionality and should be permitted to recover prudently incurred implementation and ongoing administrative costs. UI supports PURA’s efforts to develop a successor NRES framework that satisfies the requirements of Public Act No. 26-127 while continuing to promote renewable-resource development and customer participation. The Company believes that existing NRES netting should be retained and export compensation below the full retail rate may be implemented within the successor program framework, subject to the establishment of clear program rules, billing requirements, metering standards, settlement procedures, customer protections, and implementation timelines. The Company does not oppose modifications to the existing NRES program if PURA determines that such changes are necessary to achieve statutory objectives. However, UI believes that preserving existing program categories, compensation mechanisms, procurement structures, customer classifications, and administrative processes wherever practical would provide meaningful benefits to customers, developers, administrators, and ratepayers. Leveraging existing infrastructure would facilitate a more efficient and timely implementation, reduce operational complexity, minimize implementation risk, mitigate Page 13 of 23
  6. Page 14 of 23

    implementation costs to ratepayers, and preserve continuity for customers, market participants, and program administrators. To the extent PURA adopts changes to netting methodologies, export-compensation structures, storage incentives, metering requirements, or settlement processes, UI believes that implementation should occur only after sufficient time has been provided for detailed requirements development, vendor assessment, system configuration, testing, validation, and customer communication activities. Accordingly, UI recommends that PURA: 1. Preserve the existing Small, Medium, and Large NRES project categories and existing procurement methodologies to the greatest extent practicable. 2. Implement statutory requirements within existing program structures whenever feasible. 3. Adopt a standardized export-compensation methodology applicable to similarly situated projects. 4. Coordinate any revised netting intervals with future time-varying and TOU ratedevelopment efforts. 5. Maintain program rules that provide transparency, predictability, and administrative simplicity. 6. Avoid unnecessary modifications that increase implementation complexity and cost without corresponding customer or policy benefits. 7. Provide adequate implementation time following issuance of a final decision. 8. Authorize recovery of prudently incurred implementation and administrative costs associated with successor program requirements. Page 14 of 23
  7. Page 15 of 23

    9. Ensure that the final program design balances renewable-energy objectives with administrative feasibility, customer understanding, and ratepayer impacts. By leveraging existing NRES program infrastructure to the maximum extent practicable, PURA can achieve the objectives of Public Act No. 26-127 while minimizing implementation costs, reducing operational risk, and facilitating a timely transition to the successor program. 3. RESIDENTIAL INCENTIVE ADDER IMPLEMENTATION PURA requests comments on fixed per-kW incentives and per-kWh incentives based on exports recorded at the revenue meter, including whether a fixed per-kW incentive should be administered monthly or through a one-time upfront payment. As discussed in the Company’s prior comments, production meters provide accurate, verifiable, and auditable generation data used to administer production-based charges, including applicable Low-Income and Distressed Municipality adders. The Company continues to believe that incentive structures should be supported by reliable and independently verifiable data sources. Reliance on estimated production values or inverter-reported data may present challenges related to data accuracy, consistency, oversight, customer communications, and REC accounting. Accordingly, any performance-based incentive should be designed to utilize objective and auditable data to promote transparency, consistency, and effective program administration. UI also identified operational, REC-accounting, customer-service, accuracy, and oversight concerns associated with estimates or inverter data. UI Recommendation UI recommends retaining production-based adders for the RRES program. Productionbased incentives directly link compensation payments to verified renewable energy generation, Page 15 of 23
  8. Page 16 of 23

    ensuring the greatest degree of accuracy, transparency, accountability, and alignment between incentive payments and actual system performance. Production meter data remains the most accurate, verifiable, and auditable source of generation information. Production meters provide an independent record of all renewable energy generated, supporting incentive administration, REC accounting, program reporting, regulatory oversight, and program integrity. Because the current RRES program already relies on this infrastructure and established administrative processes, production-meter data is the preferred basis for any production-based incentive or adder. Production-based incentives also promote equitable treatment by linking compensation to actual renewable energy generation. Systems that generate more renewable energy receive correspondingly greater incentives. By contrast, a fixed per-kW incentive compensates projects solely on installed capacity, regardless of actual output, and could provide identical payments to projects with materially different generation levels. A. Fixed per-kW Incentive Alternative UI acknowledges that a fixed per-kW incentive may offer customers greater simplicity and predictability because the incentive value can be established at enrollment without ongoing production-based calculations. However, such approach reduces the direct relationship between incentive payments and actual renewable energy generation and may therefore result in compensation that is not fully aligned with project performance. UI's existing systems and administrative processes are not configured to administer residential incentive adders as either one-time upfront payments based on installed capacity or recurring monthly capacity-based payments. Although a fixed-capacity structure may be feasible, implementation would require modifications to existing processes and supporting system Page 16 of 23
  9. Page 17 of 23

    functionality. If PURA retains an annual or quarterly payment cadence, UI could potentially administer the incentive through a modified semi-automated process similar to the current approach. However, this would increase administrative effort and operating costs. A recurring monthly per-kW payment structure would present substantially greater operational and system challenges. Existing processes are not designed to support monthly capacity-based calculations, validations, and payments over the life of the program. A sustainable framework would likely require a dedicated SAP project and additional automation, potentially affecting billing and incentive-management processes, customer account administration, payment processing, reporting, financial controls, program tracking, system interfaces, installed-capacity verification, eligibility validation, audits, and customer communications. If PURA adopts a fixed per-kW structure, UI recommends a yearly or one-time upfront payment rather than recurring monthly payments. An upfront incentive would reduce ongoing tracking and payment-processing requirements, minimize administrative burden, provide greater certainty to customers and developers, and avoid many of the operational and system complexities associated with monthly capacity-based payments. UI also recommends a mechanism to suspend, reduce, or discontinue incentives for projects that consistently perform below a defined production threshold. This safeguard would help align incentive levels with actual project performance, promote equitable treatment, and encourage proper system operation and maintenance. B. Export-based per-kWh Incentive Alternative An export-based per-kWh adder would utilize energy-export data recorded by the revenue meter to determine incentive payments. Because revenue-meter data is already collected for billing, this approach could reduce reliance on separate production-meter infrastructure and related Page 17 of 23
  10. Page 18 of 23

    installation, maintenance, and data-management activities. It would also retain a performancebased component because payments would vary with measured energy delivered to the grid and may be easier for customers to understand because the measurement would come from utilityowned and utility-maintained equipment. The main limitation is that exports do not equal total renewable energy production. A production meter records all energy the renewable energy system generates, while a revenue meter records only the portion exported after on-site consumption and operational losses. Export quantities therefore reflect not only system performance but also customer load profiles, appliance use, occupancy patterns, electrification decisions, and other site-specific factors. As a result, customers with identical systems and identical production could receive materially different incentive payments. A customer who uses more generation on-site for air conditioning, electric vehicles, heat pumps, or other loads would export less and receive a lower incentive than a similarly situated customer with lower on-site consumption. An export-based incentive could therefore compensate consumption behavior and load characteristics rather than renewable energy production, creating inequitable outcomes among participants with comparable systems. C. Battery Storage Considerations Battery energy storage further complicates an export-based structure. Customers may store renewable energy and export it later, allowing battery-dispatch decisions to affect export timing and quantity independently of contemporaneous renewable generation. If storage can also be charged from the grid, exported energy may not be directly attributable to renewable generation. As discussed in UI's Motion for Clarification in Docket No. 25-08-02, integrated solar-plus-storage configurations may make it difficult to distinguish renewable generation from other energy flows Page 18 of 23

As listed on the current system

Written Comments - 10/02/2026 [26-06-04] (Avangrid)

This filing on the current system (opens in a new tab)