Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

5. Annual Compliance Filings – Additional Filings (Program Materials)

Compliance filingFiled by Avangrid13 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files13

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
  1. Page 34 of 59

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 1 RRES Program Manual Page 34 of 59 deployment of the system (i.e., for systems deployed in 2023, relevant documents should be maintained until December 31, 2024), as they may be requested by the Authority or EOE in reviewing such annual filings. Each contractor’s annual financial benefit tracking filing may contain sensitive customer information not suitable for public disclosure. All confidential material must be provided in accordance with the instructions outlined in the annual docket’s Notice of Proceeding. Currently, such instructions require the materials to be emailed to the Authority’s Executive Secretary, [email removed], contemporaneously with the motion. The email’s subject line shall state in all capital letters “CONFIDENTIAL MATERIAL - NOT FOR PUBLIC DISCLOSURE.” Each page of any electronic confidential information shall also contain a header “CONFIDENTIAL – NOT FOR PUBLIC DISCLOSURE.” Contractors may file a Motion for Protective Order requesting that portions of their annual filing be protected. The Motion and accompanying affidavit shall be filed publicly along with the redacted version of the submission. Each contractor may file one Motion for Protective Order for their entire annual filing. Any Compliance Documents may be audited by EOE, and EOE can request additional documentation or evidence as needed to verify a contractor’s Financial Benefits Compliance calculations. Additionally, EOE annually audits a percentage of the Compliance Documents for each developer through the annual Program review docket for contractor education and enforcement. Any false or misleading information provided in in the Compliance Documents could result in enforcement action by PURA up to and including termination of eligibility, removal from Residential Renewable Energy Solutions or other consequences within PURA’s discretion. The Guideline on Connecticut Residential Solar Tariff Consumer Protection provides specific information on the consumer protection enforcement process overseen by the PURA Office of Education, Outreach, and Enforcement (EOE) under Residential Renewable Energy Solutions. 34 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  2. Page 35 of 59

    The United Illuminating Company Docket No. 26-08-01 X. UI Attachment 1 RRES Program Manual Page 35 of 59 Ombudsperson Matters involving program disputes should be emailed to [email removed] using the subject line format: RRES – [Stakeholder name] – [Short description of the issue]. If the dispute can be handled by the Ombudsperson, the Ombudsperson will work to address a request or resolve the issue at hand. This may, as appropriate, include additional requests for clarification and documentation via email, phone call, shared screen meeting, etc. If the Ombudsperson determines that the request or dispute should not or cannot be resolved by them, the Ombudsperson will direct the stakeholder to first bring the issue to the relevant EDC, or in other cases, work with the stakeholder to submit a filing to PURA requesting a ruling. 35 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  3. Page 36 of 59

    The United Illuminating Company Docket No. 26-08-01 XI. UI Attachment 1 RRES Program Manual Page 36 of 59 Appendix A Program Required Documents Checklist The following documents are required to submit an application to Residential Renewable Energy Solutions. Required Documents on all Applications or Applications with Adders Document Proof of 1-4 Family Property • • • • • Proof of Alternate Assessment (if HES or HES-IE not completed or scheduled) Signed Customer Disclosure Form Income Eligible Adder Eligibility Documentation • Qualifying Documents HES/HES-IE assessment previously completed, no document required. Copy of property assessors’ card for projects not qualifying for the HES/HES-IE assessment. Screen clip of real estate webpage (i.e. Zillow or Realtor.com) showing property type and must show the year the property was built. Department of Energy Home Energy Score Report Weatherization Assistance Program proof (e-mail from State Agency or other documentation confirming date of completed assessment) Copy of property assessors’ card for home built on/after January 1, 1980 • Direct Ownership Disclosure Form, or • Third-party Ownership Disclosure Form Customers who have completed a HES-IE assessment within the past three years or who currently participate in EDC Hardship programs require no additional documentation. Customers of Record seeking to qualify via other means (see list in Section IV E) should reach out to Eversource or UI directly: • Eversource Hardship Program Enrollment [phone removed] https://www.eversource.com/content/ct-c/residential/my-account/billingpayments/help-pay-my-bill • UI: [phone removed] or Contact Us - UI (uinet.com) Required Documents When a Tariff Payment Beneficiary is Designated to Receive Direct Payments Available at: https://www.irs.gov/pub/irs-pdf/fw9.pdf Signed W-9 for Tariff Payment Beneficiary Note: Eversource projects submit this to Payment Portal, not PowerClerk. 36 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  4. Page 37 of 59

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 1 RRES Program Manual Page 37 of 59 • Vendor Creation Form UI Only – Forms to Establish Payee Information46 46 UI Payment Forms are required when a Tariff Payment Beneficiary is designated in order to establish direct payments. 37 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  5. Page 38 of 59

    The United Illuminating Company Docket No. 26-08-01 XII. UI Attachment 1 RRES Program Manual Page 38 of 59 Appendix B: Sample Statements of Qualification Residential Renewable Energy Solutions Buy-All Tariff Statement of Qualifications This Statement of Qualification, provided by the Eversource Energy/United Illuminating, signifies that the renewable energy project identified below meets the requirements for eligibility as a Qualified Project under Residential Renewable Energy Solutions. Qualified Project Unique ID#: Date of Statement of Qualification Issuance System Capacity: System Location: System Owner and Address: The project’s qualification as a tariff-eligible generator will be in effect for 20 years, starting upon the project’s EDC Approval to Operate/Approval to Interconnect. This Statement of Qualification may expire in the event the Qualified Project is not interconnected within 12 months of issuance of this Statement of Qualification. The Qualified Project has been approved for the following tariff compensation rates. Tariff Type Base Buy-All Rate 47 Income-Eligible Customer Adder Economically Distressed Municipality Adder Total Buy-All Rate Percent to Customer* Percent to Tariff Payment Beneficiary* Buy-All *The Percentage of the Total Buy-All Rate payable to the Customer will be delivered on the Customer’s bill as a dollar denominated credit. **The Percentage of the Total Buy-All Rate payable to the Customer Tariff Payment Beneficiary will be delivered to the Tariff Payment Beneficiary 47 The Base Buy-All Tariff Rate noted is an illustrative example. 38 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  6. Page 39 of 59

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 1 RRES Program Manual Page 39 of 59 Residential Renewable Energy Solutions Netting Tariff Statement of Qualifications This Statement of Qualification, provided by the Eversource Energy/United Illuminating, signifies that the renewable energy project identified below meets the requirements for eligibility as a Qualified Project under Residential Renewable Energy Solutions. Qualified Project Unique ID#: Date of Statement of Qualification Issuance: System Capacity: System Location: System Owner and Address: The project’s qualification as a tariff-eligible generator will be in effect for 20 years, starting upon the project’s EDC Approval to Operate/Approval to Interconnect. This Statement of Qualification may expire in the event the Qualified Project is not interconnected within 12 months of issuance of this Statement of Qualification. The Qualified Project has been approved for the following tariff compensation rates. Tariff Type Netting Tariff Export Rate* REC Incentive Rate 48** Income-Eligible Adder ** Economically Distressed Municipality Adder ** Solar Energy Adjustment Rate / Solar Production Charge*** Netting Tariff Rate Currently Applicable Retail Rate *The Netting Export Rate is the Customer’s current retail rate at the time of application approval, though the retail rate and therefore Netting Export Rate will vary periodically according to rate changes. Production from the solar system will be netted with the customer’s consumption and excess production is compensated at this rate on the customer’s bill. Credits for excess production cannot be cashed out until the customer closes their electric account. **If applicable, the REC Incentive Rate, Income-Eligible Adder or Economically Distressed Municipality Adder will be paid as quarterly Direct Payments to the Payment Beneficiary. ***If a value greater than zero is assessed, the Solar Energy Adjustment / Solar Production Charge will appear as a line item on customers’ bills. 48 The REC Incentive rate used is an illustrative example. 39 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  7. Page 40 of 59

    The United Illuminating Company Docket No. 26-08-01 XIII. UI Attachment 1 RRES Program Manual Page 40 of 59 Appendix C. Metering Diagrams For metering diagrams and guidance visit: • Eversource: www.eversource.com/content/ct-c/about/about-us/doing-business-with-us/builderscontractors/interconnections/renewable-energy-solutions-interconnections • UI: RRES Meter Diagrams Netting/Buy-All 40 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  8. Page 41 of 59

    The United Illuminating Company Docket No. 26-08-01 XIV. UI Attachment 1 RRES Program Manual Page 41 of 59 Appendix D. Meter Costs Eversource Meter Types and Fees: Voltage / Meter Type Main Service Meter Form Meter Fee 120/240V Single Phase 120/208V Single Phase (Network) Under 400A Under 400A Form 2S Bridge Form 12S Bridge $183.00 $234.00 UI Meter Types and Fees: Voltage / Meter Type Main Service Meter Form Meter Fee 120/240V Single Phase 120/208V Single Phase (Network) Under 400A Under 400A Form 2S Form 25S $348.00 $348.00 41 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  9. Page 42 of 59

    The United Illuminating Company Docket No. 26-08-01 XV. UI Attachment 1 RRES Program Manual Page 42 of 59 Appendix E: Residential Renewable Energy Solutions Terms and Conditions RESIDENTIAL RENEWABLE ENERGY SOLUTIONS TERMS AND CONDITIONS 1. Definitions 1.1 As used throughout these Terms and Conditions, the capitalized terms shall have the definitions set forth in the Residential Renewable Energy Solutions Program Manual. 2. Tariff Qualification, Tariff Structure Payment Rates, Payment Timing and Tariff Term 2.1 The EDC shall compensate System Owners, Customers of Record and/or Tariff Payment Beneficiaries participating in the Buy-All Tariff for energy and RECs produced by a Qualifying Project consistent with the tariff structure, rates and practices described in the Residential Renewable Energy Solutions Program Manual in effect on the date the Qualified System’s tariff application was deemed complete by the EDC. 2.2 The EDC shall compensate System Owners, Customers of Record and/or Tariff Payment Beneficiaries participating in the Netting Tariff for energy and RECs produced by a Qualifying System consistent with the tariff structure, rates and practices described in the Residential Renewable Solutions Program Manual in effect on the date the Qualified System’s tariff application was deemed complete by the EDC. 2.3 The Total Tariff Rate for a Qualified Project shall be the compensation rate listed on the Statement of Qualification issued by the EDC. 2.4 The Tariff Term shall commence as of the date Authorization to Interconnect is issued by the EDC and shall remain in effect for twenty (20) years. 2.5 System Owners, Customers of Record and/or Tariff Payment Beneficiaries enrolled in the Buy-All Tariff or Netting Tariff whose term has expired may be eligible to be compensated for energy exported to the distribution system through the company’s purchase power tariff, if available. The EDC is not under any obligation to purchase RECs after the tariff term from the Projects. 2.6 At the time of Application, the Customer of Record must acknowledge review of the Renewable Energy Solutions customer information webpage on its respective EDC’s website, which contains information about historic electric rates and system costs. 2.7 The EDCs shall assume all right, title and interest in, and to, the Qualified System’s generation, and environmental attributes, including, without limitation, all RECs for the Tariff Term. The EDCs shall take title to all energy delivered to the distribution system by the Qualified System, all available capacity rights and all Environmental Attributes at the time of production. 42 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
  10. Page 43 of 59

    The United Illuminating Company Docket No. 26-08-01 2.8 UI Attachment 1 RRES Program Manual Page 43 of 59 At the time of Application the Customer of Record and System Owner must designate a Payment Beneficiary. For the Buy-All Tariff, a Payment Beneficiary, other than a Customer of Record, can be designated to receive a percentage of the total tariff compensation. Any compensation not assigned to a third party will result in Monetary On-Bill Credits to the Customer of Record. The Netting Tariff Payment Beneficiary, which may be the Customer of Record or a third-party, can be designated to receive the Renewable Energy Certificate (REC) Incentive Payment and/or Adder paid out once every quarter. 3. Qualified Projects 3.1 The Qualified Project is as described in the Statement of Qualification and in the tariff and interconnection applications filed with the EDC. 3.2 The Qualified Project shall be constructed substantially as described in the tariff and interconnection applications filed with the EDC. In the event the as-built system differs in a manner that would make the system ineligible for Residential Renewable Energy Solutions, the EDC may revoke the Qualified Project’s Statement of Qualification. 3.3 The final Qualified Project size shall be based on the as-built configuration and shall not exceed 25 kW (AC). If final Qualified Project size differs from original description as set forth in the Statement of Qualification: 3.4 3.3.1 any increase that results in a Qualified Project size exceeds 25 kW (AC) will result in immediate and automatic disqualification of the Qualified Project from Residential Renewable Energy Solutions. 3.3.2 any increase that results in a Qualified Project’s size exceeding the expected Customer of Record’s annual energy consumption, after accounting for expected electrification, will result in immediate and automatic disqualification from Residential Renewable Solutions. The Qualified Project must meet energy assessment requirements and sizing requirements based on the Customer of Record’s annual energy consumption. Data on the Customer of Record’s energy assessment participation and historical annual energy consumption may be shared with the Applicant and with the Installer as part of the application process. 4. Limitation of Liability 4.1 Each Party’s liability to the other Parties for any loss, cost, claim, injury, liability, or expense, including reasonable attorney’s fees, relating to or arising from any act or omission in its performance of its obligations under Residential Renewable Energy Solutions, shall be limited to the amount of direct damage actually incurred. In no event shall either party be liable to the other party for any indirect, incidental, special, consequential, or punitive damages of any kind whatsoever, including, but not limited to, lost profits, lost revenue, or failure to realize expected savings. 5. Regulatory Changes, Regulatory Approval and Cost Recovery 43 Residential Renewable Energy Solutions - Program Manual Version 2026.1 – Effective 1/1/2026
Words on different pages
Words on different pages

Text of 2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdf

Extracted from the file · 203 pages · 522,519 characters

Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf

Extracted from the file · 2 pages · 6,256 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf

Extracted from the file · 2 pages · 3,261 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf

Extracted from the file · 1 page · 528 characters

Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf

Extracted from the file · 2 pages · 4,800 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)

This filing on the current system (opens in a new tab)