Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

5. Annual Compliance Filings – Additional Filings (Program Materials)

Compliance filingFiled by Avangrid13 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files13

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages
  1. Page 29 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials appropriately sized to load as demonstrated by the proof of historical or anticipated load which must be provided during Bid Submission. 3.2.4. Customers are eligible to receive monetary (i.e., dollars, not kWh) credits on their electric bill and/or applicable direct cash payments for generation through either compensation structure. Any monetary bill credits applied to an on-site account or, in the case of State, Agricultural, or Municipal Projects, to any Beneficial Accounts, will be applied on a monthly basis. All other direct cash compensation will be provided on a quarterly basis. 3.2.5. The EDCs will provide for monetary crediting in the form of bill credits (“Beneficial Account Credits”) to Beneficial Accounts of projects hosted by eligible State, Agricultural and Municipal customers. The EDCs will allow the Customer Host to determine the allocation percentages for each of the Beneficial Accounts by providing the required information to the respective EDC via the Beneficial Account Credit Allocation Form (“BACAF”). To be eligible as Beneficial Accounts, accounts must meet all requirements set forth in Public Act 19-35. For non-state or non-municipal Critical Facilities to be designated as Beneficial Accounts, they must be physically connected to the same Microgrid as the Customer Host. 5 3.2.5.1. Each Customer Host shall set credit allocation percentages for Beneficial Accounts, and each Beneficial Account shall set credit allocation percentages for each eligible individually numbered account, which may be reapportioned on an annual basis subject to a fee of $250. For further details on the Beneficial Account allocation process, see Appendix C - Beneficial Account Allocation Guidelines. 3.2.6. Monetary bill credits remaining on customer bills shall roll over until the end of the 20-year term. Customers may receive an On-Bill Credit Cash Out payment for any accrued Monetary Bill credits at the end of the 20-year term. Such credits shall also be transferable in the event that the Customer of Record changes at the Project Site. 3.2.7. Any direct cash payments a customer is eligible to receive may be assigned to a Tariff Payment Beneficiary. The Customer of Record must certify and approve any payments to be made to a Tariff Payment Beneficiary. If the Customer of Record chooses to redesignate the Tariff Payment Beneficiary at any time after the Project has executed a Tariff Agreement, a fee of $22 may be charged each time such request is made. 3.2.8. The EDCs will provide all Customers of Record who have received cash payments, including an On-Bill Credit Cash Out, of $600 or more in a calendar year with a 1099 tax form. 3.2.9. Buy-All: Under the Buy-All Compensation Structure, the EDC will compensate the Customer or the Tariff Payment Beneficiary, as applicable at a fixed per kWh Refer to the Appendix C - Beneficial Account Credit Allocation Guideline for further guidance regarding redesignation of Beneficial Accounts. 5 Updated 1/9/2026 11 Page 29 of 100
  2. Page 30 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials volumetric rate for all energy, RECs, and Environmental Attributes produced by the Project. There is no separate rate for RECs and Environmental Attributes. 3.2.9.1. A set percentage of the total compensation rate, up to 100 percent, may be assigned to a Tariff Payment Beneficiary and such percentage may be modified throughout the Tariff Term subject to Section 3.2.7 hereof. If a Bidder elects to provide direct cash payments to a Tariff Payment Beneficiary, the Bidder must clearly identify the percentage of total compensation to be paid to a Tariff Payment Beneficiary. Any remaining compensation shall be applied to the Customer of Record’s account in the form of monetary credits. 3.2.10. Netting Tariff: Under the Netting Tariff structure, the EDC will compensate the Customer based on a two-part Tariff Rate. The two-part rate will consist of an Export Rate, and a REC and Environmental Attribute (“REC”) rate. 3.2.10.1. The EDC will purchase energy exported to the electric grid and not consumed on-site (“Net Excess Generation”) calculated monthly. The amount of energy on a per kWh basis sold to the Company shall be compared to the amount of energy purchased from the Company. If the amount of energy sold to the Company exceeds the amount of energy purchased from the Company, the monthly net kWh delivered to the distribution system shall be calculated as the difference between the amount of energy sold to the Company minus the amount of energy purchased from the Company. If the amount of energy purchased from the Company exceeds the amount of energy sold to the Company, the monthly net kWh consumption shall be calculated as the difference between the amount of energy purchased from the Company minus the amount of energy sold to the Company. 3.2.10.2. Monetary On-Bill Credits are calculated based on a Customer’s monthly Net Excess Generation multiplied by the Customer’s current Retail Rate inclusive of Standard Service supply rates. Excess Monetary On-Bill Credits appearing on a Customer’s bill will carry forward from month to month and can be used to offset Customer, supply, and delivery charges. 3.2.10.3. The Customer will pay the EDC for any monthly net kWh consumption during the billing period at the applicable EDC Retail Rate. 3.2.10.4. The Customer or the Tariff Payment Beneficiary, as applicable, will receive direct cash payment for the RECs and Environmental Attributes of the total kWh of generation produced by the Project at the REC rate as measured at the Production Meter. 3.2.10.5. Customers with an existing project currently enrolled in the respective Companies’ Net Metering Tariff may qualify for the Netting Tariff for any generation associated with such Project. If an Add-On System is proposed behind a Revenue Meter associated with a project enrolled, or planning to be enrolled, on the respective Companies’ Net Metering Tariff, the following applies: Updated 1/9/2026 3.2.10.5.1. The Add-On system must be electrically separate from the existing renewable energy system(s) and requires a separate application for interconnection. 12 Page 30 of 100
  3. Page 31 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials 3.2.10.5.2. Monetary On-Bill Credits: In applying for the NRES Netting incentive structure for an Add-On System, the Customer agrees to discontinue service under the Class I Renewable Net Energy Billing tariff (Rider N or Rider NEC1), if applicable, following receipt of the Approval to Energize for the Add-On System. Upon discontinuing Rider N or Rider NEC1 service, any existing kWh credit bank will be cashed out to the customer of record and the account will be enrolled in the Connecticut Non-Residential Renewable Energy Solutions Rider. Once enrolled, all net excess generation from both systems, as recorded at the revenue meter, will be credited per the Connecticut Non-Residential Renewable Energy Solutions Rider. In accordance with the Connecticut NonResidential Energy Solutions Rider, Monetary On-Bill Credits can only be cashed out upon closure of the billing account or at the end of the twenty-year tariff term. 3.2.10.5.3. REC Payments: The EDC will purchase all RECs generated by an AddOn System as measured by the system’s Production Meter at the applicable REC Incentive Rate. No changes will be made to the existing system regarding payments for RECs. 3.2.10.5.4. Metering: The Add-On System must be installed behind the same Revenue Meter as the existing net metering project and must install a separate NRES Production Meter in accordance with all NRES requirements. Both the existing system and Add-On System will be interconnected behind the Customer’s Revenue meter and load such that system production first serves onsite load and any generation in excess of customer load is exported to the EDC’s grid through a bidirectional meter. At the time of interconnection, unless otherwise authorized by the EDC, the EDC will install a Production Meter that will exclusively measure the output of the Add-On System and will be located behind the Customer’s Revenue Meter. The EDC will not install any additional Production Metering equipment for the existing system. This Production Meter will measure both the production from the Add-On System and any parasitic load associated with the Add-On System. The monthly net value of any reads on the generation and consumption meter channels will be the basis for calculation of REC Payment Incentives, if applicable. The System Owner will be responsible for costs associated with the procurement and installation of any system’s Production Meter. Customers and their developer are responsible for ensuring that Production Meters exclusively report the production of the Add-On System and do not measure production from any existing system. Customers and their developers are responsible for configuring system wiring to ensure generation from Add-On Systems is not reported to any other entity for the purposes of generating RECs (i.e., double counting). Failure to meet these requirements may result in an EDC withholding REC payments and/or termination of the Project’s eligibility under the Tariff. 3.3. Tariff Rates (Pricing) Updated 1/9/2026 13 Page 31 of 100
  4. Page 32 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials Page 32 of 100 3.3.1. Pricing for Large and Medium Zero Emission Projects: Tariff pricing for Large and Medium Zero Emission Projects will be based on competitive bidding within the Project size tiers set forth in Section 3 hereof. Each Project will have its own Tariff Rate based on its accepted Bid, as approved by PURA. Tariff Rates will be applied in accordance with §16-244z of the Connecticut General Statutes and will be based on a cents per kWh calculation of the Tariff Rate multiplied by the applicable metered kWh. 3.3.2. Pricing for Small Zero Emission Projects: Tariff pricing for Small Zero Emission Projects will be administratively set on an annual basis and approved by PURA as noted in the applicable RFP. Tariff Rates will be applied in accordance with §16244z of the Connecticut General Statutes and will be based on a cents per kWh calculation of the Tariff Rate multiplied by the applicable metered kWh. 3.3.3. Pricing for School Solar Projects: Tariff Pricing for School Solar Projects will be administratively set on an annual basis and approved by PURA as noted in the applicable RFP. Tariff rates will be the same as the Medium Zero Emission category and will be based on a cents per kWh calculation of the Tariff Rate multiplied by the applicable metered kWh. 3.3.4. Price Cap: For each Procurement Year, PURA will establish a price cap for competitive bidding. The price cap may be different for each competitive bidding class/size tier, and for each EDC service territory. 3.3.5. For Year 5, the Buy-All Price Caps for each Project Size Category are outlined below: NRES Buy-All Bid Price Caps Category Small Zero Emission Medium Zero Emission Large Zero Emission School Solar Price Cap Price Cap for 100% Solar Canopy/Solar Carport Projects ONLY $250.42/MWh N/A $236.74/MWh $338.20/MWh $182.94/MWh $236.74/MWh $261.34/MWh $307.76/MWh The Netting Bid Price Caps for each Project Size Category and Retail Rate can be calculated using the following formula ensuring that the Net Present Value (NPV) Retail Rate used in said formula is the one from the recent version of the Bid Price Calculator filed in Docket 25-08-03 (reference Section 1.4 of the Year 5 RFP for the full list of Netting Bid Price Caps): Updated 1/9/2026 14
  5. Page 33 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials Buy-All Bid Price Cap - NPV Retail Rate ($/MWh) = Netting Bid Price Cap ($/REC) 6 For Years 3 – 6, the price cap shall be adjusted based on the prior year’s solicitation results, adjusting for known market changes, as approved by PURA. 3.4. Purchased Products 3.4.1. By participating in the Program, the Customer (or Project owner if other than the Customer) transfers to the EDC all rights and claims to RECs and Environmental Attributes that have monetary value, including without limitation RECs and marketable emissions offsets. 3.4.1.1. The EDC shall retain the sole right to register any RECs and/or Environmental Attributes and be compensated for the same. The EDC shall take title to all energy delivered to the distribution system by the Customer, all available capacity rights and to all Environmental Attributes at the time of production. 4. ELIGIBILITY REQUIREMENTS 4.1. Customer Eligibility Criteria 4.1.1. Eligible Customers must be a current or future 7 Customer of Record of the EDC to which they are applying, and Qualified Projects must be located on the Customer of Record’s premises, or, for eligible SAM Customers, premises where the Customer Host has rights to develop a Project. The Project shall always be linked to the Customer of Record at the Project Site, and eligibility for payments under the Tariff shall transfer from one Customer of Record to the new Customer of Record in situations where the original Customer of Record changes at the Project Site. 4.1.2. Customers are eligible to submit only one Netting Bid per technology or one Netting Bid for a Project that uses a combination of technologies (i.e., a wind turbine that has associated solar panels) at any Revenue Meter during any single respective solicitation. 4.1.3. Customers are eligible to submit only one Buy-all Bid per technology or one BuyAll Bid for a Project that uses a combination of technologies (i.e., a wind turbine that has associated solar panels) at any Parcel or contiguous Parcels under common ownership during any single respective solicitation. 4.1.4. Eligible Customers may not propose the same class of technology at the same Project Site which was selected under this Program, the SCEF Program, or the LREC/ZREC Program with an agreement that was in effect prior to the submission of a Bid under a particular procurement year for this Program, except under any of the following conditions: In the situation where Netting Bid Price Cap would be less than $0, Bidders should treat the Netting Bid Price Cap as $0. 6 7 Eligible future customers must be the Customer of the New Construction Project Updated 1/9/2026 15 Page 33 of 100
  6. Page 34 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials 4.1.4.1. The existing Project is in-service. 4.1.4.2. A one-year calendar period has expired following termination of the previously existing Tariff Agreement. 4.1.4.3. For Netting projects, the new Project is submitted by the same Project developer on the same Parcel or contiguous Parcel(s) of land under common ownership but interconnects behind a different Revenue Meter than that associated with the existing Tariff Agreement (i.e., Virtual Net Metering, LREC/ZREC, SCEF, or Non-Residential Renewable Energy Solutions Program). This exception is intended to allow for Bids from multiple Netting Projects that would serve load separate and distinct from the load served by any existing Projects, such as load behind a separate existing Revenue Meter or New Construction Projects. Bids found to be serving the same load as an existing Project may be subject to removal from the Program and forfeit any Performance Assurance or other payments. This explicitly allows New Construction Projects, proposed to be built behind new load, to which the Project is appropriately sized according to Sections III.D.1. and Section III.D.2. of PURA’s June 30, 2021 Decision in Docket No. 20-07-01 and meet all other Program requirements, to Bid into the same or future auction of other Projects selected on the same Parcel of land. 4.1.4.4 For Rooftop Buy-All projects constructed on physically separate rooftops on the same Parcel, one Bid per building rooftop will be allowed in a single respective solicitation. 4.1.5. Any subdivision of Parcels must be recorded on the land records of the municipality in which such Parcel is located prior to January 1 of the year of the solicitation. If multiple Bids are received for a Parcel of land that was not subdivided before January 1 of the year of the solicitation to which the Bidder is responding, or for which a subdivision was not recorded with the municipality in which such Parcel is located prior to January 1 of the year of the solicitation, only the lowest priced Bid, meeting the above requirements, will be eligible and all other Bids will be disqualified. 4.2. System Sizing Requirements 4.2.1. The total generation 8 of Customer Projects that are not Rooftop Buy-All Projects cannot exceed the highest consecutive 12 months of kWh load of the Customer, net of any existing generation, over the five years prior to the date of Bid submission plus eligible adjustments to load for electrification or removal of onsite generation. The EDCs will apply a standard calculation using a capacity factor of no less than 15% for solar Projects in order to accurately and equitably verify that expected annual production does not exceed historical load. The calculation will be as follows: Installed Capacity (kW AC) x 8760 hours x Capacity Factor. For example, 50 kW AC x 8760 x 15% =65,700 kWh/year. The EDCs may consider alternative capacity factors for projects that have lower production estimates due to project’s solar panels orientation or shading, when supported by calculations from a Connecticut Licensed Professional Engineer. The EDCs will review requests for alternative capacity factors on a project-byproject basis and reserve the right to disqualify Bids that do not adhere to Program rules. 8 Updated 1/9/2026 16 Page 34 of 100
  7. Page 35 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials The highest consecutive 12 months of kWh load shall be measured by the Customer’s individual electric meter or a set of electric meters at a Project Site, when such meters are already combined for billing purposes at the time of Bid submission, as determined by the EDC providing service to the Customer. 4.2.1.1. All Bids must submit load information for the meter(s) associated with the Project. 9 4.2.2. Eligible combinations of meters to determine site load for Projects participating in the Buy-All Tariff include a set of meters on the same Parcel or contiguous Parcels that have the same building or landowner, and customers that are not currently submetered. 4.2.3. The maximum total generation of Customer projects for State, Agricultural and Municipal Customers may also include the load of up to five State, Agricultural, or Municipal Beneficial Accounts identified by the Customer and up to five Nonstate or Municipal Beneficial Accounts identified by the Customer that are Critical Facilities, and are connected to a Microgrid. State, Agricultural, or Municipal Projects are not required to be constructed on Project Sites that have existing or future electric load 10. 4.2.3.1. The percentage of each Beneficial Account’s load that will be used to support the Project size must be identified during Bid submission. 11 4.2.3.1.1. The EDCs will perform the load analysis review during eligibility screening for the given NRES RFP Bid submission and will consider current loads associated with the Beneficial Accounts for a given SAM Project Bid. 4.2.4. The maximum total generation of Customer projects may include a reasonable approximation of the annual load attributable to transportation electrification (i.e., electric vehicles) and/or fuel switching (i.e., air source heat pumps) at a Project site and/or exclude existing generation that is expected to be removed from a Project Site. 4.2.4.1. A Connecticut Licensed Professional Engineer must certify the load expected to materialize over the five years following Bid submission that is attributable to transportation electrification, fuel switching, and/or the removal of existing generation. A completed Professional Engineer Certification Form, available within the corresponding RFP on the EDCs’ respective websites, must be submitted along with the Connecticut Licensed Professional Engineer calculation. 9 Rooftop Buy-All Projects are not required to be sized to load but must submit load information. 10 Refer to the Appendix C - Beneficial Account Credit Allocation Guidelines for further guidance regarding redesignation of Beneficial Accounts. 11 Reference the Final Decision dated November 6, 2024 in Docket No. 24-08-03. Updated 1/9/2026 17 Page 35 of 100
  8. Page 36 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials 4.2.4.2. If expected load adjustments do not materialize within five years of the InService date, a Project’s compensation under the Tariff will be reduced proportionally to the unrealized load 12. 4.2.4.3. A Customer may reduce the size of a proposed system prior to the In-Service date if expected load adjustments are revised. Such customer shall receive compensation for energy and RECs generated from the reduced-size project after the In-Service Date, and such reduced Megawatts shall be treated as allocated, but unused, and will be reallocated to the next open Program solicitation. 4.2.5. For New Construction Projects that are not for SAM Customers sizing the Project to the load of Beneficial Accounts, or Rooftop Buy-All Projects, a Connecticut Licensed Professional Engineer must certify the anticipated Customer load at the Project Site, and how such Project shall be sized so as not to exceed such anticipated Customer load at the Project Site. 4.3. System Eligibility Criteria 4.3.1. Eligible Zero Emission Projects shall be less than or equal to five (5) MW (AC) in size and qualify as a Class I renewable energy source under Conn. Gen. Stat. Section 16-1(a)(20), as amended by Section 1 of Public Act 22-14 and Section 9 of Public Act 25-173. 4.3.2. Each Project must be located at a Project Site and be interconnected at or behind the EDC’s Delivery Point. All Buy-All Projects interconnect directly to the grid, otherwise referred to as “front-of-the-meter” or “standalone.” All Buy-All Projects will have an associated EDC Buy-All Production Meter. Any Add-On System proposed behind the same Revenue Meter as an existing net metering project must have a separately metered Production Meter. Projects intending to allocate to Beneficial Accounts may be sited on properties that do not have existing or future anticipated load. 4.3.3. Projects must seek and gain approval to interconnect to the EDC’s distribution system to which such system is interconnecting through the standard EDC interconnection process and be metered by that EDC. Projects must meet Distribution Company Guidelines for Interconnection (“Guidelines”) as approved by PURA. The interconnection process is separate and distinct from the Program. 4.3.4. Projects may not receive or seek to receive both funding from this Program and/or also receive(d) any funding, grants or rebates of any kind in any amount from any one or more of the following Programs or sources: (a) the Connecticut Green Bank (“CT Green Bank”) or any of its predecessors, (b) the LREC/ZREC Program, (c) any Shared Clean Energy Facility (“SCEF”) Program, (d) any net metering or virtual net metering Program 13, (e) any other Public Act 19-35 tariffs, (f) any other 12 For Buy-All Projects, this will result in a reduction in total compensation, and for Netting Projects, this will result in a reduction in the compensation for the RECs generated by the Project. Projects in the VNM queue or waiting list that have yet to reach commercial operation may submit the same Project into the Non-Residential Renewable Energy Solutions Program so long as the Project is withdrawn from the 13 Updated 1/9/2026 18 Page 36 of 100
  9. Page 37 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials Public Act 18-50 tariffs, (g) any Public Act 21-162 tariffs or (h) any other contract or Program of any kind in which an EDC purchases the Project’s energy, capacity or renewable attributes (collectively, “Other Programs”). Specifically, a Project which receives, or entered into a contract to receive, funding, grants or rebates under any one or more of the Other Programs may not also participate in this Program for the same Project. This prohibition does not include (x) Projects that receive(d) incentives for battery storage from the CT Green Bank established through Public Act 21-53, (y) Projects that receive(d) only predevelopment and/or feasibility funding from the CT Green Bank or any of its predecessors, or (z) Projects that receive(d) only financing in accordance with Section 99 of Conn. Gen. Stat. 244(r) through CEFIA. Any EDC may consult with the CT Green Bank, PURA and/or DEEP regarding the eligibility of each selected Project, or any Project that receives incentives for storage that may be co-located with a qualified Project, as long as such incentive is not associated with the purchase of the Project’s energy, capacity or renewable attributes associated with a storage Project. 4.3.5. Projects that are or will be located at Residential Renewable Energy Solutions (“RRES”) Program eligible Project Sites, or multifamily affordable housing projects that qualify for the RRES Program, shall not be eligible to participate in the solicitations outlined herein. 4.3.5.1. Any Project that does not qualify for the Residential Renewable Energy Solutions Program for any reason, including Projects with capacity larger than 25 kW but smaller than or equal to 200 kW, shall be eligible for the Small Zero Emission category. 4.3.6. Projects must receive Approval to Energize after the solicitation to which the Customer is responding. For facilities constructed prior to the solicitation to which the Customer is responding, which have been uprated with new production equipment (e.g., new solar panels, turbines) installed after the solicitation to which the Customer is responding, the new incremental production equipment may be eligible to the extent that it meets all of the eligibility criteria and is separately metered and compensated pursuant to the rules set forth in this Program Manual. 4.4. Bid Eligibility Requirements 4.4.1. Bidder must submit a complete Bid to the EDC in whose territory the Project is located (either Eversource or UI) in accordance with the RFP to which the Bidder is responding. Projects physically located outside of the applicable EDC’s service territory are ineligible. 4.4.1.1. For Projects located on Parcels in contiguous towns that are in different EDC service territories, Projects shall submit Bids to the EDC in which the Project proposes to interconnect. appropriate VNM list prior to the applicable RFP Issue date. Importantly, however, if the VNM Project in question has also sought compensation under the LREC/ZREC Program, such Project would be subject to the rules detailed in Section 3.1.3 hereof.) Updated 1/9/2026 19 Page 37 of 100
  10. Page 38 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials 4.4.2. Bids for Large and Medium Zero Emission categories must include binding offer prices in the format specified in the applicable RFP that are applicable to each of the twenty (20) years of the Tariff, subject to the Program pricing caps. 4.4.3. Bidder must either be a Customer of Record at the Project Site, the Owner of the Project Site with consent of the Customer of Record at the Project Site, or a developer authorized by the Customer of Record and the Owner of the Project Site. 4.4.4. Site control must be evidenced to the EDC at the time of Bid submission by submission of the Bid Certification Form inclusive of documentation proving site control, such as but not limited to: Warranty Deed, Quit Claim Deed, Executor’s Deed, Trustee’s Deed, or any other valid proof of ownership, written leases, options to lease, memorandums of lease, memorandums of option to lease, and contracts to purchase, or other agreements between the Project developer and Owner of the Project Site regarding the right to develop the Project. For Projects where the SAM Customer Host is not the Owner of the Project Site, the Owner of the Project Site must attest that the SAM Customer Host: 1) has control of the Project Site or an unconditional right to obtain site control, 2) has authorized the Bidder, if different than the Customer Host, to submit a NRES Bid for the Project Site, and 3) is authorized to participate in the NRES Program for the entire 20-year Tariff Term should the Bid be selected. 4.4.4.1. For Bids where the SAM Customer Host is not the Owner of the Project Site, if the EDCs determine that the SAM Customer Host does not have control of the Project Site, or an unconditional right granted by the Owner of the Project Site to acquire such control by the start of the Tariff Term, at any point during the solicitation process or Tariff Term, the SAM Customer Host may be removed from the Program and the Tariff Agreement may be terminated by the respective EDC. 4.4.5. Bidder and/or Customer must certify that it understands and affirms the requirements, and terms and conditions of the applicable Tariff/this Program and accepts such Tariff without modification. 4.4.6. Bidder must submit both the Non-Refundable Bid Fee and Performance Assurance in accordance with the RFP at the time of Bid Submission. 4.4.7. Any Project that does not qualify for the Residential Renewable Energy Solutions ("RRES") Program for any reason must upload a copy of an email from the RRES team indicating that the project does not qualify for the RRES program and the reason why as a required document in the Bid submission process. 4.4.8. Agricultural Customers are required to submit proof of Agricultural status with their Bid. 4.4.8.1. The Customer shall provide one year of tax returns with a Schedule F, a farmer’s tax exemption permit, and a NAICS classification code beginning with an 11. These requirements may be fulfilled with documentation that was valid at any point in the last three years. Updated 1/9/2026 20 Page 38 of 100
Words on different pages

Text of 2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdf

Extracted from the file · 203 pages · 522,519 characters

Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf

Extracted from the file · 2 pages · 6,256 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf

Extracted from the file · 2 pages · 3,261 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf

Extracted from the file · 1 page · 528 characters

Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf

Extracted from the file · 2 pages · 4,800 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)

This filing on the current system (opens in a new tab)