Compliance Filing, Order No. 1

5. Annual Compliance Filings – Additional Filings (Program Materials)

Compliance filingFiled by Avangrid13 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files13

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
  1. Page 25 of 59

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 1 RRES Program Manual Page 25 of 59 up to 4 billing accounts associated with the premise and all billing accounts must be provided at the time of application. Installers must indicate in the project application whether the Customer of Record intends to size the Qualified System to exceed the existing annual load during the application process and must indicate which beneficial electrification technologies the customer intends to purchase/install and the anticipated timeline for such an installation/purchase. In scenarios where less than 12 months of historical electric usage is available for the premise with its current occupant as the Customer of Record (i.e., an existing home that was purchased and the Customer of Record has resided there for 8 months), the system may be sized up to a maximum of 9 kW AC40 nameplate capacity without consideration of the limited available electric usage. Such systems may exceed 9 kW AC by an amount consistent with any planned future electrification measures. The following assumptions are used for the purposes of estimating future kWh consumption from planned electric vehicles or a whole-home air source heat pump. Future Electrification Measure Electric Vehicle (per vehicle, maximum of two) Whole-Home Air Source Heat Pump Whole-Home Ground Source Heat Pump Estimated Expected Annual Load 3,285 kWh 3,608 kWh 2,458 kWh For projects at new construction homes, systems may be sized up to 9 kW AC without including an energy model with the application. If the system is sized larger than 9 kW AC, the installer will submit with the application a copy of an energy model for the proposed property estimating the design day load or annual kWh consumption at the site. Acceptable models41 include the following: • • • • • • REM/Rate EkoTrope WUFI Passive EQuest REVIT Manual J Installers may petition the EDCs to allow acceptance of alternative energy models not listed above by e-mailing [email removed] or [email removed] The average system size for the 2020-2021 period in the Connecticut Green Bank’s RSIP program was 9.04 kW AC. Data source: https://www.gosolarct.com/wp-content/uploads/2022/01/RSIP-Web-Report-1-13-2022.csv. This sizing may be reevaluated annually by the EDCs based on the previous 2 years’ average installed system size. 41 Models were selected based on their ability to produce either 1) design day load for heating, which were then used in the Conservation & Load Management Program Savings Documentation equation to determine annual kWh, or 2) annual energy usage kWh for heating 40 25 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  2. Page 26 of 59

    The United Illuminating Company Docket No. 26-08-01 VI. O. UI Attachment 1 RRES Program Manual Page 26 of 59 Program Processes Enrolling in Residential Renewable Energy Solutions System Installers or their agents are responsible for applying to Residential Renewable Energy Solutions on behalf of System Owners and Customers of Record. The application process is a requirement of each EDC’s interconnection application process. The EDC’s review of Program eligibility occurs concurrently with the review of a project’s interconnection application. For the purposes of the tariff application process, the EDCs will primarily communicate with the identified System Installer and will copy the identified System Owner and Customer of Record on relevant communications. System Owners and Customers of Record will be required to review and provide signatures agreeing to the Terms and Conditions of the Tariffs and attesting to the accuracy of the application submitted on their behalf. For purposes of DG Interconnection, customers will continue to follow the interconnection guidelines as outlined in the Guidelines for the Interconnection of Residential Single Phase Certified Inverter-Based Generating Facilities of 25kW (ac) or Less42. The following table provides the steps associated with both the interconnection application and the tariff application processes. Step Number 1 2 3 4 5 6 7 8 9 10 11 12 Description of Step Collect required interconnection and Renewable Energy Solutions application documentation Complete online interconnection and tariff applications in EDC portals Sign tariff application document Review and approve interconnection and tariff applications Construct Qualified System Completion of Authority Having Jurisdiction release specific to each EDC territory Pay for meter assigned by EDC EDC installation of applicable meters EDC Inspection (i.e., Witness test) if necessary EDC issuance of Approval to Operate/Approval to Interconnect PV system turned on and begins operations Ongoing generation of monetary on-bill credits and incentive or REC payments to Customer of Record and System Owner based on system production Responsible Entity System Installer, Customer of Record, System Owner System Installer System Owner, Customer of Record EDC System Installer System Installer, AHJ System Installer EDC EDC, System Installer EDC System Installer EDC The Residential Renewable Energy Solutions Application Date is the date on which the EDC determines the System Installer has provided a complete tariff and interconnection application in the relevant application portal. An application is considered complete once all required fields and documents are submitted and applicable application fees are paid. The Application Date is used to determine the applicable REC Incentive Rate for Netting Tariff systems and Total Incentive Payment rates for Buy-All systems. The Tariff Term Start Date is the date on 42 https://www.eversource.com/content/docs/default-source/builders-contractors/25kw-lessguidelines.pdf?sfvrsn=f630af62_2 26 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  3. Page 27 of 59

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 1 RRES Program Manual Page 27 of 59 which the EDC has provided Approval to Operate/Approval to Interconnect the Qualified System. A Qualified System may not be energized prior to the Approval to Operate/Approval to Interconnect date and the EDCs will not compensate any system that began operations before the applicable Approval to Operate/Approval to Interconnect Date. It is the sole responsibility of the System Installer to energize the Qualified System on or after the Approval to Operate/Approval to Interconnect Date. The EDCs will not compensate customers for lost generation in the event a System Installer fails to energize a system after receiving Approval to Operate/Approval to Interconnect. The EDC will also not credit any generation if the installer exports energy prior to receiving Approval to Operate/Approval to Interconnect. Customers will be notified to turn off their systems if they are exporting without approval. The EDC has the right to lock the disconnect OFF if the customer fails to turn off their system after 7 days. For the safety of EDC employees during the meter installation process, all relevant disconnects will be opened during the meter installation process and will be left in the open (i.e., non-generating) position upon leaving a project site. The EDC will not be liable for a disconnect that fails when an EDC employee operates it (i.e., disconnect that is unable to open or close). P. Designating Payment Beneficiaries System Owners can designate a Payment Beneficiary to receive a Direct Payment for any portion (0%-100%) of the Total Incentive Payment for Buy-All systems, or the REC Incentive Payment and applicable Adders for Netting Tariff Systems. System Owners, through their System Installers designate an initial Payment Beneficiary to receive Direct Payments as part of the initial application process. For Buy-All systems in which a Payment Beneficiary is designated to receive a Direct Payment, and for REC and Adder Incentive Payments under the Netting Tariff, the System Owner must provide Payment Beneficiary information as part of the application.43 In instances where the Netting Incentive REC value is $0, a Tariff Payment Beneficiary must be designated as part of the application. Anytime an individual or entity, including the Customer of Record, is receiving the Direct Payment under either incentive structure, the Payment Beneficiary information must be designated on the Application Form at the time of the application. For UI projects, a W-9 and Vendor Creation Form are required. For Eversource projects, the W-9 should not be uploaded during the application and will be requested via e-signature following Permission to Operate when necessary. Q. Changing Payee or Direct Payment Allocation Percentage A System Owner may submit a revised Payment Beneficiary Form once per calendar year. As part of this revision, the System Owner may change the allocation of Direct Payments vs. Monetary On-Bill Credits for BuyAll systems, as well as the Payment Beneficiary and/or any relevant payment information. As discussed in the Application Fee section of this Program Manual, an administrative fee will be charged for any updates to the Tariff Payment Beneficiary forms. R. Application Cancellation Period and Duplicate Management Level 1 Applications (25 kW and less) that remain in a status requiring customer/applicant action for 12 months or more may be automatically withdrawn by the EDCs. The applicant and customer will both be provided no less than 15 business days' notice, via email, prior to the automatic withdrawal of their application, and the EDCs will maintain the application in its current status at the request of either the customer or the applicant. Duplicate applications may also be automatically withdrawn by the EDCs, particularly if they are preventing the efficient enrollment of customers in the RRES tariff. The applicant and customer will both be 43 UI has additional forms required for direct payments: the Vendor Set-Up Form, the ACH Authorization Form or Wire Authorization Form, and Business Classification Form 27 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  4. Page 28 of 59

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 1 RRES Program Manual Page 28 of 59 provided no less than 15 business days' notice, via email, prior to the automatic withdrawal of the application and during this notice period, the customer or applicant may direct the EDCs to retain a project and withdraw a subsequent duplicate application. Review of subsequent duplicate RRES and interconnection applications will remain on hold during the notice period. 28 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  5. Page 29 of 59

    The United Illuminating Company Docket No. 26-08-01 VII. UI Attachment 1 RRES Program Manual Page 29 of 59 Metering Eversource and United Illuminating will install and own all meters required to participate in Residential Renewable Energy Solutions. System Owners and Installers are responsible for ensuring that all meter equipment is installed consistent with EDC requirements and that systems are wired in conformance with published EDC Residential Renewable Energy Solutions metering specifications and are installed in accordance with all state and local electrical codes and approved for use by the local electrical inspector. System Owners and Installers are also responsible for reporting valid generation data when production is not measured by a utility meter44. The EDC cannot inspect individual system wiring configurations on a customer’s premises and are not responsible for any lost tariff payments or revenue associated with meter configuration wiring that does not conform to published EDC standards. Appendix C includes links to approved Residential Renewable Energy Solutions Meter Diagrams and Supplemental written Guidance. The program requires adherence to UI’s Interconnection guidelines and RRES program requirements, or the project may be withdrawn or delayed. For applications submitted on or after January 1, 2025, all new Netting and Buy-All projects must have a utility-owned production meter, ideally with an approved bypass socket. Non-bypass sockets will, however, be permitted on Netting projects. S. Buy-All Metering Approved Buy-All metering configurations are provided in Appendix C of this Program Manual. Buy-All Tariff systems are configured to export the entirety of their production to the grid, less any applicable parasitic load associated with the system. The single bi-directional meter at the Point of Interconnection (POI) measures all system production. The EDC will net any parasitic load associated with the system against the total value of energy exported over the course of the month to determine the tariff eligible kWh on which monetary on-bill credits and cash payments will be calculated. Applicable fees for procuring and installing meters for Buy-All systems are listed in Appendix D. T. Netting Metering Approved Netting Tariff configurations are provided in Appendix C of this Program Manual. Each Netting Tariff System will be interconnected behind the customer’s revenue meter and load such that system production first serves onsite load and any generation in excess of customer load is exported to the EDC’s grid through a bidirectional meter. At the time of interconnection, the EDC will replace the customer’s existing meter with a bi-directional net revenue meter that will register real time power delivered to the grid on one channel and power received from the grid on a separate channel. The monthly net of these two channels will be used to determine the customer’s monthly on-bill credit valued at the customer’s retail rate, if applicable. No fees will be charged for the procurement and installation of the customer’s net revenue meter at the POI. Each Netting System, unless otherwise authorized by the EDC,45 will also have a Production Meter that will exclusively measure the output of the Qualified System and will be located behind the customer’s net revenue meter. This bi-directional meter will measure both the production from the PV system and any parasitic load associated with the PV system. The monthly net value of any reads on the generation and consumption meter channels will be 44 This will only be allowable on a temporary basis with authorization from the utility. Visit the EDCs respective webpages for a list of Temporary Approved Non-bypass Sockets and additional up-to-date guidance around this topic. 45 29 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  6. Page 30 of 59

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 1 RRES Program Manual Page 30 of 59 the basis for the calculation of REC Payment Incentives, if applicable. The System Owner will be responsible for the costs associated with the procurement and installation of any system’s Production Meter. Meter fees are listed in Appendix D of this Program Manual. Meter wiring diagrams, including battery storage configurations, are included in Appendix C of this Program Manual. 30 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  7. Page 31 of 59

    The United Illuminating Company Docket No. 26-08-01 VIII. U. UI Attachment 1 RRES Program Manual Page 31 of 59 Application, Metering and Payment Change Fees Application Fees Application fees are collected by the EDCs to pay for the administrative costs associated with application review. Fees are used to reduce costs charged to non-participating ratepayers who would otherwise bear the costs of the program. Application fees are collected at the initial application phase. Application fees are non-refundable. Application fees as of the publication date of this Program Manual are listed below for each EDC. Application fees are in addition to any fees charged as part of an Interconnection Application. Electric Distribution Company Eversource United Illuminating V. Application Fee $163.00 $200.00 Metering Fees Metering fees are collected to cover the costs associated with procuring and installing Production Meters for Qualified Systems taking service under the Netting Tariff and Buy-All Tariff. Production meter fees are paid once a Qualified Project is deemed ready to receive Approval to Operate/Approval to Interconnect. If a qualified project is authorized to operate without a utility production meter for any period, meter fees may be paid when a qualified project is deemed ready to receive a Production Meter. Meter fees are refundable should a System Owner not move forward with a project. Current Production Meter fees are provided for each EDC below. Note that these options represent the vast majority of Production Meter installations expected as part of Residential Renewable Energy Solutions, however, in rare cases, a different meter may be required. Meter Fees are subject to change based on industry and supply chain factors and any changes will be communicated as soon as practicable by the EDCs to the industry. Eversource Meter Types and Fees: Voltage / Meter Type Main Service Meter Form Meter Fee 120/240V Single Phase 120/208V Single Phase (Network) Under 400A Under 400A Form 2S Bridge Form 12S Bridge $183.00 $234.00 UI Meter Types and Fees: Voltage / Meter Type 120/240V Single Phase 120/208V Single Phase (Network) Main Service Under 400A Under 400A Meter Form Meter Fee Form 2S Form 25S $348.00 $348.00 W. Change in Payment Beneficiary Form Once per 12-month period, System Owners may request a change to the Payment Beneficiary form on file with the EDC or the EDC’s Payment Vendor. Changes can be made to payee information, or, for Buy-All customers, changes can be made to the proportion of the total incentive that is provided as a Monetary On-Bill Credit or a Direct Payment. Fees associated with such changes are provided below. These fees may be deducted from the next REC Payment or Direct Payment provided to the Payment Beneficiary or may be paid through another EDCapproved process. 31 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  8. Page 32 of 59

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 1 RRES Program Manual Electric Distribution Company Eversource United Illuminating Page 32 of 59 Payment Beneficiary Change Fee $22.00 $22.00 32 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  9. Page 33 of 59

    The United Illuminating Company Docket No. 26-08-01 IX. UI Attachment 1 RRES Program Manual Page 33 of 59 Consumer Protection and Customer Disclosures Each Tariff Application must include a completed Customer Disclosure Form signed by all applicable parties. Customer Disclosure Forms shall be presented to and signed by the customer prior to entering a contract for solar. Copies of these forms are available on the EDC’s websites below: • • https://www.eversource.com/content/ct-c/about/about-us/doing-business-with-us/builderscontractors/interconnections/renewable-energy-solutions-interconnections Residential Renewable Energy Solutions - UI Two types of Customer Disclosure Forms are available. The Third-Party Ownership Customer Disclosure Form should be used in instances where the System Owner is not the Customer of Record. The Direct Ownership Customer Disclosure Form should be used when a Customer of Record is also the System Owner. Note cost information on the Customer Disclosure, and any other RRES forms, should only include the qualified project and battery (if applicable) costs. Additional costs, such as roof repairs or electrical upgrades, should not be included, even if they are within the same customer contract. Applicants are required to file annual Compliance Documents with PURA in the annual Program review docket for contractor education and enforcement. The Compliance Documents required are (1) all marketing materials, (2) training materials regarding sales and communications with potential customers, and (3) Financial Benefits Compliance. The first annual filing is due June 1, 2024, with subsequent filings due by April 1 annually. The Financial Benefits Compliance must include the following information for all projects deployed in the previous calendar year: 1. All customer disclosure forms 2. An unlocked Excel file summarizing key information from the customer disclosure forms, as well as other information provided to customers, such as contracts and promotional materials, for each project as detailed below (Financial Benefits Summary Sheet) 3. A narrative explanation of any calculation methodologies included in the Financial Benefits Summary Sheet (Sheet Narrative) 4. A single customer-facing point of contact that EOE can connect with regarding questions or issues received by EOE’s customer affairs unit The Financial Benefits Summary Sheet shall include one row each for every project deployed by the developer under the RRES program in the previous calendar year. For each project, the following information shall be provided (i.e., each of the following should be a column in the Financial Benefits Summary Sheet): (1) site address; (2) utility account number associated with the project; (3) annual contract rate increase amount; (4) estimated year one production (kWh) as a percentage of estimated annual utility customer usage (kWh); (5) estimated year one customer net savings; (6) starting utility rate used to estimate net year one savings; (7) estimated net savings over the RRES tariff term (i.e., 20 years) if provided by the developer to customers in a contract or promotional materials, or if it can be easily extrapolated form the customer disclosure data; and (8) utility rate used to estimate net savings over the RRES tariff term (i.e., 20 years) if provided by the developer to customers in a contract or promotional materials, or if it can be easily extrapolated from the customer disclosure data. The Sheet Narrative may be a simple summary document (e.g., as brief as a couple of pages) outlining the methodology used to calculate the above required information to be included in the Financial Benefits Summary Sheet, as applicable, along with a general list of the documents needed for such calculations (e.g., a customer’s electric bill and sales contract are needed to verify the methodology for the fourth requirement, etc.). Developers should retain all documents listed in the Sheet Narrative at least through the end of the calendar year following the 33 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  10. Page 34 of 59

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 1 RRES Program Manual Page 34 of 59 deployment of the system (i.e., for systems deployed in 2023, relevant documents should be maintained until December 31, 2024), as they may be requested by the Authority or EOE in reviewing such annual filings. Each contractor’s annual financial benefit tracking filing may contain sensitive customer information not suitable for public disclosure. All confidential material must be provided in accordance with the instructions outlined in the annual docket’s Notice of Proceeding. Currently, such instructions require the materials to be emailed to the Authority’s Executive Secretary, [email removed], contemporaneously with the motion. The email’s subject line shall state in all capital letters “CONFIDENTIAL MATERIAL - NOT FOR PUBLIC DISCLOSURE.” Each page of any electronic confidential information shall also contain a header “CONFIDENTIAL – NOT FOR PUBLIC DISCLOSURE.” Contractors may file a Motion for Protective Order requesting that portions of their annual filing be protected. The Motion and accompanying affidavit shall be filed publicly along with the redacted version of the submission. Each contractor may file one Motion for Protective Order for their entire annual filing. Any Compliance Documents may be audited by EOE, and EOE can request additional documentation or evidence as needed to verify a contractor’s Financial Benefits Compliance calculations. Additionally, EOE annually audits a percentage of the Compliance Documents for each developer through the annual Program review docket for contractor education and enforcement. Any false or misleading information provided in in the Compliance Documents could result in enforcement action by PURA up to and including termination of eligibility, removal from Residential Renewable Energy Solutions or other consequences within PURA’s discretion. The Guideline on Connecticut Residential Solar Tariff Consumer Protection provides specific information on the consumer protection enforcement process overseen by the PURA Office of Education, Outreach, and Enforcement (EOE) under Residential Renewable Energy Solutions. 34 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
Words on different pages
Words on different pages

Text of 2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdf

Extracted from the file · 203 pages · 522,519 characters

Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf

Extracted from the file · 2 pages · 6,256 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf

Extracted from the file · 2 pages · 3,261 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf

Extracted from the file · 1 page · 528 characters

Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf

Extracted from the file · 2 pages · 4,800 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)

This filing on the current system (opens in a new tab)