Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

5. Annual Compliance Filings – Additional Filings (Program Materials)

Compliance filingFiled by Avangrid13 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files13

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
  1. Page 11 of 59

    The United Illuminating Company Docket No. 26-08-01 IV. C. UI Attachment 1 RRES Program Manual Page 11 of 59 Incentive Description, Timing and Values Description of Incentives Eligible customers with Qualified Projects receive a 20-year payment commitment from the EDCs starting from the system’s Approval to Operate/Approval to Interconnect6 date. After the 20-year term, customers may be eligible to be compensated for energy exported to the distribution system through the company’s purchase power tariff, if available. Different incentive values are provided for the Buy-All or Netting incentive structures. These incentive structures are described in more detail below. By participating in either Buy-All or Netting option, the System Owner agrees that the Company takes title to all energy delivered to the distribution system by the Customer, all available Capacity Rights, and ownership to all RECs and Environmental Attributes produced by their Qualified Project. .7 The incentive structure will be selected at the time of Application submission and cannot be modified once selected, either before or after the system receives Approval to Operate/Approval to Interconnect from the utility. Residential Renewable Energy Solutions will provide Payment Beneficiaries who have received Direct Payments of $2,000 or more in a calendar year with an IRS Form 1099-MISC tax form on an annual basis as required. The EDCs do not provide tax advice and are not in a position to determine whether such payments constitute taxable income. Buy-All Incentive Under this structure, the EDC purchases all the energy and RECs generated by the Qualified Project. The Qualified Project exports all its energy to the EDC’s electric grid and all Net Excess Generation8 will be compensated at the Total Incentive Payment Rate. The Total Incentive Payment Rates are established by PURA through a rate setting regulatory process and will be identified in the Statement of Qualification issued to the project. The Total Incentive Payment Rate, once established for a project, will be fixed for the life of the 20-year project. The System Owner may determine how the Total Incentive Payment will be divided between two compensation options: i) ii) a Monetary On-Bill Credit that will be applied to the Customer of Record’s EDC billing account for the Project Site to offset their electric bill, and/or a Direct Payment provided to a Payment Beneficiary. The Payment Beneficiary cannot be the Customer of Record but may be the System Owner or another individual or entity. At application, the System Owner will designate the percentage of the system’s Total Incentive Payment that will be provided as Monetary On-Bill Credits to the Customer of Record and the percentage of total incentive that will be provided as Direct Payments to the designated beneficiary. Once a project has received a Statement of Qualification, the Total Incentive Payment Rate will not change for the 20-year Tariff term. The Tariff Payment Beneficiary is specified on the application form. For UI projects, the W-9 and additional payment forms will also be required as part of the application and may include Vendor Set-up Form, Business Classification Form, ACH or Wire Authorization Form and either a Voided Check or Banking Information on Company Letterhead. For Each EDC uses separate terms for the date at which the EDC has approved an interconnecting project’s permission to begin operations and exporting power to the grid. UI refers to this date as the Approval to Operate date while Eversource refers to this date as the Approval to Interconnect date. 7 The Tariff Terms and Conditions provide more information on the EDCs rights related to RECs and other environmental attributes associated with Systems participating in the Tariff. 8 Buy-All systems may have limited electricity consumption associated with the parasitic load of the PV system equipment. The EDCs will net this limited energy consumption against the Qualified System’s total generation monthly. 6 11 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  2. Page 12 of 59

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 1 RRES Program Manual Page 12 of 59 Eversource projects requiring a W-9, the W-9 should not be uploaded during application and will be requested via e-signature following Permission to Operate. In the event the Customer of Record accrues a balance of Monetary On-Bill Credits on their account, the Customer of Record may elect to receive a Monetary On-Bill Credit Cash Out Payment. Customers can request a Monetary On-Bill Credit Cash Out Payment no more than once annually. The first day a Customer of Record will be eligible to receive a Monetary On-Bill Credit Cash Out Payment is the one-year anniversary of the Approval to Operate/Approval to Interconnect date. Customers can request a Monetary On-Bill Credit Cash Out Payment by contacting [email removed] or [email removed]. Netting Incentive Under this incentive or tariff type, the EDC purchases all RECs generated by a Qualified Project at the REC Incentive Rate9 and/or assesses a Solar Energy Adjustment / Solar Production charge on production as measured by the system’s Production Meter at the Solar Energy Adjustment / Solar Production rate. REC Incentive Rates and Solar Energy Adjustment / Solar Production rates are established by PURA through an annual rate setting process and will be noted in the Statement of Qualification issued to the project. REC Incentive Rates and Solar Energy Adjustment / Solar Production rates may be greater than zero but may also be set by PURA at $0 per kWh.10 Once a project has received a Statement of Qualification designating a particular REC Incentive Rate and/or Solar Energy Adjustment / Solar Production rate, those rates will not change for the 20-year Tariff term. REC Payments are made as quarterly Direct Payments. For the Netting incentive structure, REC payments will be issued to a Tariff Payment Beneficiary, who may be either the Customer of Record or third party. When a Tariff Payment Beneficiary is designated to receive Direct Payments, the Tariff Payment Beneficiary fields must be completed at the time of application. For UI projects, a W-9 and a Vendor Creation Form is required and must be completed. For Eversource projects requiring a W-9, the W-9 should not be uploaded during application and will be requested via e-signature following Permission to Operate. In addition to REC Incentives, the EDCs also provide Monetary On-Bill Credits on a Customer of Record’s electric bill for any energy exported to the electric grid and not consumed on-site (“Net Excess Generation”). The Netting Tariff Export Rate is defined as the Customer of Record’s currently applicable Retail Rate inclusive of Standard Service energy supply charges. In the event a customer’s Retail Rate changes or the structure of the Retail Rate changes, the customer will receive Monetary On-Bill Credits based on the customer’s new Retail Rate. Monetary On-Bill Credits are calculated based on a customer’s monthly Net Excess Generation. Excess Monetary On-Bill Credits appearing on a customer’s bill will carry forward from month to month and can be used to offset customer, supply, and delivery charges. Customers may receive an On-Bill Credit Cash Out payment for any accrued Monetary Bill Credits at the time they close their EDC account. Incentive Adders Effective January 1, 2026, Qualified Projects serving Customers of Record who have incomes 60% or below of State Median Income are eligible to receive an additional $0.035 per net kWh for Netting projects and $0.055 per kWh for Buy-All projects, as registered on the system Production Meter. Eligibility requirements for incentive adders are found in Section IV E of this document. Projects located in Economically Distressed Municipalities11 are eligible to receive an additional incentive of $0.0175 per net kWh for Netting Projects and $0.0275 per kWh Appendix C provides illustrative examples of metering configurations available under the EDC’s respective solar tariffs. In future regulatory proceedings, PURA may establish negative REC Incentive Rates for projects installed after 2022. This Program Manual will be updated to include negative REC Incentive Rates should PURA establish such a mechanism. 11 Economically Distressed Municipalities are defined as the most recent list developed by the Connecticut Department of Economic and Community Development, see https://portal.ct.gov/DECD/Content/About_DECD/Research-andPublications/02_Review_Publications/Distressed-Municipalities. 9 10 12 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  3. Page 13 of 59

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 1 RRES Program Manual Page 13 of 59 for Buy-All projects, as registered on the system Production Meter. Qualified Systems are only eligible for one adder and cannot receive both adders. Adders should be applied for within the Application process and cannot be added or removed once the project has received Permission to Operate/Approval to Energize if a customer’s income status changes. In cases where the adder was not applied for and the Customer of Record is the Payment Beneficiary, if the EDCs confirm that the Customer of Record is eligible for either adder (by enrollment in a utility hardship program, participation in Home Energy Solutions Income Eligible, or the project is located in an Economically Distressed Municipality), the EDCs will automatically apply the relevant adder to the project, designating the Customer of Record as the Tariff Payment Beneficiary/Adder recipient. If a customer is Income Eligible and also located in an Economically Distressed Municipality, the higher of the two adders will be applied. Adders are applied to net generation at the Production Meter for both the Buy-All Tariff and Netting Tariff and dispersed as a Direct Payment included with the REC incentive (when there is a $0 REC incentive for the project year, the Adders will only be provided as a Direct Payment). For UI projects, a W-9 and Vendor Creation Form are required for residential customers to receive Adder incentives. For Eversource projects requiring a W-9, the W-9 should not be uploaded during the application and will be requested via e-signature following Permission to Operate. D. Incentive Payment, Bill Credits and Cash-Out Timing The following sections provide an overview of the timing of incentive payments for each tariff structure. Buy-All The following table provides information on the frequency and type of incentives available under the Buy-All Tariff. The Total Incentive Payment rate is applied to Net Excess Generation registered at the Production Meter. Incentive payments can be split between Monetary On-Bill Credits applied to Customer of Record’s main onpremise billing account and Direct Payments to the Payment Beneficiary. Cash-out payments are made for accumulated bill credits and are available to Buy-All incentive Customers of Record annually upon request. Incentive Type Direct Payment Monetary On-Bill Credits Monetary On-Bill Credit Cash Out Payment Type of Incentive Entity or Individual Receiving Incentive Payment Beneficiary as designated by Customer/System Owner. May not be Customer of Record but may be the System Owner or another individual or entity Percentage of Incentive X% Minimum amount to issue a Direct Payment is $5.00. Payment increments of less than $5.00 for any given Quarter will be rolled into the next Quarter. Dollar denominated bill credits Customer of Record X% to 100% Monthly on the customer’s electric bill for the premises Cash payment Customer of Record N/A Cash payment Frequency of Incentive Once every quarter. Not more than annually 13 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  4. Page 14 of 59

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 1 RRES Program Manual Page 14 of 59 Netting The following table provides information on the frequency and type of incentives and/or bill adjustments available under the Netting Tariff. Monetary On-Bill Credits, which are valued at the customer’s retail rate, are applied to Net Excess Generation registered at the retail meter. In addition, the REC incentive payment rate and/or Solar Energy Adjustment / Solar Production charge is applied to solar production registered at the Production Meter. REC incentive payments, including adders, are issued to the Tariff Payment Beneficiary. Netting incentive CashOut Payments are only made when a Customer of Record closes their account with an EDC.12 Incentive Type Type of Incentive Entity or Individual Receiving Incentive Percentage of Incentive REC Incentive Payment Cash payment Tariff Payment Beneficiary as designated by the Customer/System Owner. Beneficiary may be Customer of Record, System Owner or a third party. Monetary On-Bill Credits Dollar denominated bill credits Customer of Record 100% Customer of Record N/A Customer of Record N/A Monetary On-Bill Credit Cash Out Cash payment Payment Solar Energy Dollar denominated Adjustment / Solar bill charge Production Charge E. 100% Frequency of Incentive Once every quarter. Minimum amount to issue a Direct Payment is $5.00. Payment increments of less than $5.00 for any given Quarter will be rolled into the next Quarter. Monthly on the customer’s electric bill for the premises Once when a Customer of Record closes an account Monthly on the customer’s electric bill for the premise How Incentive Values are Determined Incentive values for projects applying to the Tariff are determined through a process by PURA that evaluates whether the program is achieving its objectives. Incentive rates are established annually using an incentive rate setting model that is intended to provide System Owners with a target 9-11% rate of return on their project and a total annual deployment of at least 50 to 60 MW to the grid. The rates established each year are applicable for projects that submit a completed Application to both Residential Renewable Energy Solutions and to interconnect that same year. For example, all projects submitting a completed application in 2023 will receive the incentive rates established by PURA for 2023. Applications are considered complete for rate assignment purposes once all required fields and documents have been submitted and the application fee has been paid. Once an incentive rate is established for an individual project, the incentive rate will not change over the 20-year incentive term. After the incentive term reaches expiration customers may be eligible to be compensated for energy exported to the distribution system through the company’s purchase power tariff, if available. The EDC is not under any obligation 12 For UI, a cash-out must be specifically requested by the Customer of Record when they close the account. 14 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  5. Page 15 of 59

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 1 RRES Program Manual Page 15 of 59 to purchase RECs after the tariff term from the Projects. More information about the incentive rate setting process is available on the PURA website13 under Docket 21-08-02 and 22-08-02. F. Current Incentive Values Incentive values for projects applying for interconnection between January 1st, 2026 and December 31st, 2026 are provided for each EDC below. Buy-All Buy-All Incentive Rate per kWh Low-Income Customer Adder per kWh14 Economically Distressed Municipality Adder per kWh15 Netting Netting Tariff Production Meter (“REC”) Rate per kWh Netting Tariff Export Rate per kWh Low-Income Customer Adder per kWh14 Economically Distressed Municipality Adder per kWh15 Solar Production Charge / Solar Energy Adjustment per kWh Eversource $0.3289 United Illuminating $0.3289 $0.055 $0.0275 $0.000 $0.000 Currently Applicable Retail Rate16 Currently Applicable Retail Rate17 $0.035 $0.0175 -$0.0402 For Netting Tariff projects, the Currently Applicable Retail Rate for all customers will be calculated using the currently applicable Standard Service rates. G. Historical Incentive Values 13 http://www.dpuc.state.ct.us/dockcurr.nsf/(Web+Main+View/All+Dockets)?OpenView&StartKey=21-08-02 The Low-Income Customer Adder will be applied even if the REC Rate is $0.00. 15 The Economically Distressed Municipality Adder will be applied even if the REC rate is $0.00. 16 Current Eversource rates are available at: https://www.eversource.com/content/ct-c/residential/my-account/billingpayments/about-your-bill/rates-tariffs. For Customers on a third-party supplier rate, Eversource’s standard service rate will be used for the export rate. 17 Current UI rates are available at Pricing - UI . Customers on a third-party supplier rate, UI’s standard service rate will be used for the export rate. 14 15 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  6. Page 16 of 59

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 1 RRES Program Manual Page 16 of 59 2022 Historic Incentive Rates Buy-All Incentive Rate per kWh Netting Tariff Production Meter (“REC”) Rate per kWh Netting Tariff Export Rate per kWh Low-Income Customer Adder per kWh Economically Distressed Municipality Adder per kWh Eversource $0.2943 United Illuminating $0.2943 $0.0318 $0.000 Currently Applicable Retail Rate Currently Applicable Retail Rate $0.025 $0.0125 2023 Historic Incentive Rates Buy-All Buy-All Incentive Rate per kWh Low-Income Customer Adder per kWh18 Economically Distressed Municipality Adder per kWh19 Netting Netting Tariff Production Meter (“REC”) Rate per kWh Netting Tariff Export Rate per kWh Low-Income Customer Adder per kWh14 Economically Distressed Municipality Adder per kWh15 Eversource $0.2943 United Illuminating $0.2943 $0.030 $0.0175 $0.0318 $0.000 Currently Applicable Retail Rate20 Currently Applicable Retail Rate21 $0.025 $0.0125 18 The Low-Income Customer Adder will be applied even if the REC Rate is $0.00. The Economically Distressed Municipality Adder will be applied even if the REC rate is $0.00. 20 Current Eversource rates are available at: https://www.eversource.com/content/ct-c/residential/my-account/billingpayments/about-your-bill/rates-tariffs. For Customers on a third-party supplier rate, Eversource’s standard service rate will be used for the export rate. 21 Current UI rates are available at: Pricing - UI. Customers on a third-party supplier rate, UI’s standard service rate will be used for the export rate. 19 16 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  7. Page 17 of 59

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 1 RRES Program Manual Page 17 of 59 2024 Historic Incentive Rates Buy-All Buy-All Incentive Rate per kWh Low-Income Customer Adder per kWh22 Economically Distressed Municipality Adder per kWh23 Netting Netting Tariff Production Meter (“REC”) Rate per kWh Netting Tariff Export Rate per kWh Low-Income Customer Adder per kWh14 Economically Distressed Municipality Adder per kWh15 Solar Production Charge / Solar Energy Adjustment per kWh Eversource $0.3189 United Illuminating $0.3189 $0.055 $0.0275 $0.000 $0.000 Currently Applicable Retail Rate24 Currently Applicable Retail Rate25 $0.035 $0.0175 $0.000 2025 Historic Incentive Rates 22 The Low-Income Customer Adder will be applied even if the REC Rate is $0.00. The Economically Distressed Municipality Adder will be applied even if the REC rate is $0.00. 24 Current Eversource rates are available at: https://www.eversource.com/content/ct-c/residential/my-account/billingpayments/about-your-bill/rates-tariffs. For Customers on a third-party supplier rate, Eversource’s standard service rate will be used for the export rate. 25 Current UI rates are available at: Pricing - UI. Customers on a third-party supplier rate, UI’s standard service rate will be used for the export rate. 23 17 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  8. Page 18 of 59

    The United Illuminating Company Docket No. 26-08-01 Buy-All Buy-All Incentive Rate per kWh Low-Income Customer Adder per kWh26 Economically Distressed Municipality Adder per kWh27 Netting Netting Tariff Production Meter (“REC”) Rate per kWh Netting Tariff Export Rate per kWh Low-Income Customer Adder per kWh14 Economically Distressed Municipality Adder per kWh15 Solar Production Charge / Solar Energy Adjustment per kWh UI Attachment 1 RRES Program Manual Page 18 of 59 Eversource $0.3195 United Illuminating $0.3195 $0.055 $0.0275 $0.000 $0.000 Currently Applicable Retail Rate28 Currently Applicable Retail Rate29 $0.035 $0.0175 -$0.0050 26 The Low-Income Customer Adder will be applied even if the REC Rate is $0.00. The Economically Distressed Municipality Adder will be applied even if the REC rate is $0.00. 28 Current Eversource rates are available at: https://www.eversource.com/content/ct-c/residential/my-account/billingpayments/about-your-bill/rates-tariffs. For Customers on a third-party supplier rate, Eversource’s standard service rate will be used for the export rate. 29 Current UI rates are available at: Pricing - UI. Customers on a third-party supplier rate, UI’s standard service rate will be used for the export rate. 27 18 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  9. Page 19 of 59

    The United Illuminating Company Docket No. 26-08-01 V. UI Attachment 1 RRES Program Manual Page 19 of 59 Eligibility Residential Renewable Energy Solutions eligibility is determined during the application process. Once a Qualified Project has been determined to be eligible, eligibility may only be revoked for violations of the program Terms and Conditions or due to changes in law or regulatory rulings as further described in the program Terms and Conditions. H. Customer Eligibility Eligible Customers of Record must be a current or future electric customer of either Eversource or United Illuminating. If an Eligible Customer of Record is not a current customer of an EDC and a project is a New Construction Project, they must have previously submitted an application to their EDC to receive electric distribution service for the Eligible Property. I. System Eligibility A renewable energy system is not eligible for Residential Renewable Energy Solutions if the System Owner has received Approval to Operate/Approval to Interconnect from an EDC prior to January 1, 2022 or has submitted a complete Application to Interconnect prior to January 1, 2022. Qualified Projects are limited to technologies meeting the requirements of the Connecticut Class I Renewable Portfolio Standard. If a project has already received or been approved for an incentive under the Connecticut Green Bank’s Residential Solar Incentive Program (“RSIP”), the project is NOT eligible to participate in Residential Renewable Energy Solutions for the same solar PV project. All Qualified Project equipment must be new. Qualified Projects may not be moved and subsequently seek to qualify for Residential Renewable Energy Solutions. It is both the customer’s and contractor’s responsibility to know whether a project has already received an RSIP incentive, and this must be disclosed during the application process. J. Property Eligibility As per the requirements of the Statute, Eligible Properties are one-to-four family residential properties receiving service from an EDC or qualified Multi-Family Affordable Housing as defined in Appendix G. Applications must include suitable proof that the project will be installed at a one-to-four family property or a Multi-Family Affordable Housing property. For single family and 2-4 unit properties, suitable proof of this eligibility requirement includes a copy of an assessor’s property card or screenshot from a real estate listing site.30 If the home has previously participated in the Home Energy Solutions (HES) or Home Energy Solutions – Income Eligible (HES-IE) programs, the home will automatically meet this eligibility criteria.31 For Multi-Family Affordable Housing properties, proof of eligibility is defined in Appendix G. For 2-4 unit properties, a Qualified System must be associated with a single utility billing account. Documentation of an energy assessment is required for the unit served by the Customer of Record’s billing account. System sizing (kWh) can account for full premise load (premise must have 4 or less units) being served by the solar PV. At the time of application, the applicant must provide the additional billing account numbers located on the premise that would be served by the solar. The total nameplate AC capacity for all qualified systems on a premise may not exceed 25kW. The maximum qualified systems size for a Multi-Family Affordable Housing property is described in Appendix G. Electronic assessor’s databases are available for many Connecticut cities and towns at https://www.vgsi.com/connecticutonline-database/. Individual city and town websites also have links to assessor’s databases. 31 HES and HES-IE exclusively serve one-to-four family properties. 30 19 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  10. Page 20 of 59

    The United Illuminating Company Docket No. 26-08-01 K. UI Attachment 1 RRES Program Manual Page 20 of 59 Energy Assessment Requirement For a property to be eligible for Residential Renewable Energy Solutions, the property must have had in-home HES or HES-IE energy assessment after 2011.32 At the time of application, the Customer of Record must verify that their property had either completed a HES or HES-IE assessment after 2011 or must have scheduled such an assessment. EDCs will validate HES or HES-IE was performed via internal systems; however, they may request documentation if this cannot be validated internally. When scheduling the assessment, the customer of record should be apprised of the scheduled appointment and must be screened for HES-IE eligibility by the HES(-IE) vendor. Information on scheduling HES and HES-IE assessments is available at: • • Home Energy Solutions-Income Eligible: https://energizect.com/your-home/solutions-list/save-energyand-money-all-year-long Home Energy Solutions: https://energizect.com/your-home/solutions-list/home-energy-solutions-coreservices In the event that the residence was not able to move forward with a HES or HES-IE assessment due to the existence of a health and safety barrier or is not eligible for efficiency measures to be installed due to the age of the home,33, the EDCs will accept proof of a Weatherization Assistance Program (WAP) assessment that was performed at the residence within 15 years of the Application. If a HES or HES-IE assessment has not been completed in the past, a home energy assessment shall be scheduled by the Customer, and the EDC will confirm the scheduling within its internal systems. If the assessment is not completed or scheduled due to HES(-IE) program scheduling and/or budget constraints, it will not impede application or interconnection approval of the system. Homes built on or after January 1, 1980, are not required to have an energy assessment in order to apply for the Tariff. If the applicant would like to waive the energy assessment requirement due to the home being built in 1980 or more recently, the applicant needs to provide a property assessor’s card verifying the built date with the application submittal. Partial new construction or renovations will not be considered for waiving the energy assessment requirement. In certain limited circumstances, one-to-four family homes may not be eligible for any of the energy assessments described above. In these instances, the EDCs may provide a good cause exception to the energy assessment requirement.34 Contact [email removed] or [email removed] to discuss a good-cause exemption. L. Income-Eligible Adder Qualification Qualified Systems that serve Income Eligible Customers of Record receive additional incentives. Income Eligible Customers of Record are EDC customers that have verified incomes at or below 60% of State Median Income (SMI). A System Installer should indicate in the project application that a project seeks to qualify for an Income-Eligible Adder at the time of application. 32 Only applicable for homes built prior to January 1, 1980. For applications received on January 1, 2026 or later, the energy assessment must have been performed within the last 15 years. 33 Homes built after 1980 have been built to more stringent building and energy codes in Connecticut. 34 HES and HES-IE assessments may not be available for certain newer homes or for homes with health and safety barriers that prevent completion of assessments. Homes that have gone through the new construction energy efficiency program will qualify without further qualification. 20 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
Words on different pages
Words on different pages

Text of 2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdf

Extracted from the file · 203 pages · 522,519 characters

Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf

Extracted from the file · 2 pages · 6,256 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf

Extracted from the file · 2 pages · 3,261 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf

Extracted from the file · 1 page · 528 characters

Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf

Extracted from the file · 2 pages · 4,800 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)

This filing on the current system (opens in a new tab)