Page 1 of 15
Paschaline Poku, Esq. Direct Dial: [phone removed] Email: [email removed] October 2nd, 2026 Public Utilities Regulatory Authority Ten Franklin Square New Britain, Connecticut 06051 RE: DOCKET NO. 26-06-04: IMPLEMENTATION OF CLEAN ENERGY SUCCESSOR PROGRAMS Dear Commissioners, The Office of Consumer Counsel (“OCC”) submits these comments 1 in response to the Authority’s Notice of Request for Written Comments, as issued in the above-captioned docket on September 9, 2026.2 OCC appreciates the opportunity to comment on the development of successor programs to the Residential Renewable Energy Solutions (“RRES”), Non-Residential Renewable Energy Solutions (“NRES”), and Shared Clean Energy Facility (“SCEF”) programs. OCC continues to gather data and information to better understand the issues and develop recommendations for PURA. OCC looks forward to offering further recommendations and analysis as the record in this docket develops. I. MULTIPART PAYMENT FRAMEWORK FOR NRES BUY-ALL AND SCEF SUCCESSOR PROGRAMS A. How the per-kW payment level should be determined and updated OCC recommends that compensation be aligned with the marginal system value of the resource at the time of delivery, based on predetermined hourly per-kW payments rather than a 1 These comments were prepared with substantial assistance from Synapse, OCC’s consultant in this proceeding Notice of Request for Written Comments (Second Notice), Docket No. 26-06-04, Implementation of Clean Energy Successor Programs, Sept. 9, 2026. 2Page 2 of 15
single payment applied to the whole designated period. Capacity value is not constant within the designated period; discharge between 6:00 PM and 7:00 PM may offer considerably more value to the electricity system than discharge between 4:00 PM and 5:00 PM. A battery is dispatchable, so compensation levels should signal when the resource could optimally discharge; solar is passive and cannot shift its production in response to an hourly price signal. 3 OCC further recommends that hourly payments be set using avoided costs as the price cap, accounting for the extent to which generation transmission and capacity costs are avoided in each hourly period.4 Those values should be informed by an updated value of distributed energy resources study, guided by the National Standard Practice Model, which OCC has recommended in previous rounds of comments.5 The Authority may want to consider adjusting incentives to recognize the distribution peaks and locations subject to grid constraints. In this regard, it may be helpful for the Authority to review how incentive levels are set under ConnectedSolutions+ in Massachusetts.6 The Authority should review incentive levels periodically rather than keep them fixed for the life of the program. Annual review would allow the Authority to adjust compensation as system conditions and avoided costs change and is consistent with what OCC has previously recommended.7 B. How the targeted period should be determined and updated, and whether the timing should vary seasonally 3 OCC Written Comments, Docket No. 25-02-14, p. 2, Dec. 12, 2025, (time-differentiated compensation “reflects the marginal system value of solar at different times/periods and aligns with ratemaking principles”). 4 OCC Written Comments, Docket No. 25-02-14, p. 8, Feb. 4, 2026, (recommending that interim compensation rates “reflect the avoided costs associated with solar energy relative to prevailing retail rates”). 5 OCC Letter in Lieu of Written Comments, Docket No. 25-02-14, pp. 1–2, Sept. 10, 2025, (a value of solar study “that quantifies avoided energy, capacity, transmission, distribution, and integration costs would provide the most efficient reference for determining compensation rates and adders”); OCC Written Comments, Docket No. 25-0214, p. 8, Feb. 4, 2026, (recommending that the National Standard Practice Manual “be used as a guide for conducting the study”). See also National Standard Practice Manual, National Association of State Energy Officials, https://www.naseo.org/Data/Sites/1/media/tknaseo/nspm-main-2026-final.pdf. 6 See https://www.eversource.com/business/save-money-energy/energy-efficiency-programs/demandresponse/connectedsolutionsplus 7 OCC Written Comments, id, p. 9, Feb. 4, 2026 (supporting a common program duration “provided that the Authority retains the ability to review and adjust program parameters annually”); OCC Written Comments, id, p. 2, May 9, 2025, (supporting “the continuation of an annual review process” that would “allow for adjustments to the tariffs where closer alignment with program goals and cost containment is necessary or achievable”)Page 3 of 15
The Authority should maintain flexibility in defining the targeted period instead of establishing a permanent one. The period should respond to evolving system peaks and account for realistic battery discharge duration alongside demonstrated system need. The same flexibility holds for seasonal variation, which OCC supports where system data reflects and supports such an approach. OCC, accordingly, recommends that the Authority direct the electric distribution companies (“EDCs”) to provide data and metrics to indicate the seasonal variance in timing, duration, magnitude, and pricing of system peaks. This data could inform the initial definition of the designated period and, if the EDCs provide updated data annually, indicate when the period should be updated. C. Whether kW performance payments should be based on the minimum one-hour average discharge over the designated period, or another method Payment based on the minimum one-hour average discharge over the designated period oversimplifies the compensation structure and potentially omits information about when resources contribute within the period. Eversource notes that a resource failing to sustain output through the final hour would register a performance value of effectively zero kW, receiving no additional compensation.8 If the dispatch period is extended to include more hours, batteries bear the risk of providing minimal output by the final hour and receiving a disproportionately penalized level of compensation. OCC recommends hourly performance payments instead: actual performance in each hour, multiplied by that hour's applicable rate. This would reflect the time-differentiated performance of the resources providing capacity throughout the designated period. Depending on how the hourly rates are set, this structure would also encourage batteries to optimize their performance throughout the period rather than curtailing exports to maintain a leveled output. While consistent output contributes to efficient peak reduction, it is OCC’s understanding that storage discharge under hourly pricing would generally align with the multi-hour discharging capacity of modern batteries in a grid-beneficial manner. OCC also recommends that the designated period duration be determined such that the intervals within the period do not significantly vary in price. 8 Eversource Written Comments, Docket No. 26-06-04, p. 7, August 26, 2026.Page 4 of 15
The Authority may alternatively consider kWh-based performance payments to reflect the value of the energy exported during the peak period. Under the Energy Storage Solutions (“ESS”) program, capacity-based compensation is associated with EDC-announced active dispatch events, not fixed periods.9 When the period is fixed and recurring and no system need threshold governs the measurement of peak production benefits, resource contributions are reflected by the actual volume of energy they export. Resources that dispatch on this schedule operate more as energy resources than demand resources. A kWh-based payment would also align with the fixed period structure of time-varying rates and how customers realize benefits from onsite consumption of solar during on-peak periods. D. Whether MPF participation should require co-located storage to charge exclusively from PV to maintain statutory eligibility for the renewable energy tariff program, and how exclusive PV charging should be verified and enforced OCC recommends that the Authority does not limit co-located batteries to charging from paired photovoltaic (“PV”) facilities, so long as the arrangement otherwise satisfies Public Act 26127 and applicable program requirements. 10 OCC is not aware of a strong system value justification for exclusively requiring PV charging. The economic benefit a paired resource delivers depends on when the battery charges and when it discharges, not on where the stored energy originated. A customer on a time-varying rate who charges off-peak from the grid and discharges during the system peak still provides peak load shifting, which is the benefit the program is designed to procure. Where a battery is sited with solar, the pairing itself satisfies the statutory purpose of encouraging renewable technologies, regardless of the source of each kWh stored. An exclusive charging requirement could potentially result in inefficient battery charging and discharging. It could also act as a barrier to storage deployment without any associated cost savings for ratepayers. 9 General. Statute. § 16-243ee; Energy Storage Solutions Program, Docket No. 17-12-03RE03. Performance-based compensation under that program is associated with EDC-announced dispatch events rather than with fixed, recurring periods. 10 Public Act No. 26-127; see also § 16-243ee (limiting Energy Storage Solutions eligibility to behind-the-meter systems paired with end-use customers).Page 5 of 15
E. The implications of an MPF compensation structure for solar-only and paired solar and storage project economics The economics for solar-only and paired solar and storage projects depend on the compensation rates and actual project performance. The Authority’s question is, therefore, best answered through a benefit-cost analysis and a rate and bill impact analysis, as OCC has previously stated.11 OCC has observed that the costs of storage projects are high and the subsidy gap is potentially substantial. Storage incentives warrant further analysis to confirm that programs are designed in a manner to deliver commensurate benefits for all contributing customers.12 With this pending analysis, OCC recommends that storage projects be funded within existing annual program budgets rather than increasing the program budgets to fund storage.13 F. How bid preferences should be administered within an MPF framework OCC continues to support bid preferences that advance policy objectives, including preferences for distressed municipalities, landfills and brownfields, and projects sited to relieve localized congestion. 14 The more challenging issue that the MPF raises is the difference in underlying bid factors between solar-only and paired solar and storage projects, which complicates comparative bid evaluation. Paired solar and storage projects have higher costs to recover but may reduce their bid prices due to anticipated compensation from peak period storage discharge. Given that difference, OCC recommends that the Authority consider adopting auction tranches to separately evaluate the two resource types: solar-only in one tranche and paired solar 11 OCC Written Comments, Docket No. 25-02-14, p. 2, May 9, 2025 (recommending “a thorough benefit costs analysis and cost-effectiveness test, as designed through the National Standard Practice Manual”); OCC Written Comments, Docket No. 25-02-14, p. 1, July 31, 2025 (“conducting a full-benefit cost-analysis as well as a corresponding bill impact analysis would allow participants and stakeholders a more granular understanding of these benefits and costs”). 12 Id, “the costs of storage projects are high, and the necessary subsidy gap is substantial. Any storage incentives considered in the successor programs should be seriously analyzed to ensure that they provide commensurate benefits for all contributing consumers” 13 OCC Written Comments, Docket No. 25-02-14, p. 4, Dec. 12, 2025 (budget-based caps “provide clearer and more predictable cost controls than fixed megawatt limits”); see also OCC Written Comments, Docket No. 25-02-14, p. 4, Feb. 4, 2026; § 16-244z(c)(1). 14 OCC Written Comments, Docket No. 25-02-14, p. 2, 4, May 9, 2025, see also OCC Written Comments, Id, p. 4, Feb. 4, 2026 (noting “the demonstrated effectiveness of bid preferences under NRES”).Page 6 of 15
and storage in another. A bidder could still submit a single bid, which the Authority would evaluate and procure within separate categories. Tranches would permit a more equitable comparison across consistent technologies and help ratepayers pay the lowest reasonable price for the relevant resource. This approach could allow developers to prepare complete bids rather than modifying their prices to account for the per-kW compensation or in an attempt to underbid solar-only projects. Adoption of tranches would raise the question of how much capacity to procure for each. The Authority could set aside a fixed amount to procure from each tranche, procuring all projects priced below avoided costs, whether solar-only or paired solar and storage, until the budget caps are reached. Alternatively, the Authority could first procure paired solar and storage projects, then accept solar-only projects until the budget caps thresholds are met. OCC recommends against fixing allocations for any tranches at this time. Once actual bids are available, the Authority could then compare pricing across categories and decide whether the differences warrant different treatments. G. Whether the EDCs should have discretion to adjust the targeted period for individual projects to align with specific system demands OCC does not oppose giving the EDCs some discretion to adjust the targeted period for individual projects, particularly where an EDC is targeting specific constrained locations. Massachusetts offers such an example, where utilities have sought to increase load between 11:00 AM and 3:00 PM to absorb excess solar generation near certain substations. 15 Similar discretion could be exercised in Connecticut, pursuant to published and standardized criteria. Without that structure, project-specific adjustments risk inconsistent treatment across the EDCs and potentially complicate the bid comparison upon which competitive solicitation relies. Any adjustments should, therefore, be disclosed in the annual program review.16 15 Massachusetts Energy Efficiency Advisory Council, ConnectedSolutions Update, slide 11, https://maeeac.org/wp-content/uploads/Connected-Solutions-Update-For-Posting-v25523139.pdf 16 OCC Comments, Feb. 4, 2026Page 7 of 15
H. Relevant operational aspects and lessons learned from similar programs in other jurisdictions, such as Hawaii and Nevada OCC is not aware of any state that requires a competitive bidding process for both solar and storage. There are examples of solar-only competition, but the battery programs known to OCC use a standard offer approach. OCC recommends that the Authority treat the experience of standard offer storage programs elsewhere as informative on potential program mechanics, including how designated periods are defined, how performance is measured, and how compliance is verified. Those programs may help inform compensation levels, which should be capped using Connecticut-specific avoided costs.17 In this section, OCC offers some preliminary findings from other jurisdictions but notes that none of these programs serve as a true analogue to Connecticut’s NRES or SCEF programs. The salient difference is that most of the customer-facing DER programs described use tariffs or administratively determined incentive structures rather than selecting each participating project through a competitive solicitation. i. Summary of Lessons Learned from Jurisdictional Practices • All three states in this section value energy exports at less than retail rates. • The export rates in other states generally provide incentives to optimize storage charge and discharge through shorter netting intervals and distinct compensation structures for self-consumption and export. • Compensation rates based on $/kWh can appropriately incent storage without $/kW compensation. • Administratively-set, regularly updated adjustment factors can be used to approximate export forecasts, simplifying developer bids made under netting programs. ii. Hawaii Hawaii has adopted a multi-part payment framework by recognizing the value of energy exports and battery performance individually. The Hawaii Public Utilities Commission launched 17 IdPage 8 of 15
its Smart DER and Bring Your Own Device (“BYOD”) tariffs in April 2024.18 Under Smart DER, exported energy receives time-varying compensation, with higher rates during the evening peak and lower rates during solar-heavy daytime hours. BYOD provides participating battery customers with additional compensation for providing grid services. The structure is conceptually similar to the proposed MPF for Connecticut, even though the programs are not direct procurement analogues. Smart DER puts the time signal in the $/kWh export rate, while BYOD separately recognizes the ability of a battery to provide dependable power when needed. Under the initial BYOD Level 1 design, participants committed a specified amount of battery capacity for a two-hour daily period.19 For example, a customer could receive Smart DER compensation for energy exported during the evening peak while separately receiving BYOD compensation for committing a specified amount of battery capacity during a two-hour period. This provides one instance of treating the value of delivered energy and the value of dependable battery capability as separate products rather than trying to capture both in one single payment. Hawaii’s implementation also highlights several operational issues that can affect whether compensated battery capacity delivers the intended system value. Hawaiian Electric found that some batteries participating in the predecessor Battery Bonus or Scheduled Dispatch Program did not always operate as expected. Certain systems shifted into manufacturercontrolled “Storm Watch” charging during severe weather, while some could only begin scheduled discharge at 15-minute increments. Hawaiian Electric also used AMI data to identify non-performing systems, directed 50 customers 20 to correct performance, and applied monthly penalties where continued noncompliance warranted them. All identified customers had returned to compliance by the end of 2024. Hawaii supports separating energy value from batteryperformance value but highlights that payment design is only one part of ensuring batteries perform as intended. Dispatch precision, metering, device controls, verification, and treatment of 18 Public Utilities Commission of The State Of Hawaii, Docket No. 2019-0323, Summary of Instituting a Proceeding to Investigate Distributed Energy Resource Policies Pertaining to the Hawaiian Electric Companies https://puc.hawaii.gov/wp-content/uploads/2023/12/DPS-Phase-3-Decision-and-Order-Summary.pdf ,p. 1-2, April 1, 2024 19 Id, p. 2-3 20 Hawai‘i Public Utilities Commission, Docket No. 2019-0323, Instituting a Proceeding to Investigate Distributed Energy Resource Policies Annual CER Program Review Report, https://www.hawaiianelectric.com/documents/products_and_services/customer_renewable_programs/custo mer_energy_resource_equipment/2024_annual_cer_report.pdf , March 31, 2025Page 9 of 15
non-performance determine whether promised capacity actually provides system value. Those lessons are particularly relevant to the discussions in Connecticut regarding compensation of storage as a capacity resource. One important distinction is that, while Hawaii’s Smart DER and BYOD programs are tariff-based, Hawaii does use competitive procurement for renewable generation, storage, and aggregated DER grid services.21 However, those procurements do not provide a direct example of comparing individual solar-only and solar-plus-storage projects under a tariff program like Connecticut’s proposed NRES and SCEF successors. iii. Nevada Nevada’s practices regarding export rate compensation and netting intervals provide useful information for Connecticut’s NRES Netting discussion. Under NRS § 704.7732, qualifying customer-generators receive a credit for excess electricity, with the credit based on a percentage of the retail rate that would otherwise apply when the electricity is exported. The credit decreases as capacity thresholds are reached. The statutory tiers stepped down the credit from 95% to 88%, then to 81%, and ultimately to 75%22 of the applicable retail rate. Tier 4, at 75% of the retail rate, is now the open tier with no capacity limit.23 Nevada’s approach to compensation creates a distinction between self-consumption and exports.24 Solar used onsite avoids a retail-priced purchase, while excess generation sent to the grid receives the discounted export credit. Storage can therefore have value even without a separate battery incentive by allowing customers to retain solar generation for later use rather than exporting it below the retail rate. Nevada also illustrates why the netting interval matters separately from the export rate. Beginning October 1, 2025, new net-metering customers in northern Nevada are billed using 15- 21 State of Hawaii Public Commission, RFP DOCKET NO. 2017-0352, Renewable Energy Procurement https://puc.hawaii.gov/energy/renewable-energy-procurement/ 22 NRS 704.7732, Utility required to provide customer-generator with credit for excess electricity; amount of credit; monthly report of cumulative installed capacity of certain net metering systems https://www.leg.state.nv.us/nrs/nrs23 Public Utilities Commission of Neveda, Net Metering in Nevada https://www.puc.nv.gov/renewables/net-metering-in-nevada/ 24 NRS 704.7732, https://www.leg.state.nv.us/nrs/nrs-704.html#NRS704Sec7732Page 10 of 15
minute netting.25 Within each interval, NV Energy compares generation and consumption, and any remaining export is credited at 75% of the applicable retail rate. The distinction matters even though the nominal export rate remains 75%. Under broader netting (e.g., monthly netting), generation produced earlier may offset consumption occurring later. Shorter-interval netting reduces that opportunity, meaning more generation can be treated as an export while later consumption is purchased at retail rates. For example, if a customer exports 10 kWh of solar generation in the afternoon and later consumes 10 kWh in the evening, monthly netting may allow those amounts to offset. Under 15-minute netting, the afternoon generation may instead receive the 75% export credit while the evening consumption is purchased at the full retail rate. A battery could reduce that difference by storing the afternoon generation for later use. Nevada law also recognizes the connection between time-varying rates and storage. NRS § 704.772526 supports greater use of energy storage by providing time-variant rate structures with rates that vary based on when electricity is consumed from or supplied to the grid. Nevada shows that below-retail rate compensation and shorter-interval netting can and likely should be considered together. The export rate determines the value of an exported kWh, while the netting interval determines whether that kWh is treated as an export. iv. California California provides a different model for recognizing the time-dependent value of solar and storage. Under the Net Billing Tariff (“NBT”), adopted by the California Public Utilities Commission (“CPUC”) in Decision 22-12-056,27 exported electricity is no longer compensated at the full retail rate. Instead, export credits are based on values derived from the CPUC Avoided Cost Calculator (“ACC”), which reflects costs such as energy, generation capacity, transmission 25 NVEnergy, Net Metering and Energy Storage Interconnection Handbook https://www.nvenergy.com/publish/content/dam/nvenergy/brochures_arch/cleanenergy/handbooks/SolarGenerations -Handbook.pdf ,p. 21. 26 NRS 704.7725, Utility required to submit request to Commission to establish time-variant rate schedule designed to expand use of energy storage systems; review and approval or denial of request by Commission https://www.leg.state.nv.us/nrs/nrs-704.html#NRS704Sec7725 27 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA, Order Instituting Rulemaking to Revisit Net Energy Metering Tariffs Pursuant to Decision 16-01-044, and to Address Other Issues Related to Net Energy Metering. https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M500/K043/500043682.PDF , December 15, 2022, p. 59-60
As listed on the current system
Written Comments - 10/02/2026 [26-06-04] (Office Of Consumer Counsel)