5. Annual Compliance Filings – Additional Filings (Program Materials)

Compliance filingFiled by Avangrid13 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files13

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages
  1. Page 16 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials TABLE 5 – February RFP Schedule* Action Item Date Bidders Conference – Webinar Only January 20, 2026 Deadline for Submission of Questions January 27, 2026 Release of RFP and Opening of Bid Window for All Project Size Categories, and Opening of Two-Week Window for Small Zero Emission Category February 2, 2026 at 1:00:00 p.m. (Eastern Prevailing Time “EPT”) Close of Two-Week Window for Small Zero Emission Category February 17, 2026 at 1:00:00 p.m. (Eastern Prevailing Time “EPT”), at which time the Pricing shall become firm, irrevocable and binding. Bid Forms Due for All Categories March 16, 2026 by 1:00 p.m. (Eastern Prevailing Time “EPT”), at which time the Pricing shall become firm, irrevocable and binding. Selection and Notification of Winning Bidders for All Categories On or about May 4, 2026 Tariff Agreement Execution After Selection and Notification of Winning Bidders. Bidders will have to return partially executed contracts by the date established by the Companies which is expected to be approximately 10 business days. Tariff Agreement(s) Filed with PURA Date to be determined at the Authority’s discretion Commencement of Service In accordance with Tariff Agreements * Pursuant to Section 2.1, Schedule, the Companies, at their sole discretion, may modify the schedule at any time. 16 Page 16 of 100
  2. Page 17 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials TABLE 6 – August RFP Schedule* Action Item Date Bidders Conference – Webinar Only July 21, 2026 Deadline for Submission of Questions July 28, 2026 Release of RFP and Opening of Bid Window for All Project Size Categories, and Opening of TwoWeek Window for Small Zero Emission Category August 3, 2026 at 1:00:00 p.m. (Eastern Prevailing Time “EPT”) Close of Two-Week Window for Small Zero Emission Category August 17, 2026 at 1:00:00 p.m. (Eastern Prevailing Time “EPT”), at which time the Pricing shall become firm, irrevocable and binding. Bid Forms Due for All Categories September 14, 2026 by 1:00 p.m. (Eastern Prevailing Time “EPT”), at which time the Pricing shall become firm, irrevocable and binding. Selection and Notification of Winning Bidders for All Categories On or about November 2, 2026 Tariff Agreement Execution After Selection and Notification of Winning Bidders. Bidders will have to return partially executed contracts by the date established by the Companies which is expected to be approximately 10 business days. Tariff Agreement(s) Filed with PURA Date to be determined at the Authority’s discretion * Pursuant to Section 2.1 of the RFP, Schedule, the Companies, at their sole discretion, may modify the schedule at any time. 17 Page 17 of 100
  3. Page 18 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials Attachment 1 Tariff Agreement for the Purchase and Sale of Connecticut Class I Renewable Energy Credits and Energy from Non-Residential Renewable Energy Solutions Projects (“Tariff Agreement”) 1. Cover Sheet inclusive of Tariff Payment Beneficiary Form as applicable 2. Terms and Conditions 18 Page 18 of 100
  4. Page 19 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY Year 5 Non-Residential Renewable Energy Solutions (“NRES”) Program Manual Implementing Section 3 of Public Act 19-35, An Act Concerning A Green Economy and Environmental Protection, Section 1 of Public Act 22-14, An Act Concerning Clean Energy Tariff Programs, Section 25 of Public Act 23-102, An Act Strengthening Protections for Connecticut’s Consumers of Energy, Section 173 of Public Act 24-151 An Act Authorizing And Adjusting Bonds of the State And Concerning Provisions Related To State And Municipal Tax Administration, General Government And School Building Projects, and Section 9 of Public Act 25-173, An Act Concerning Energy Affordability, Access, and Accountability prepared by THE CONNECTICUT LIGHT AND POWER COMPANY d/b/a EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY February 2, 2026 Updated 1/9/2026 1 Page 19 of 100
  5. Page 20 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials Table of Contents 1. INTRODUCTION ........................................................................................................................... 3 2. DEFINITIONS ................................................................................................................................. 4 3. TARIFF STRUCTURE AND PAYMENTS ................................................................................ 10 4. ELIGIBILITY REQUIREMENTS .............................................................................................. 15 5. SOLICITATION RULES AND PROCESS ................................................................................ 21 6. PROJECT PURCHASE COMMITMENT ................................................................................. 31 7. AGGREGATION AND RESALE OF PRODUCTS .................................................................. 33 8. METERING ................................................................................................................................... 34 9. OMBUDSPERSON ....................................................................................................................... 34 Appendix A – Non-Residential Renewable Energy Solutions Program Bid Comparison Guidelines .............................................................................................................................................. 36 Appendix B – Non-Residential Renewable Energy Solutions Beneficial Electrification and New Construction Load Guidelines ............................................................................................................. 39 Appendix C – Beneficial Account Credit Allocation Guidelines ...................................................... 42 Updated 1/9/2026 2 Page 20 of 100
  6. Page 21 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials 1. INTRODUCTION This Program Manual for Non-Residential Renewable Energy Solutions is intended to be used by System Owners and renewable energy project installers (“Installers”). The Program Manual describes the program bidding process, payment terms, tariff structures, eligibility requirements and other key program elements. It was initially developed in accordance with the Final Decision dated June 30, 2021 in Docket No. 20-07-01, and Section 3 of Public Act 19-35, An Act Concerning a Green Economy and Environmental Protection, and has been updated in accordance with Section 1 of Public Act 22-14, An Act Concerning Clean Energy Tariff Programs, Section 25 of Public Act 23-102, An Act Strengthening Protections for Connecticut’s Consumers of Energy, and Public Act No. 24-151, An Act Authorizing And Adjusting Bonds of the State And Concerning Provisions Related To State And Municipal Tax Administration, General Government And School Building Projects, and Section 9 of Public Act 25-173, An Act Concerning Energy Affordability, Access, and Accountability as codified in §16-244z of the Connecticut General Statutes. This Program Manual may be updated periodically to reflect current Tariff rates and other changes. In the event that any element of this Program Manual is deemed contrary to any state law or ruling from the Public Utilities Regulatory Authority (“PURA” or the “Authority”), the applicable law or ruling shall take precedence, and the Electric Distribution Companies (“EDCs”) will revise this Program Manual accordingly. Questions concerning this Program Manual should be emailed to [email removed] or [email removed]. The EDCs maintain a list of frequently asked questions on their below websites. System Owners and Solar Installers are encouraged to visit these websites prior to submitting a question: • • Eversource.com/NRES Non-Residential Renewable Energy Solutions Program - UI Updated 1/9/2026 3 Page 21 of 100
  7. Page 22 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials 2. DEFINITIONS Capitalized terms used but not defined in the body of this Program Manual shall have the meanings given to such terms in each of the Electric Distribution Company’s Tariff or the Request for Proposals. “Acts” shall mean Connecticut Public Act 19-35, An Act Concerning A Green Economy and Environmental Protection (approved July 1, 2019) now codified in General Statutes §244-z, Connecticut Public Act 22-14, An Act Concerning Clean Energy Tariff Programs (approved May 10, 2022), and Public Act 23-102, An Act Strengthening Protections for Connecticut’s Consumers of Energy (approved June 29, 2023) ), Public Act No. 24-151, An Act Authorizing And Adjusting Bonds of the State And Concerning Provisions Related To State And Municipal Tax Administration, General Government And School Building Projects (approved on July 1, 2024), and Public Act 25-173, An Act Concerning Energy Affordability, Access, and Accountability (approved on July 1, 2025). "Add-On System” shall mean a Netting Tariff Project being installed behind the same Revenue Meter as an existing renewable energy system that is currently enrolled in the legacy net metering tariff for either of the Companies. For Eversource, the legacy net metering tariff is referred to as “Rider N”, and for UI, the legacy net metering tariff is referred to as “Rider NEC1.” “Agricultural Customer” shall mean an in-state retail end user of an EDC that uses electricity for the purpose of agriculture, as defined in Conn. Gen. Stat, Section 1-1(q). “Approval to Energize” means the date on which an EDC has determined that a Project has provided sufficient proof that the Project has satisfied all of the necessary conditions precedent to energize the Project. “Beneficial Account” shall mean all existing individually numbered accounts (i.e., meters) of one in- state retail end user eligible to receive monetary bill credits associated with the energy produced at a Customer Host account. 1 “Bid Certification Form” shall mean the signed and notarized form to certify that a Project is in compliance with all Program requirements, as prepared and issued by the EDCs. “Bidder” shall mean the individual or business submitting a proposal (or “Bid”) to be considered to be selected for the EDC to purchase energy and RECs produced by the Project over the duration of the applicable Tariff. The Bidder entered in the Bid form cannot be changed once the Bid is submitted. “Bid Preference” shall mean a percentage by which a Project’s Bid will be reduced solely for Bid evaluation purposes. For example, using a 10% Bid preference, a Bid for 5 cents/kWh would be evaluated as if it were 4.5 cents/kWh (5 cents x 90%). “Brownfield” means a site that is either: (1) an address that is included on the Connecticut Brownfields Inventory maintained by DEEP and an attestation that such site has not achieved For example, one Beneficial Account could be a municipality or political subdivision of the State, such as the City of New Britain. 1 Updated 1/9/2026 4 Page 22 of 100
  8. Page 23 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials regulatory closure in the form of either a verification report from a licensed environmental professional or from DEEP; or (2) an address with a Phase 2 Environmental Site Assessment from a licensed environmental professional identifying that the site is contaminated with pollutants, unless such pollutants are present solely because soil at such address has been historically intermixed with coal ash, wood ash, coal fragments, coal slag, coal clinkers, asphalt paving fragments, or any combination thereof. For both (1) and (2), the Bidder must demonstrate, to DEEP’s sole satisfaction, the site is either abandoned or underutilized because of such contamination. DEEP maintains a non-exhaustive list of Brownfields that meet this definition, which is available at: https://portal.ct.gov/DEEP/Remediation--Site-CleanUp/Brownfields/Brownfields-Site-Inventory. “Buy-All” shall have the meaning set forth in Section 3.2.9. hereof. “Buy-All Production Meter” shall mean the new service established for the purpose of tracking production for a Buy-All project. “Compensation Structure” shall have the meaning set in Section 3.2. hereof. “Connecticut Green Bank” or “CT Green Bank” shall mean the Connecticut Green Bank and any predecessor or successor agency. “Connecticut Licensed Professional Engineer Certification” shall mean an expression of professional opinion by a Connecticut licensed Professional Engineer regarding facts or findings that are the subject of the certification. “Critical Facility” means any hospital, police station, fire station, water treatment plant, sewage treatment plant, public shelter, correctional facility or production and transmission facility of a television or radio station, whether broadcast, cable or satellite, licensed by the Federal Communications Commission, any commercial area of a municipality, a municipal center, as identified by the chief elected official of any municipality, or any other facility or area identified by the Department of Energy and Environmental Protection as critical. “Customer” or “Customer of Record” under this Program Manual shall mean any person, partnership, corporation, or any other entity, whether public or private, who obtains delivery service at a Customer Delivery Point and who is or will be the Customer of Record of the EDC for the Project Site. The Customer may or may not be the owner of the Project, and the Customer or Customer of Record may or may not be the Owner of the Project Site. For New Construction Rooftop Buy-All Bids, the Customer may be an entity with site control of the Project Site. However, the Project will always remain linked to the Customer. “Customer Host” shall mean the State Customer, Agricultural Customer, or Municipal Customer of Record at a Project Site eligible to produce monetary credits for Beneficial Accounts pursuant to Section 3(a)(4) of Public Act 19-35. “DEEP” shall mean the Connecticut Department of Energy and Environmental Protection Bureau of Energy Technology Policy and any successor agency. “Delivery Point” shall mean the EDC's meter or a point designated by the EDC located on the Customer's premises. All Projects, whether Buy-All or Netting have an associated Delivery Point. The Delivery Point may alternatively be referred to as the point of common coupling or the point of interconnection. “Distressed Municipality” shall mean any municipality listed on the most recent version of the Connecticut Department of Economic and Community Development’s website as of the issue Updated 1/9/2026 5 Page 23 of 100
  9. Page 24 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials date of the RFP (https://portal.ct.gov/DECD/Content/About_DECD/Research-andPublications/02_Review_Publications/Distressed-Municipalities). “Distribution Company Guidelines for Interconnection (“Guidelines”)” shall mean the agreement for interconnection service entered into between the interconnecting Customer and an EDC, as defined and provided in each EDC’s PURA approved standards for interconnection of distributed generation. “EDC” is the acronym for Electric Distribution Company. “Environmental Attributes” shall mean each of the following that exists under the laws and regulations of the state of Connecticut, or under any other international, federal, regional, state or other law, rule or regulation as of the Effective Date or may come into existence during the twentyyear term of the purchase commitment applicable to the selected Project: (i) GIS Certificates, (ii) credits, benefits, reductions, offsets and other beneficial allowances, including, to the extent applicable and without limitation, performance based incentives or renewable portfolio standard in the state in which the Project is located or in other jurisdictions (collectively, “Allowances”) attributable to the ownership or operation of the Project or the production or sale of energy that avoids the emission of carbon into the air, soil or water, (iii) other Allowances howsoever named or referred to, with respect to any and all fuel, emissions, air quality, or other environmental characteristics, resulting from the production of electric generation or the production or sale of energy that avoids the emission of carbon into the air, soil or water and in which Seller has good and valid title, including any credits to be evidenced by Renewable Energy Certificates or similar laws or regulations applicable in any jurisdiction as such may be amended during the term of the Tariff applicable to the selected Project, (iv) any such Allowances related to (A) oxides of carbon or (B) the United Nations Framework Convention on Climate Change (the “UNFCCC”) or the Kyoto Protocol to the UNFCCC or crediting “early action” with a view thereto, or involving or administered by the Clear Air Markets Division of the United States Environmental Protection Agency or any successor or other agency that is given jurisdiction over a Program involving transferability of specific Environmental Attributes, and (v) all reporting rights with respect to such allowances under Section 1605(b) of the Energy Policy Act of 1992, as amended from time to time or any successor statute, or any other current or future international, federal, state or local law, regulation or bill, or otherwise. “Export Rate” shall mean the monetary value given to monthly Net Excess Generation for Netting Tariff systems. This is the currently applicable Retail Rate inclusive of Standard Service energy supply charges. “Hybrid Project” shall mean Projects that include those which are split between rooftops and ground-mounted systems, including carports and solar canopies. “In-Service Date” shall mean the Approval to Energize date listed on the EDC issued Approval to Energize letter to the System Owner. “Landfill” means any property that is listed on the Closed Landfills list, though this list is not intended to be exhaustive or an acknowledgement of ideal properties for renewable energy development. “LREC/ZREC Program” shall have the meaning as outlined in Conn. Gen. Stat. Sections 16244r, 16-244s, and 16-244t. “LREC/ZREC Project” shall mean a renewable energy Project capable of producing Renewable Energy Credits from low emission or zero emission Projects (“LRECs or ZRECs”) which were Updated 1/9/2026 6 Page 24 of 100
  10. Page 25 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials selected under any of the procurements as defined under Conn. Gen. Stat. Sections 16-244r, 16244s, and 16-244t. “Microgrid” shall mean a Microgrid as defined in Conn. Gen. Stat. Section 16-243y. “Municipal Customer” shall mean a retail end user of electric service located in the service territory of the EDC that is a Municipality. “MW” shall mean megawatt. “Nameplate Capacity” is defined as the aggregate nameplate rating (stated in kW AC) of all renewable generation at the Project Site. “Netting Tariff” shall have the meaning set forth in Section 3.2.10. hereof. “New” or “New Project” shall mean that the Project for which the Bid is being submitted received Approval to Energize after the solicitation to which it is applying. “New Construction Project” shall mean a project that will generate energy for new separately metered onsite consumption and/or a Project that shall be associated with a new electric account that has not received service as of the date of Bid submission. 2,3 "Ombudsperson” shall mean an independent consultant directed by PURA to efficiently resolve disputes with the electric distribution companies (EDCs) and review and approve extension requests beyond the three-year in-service time period. “Owner of the Project Site” shall mean the legal owner of the Project Site. “Parcel” shall mean the clearly defined property boundaries registered with the local municipality before January 1 of the year of the solicitation. “Performance Assurance” shall mean collateral in the form of cash, or other security as may be acceptable to the EDC in its sole discretion. Cash collateral held by the EDC shall not earn interest. In addition, Performance Assurance shall be deemed, for all legal purposes, to mean adequate assurance as such term is used in the Uniform Commercial Code ("UCC") and the Bankruptcy Code and amendments thereto. The parties specifically recognize that the use of Performance Assurance throughout the term of the Tariff Agreement applicable to the selected Project shall not limit any legal right, action or remedy that would have otherwise been available to the aggrieved party under either the UCC or Bankruptcy Code. “Production Meter” shall mean a meter installed and owned by the EDC that measures the output from a Project prior to any netting of Customer load. “Program” shall mean the required rules and processes for the solicitation and selection of Projects eligible pursuant to subparagraphs (A) and (B) of Section 3(a)(2) of Public Act 19-35, Section 1 of Public Act 22-14, and Section 25 of Public Act 23-102, and Section 9 of Public Act 25-173, An Act Concerning Energy Affordability, Access, and Accountability. An Owner of the Project Site who is not the Customer of Record may submit a Bid as a New Construction Project under the Buy-All Tariff. 2 If the NRES project is submitted with an existing account number, the same account number must be used in the Distributed Generation (“DG”) Interconnection Application and/or for the new service request for the Buy-All production meter. New Construction projects should not include an account number in the DG Interconnection Application and/or for the new service request for the Buy-All production meter. 3 Updated 1/9/2026 7 Page 25 of 100
Words on different pages

Text of 2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdf

Extracted from the file · 203 pages · 522,519 characters

Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf

Extracted from the file · 2 pages · 6,256 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf

Extracted from the file · 2 pages · 3,261 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf

Extracted from the file · 1 page · 528 characters

Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf

Extracted from the file · 2 pages · 4,800 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)