Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

5. Annual Compliance Filings – Additional Filings (Program Materials)

Compliance filingFiled by Avangrid13 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files13

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages
  1. Page 22 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials 2. DEFINITIONS Capitalized terms used but not defined in the body of this Program Manual shall have the meanings given to such terms in each of the Electric Distribution Company’s Tariff or the Request for Proposals. “Acts” shall mean Connecticut Public Act 19-35, An Act Concerning A Green Economy and Environmental Protection (approved July 1, 2019) now codified in General Statutes §244-z, Connecticut Public Act 22-14, An Act Concerning Clean Energy Tariff Programs (approved May 10, 2022), and Public Act 23-102, An Act Strengthening Protections for Connecticut’s Consumers of Energy (approved June 29, 2023) ), Public Act No. 24-151, An Act Authorizing And Adjusting Bonds of the State And Concerning Provisions Related To State And Municipal Tax Administration, General Government And School Building Projects (approved on July 1, 2024), and Public Act 25-173, An Act Concerning Energy Affordability, Access, and Accountability (approved on July 1, 2025). "Add-On System” shall mean a Netting Tariff Project being installed behind the same Revenue Meter as an existing renewable energy system that is currently enrolled in the legacy net metering tariff for either of the Companies. For Eversource, the legacy net metering tariff is referred to as “Rider N”, and for UI, the legacy net metering tariff is referred to as “Rider NEC1.” “Agricultural Customer” shall mean an in-state retail end user of an EDC that uses electricity for the purpose of agriculture, as defined in Conn. Gen. Stat, Section 1-1(q). “Approval to Energize” means the date on which an EDC has determined that a Project has provided sufficient proof that the Project has satisfied all of the necessary conditions precedent to energize the Project. “Beneficial Account” shall mean all existing individually numbered accounts (i.e., meters) of one in- state retail end user eligible to receive monetary bill credits associated with the energy produced at a Customer Host account. 1 “Bid Certification Form” shall mean the signed and notarized form to certify that a Project is in compliance with all Program requirements, as prepared and issued by the EDCs. “Bidder” shall mean the individual or business submitting a proposal (or “Bid”) to be considered to be selected for the EDC to purchase energy and RECs produced by the Project over the duration of the applicable Tariff. The Bidder entered in the Bid form cannot be changed once the Bid is submitted. “Bid Preference” shall mean a percentage by which a Project’s Bid will be reduced solely for Bid evaluation purposes. For example, using a 10% Bid preference, a Bid for 5 cents/kWh would be evaluated as if it were 4.5 cents/kWh (5 cents x 90%). “Brownfield” means a site that is either: (1) an address that is included on the Connecticut Brownfields Inventory maintained by DEEP and an attestation that such site has not achieved For example, one Beneficial Account could be a municipality or political subdivision of the State, such as the City of New Britain. 1 Updated 1/9/2026 4 Page 22 of 100
  2. Page 23 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials regulatory closure in the form of either a verification report from a licensed environmental professional or from DEEP; or (2) an address with a Phase 2 Environmental Site Assessment from a licensed environmental professional identifying that the site is contaminated with pollutants, unless such pollutants are present solely because soil at such address has been historically intermixed with coal ash, wood ash, coal fragments, coal slag, coal clinkers, asphalt paving fragments, or any combination thereof. For both (1) and (2), the Bidder must demonstrate, to DEEP’s sole satisfaction, the site is either abandoned or underutilized because of such contamination. DEEP maintains a non-exhaustive list of Brownfields that meet this definition, which is available at: https://portal.ct.gov/DEEP/Remediation--Site-CleanUp/Brownfields/Brownfields-Site-Inventory. “Buy-All” shall have the meaning set forth in Section 3.2.9. hereof. “Buy-All Production Meter” shall mean the new service established for the purpose of tracking production for a Buy-All project. “Compensation Structure” shall have the meaning set in Section 3.2. hereof. “Connecticut Green Bank” or “CT Green Bank” shall mean the Connecticut Green Bank and any predecessor or successor agency. “Connecticut Licensed Professional Engineer Certification” shall mean an expression of professional opinion by a Connecticut licensed Professional Engineer regarding facts or findings that are the subject of the certification. “Critical Facility” means any hospital, police station, fire station, water treatment plant, sewage treatment plant, public shelter, correctional facility or production and transmission facility of a television or radio station, whether broadcast, cable or satellite, licensed by the Federal Communications Commission, any commercial area of a municipality, a municipal center, as identified by the chief elected official of any municipality, or any other facility or area identified by the Department of Energy and Environmental Protection as critical. “Customer” or “Customer of Record” under this Program Manual shall mean any person, partnership, corporation, or any other entity, whether public or private, who obtains delivery service at a Customer Delivery Point and who is or will be the Customer of Record of the EDC for the Project Site. The Customer may or may not be the owner of the Project, and the Customer or Customer of Record may or may not be the Owner of the Project Site. For New Construction Rooftop Buy-All Bids, the Customer may be an entity with site control of the Project Site. However, the Project will always remain linked to the Customer. “Customer Host” shall mean the State Customer, Agricultural Customer, or Municipal Customer of Record at a Project Site eligible to produce monetary credits for Beneficial Accounts pursuant to Section 3(a)(4) of Public Act 19-35. “DEEP” shall mean the Connecticut Department of Energy and Environmental Protection Bureau of Energy Technology Policy and any successor agency. “Delivery Point” shall mean the EDC's meter or a point designated by the EDC located on the Customer's premises. All Projects, whether Buy-All or Netting have an associated Delivery Point. The Delivery Point may alternatively be referred to as the point of common coupling or the point of interconnection. “Distressed Municipality” shall mean any municipality listed on the most recent version of the Connecticut Department of Economic and Community Development’s website as of the issue Updated 1/9/2026 5 Page 23 of 100
  3. Page 24 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials date of the RFP (https://portal.ct.gov/DECD/Content/About_DECD/Research-andPublications/02_Review_Publications/Distressed-Municipalities). “Distribution Company Guidelines for Interconnection (“Guidelines”)” shall mean the agreement for interconnection service entered into between the interconnecting Customer and an EDC, as defined and provided in each EDC’s PURA approved standards for interconnection of distributed generation. “EDC” is the acronym for Electric Distribution Company. “Environmental Attributes” shall mean each of the following that exists under the laws and regulations of the state of Connecticut, or under any other international, federal, regional, state or other law, rule or regulation as of the Effective Date or may come into existence during the twentyyear term of the purchase commitment applicable to the selected Project: (i) GIS Certificates, (ii) credits, benefits, reductions, offsets and other beneficial allowances, including, to the extent applicable and without limitation, performance based incentives or renewable portfolio standard in the state in which the Project is located or in other jurisdictions (collectively, “Allowances”) attributable to the ownership or operation of the Project or the production or sale of energy that avoids the emission of carbon into the air, soil or water, (iii) other Allowances howsoever named or referred to, with respect to any and all fuel, emissions, air quality, or other environmental characteristics, resulting from the production of electric generation or the production or sale of energy that avoids the emission of carbon into the air, soil or water and in which Seller has good and valid title, including any credits to be evidenced by Renewable Energy Certificates or similar laws or regulations applicable in any jurisdiction as such may be amended during the term of the Tariff applicable to the selected Project, (iv) any such Allowances related to (A) oxides of carbon or (B) the United Nations Framework Convention on Climate Change (the “UNFCCC”) or the Kyoto Protocol to the UNFCCC or crediting “early action” with a view thereto, or involving or administered by the Clear Air Markets Division of the United States Environmental Protection Agency or any successor or other agency that is given jurisdiction over a Program involving transferability of specific Environmental Attributes, and (v) all reporting rights with respect to such allowances under Section 1605(b) of the Energy Policy Act of 1992, as amended from time to time or any successor statute, or any other current or future international, federal, state or local law, regulation or bill, or otherwise. “Export Rate” shall mean the monetary value given to monthly Net Excess Generation for Netting Tariff systems. This is the currently applicable Retail Rate inclusive of Standard Service energy supply charges. “Hybrid Project” shall mean Projects that include those which are split between rooftops and ground-mounted systems, including carports and solar canopies. “In-Service Date” shall mean the Approval to Energize date listed on the EDC issued Approval to Energize letter to the System Owner. “Landfill” means any property that is listed on the Closed Landfills list, though this list is not intended to be exhaustive or an acknowledgement of ideal properties for renewable energy development. “LREC/ZREC Program” shall have the meaning as outlined in Conn. Gen. Stat. Sections 16244r, 16-244s, and 16-244t. “LREC/ZREC Project” shall mean a renewable energy Project capable of producing Renewable Energy Credits from low emission or zero emission Projects (“LRECs or ZRECs”) which were Updated 1/9/2026 6 Page 24 of 100
  4. Page 25 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials selected under any of the procurements as defined under Conn. Gen. Stat. Sections 16-244r, 16244s, and 16-244t. “Microgrid” shall mean a Microgrid as defined in Conn. Gen. Stat. Section 16-243y. “Municipal Customer” shall mean a retail end user of electric service located in the service territory of the EDC that is a Municipality. “MW” shall mean megawatt. “Nameplate Capacity” is defined as the aggregate nameplate rating (stated in kW AC) of all renewable generation at the Project Site. “Netting Tariff” shall have the meaning set forth in Section 3.2.10. hereof. “New” or “New Project” shall mean that the Project for which the Bid is being submitted received Approval to Energize after the solicitation to which it is applying. “New Construction Project” shall mean a project that will generate energy for new separately metered onsite consumption and/or a Project that shall be associated with a new electric account that has not received service as of the date of Bid submission. 2,3 "Ombudsperson” shall mean an independent consultant directed by PURA to efficiently resolve disputes with the electric distribution companies (EDCs) and review and approve extension requests beyond the three-year in-service time period. “Owner of the Project Site” shall mean the legal owner of the Project Site. “Parcel” shall mean the clearly defined property boundaries registered with the local municipality before January 1 of the year of the solicitation. “Performance Assurance” shall mean collateral in the form of cash, or other security as may be acceptable to the EDC in its sole discretion. Cash collateral held by the EDC shall not earn interest. In addition, Performance Assurance shall be deemed, for all legal purposes, to mean adequate assurance as such term is used in the Uniform Commercial Code ("UCC") and the Bankruptcy Code and amendments thereto. The parties specifically recognize that the use of Performance Assurance throughout the term of the Tariff Agreement applicable to the selected Project shall not limit any legal right, action or remedy that would have otherwise been available to the aggrieved party under either the UCC or Bankruptcy Code. “Production Meter” shall mean a meter installed and owned by the EDC that measures the output from a Project prior to any netting of Customer load. “Program” shall mean the required rules and processes for the solicitation and selection of Projects eligible pursuant to subparagraphs (A) and (B) of Section 3(a)(2) of Public Act 19-35, Section 1 of Public Act 22-14, and Section 25 of Public Act 23-102, and Section 9 of Public Act 25-173, An Act Concerning Energy Affordability, Access, and Accountability. An Owner of the Project Site who is not the Customer of Record may submit a Bid as a New Construction Project under the Buy-All Tariff. 2 If the NRES project is submitted with an existing account number, the same account number must be used in the Distributed Generation (“DG”) Interconnection Application and/or for the new service request for the Buy-All production meter. New Construction projects should not include an account number in the DG Interconnection Application and/or for the new service request for the Buy-All production meter. 3 Updated 1/9/2026 7 Page 25 of 100
  5. Page 26 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials “Project” shall mean a distributed renewable generation system that qualifies for and is eligible under Section 3 of Public Act 19-35, Section 1 of Public Act 22-14, and Section 25 of Public Act 23-102, and Section 9 of Public Act 25-173, An Act Concerning Energy Affordability, Access, and Accountability that has been offered into an EDC solicitation, selected by the EDC, and approved by PURA to receive compensation from the EDC for energy and Renewable Energy Credits produced and delivered to the EDC. “Project Site” shall mean the location of a distributed renewable generation system that qualifies for and is eligible under these Rules, is located on either the same premises as the Customer or, for eligible SAM Customers, premises where the Customer Host has rights to develop a Project, and is a single Parcel of land consistent with Parcel boundaries that existed as of January 1 of the solicitation year. “PURA” or “Authority” shall mean the Connecticut Public Utilities Regulatory Authority and any predecessor or successor agency. “Purchased Products” shall have the meaning set forth in Section 3.4 hereof. “Renewable Energy Certificate” or “Renewable Energy Credit” or “REC” shall mean the certificates created to represent one Megawatt hour of production from a Connecticut Class I renewable generation facility. “Residential Customer” shall mean a Customer of a single-family dwelling, a multifamily dwelling consisting of two to four units, or a multifamily dwelling consisting of five or more units, provided in the case of a multifamily dwelling consisting of five or more units, (i) not less than sixty per cent of the units of the multifamily dwelling are occupied by persons and families with income that is not more than sixty per cent of the area median income for the municipality in which it is located, as determined by the United States Department of Housing and Urban Development, or (ii) such multifamily dwelling is determined to be affordable housing by the Public Utilities Regulatory Authority in consultation with the Department of Energy and Environmental Protection, Department of Housing, Connecticut Green Bank, Connecticut Housing Finance Authority and United States Department of Housing and Urban Development. “Retail Rate” shall mean the total electric rate, based on kilowatt-hours, at which the Customer will purchase all energy from the applicable EDC. “Revenue Meter” shall mean the meter required under the Customer’s applicable general service rate schedule. “Request for Proposals” or “RFP” shall mean the document(s) issued by the EDCs for the solicitation of Project Bids for the NRES Program. “Rooftop Project” shall mean a solar generation Project with 100% of the Nameplate Capacity of the solar photovoltaic modules used for generating power installed on top of either 1) a single building rooftop, or 2) a set of rooftops served by the same Revenue Meter, at the Project Site owned by the commercial or industrial Customer (i.e., this does not include Customers on Residential Rate codes). A Rooftop Project shall not include a Solar Canopy or Solar Carport. “SAM Customer” shall mean State Customers, Agricultural Customers, and Municipal Customers. The Customer Host must maintain the original SAM Designation (i.e., State, Agricultural, or Municipal) as designated at the time of Bid submission throughout the Tariff Term. Updated 1/9/2026 8 Page 26 of 100
  6. Page 27 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials “School Solar Category” shall mean the NRES Program category established under Public Act No. 24-151§173, which is a state authorized initiative aimed at encouraging the installation of solar photovoltaic system and energy storage systems at public schools. This Program category is an extension of Connecticut’s NRES and Energy Storage Solutions (ESS) programs. The annual 25MW cap for the school program offering will be incremental to the NRES Program’s existing annual 100 MW cap. School Solar category projects may include solar-only, storage-only, or solarplus-storage. Only the solar component of projects counts towards 25MW school category cap. “School Solar Pre-Application Checklist” shall have the meaning set forth in Section 5.3.7 hereof. “Shared Clean Energy Facility” or “SCEF” shall mean a Shared Clean Energy Facility as defined in Conn. Gen. Stat. Section 16-244x. “Solar Canopy” or “Solar Canopies” or “Solar Carport” shall mean a solar generation Project where the alternating current (AC) Nameplate Capacity of a Project used for generating power is installed above a permeable and/or nonpermeable existing or new parking/driving area, pedestrian walkway, courtyard, canal, or other utilized surface that requires shade, which is installed in a manner that maintains the function of the area beneath the structure and continues to be used or available for use for such purposes for the term of Program participation. “Standard Service” shall mean the electric generation services provided by the Company, on or after January 1, 2007, to any Customer who (a) does not arrange for or is not receiving electric generation services from an electric supplier, and (b) does not use a demand meter or has a maximum demand of less than five hundred kilowatts. The availability for this service shall be in accordance with the provisions set forth in the Company’s Generation Services tariff, on file with PURA. “State Customer” shall mean a retail end user of electric service located in the service territory of the EDC that belongs to any office, department, board, council, commission, institution, constituent unit of the state system of higher education, technical high school or other agency in the executive, legislative or judicial branches of state government of Connecticut. “System Owner” shall mean any person or entity that, alone or in conjunction with others, has legal ownership of a Project. The System Owner may, but is not required to be, the Customer of Record. “Tariff Agreement” shall mean the Non-Residential Renewable Energy Solutions Program Tariff Agreement for the Customer inclusive of the Non-Residential Renewable Energy Solutions Program Tariff, Terms and Conditions and all referenced attachments and appendices. “Tariff Payment Beneficiary” shall mean an individual or entity designated by the Customer of Record to receive tariff-related payments. The Tariff Payment Beneficiary may, but is not required to be, the System Owner or the Customer of Record. “Tariff Rate” shall mean the Project-specific rate(s) approved by PURA. The Tariff Rate may include separate pricing for energy and Environmental Attributes under the Netting Tariff structure. “Tranche Year” means the year of the solicitation in which a Project is selected by the EDC and approved by PURA. Updated 1/9/2026 9 Page 27 of 100
  7. Page 28 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials 3. TARIFF STRUCTURE AND PAYMENTS 3.1. Tariff Structure 3.1.1. The provisions for service, rates and other terms and conditions applicable to Customer’s zero-emission Projects and low-emission Projects will be established in the form of a Rider and a Tariff Agreement developed by the EDCs and submitted for review and approval by PURA. Service to Customers under this Rider structure shall be provided under their applicable general service rate schedule. 3.1.2. The Rider will include provisions for the following: 3.1.2.1. The EDC Purchase Commitments and procurement rules contained in this Program Manual, as approved and amended by PURA. 3.1.2.2. Common terms and conditions of service for Projects selected by the EDCs and approved by PURA that provide a detailed description of Customer and EDC obligations for selected Projects. 3.1.2.3. Service Qualifications, which includes documenting demonstrated fulfillment of Customer and EDC obligations. 3.1.3. The Tariff Agreement will provide the Project the selected details including the PURA approved Purchase Price, Project location, and other related and required information. 3.1.4. Customers enrolled in the Non-Residential Solar Tariff Rider whose term has expired may be eligible to be compensated for energy exported to the distribution system through the Company’s purchased power tariff, (UI Rate SG2, or Eversource Rate 980) or its successor, if available. The Company is not under any obligation to purchase RECs after the Tariff Term from the Projects. 3.2. Compensation Structures 3.2.1. The Compensation Structure will be selected at the time of Bid submission and cannot be modified once selected, either before or after the system receives Approval to Energize from the utility. 3.2.2. Certain customers are only eligible to participate in the Buy-All Compensation Structure. These include: 3.2.2.1. A customer of record with existing net metering rights pursuant to Conn. Gen. Stat. Section 16-243h, as amended by Section 1 of Public Act 19-35 who is not installing an Add-On System. 4 3.2.3. Customers with oversized Rooftop Projects shall only qualify for the Buy-All Compensation Structure for any generation associated with such Project. Rooftop Projects can qualify for the Netting Compensation Structure, so long as they are A Customer with existing net metering rights already has the benefit of netting, and the EDCs cannot implement dual netting structures behind a single Revenue Meter unless the existing net metering system is converted to the NRES Netting Tariff in accordance with Section 3.2.10.5. 4 Updated 1/9/2026 10 Page 28 of 100
  8. Page 29 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials appropriately sized to load as demonstrated by the proof of historical or anticipated load which must be provided during Bid Submission. 3.2.4. Customers are eligible to receive monetary (i.e., dollars, not kWh) credits on their electric bill and/or applicable direct cash payments for generation through either compensation structure. Any monetary bill credits applied to an on-site account or, in the case of State, Agricultural, or Municipal Projects, to any Beneficial Accounts, will be applied on a monthly basis. All other direct cash compensation will be provided on a quarterly basis. 3.2.5. The EDCs will provide for monetary crediting in the form of bill credits (“Beneficial Account Credits”) to Beneficial Accounts of projects hosted by eligible State, Agricultural and Municipal customers. The EDCs will allow the Customer Host to determine the allocation percentages for each of the Beneficial Accounts by providing the required information to the respective EDC via the Beneficial Account Credit Allocation Form (“BACAF”). To be eligible as Beneficial Accounts, accounts must meet all requirements set forth in Public Act 19-35. For non-state or non-municipal Critical Facilities to be designated as Beneficial Accounts, they must be physically connected to the same Microgrid as the Customer Host. 5 3.2.5.1. Each Customer Host shall set credit allocation percentages for Beneficial Accounts, and each Beneficial Account shall set credit allocation percentages for each eligible individually numbered account, which may be reapportioned on an annual basis subject to a fee of $250. For further details on the Beneficial Account allocation process, see Appendix C - Beneficial Account Allocation Guidelines. 3.2.6. Monetary bill credits remaining on customer bills shall roll over until the end of the 20-year term. Customers may receive an On-Bill Credit Cash Out payment for any accrued Monetary Bill credits at the end of the 20-year term. Such credits shall also be transferable in the event that the Customer of Record changes at the Project Site. 3.2.7. Any direct cash payments a customer is eligible to receive may be assigned to a Tariff Payment Beneficiary. The Customer of Record must certify and approve any payments to be made to a Tariff Payment Beneficiary. If the Customer of Record chooses to redesignate the Tariff Payment Beneficiary at any time after the Project has executed a Tariff Agreement, a fee of $22 may be charged each time such request is made. 3.2.8. The EDCs will provide all Customers of Record who have received cash payments, including an On-Bill Credit Cash Out, of $600 or more in a calendar year with a 1099 tax form. 3.2.9. Buy-All: Under the Buy-All Compensation Structure, the EDC will compensate the Customer or the Tariff Payment Beneficiary, as applicable at a fixed per kWh Refer to the Appendix C - Beneficial Account Credit Allocation Guideline for further guidance regarding redesignation of Beneficial Accounts. 5 Updated 1/9/2026 11 Page 29 of 100
  9. Page 30 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials volumetric rate for all energy, RECs, and Environmental Attributes produced by the Project. There is no separate rate for RECs and Environmental Attributes. 3.2.9.1. A set percentage of the total compensation rate, up to 100 percent, may be assigned to a Tariff Payment Beneficiary and such percentage may be modified throughout the Tariff Term subject to Section 3.2.7 hereof. If a Bidder elects to provide direct cash payments to a Tariff Payment Beneficiary, the Bidder must clearly identify the percentage of total compensation to be paid to a Tariff Payment Beneficiary. Any remaining compensation shall be applied to the Customer of Record’s account in the form of monetary credits. 3.2.10. Netting Tariff: Under the Netting Tariff structure, the EDC will compensate the Customer based on a two-part Tariff Rate. The two-part rate will consist of an Export Rate, and a REC and Environmental Attribute (“REC”) rate. 3.2.10.1. The EDC will purchase energy exported to the electric grid and not consumed on-site (“Net Excess Generation”) calculated monthly. The amount of energy on a per kWh basis sold to the Company shall be compared to the amount of energy purchased from the Company. If the amount of energy sold to the Company exceeds the amount of energy purchased from the Company, the monthly net kWh delivered to the distribution system shall be calculated as the difference between the amount of energy sold to the Company minus the amount of energy purchased from the Company. If the amount of energy purchased from the Company exceeds the amount of energy sold to the Company, the monthly net kWh consumption shall be calculated as the difference between the amount of energy purchased from the Company minus the amount of energy sold to the Company. 3.2.10.2. Monetary On-Bill Credits are calculated based on a Customer’s monthly Net Excess Generation multiplied by the Customer’s current Retail Rate inclusive of Standard Service supply rates. Excess Monetary On-Bill Credits appearing on a Customer’s bill will carry forward from month to month and can be used to offset Customer, supply, and delivery charges. 3.2.10.3. The Customer will pay the EDC for any monthly net kWh consumption during the billing period at the applicable EDC Retail Rate. 3.2.10.4. The Customer or the Tariff Payment Beneficiary, as applicable, will receive direct cash payment for the RECs and Environmental Attributes of the total kWh of generation produced by the Project at the REC rate as measured at the Production Meter. 3.2.10.5. Customers with an existing project currently enrolled in the respective Companies’ Net Metering Tariff may qualify for the Netting Tariff for any generation associated with such Project. If an Add-On System is proposed behind a Revenue Meter associated with a project enrolled, or planning to be enrolled, on the respective Companies’ Net Metering Tariff, the following applies: Updated 1/9/2026 3.2.10.5.1. The Add-On system must be electrically separate from the existing renewable energy system(s) and requires a separate application for interconnection. 12 Page 30 of 100
  10. Page 31 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials 3.2.10.5.2. Monetary On-Bill Credits: In applying for the NRES Netting incentive structure for an Add-On System, the Customer agrees to discontinue service under the Class I Renewable Net Energy Billing tariff (Rider N or Rider NEC1), if applicable, following receipt of the Approval to Energize for the Add-On System. Upon discontinuing Rider N or Rider NEC1 service, any existing kWh credit bank will be cashed out to the customer of record and the account will be enrolled in the Connecticut Non-Residential Renewable Energy Solutions Rider. Once enrolled, all net excess generation from both systems, as recorded at the revenue meter, will be credited per the Connecticut Non-Residential Renewable Energy Solutions Rider. In accordance with the Connecticut NonResidential Energy Solutions Rider, Monetary On-Bill Credits can only be cashed out upon closure of the billing account or at the end of the twenty-year tariff term. 3.2.10.5.3. REC Payments: The EDC will purchase all RECs generated by an AddOn System as measured by the system’s Production Meter at the applicable REC Incentive Rate. No changes will be made to the existing system regarding payments for RECs. 3.2.10.5.4. Metering: The Add-On System must be installed behind the same Revenue Meter as the existing net metering project and must install a separate NRES Production Meter in accordance with all NRES requirements. Both the existing system and Add-On System will be interconnected behind the Customer’s Revenue meter and load such that system production first serves onsite load and any generation in excess of customer load is exported to the EDC’s grid through a bidirectional meter. At the time of interconnection, unless otherwise authorized by the EDC, the EDC will install a Production Meter that will exclusively measure the output of the Add-On System and will be located behind the Customer’s Revenue Meter. The EDC will not install any additional Production Metering equipment for the existing system. This Production Meter will measure both the production from the Add-On System and any parasitic load associated with the Add-On System. The monthly net value of any reads on the generation and consumption meter channels will be the basis for calculation of REC Payment Incentives, if applicable. The System Owner will be responsible for costs associated with the procurement and installation of any system’s Production Meter. Customers and their developer are responsible for ensuring that Production Meters exclusively report the production of the Add-On System and do not measure production from any existing system. Customers and their developers are responsible for configuring system wiring to ensure generation from Add-On Systems is not reported to any other entity for the purposes of generating RECs (i.e., double counting). Failure to meet these requirements may result in an EDC withholding REC payments and/or termination of the Project’s eligibility under the Tariff. 3.3. Tariff Rates (Pricing) Updated 1/9/2026 13 Page 31 of 100
Words on different pages

Text of 2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdf

Extracted from the file · 203 pages · 522,519 characters

Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf

Extracted from the file · 2 pages · 6,256 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf

Extracted from the file · 2 pages · 3,261 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf

Extracted from the file · 1 page · 528 characters

Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf

Extracted from the file · 2 pages · 4,800 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)

This filing on the current system (opens in a new tab)