Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

5. Annual Compliance Filings – Additional Filings (Program Materials)

Compliance filingFiled by Avangrid13 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files13

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages
  1. Page 27 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials “School Solar Category” shall mean the NRES Program category established under Public Act No. 24-151§173, which is a state authorized initiative aimed at encouraging the installation of solar photovoltaic system and energy storage systems at public schools. This Program category is an extension of Connecticut’s NRES and Energy Storage Solutions (ESS) programs. The annual 25MW cap for the school program offering will be incremental to the NRES Program’s existing annual 100 MW cap. School Solar category projects may include solar-only, storage-only, or solarplus-storage. Only the solar component of projects counts towards 25MW school category cap. “School Solar Pre-Application Checklist” shall have the meaning set forth in Section 5.3.7 hereof. “Shared Clean Energy Facility” or “SCEF” shall mean a Shared Clean Energy Facility as defined in Conn. Gen. Stat. Section 16-244x. “Solar Canopy” or “Solar Canopies” or “Solar Carport” shall mean a solar generation Project where the alternating current (AC) Nameplate Capacity of a Project used for generating power is installed above a permeable and/or nonpermeable existing or new parking/driving area, pedestrian walkway, courtyard, canal, or other utilized surface that requires shade, which is installed in a manner that maintains the function of the area beneath the structure and continues to be used or available for use for such purposes for the term of Program participation. “Standard Service” shall mean the electric generation services provided by the Company, on or after January 1, 2007, to any Customer who (a) does not arrange for or is not receiving electric generation services from an electric supplier, and (b) does not use a demand meter or has a maximum demand of less than five hundred kilowatts. The availability for this service shall be in accordance with the provisions set forth in the Company’s Generation Services tariff, on file with PURA. “State Customer” shall mean a retail end user of electric service located in the service territory of the EDC that belongs to any office, department, board, council, commission, institution, constituent unit of the state system of higher education, technical high school or other agency in the executive, legislative or judicial branches of state government of Connecticut. “System Owner” shall mean any person or entity that, alone or in conjunction with others, has legal ownership of a Project. The System Owner may, but is not required to be, the Customer of Record. “Tariff Agreement” shall mean the Non-Residential Renewable Energy Solutions Program Tariff Agreement for the Customer inclusive of the Non-Residential Renewable Energy Solutions Program Tariff, Terms and Conditions and all referenced attachments and appendices. “Tariff Payment Beneficiary” shall mean an individual or entity designated by the Customer of Record to receive tariff-related payments. The Tariff Payment Beneficiary may, but is not required to be, the System Owner or the Customer of Record. “Tariff Rate” shall mean the Project-specific rate(s) approved by PURA. The Tariff Rate may include separate pricing for energy and Environmental Attributes under the Netting Tariff structure. “Tranche Year” means the year of the solicitation in which a Project is selected by the EDC and approved by PURA. Updated 1/9/2026 9 Page 27 of 100
  2. Page 28 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials 3. TARIFF STRUCTURE AND PAYMENTS 3.1. Tariff Structure 3.1.1. The provisions for service, rates and other terms and conditions applicable to Customer’s zero-emission Projects and low-emission Projects will be established in the form of a Rider and a Tariff Agreement developed by the EDCs and submitted for review and approval by PURA. Service to Customers under this Rider structure shall be provided under their applicable general service rate schedule. 3.1.2. The Rider will include provisions for the following: 3.1.2.1. The EDC Purchase Commitments and procurement rules contained in this Program Manual, as approved and amended by PURA. 3.1.2.2. Common terms and conditions of service for Projects selected by the EDCs and approved by PURA that provide a detailed description of Customer and EDC obligations for selected Projects. 3.1.2.3. Service Qualifications, which includes documenting demonstrated fulfillment of Customer and EDC obligations. 3.1.3. The Tariff Agreement will provide the Project the selected details including the PURA approved Purchase Price, Project location, and other related and required information. 3.1.4. Customers enrolled in the Non-Residential Solar Tariff Rider whose term has expired may be eligible to be compensated for energy exported to the distribution system through the Company’s purchased power tariff, (UI Rate SG2, or Eversource Rate 980) or its successor, if available. The Company is not under any obligation to purchase RECs after the Tariff Term from the Projects. 3.2. Compensation Structures 3.2.1. The Compensation Structure will be selected at the time of Bid submission and cannot be modified once selected, either before or after the system receives Approval to Energize from the utility. 3.2.2. Certain customers are only eligible to participate in the Buy-All Compensation Structure. These include: 3.2.2.1. A customer of record with existing net metering rights pursuant to Conn. Gen. Stat. Section 16-243h, as amended by Section 1 of Public Act 19-35 who is not installing an Add-On System. 4 3.2.3. Customers with oversized Rooftop Projects shall only qualify for the Buy-All Compensation Structure for any generation associated with such Project. Rooftop Projects can qualify for the Netting Compensation Structure, so long as they are A Customer with existing net metering rights already has the benefit of netting, and the EDCs cannot implement dual netting structures behind a single Revenue Meter unless the existing net metering system is converted to the NRES Netting Tariff in accordance with Section 3.2.10.5. 4 Updated 1/9/2026 10 Page 28 of 100
  3. Page 29 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials appropriately sized to load as demonstrated by the proof of historical or anticipated load which must be provided during Bid Submission. 3.2.4. Customers are eligible to receive monetary (i.e., dollars, not kWh) credits on their electric bill and/or applicable direct cash payments for generation through either compensation structure. Any monetary bill credits applied to an on-site account or, in the case of State, Agricultural, or Municipal Projects, to any Beneficial Accounts, will be applied on a monthly basis. All other direct cash compensation will be provided on a quarterly basis. 3.2.5. The EDCs will provide for monetary crediting in the form of bill credits (“Beneficial Account Credits”) to Beneficial Accounts of projects hosted by eligible State, Agricultural and Municipal customers. The EDCs will allow the Customer Host to determine the allocation percentages for each of the Beneficial Accounts by providing the required information to the respective EDC via the Beneficial Account Credit Allocation Form (“BACAF”). To be eligible as Beneficial Accounts, accounts must meet all requirements set forth in Public Act 19-35. For non-state or non-municipal Critical Facilities to be designated as Beneficial Accounts, they must be physically connected to the same Microgrid as the Customer Host. 5 3.2.5.1. Each Customer Host shall set credit allocation percentages for Beneficial Accounts, and each Beneficial Account shall set credit allocation percentages for each eligible individually numbered account, which may be reapportioned on an annual basis subject to a fee of $250. For further details on the Beneficial Account allocation process, see Appendix C - Beneficial Account Allocation Guidelines. 3.2.6. Monetary bill credits remaining on customer bills shall roll over until the end of the 20-year term. Customers may receive an On-Bill Credit Cash Out payment for any accrued Monetary Bill credits at the end of the 20-year term. Such credits shall also be transferable in the event that the Customer of Record changes at the Project Site. 3.2.7. Any direct cash payments a customer is eligible to receive may be assigned to a Tariff Payment Beneficiary. The Customer of Record must certify and approve any payments to be made to a Tariff Payment Beneficiary. If the Customer of Record chooses to redesignate the Tariff Payment Beneficiary at any time after the Project has executed a Tariff Agreement, a fee of $22 may be charged each time such request is made. 3.2.8. The EDCs will provide all Customers of Record who have received cash payments, including an On-Bill Credit Cash Out, of $600 or more in a calendar year with a 1099 tax form. 3.2.9. Buy-All: Under the Buy-All Compensation Structure, the EDC will compensate the Customer or the Tariff Payment Beneficiary, as applicable at a fixed per kWh Refer to the Appendix C - Beneficial Account Credit Allocation Guideline for further guidance regarding redesignation of Beneficial Accounts. 5 Updated 1/9/2026 11 Page 29 of 100
  4. Page 30 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials volumetric rate for all energy, RECs, and Environmental Attributes produced by the Project. There is no separate rate for RECs and Environmental Attributes. 3.2.9.1. A set percentage of the total compensation rate, up to 100 percent, may be assigned to a Tariff Payment Beneficiary and such percentage may be modified throughout the Tariff Term subject to Section 3.2.7 hereof. If a Bidder elects to provide direct cash payments to a Tariff Payment Beneficiary, the Bidder must clearly identify the percentage of total compensation to be paid to a Tariff Payment Beneficiary. Any remaining compensation shall be applied to the Customer of Record’s account in the form of monetary credits. 3.2.10. Netting Tariff: Under the Netting Tariff structure, the EDC will compensate the Customer based on a two-part Tariff Rate. The two-part rate will consist of an Export Rate, and a REC and Environmental Attribute (“REC”) rate. 3.2.10.1. The EDC will purchase energy exported to the electric grid and not consumed on-site (“Net Excess Generation”) calculated monthly. The amount of energy on a per kWh basis sold to the Company shall be compared to the amount of energy purchased from the Company. If the amount of energy sold to the Company exceeds the amount of energy purchased from the Company, the monthly net kWh delivered to the distribution system shall be calculated as the difference between the amount of energy sold to the Company minus the amount of energy purchased from the Company. If the amount of energy purchased from the Company exceeds the amount of energy sold to the Company, the monthly net kWh consumption shall be calculated as the difference between the amount of energy purchased from the Company minus the amount of energy sold to the Company. 3.2.10.2. Monetary On-Bill Credits are calculated based on a Customer’s monthly Net Excess Generation multiplied by the Customer’s current Retail Rate inclusive of Standard Service supply rates. Excess Monetary On-Bill Credits appearing on a Customer’s bill will carry forward from month to month and can be used to offset Customer, supply, and delivery charges. 3.2.10.3. The Customer will pay the EDC for any monthly net kWh consumption during the billing period at the applicable EDC Retail Rate. 3.2.10.4. The Customer or the Tariff Payment Beneficiary, as applicable, will receive direct cash payment for the RECs and Environmental Attributes of the total kWh of generation produced by the Project at the REC rate as measured at the Production Meter. 3.2.10.5. Customers with an existing project currently enrolled in the respective Companies’ Net Metering Tariff may qualify for the Netting Tariff for any generation associated with such Project. If an Add-On System is proposed behind a Revenue Meter associated with a project enrolled, or planning to be enrolled, on the respective Companies’ Net Metering Tariff, the following applies: Updated 1/9/2026 3.2.10.5.1. The Add-On system must be electrically separate from the existing renewable energy system(s) and requires a separate application for interconnection. 12 Page 30 of 100
  5. Page 31 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials 3.2.10.5.2. Monetary On-Bill Credits: In applying for the NRES Netting incentive structure for an Add-On System, the Customer agrees to discontinue service under the Class I Renewable Net Energy Billing tariff (Rider N or Rider NEC1), if applicable, following receipt of the Approval to Energize for the Add-On System. Upon discontinuing Rider N or Rider NEC1 service, any existing kWh credit bank will be cashed out to the customer of record and the account will be enrolled in the Connecticut Non-Residential Renewable Energy Solutions Rider. Once enrolled, all net excess generation from both systems, as recorded at the revenue meter, will be credited per the Connecticut Non-Residential Renewable Energy Solutions Rider. In accordance with the Connecticut NonResidential Energy Solutions Rider, Monetary On-Bill Credits can only be cashed out upon closure of the billing account or at the end of the twenty-year tariff term. 3.2.10.5.3. REC Payments: The EDC will purchase all RECs generated by an AddOn System as measured by the system’s Production Meter at the applicable REC Incentive Rate. No changes will be made to the existing system regarding payments for RECs. 3.2.10.5.4. Metering: The Add-On System must be installed behind the same Revenue Meter as the existing net metering project and must install a separate NRES Production Meter in accordance with all NRES requirements. Both the existing system and Add-On System will be interconnected behind the Customer’s Revenue meter and load such that system production first serves onsite load and any generation in excess of customer load is exported to the EDC’s grid through a bidirectional meter. At the time of interconnection, unless otherwise authorized by the EDC, the EDC will install a Production Meter that will exclusively measure the output of the Add-On System and will be located behind the Customer’s Revenue Meter. The EDC will not install any additional Production Metering equipment for the existing system. This Production Meter will measure both the production from the Add-On System and any parasitic load associated with the Add-On System. The monthly net value of any reads on the generation and consumption meter channels will be the basis for calculation of REC Payment Incentives, if applicable. The System Owner will be responsible for costs associated with the procurement and installation of any system’s Production Meter. Customers and their developer are responsible for ensuring that Production Meters exclusively report the production of the Add-On System and do not measure production from any existing system. Customers and their developers are responsible for configuring system wiring to ensure generation from Add-On Systems is not reported to any other entity for the purposes of generating RECs (i.e., double counting). Failure to meet these requirements may result in an EDC withholding REC payments and/or termination of the Project’s eligibility under the Tariff. 3.3. Tariff Rates (Pricing) Updated 1/9/2026 13 Page 31 of 100
  6. Page 32 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials Page 32 of 100 3.3.1. Pricing for Large and Medium Zero Emission Projects: Tariff pricing for Large and Medium Zero Emission Projects will be based on competitive bidding within the Project size tiers set forth in Section 3 hereof. Each Project will have its own Tariff Rate based on its accepted Bid, as approved by PURA. Tariff Rates will be applied in accordance with §16-244z of the Connecticut General Statutes and will be based on a cents per kWh calculation of the Tariff Rate multiplied by the applicable metered kWh. 3.3.2. Pricing for Small Zero Emission Projects: Tariff pricing for Small Zero Emission Projects will be administratively set on an annual basis and approved by PURA as noted in the applicable RFP. Tariff Rates will be applied in accordance with §16244z of the Connecticut General Statutes and will be based on a cents per kWh calculation of the Tariff Rate multiplied by the applicable metered kWh. 3.3.3. Pricing for School Solar Projects: Tariff Pricing for School Solar Projects will be administratively set on an annual basis and approved by PURA as noted in the applicable RFP. Tariff rates will be the same as the Medium Zero Emission category and will be based on a cents per kWh calculation of the Tariff Rate multiplied by the applicable metered kWh. 3.3.4. Price Cap: For each Procurement Year, PURA will establish a price cap for competitive bidding. The price cap may be different for each competitive bidding class/size tier, and for each EDC service territory. 3.3.5. For Year 5, the Buy-All Price Caps for each Project Size Category are outlined below: NRES Buy-All Bid Price Caps Category Small Zero Emission Medium Zero Emission Large Zero Emission School Solar Price Cap Price Cap for 100% Solar Canopy/Solar Carport Projects ONLY $250.42/MWh N/A $236.74/MWh $338.20/MWh $182.94/MWh $236.74/MWh $261.34/MWh $307.76/MWh The Netting Bid Price Caps for each Project Size Category and Retail Rate can be calculated using the following formula ensuring that the Net Present Value (NPV) Retail Rate used in said formula is the one from the recent version of the Bid Price Calculator filed in Docket 25-08-03 (reference Section 1.4 of the Year 5 RFP for the full list of Netting Bid Price Caps): Updated 1/9/2026 14
  7. Page 33 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials Buy-All Bid Price Cap - NPV Retail Rate ($/MWh) = Netting Bid Price Cap ($/REC) 6 For Years 3 – 6, the price cap shall be adjusted based on the prior year’s solicitation results, adjusting for known market changes, as approved by PURA. 3.4. Purchased Products 3.4.1. By participating in the Program, the Customer (or Project owner if other than the Customer) transfers to the EDC all rights and claims to RECs and Environmental Attributes that have monetary value, including without limitation RECs and marketable emissions offsets. 3.4.1.1. The EDC shall retain the sole right to register any RECs and/or Environmental Attributes and be compensated for the same. The EDC shall take title to all energy delivered to the distribution system by the Customer, all available capacity rights and to all Environmental Attributes at the time of production. 4. ELIGIBILITY REQUIREMENTS 4.1. Customer Eligibility Criteria 4.1.1. Eligible Customers must be a current or future 7 Customer of Record of the EDC to which they are applying, and Qualified Projects must be located on the Customer of Record’s premises, or, for eligible SAM Customers, premises where the Customer Host has rights to develop a Project. The Project shall always be linked to the Customer of Record at the Project Site, and eligibility for payments under the Tariff shall transfer from one Customer of Record to the new Customer of Record in situations where the original Customer of Record changes at the Project Site. 4.1.2. Customers are eligible to submit only one Netting Bid per technology or one Netting Bid for a Project that uses a combination of technologies (i.e., a wind turbine that has associated solar panels) at any Revenue Meter during any single respective solicitation. 4.1.3. Customers are eligible to submit only one Buy-all Bid per technology or one BuyAll Bid for a Project that uses a combination of technologies (i.e., a wind turbine that has associated solar panels) at any Parcel or contiguous Parcels under common ownership during any single respective solicitation. 4.1.4. Eligible Customers may not propose the same class of technology at the same Project Site which was selected under this Program, the SCEF Program, or the LREC/ZREC Program with an agreement that was in effect prior to the submission of a Bid under a particular procurement year for this Program, except under any of the following conditions: In the situation where Netting Bid Price Cap would be less than $0, Bidders should treat the Netting Bid Price Cap as $0. 6 7 Eligible future customers must be the Customer of the New Construction Project Updated 1/9/2026 15 Page 33 of 100
  8. Page 34 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials 4.1.4.1. The existing Project is in-service. 4.1.4.2. A one-year calendar period has expired following termination of the previously existing Tariff Agreement. 4.1.4.3. For Netting projects, the new Project is submitted by the same Project developer on the same Parcel or contiguous Parcel(s) of land under common ownership but interconnects behind a different Revenue Meter than that associated with the existing Tariff Agreement (i.e., Virtual Net Metering, LREC/ZREC, SCEF, or Non-Residential Renewable Energy Solutions Program). This exception is intended to allow for Bids from multiple Netting Projects that would serve load separate and distinct from the load served by any existing Projects, such as load behind a separate existing Revenue Meter or New Construction Projects. Bids found to be serving the same load as an existing Project may be subject to removal from the Program and forfeit any Performance Assurance or other payments. This explicitly allows New Construction Projects, proposed to be built behind new load, to which the Project is appropriately sized according to Sections III.D.1. and Section III.D.2. of PURA’s June 30, 2021 Decision in Docket No. 20-07-01 and meet all other Program requirements, to Bid into the same or future auction of other Projects selected on the same Parcel of land. 4.1.4.4 For Rooftop Buy-All projects constructed on physically separate rooftops on the same Parcel, one Bid per building rooftop will be allowed in a single respective solicitation. 4.1.5. Any subdivision of Parcels must be recorded on the land records of the municipality in which such Parcel is located prior to January 1 of the year of the solicitation. If multiple Bids are received for a Parcel of land that was not subdivided before January 1 of the year of the solicitation to which the Bidder is responding, or for which a subdivision was not recorded with the municipality in which such Parcel is located prior to January 1 of the year of the solicitation, only the lowest priced Bid, meeting the above requirements, will be eligible and all other Bids will be disqualified. 4.2. System Sizing Requirements 4.2.1. The total generation 8 of Customer Projects that are not Rooftop Buy-All Projects cannot exceed the highest consecutive 12 months of kWh load of the Customer, net of any existing generation, over the five years prior to the date of Bid submission plus eligible adjustments to load for electrification or removal of onsite generation. The EDCs will apply a standard calculation using a capacity factor of no less than 15% for solar Projects in order to accurately and equitably verify that expected annual production does not exceed historical load. The calculation will be as follows: Installed Capacity (kW AC) x 8760 hours x Capacity Factor. For example, 50 kW AC x 8760 x 15% =65,700 kWh/year. The EDCs may consider alternative capacity factors for projects that have lower production estimates due to project’s solar panels orientation or shading, when supported by calculations from a Connecticut Licensed Professional Engineer. The EDCs will review requests for alternative capacity factors on a project-byproject basis and reserve the right to disqualify Bids that do not adhere to Program rules. 8 Updated 1/9/2026 16 Page 34 of 100
  9. Page 35 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials The highest consecutive 12 months of kWh load shall be measured by the Customer’s individual electric meter or a set of electric meters at a Project Site, when such meters are already combined for billing purposes at the time of Bid submission, as determined by the EDC providing service to the Customer. 4.2.1.1. All Bids must submit load information for the meter(s) associated with the Project. 9 4.2.2. Eligible combinations of meters to determine site load for Projects participating in the Buy-All Tariff include a set of meters on the same Parcel or contiguous Parcels that have the same building or landowner, and customers that are not currently submetered. 4.2.3. The maximum total generation of Customer projects for State, Agricultural and Municipal Customers may also include the load of up to five State, Agricultural, or Municipal Beneficial Accounts identified by the Customer and up to five Nonstate or Municipal Beneficial Accounts identified by the Customer that are Critical Facilities, and are connected to a Microgrid. State, Agricultural, or Municipal Projects are not required to be constructed on Project Sites that have existing or future electric load 10. 4.2.3.1. The percentage of each Beneficial Account’s load that will be used to support the Project size must be identified during Bid submission. 11 4.2.3.1.1. The EDCs will perform the load analysis review during eligibility screening for the given NRES RFP Bid submission and will consider current loads associated with the Beneficial Accounts for a given SAM Project Bid. 4.2.4. The maximum total generation of Customer projects may include a reasonable approximation of the annual load attributable to transportation electrification (i.e., electric vehicles) and/or fuel switching (i.e., air source heat pumps) at a Project site and/or exclude existing generation that is expected to be removed from a Project Site. 4.2.4.1. A Connecticut Licensed Professional Engineer must certify the load expected to materialize over the five years following Bid submission that is attributable to transportation electrification, fuel switching, and/or the removal of existing generation. A completed Professional Engineer Certification Form, available within the corresponding RFP on the EDCs’ respective websites, must be submitted along with the Connecticut Licensed Professional Engineer calculation. 9 Rooftop Buy-All Projects are not required to be sized to load but must submit load information. 10 Refer to the Appendix C - Beneficial Account Credit Allocation Guidelines for further guidance regarding redesignation of Beneficial Accounts. 11 Reference the Final Decision dated November 6, 2024 in Docket No. 24-08-03. Updated 1/9/2026 17 Page 35 of 100
  10. Page 36 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials 4.2.4.2. If expected load adjustments do not materialize within five years of the InService date, a Project’s compensation under the Tariff will be reduced proportionally to the unrealized load 12. 4.2.4.3. A Customer may reduce the size of a proposed system prior to the In-Service date if expected load adjustments are revised. Such customer shall receive compensation for energy and RECs generated from the reduced-size project after the In-Service Date, and such reduced Megawatts shall be treated as allocated, but unused, and will be reallocated to the next open Program solicitation. 4.2.5. For New Construction Projects that are not for SAM Customers sizing the Project to the load of Beneficial Accounts, or Rooftop Buy-All Projects, a Connecticut Licensed Professional Engineer must certify the anticipated Customer load at the Project Site, and how such Project shall be sized so as not to exceed such anticipated Customer load at the Project Site. 4.3. System Eligibility Criteria 4.3.1. Eligible Zero Emission Projects shall be less than or equal to five (5) MW (AC) in size and qualify as a Class I renewable energy source under Conn. Gen. Stat. Section 16-1(a)(20), as amended by Section 1 of Public Act 22-14 and Section 9 of Public Act 25-173. 4.3.2. Each Project must be located at a Project Site and be interconnected at or behind the EDC’s Delivery Point. All Buy-All Projects interconnect directly to the grid, otherwise referred to as “front-of-the-meter” or “standalone.” All Buy-All Projects will have an associated EDC Buy-All Production Meter. Any Add-On System proposed behind the same Revenue Meter as an existing net metering project must have a separately metered Production Meter. Projects intending to allocate to Beneficial Accounts may be sited on properties that do not have existing or future anticipated load. 4.3.3. Projects must seek and gain approval to interconnect to the EDC’s distribution system to which such system is interconnecting through the standard EDC interconnection process and be metered by that EDC. Projects must meet Distribution Company Guidelines for Interconnection (“Guidelines”) as approved by PURA. The interconnection process is separate and distinct from the Program. 4.3.4. Projects may not receive or seek to receive both funding from this Program and/or also receive(d) any funding, grants or rebates of any kind in any amount from any one or more of the following Programs or sources: (a) the Connecticut Green Bank (“CT Green Bank”) or any of its predecessors, (b) the LREC/ZREC Program, (c) any Shared Clean Energy Facility (“SCEF”) Program, (d) any net metering or virtual net metering Program 13, (e) any other Public Act 19-35 tariffs, (f) any other 12 For Buy-All Projects, this will result in a reduction in total compensation, and for Netting Projects, this will result in a reduction in the compensation for the RECs generated by the Project. Projects in the VNM queue or waiting list that have yet to reach commercial operation may submit the same Project into the Non-Residential Renewable Energy Solutions Program so long as the Project is withdrawn from the 13 Updated 1/9/2026 18 Page 36 of 100
Words on different pages

Text of 2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdf

Extracted from the file · 203 pages · 522,519 characters

Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf

Extracted from the file · 2 pages · 6,256 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf

Extracted from the file · 2 pages · 3,261 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf

Extracted from the file · 1 page · 528 characters

Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf

Extracted from the file · 2 pages · 4,800 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)

This filing on the current system (opens in a new tab)