Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

5. Annual Compliance Filings – Additional Filings (Program Materials)

Compliance filingFiled by Avangrid13 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files13

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages
  1. Page 3 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials formula is derived from the most recent version of the Bid Price Calculator which was filed and approved in Docket No. 25-08-03 and is available on the EDCs websites: Buy-All Price Cap - NPV Retail Rate ($/MWh) = Netting Price Cap ($/REC) 2 The resulting Netting Price Caps for each category and each company are included below for reference: 2 In the situation where the Netting Bid Price Cap would be less than $0, Bidders should treat the Netting Bid Price Cap as $0/REC. 3 Page 3 of 100
  2. Page 4 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials Page 4 of 100 Table 2 - UI Year 5 NRES Program Netting Tariff Rate and Price Caps by Project Size Category, Rate Class, Technology, and Project Type ($/REC) Rate Class Small Zero Medium Zero Emission Netting Emission Netting Tariff Rate Price Cap Non Time-of-Use Rates Large Zero Emission Netting Price Cap R GSN $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 GSD $48.05 $34.37 $0.00 RT GST-N GST-SS LPT-SS GST-LRS LPT-LRS Solar Time-of-Use Rates NonSolar NonSolar Solar Solar NonSolar $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $41.42 $57.47 $61.05 $68.10 $27.74 $43.79 $47.37 $54.42 $0.00 $0.00 $0.00 $0.62 $18.45 $19.86 $4.77 $6.18 $0.00 $0.00 $49.70 $51.11 $36.02 $37.43 $0.00 $0.00 100% Solar Canopy/Carport Netting Price Caps ($/REC) Rate Class Medium Zero Emission Large Zero Emission Non Time-of-Use Rates $0.00 $0.00 R $0.00 $0.00 GSN $135.83 $58.97 GSD Time-of-Use Rates Solar Non-Solar Solar Non-Solar $0.00 $0.00 RT N/A N/A $0.00 $0.00 GST-N N/A N/A $129.20 $0.00 GST-SS N/A N/A $145.25 $68.39 LPT-SS N/A N/A $106.23 $29.37 GST-LRS N/A N/A $137.48 $60.62 LPT-LRS N/A N/A Rate Class R School Solar Category Netting Prices ($/REC) With Brownfield or Distressed Municipality Without Adder Adder $0.00 Non Time-of-Use Rates $0.00 4 With 100% Carport/Canopy Adder $0.00
  3. Page 5 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials Page 5 of 100 GSN $0.00 $0.00 $0.00 GSD $34.37 $81.72 $105.39 Time-of-Use-Rates RT GST-N GST-SS LPT-SS GST-LRS LPT-LRS Without Adder $0.00 $0.00 With Brownfield or Distressed Municipality Adder $0.00 $0.00 With 100% Carport/Canopy Adder $0.00 $0.00 $27.74 $43.79 $75.09 $91.14 $98.76 $114.81 $4.77 $52.12 $75.79 $36.02 $83.37 $52.12 Table 3 - Eversource Year 5 NRES Program Netting Tariff Rate and Price Caps by Project Size Category, Rate Class, Technology, and Project Type ($/REC) Netting Price Caps ($/REC) Rate Class 3 Medium Zero Emission 1 5 30 30a 35 40 $0.00 $0.00 $68.27 $45.98 $71.79 $0.00 7 27 27a 37 41 55 56 57 58 Rate Class Solar $0.00 $39.16 $14.68 $44.62 $0.00 $67.77 $67.44 $70.84 $71.53 Non-Solar $0.00 $52.67 $32.22 $57.39 $0.00 $76.77 $76.58 $77.33 $77.93 Large Zero Emission Non Time-of-Use Rates $0.00 $0.00 $14.47 $0.00 $17.99 $0.00 Time-of-Use Rates Solar Non-Solar $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3.59 $0.00 $0.00 $13.97 $22.97 $13.64 $22.78 $17.04 $23.53 $17.73 $24.13 Medium Zero Emission Non Time-of-Use Rates Netting Tariff Rate ($/REC) Small Zero Emission $0.00 $0.00 $81.95 $59.66 $85.47 $0.00 Solar $0.00 $52.84 $28.36 $58.30 $0.00 $81.45 $81.12 $84.52 $85.21 Large Zero Emission 3 Netting projects cannot interconnect behind a meter on a customer retail rate that is not shown in Table 3. 5 Non-Solar $0.00 $66.35 $45.90 $71.07 $0.00 $90.45 $90.26 $91.01 $91.61
  4. Page 6 of 100

    The United Illuminating Company Docket No. 26-08-01 1 5 30 30a 35 40 7 27 27a 37 41 55 56 57 58 Rate Class 1 5 30 30a 35 40 7 UI Attachment 2 - NRES Program Materials Page 6 of 100 100% Carport/Canopy Netting Price Caps ($/REC) $0.00 $0.00 $26.40 $0.00 $169.73 $92.88 $147.44 $70.59 $173.25 $96.39 $54.06 $0.00 $0.00 $140.62 $116.14 $146.08 $70.20 $169.23 $168.90 $172.30 $172.99 Time-of-Use Rates School Solar Category Netting Prices ($/REC) With Brownfield or Distressed Municipality Without Adder Adder $0.00 $0.00 $68.27 $45.98 $71.79 $0.00 Without Adder $0.00 Non Time-of-Use Rates $0.00 $0.00 $115.62 $93.33 $119.14 $0.00 Time-of-Use Rates With Brownfield or Distressed Municipality Adder $0.00 6 $0.00 $63.77 $39.28 $69.23 $0.00 $92.37 $92.04 $95.44 $96.13 With 100% Carport/Canopy Adder $0.00 $0.00 $139.29 $117.01 $142.81 $23.62 With 100% Carport/Canopy Adder $0.00
  5. Page 7 of 100

    The United Illuminating Company Docket No. 26-08-01 27 27a 37 41 55 56 57 58 UI Attachment 2 - NRES Program Materials $39.16 $14.68 $44.62 $0.00 $67.77 $67.44 $70.84 $71.53 $86.51 $62.02 $91.97 $16.09 $115.12 $114.79 $118.18 $118.88 Page 7 of 100 $110.19 $85.70 $115.64 $39.76 $138.79 $138.46 $141.86 $142.55 1.5 QUALIFICATION. To be considered for selection, a Bid must meet all requirements set forth in Section 4, (“Bid Evaluation”), and adhere to the schedule and other requirements set forth in Section 2, (“RFP Process). 1.6 EVALUATION AND AWARD CRITERIA. Each Company will base its independent evaluation and award(s) on (i) qualified Bids, (ii) pricing, and (iii) compliance with the RFP Process. 1.7 PURA APPROVAL. Any agreement entered into for the purchase of energy and RECs pursuant to this solicitation is contingent upon obtaining Regulatory Approval by the Public Utilities Regulatory Authority (“PURA”) as set forth in the Tariff Agreement. Pursuant to applicable Connecticut General Statutes and PURA requirements, the Companies will submit required information to PURA following each Bid award. If any of the Bids and/or Tariff Agreements do not meet the objectives of PURA, PURA may reject the Bid(s) and Tariff Agreement(s). Article 12 of the Tariff Agreement addresses the possibility that PURA may not approve the Bid(s), and/or Tariff Agreement(s), and/or individual awards. 1.8 NATURE OF SOLICITATION. The Companies will evaluate all conforming Bids, however, the Companies make no commitment to any Bidder that it will accept any Bid(s). The Companies reserve the right to discontinue the RFP process at any time for any reason whatsoever. This is a Request for Proposals and not a binding offer to contract. 1.9 TARIFF AGREEMENT. In the event of any inconsistency between the provisions of the Tariff Agreement or any other part of this RFP or RFP Process, the provisions of the Tariff Agreement are controlling. Bidders should review the Tariff Agreement thoroughly and submit their Bids based upon the terms and conditions of the Tariff Agreement, which will solely govern the transactions between the winning Bidders and their counterparty Company through the term of the resulting Tariff Agreements. 1.10 CONFIDENTIALITY. The receiving Company agrees to treat Bids in a confidential manner and will use reasonable efforts, except as required by law or regulatory authority, not to disclose such information to any third party or use such information for any purpose other than in connection with its evaluation of Bidder’s participation in the solicitation process described herein and to obtain Regulatory Approval. Bidders are hereby on notice that, subject to relevant PURA orders, all Bid submissions are subject to regulatory oversight and all Bids submitted by any Bidder may be publicly disclosed within the time periods set forth in such orders, as may any awarded contract in its 7
  6. Page 8 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials entirety. The Companies suggest that Bidders familiarize themselves with the relevant orders, as these regulatory orders may change from time to time. 2 RFP PROCESS 2.1 SCHEDULE. Table 5 – February RFP Schedule and Table 6 – August RFP Schedule hereto provide the schedules for these RFPs. The Companies, at their sole discretion, may modify the schedules at any time. 2.2 BIDDERS CONFERENCE. 4 The Companies will hold Bidders Conferences to answer questions about the RFPs in accordance with the RFP Schedules. The purpose of the Bidders Conferences is to provide the opportunity to clarify any aspects of the RFPs. The Companies will attempt to answer questions during the Bidders Conferences. While the Companies may respond orally to questions posed at the Bidders Conferences, only written answers that are provided in response to written questions will be considered official responses. The Companies will post responses to Bidders’ questions on their websites following the Bidders Conferences. Please see Section 6 herein for contact information, including Company websites. 2.3 PROCESS OVERVIEW 2.3.1 Each Bidder must submit its Bid to the appropriate EDC in whose service territory the Project is located. Projects outside of the applicable EDC’s service territory are ineligible. 2.3.2 For Projects participating in the Year 5 Small Zero Emission category, the Tariff Rate has been administratively set by PURA in the amount of $250.42/MWh for the Buy-All Tariff and subject to the Tariff Rates outlined in Section 1.4 herein for the Netting Tariff. 2.3.2.1 Small zero emission project selection process: (1) if capacity is reached via bids submitted during the Two-Week Window, selection is based on a lottery, and (2) if capacity is not reached during the Two-Week Window, all eligible projects submitted during the Two-Week Window are selected, and subsequent to the Two-Week Window, eligible projects are selected on a rolling, first-come first-served basis. 2.3.2.2 All bids in each EDC’s standby queue will expire on the date when the results of each EDC’s procurement for the NRES Program are approved by PURA. 4 2.3.3 Bids submitted for Projects in the Year 5 Medium and Large Zero Emission categories are subject to the annual price caps as determined by PURA as noted in Section 1.4 herein. 2.3.4 For projects participating in the Year 5 School Solar Category the Tariff Rate has been administratively set by PURA in the amount of $236.74/MWh for the The Bidders Conference will be held as a Webinar only. 8 Page 8 of 100
  7. Page 9 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials Buy-All Tariff and subject to the Tariff Rates outlined in Section 1.4 herein for the Netting Tariff. 2.3.5 2.4 Each EDC will separately submit selected Projects to PURA for Regulatory Approval. BID SUBMISSION 2.4.1 Bid Forms: Each EDC will develop and maintain its own form to be used for Bid submission (“Bid Form”). Each EDC will provide a website link containing such EDC’s Bid Form and EDC-specific instructions for Bid submission, as well as any additional forms that Bidders may be required to complete. 2.4.2 Submission of Bids: Bids must be submitted in accordance with the EDCspecific instructions. Bidders must comply with the instructions to ensure that their Bids are complete. In addition to completion of the Bid Form, Bidders must provide a Bid Certification Form, and may be required to provide a Connecticut Licensed Professional Engineer Certification Form, or other forms as necessary based on the specifics of the Bid. Bidders who claim the designation of any of the Bid Preferences as designated by PURA may also be required to submit additional documentation proving such qualification. Specific instructions for how to provide these additional documents may vary by EDC, and are set forth in the EDC-specific bid instructions. 2.4.3 Bid Details: Bidders must submit their Bids by using the EDC-specific Bid Form, which contains the majority of the information necessary for the Companies to evaluate Bids. At a minimum, the information listed below may be required for Bid submission. However, additional/supplemental information is or may be required as set forth herein: Bid Form Information • Bid Certification Form from the current Program Year • Bidder name • Customer name • Owner of the Project Site • Customer billing account number • Project Site Address • An affidavit that the Project has not received grants and/or rebates from the CT Green Bank • An affidavit that the Project is not a Shared Clean Energy Facility • An affidavit of site control • An affidavit that the Project has not received an agreement under the LREC/ZREC Program that is not in-service at the time of the bid • An affidavit attesting that Bidder represents that the proposed NonResidential Renewable Energy Solutions project has not been split to qualify for a different Program category • An affidavit attesting that Project splitting is for the purposes of the NonResidential Renewable Energy Solutions Program only and does not 9 Page 9 of 100
  8. Page 10 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials affect how the Projects will be reviewed under other regulatory processes not within PURA’s jurisdiction, such as DEEP permitting processes or Connecticut Siting Council review • Tariff Payment Beneficiary Name (if applicable) • Indicated percentage of payments to be allocated to Tariff Payment Beneficiary and Customer of Record (if applicable) • System size in kW (AC) • Historical load data to demonstrate that a system meets applicable sizing requirements in Section 4.2 of the NRES Program Manual. • If a Bidder seeks to qualify a technology other than Solar PV, such as small hydro or wind, then such Bidder must submit a Connecticut Licensed Professional Engineer certification that includes the average annual production of the Project. • Copy of the most recent Customer bill • For New Construction Projects, a copy of documentation certified by a Connecticut Licensed Professional Engineer certifying the Customer load estimated to materialize over the five years following Bid submission attributable to these items will be required, with the exception of Buy-All Rooftop Projects • For Projects indicating at the time of Bid submission that they meet any of the Bid Preference criteria, an explanation with supporting description and/or documentation is necessary for each such Bid Preference at the time of Bid Submission to the respective EDC via the Bid Preference Explanation and Description form • For State, Agricultural, or Municipal (“SAM”) Projects seeking to qualify for the Distressed Municipality Bid Preference using a Municipal Beneficial Account whose electric service is not physically located within a Distressed Municipality, the Bidder must provide evidence to the applicable EDC that such Beneficial Account is owned by a Distressed Municipality and has an electric account that is paid for by a Distressed Municipality. A nonexhaustive list of such evidence includes electric bills for the Beneficial Account showing that a Distressed Municipality pays for the account’s electricity, deeds or titles for the land that the Beneficial Account is on proving Distressed Municipality ownership, or lease agreements or options to lease signed by a Distressed Municipality. The EDC may accept alternative evidential documentation at their sole discretion if such alternative documentation is approved by the EDC prior to bid submission. • Projects seeking to participate in the School Solar program must provide a completed School Solar Pre-Application Checklist. The Project’s Interconnection Agreement must be fully executed before Bid submission. • Other Bid requirements as determined by the EDCs • Specific instructions for how to provide all bid documents may vary by Company, and are set forth in the Company-specific instructions. 10 Page 10 of 100
  9. Page 11 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials • TO EVERSOURCE: Bids must be submitted to Eversource via the Eversource Bid Portal which can be found on the Eversource NRES Program page linked here. • TO UI: Bids must be submitted to UI via the UI Bid Portal which can be found on the UI NRES Program page linked here. 2.4.3.1 “Bid Certification Form”. This five (5) page form is mandatory. Every Bid must be accompanied by an executed Bid Certification Form, which must contain four signatures, one by the Bidder, one by the Owner of the Project Site, one from the Customer of Record, and one from the Tariff Payment Beneficiary. The Bid Certification Form is an integral part of the Bid, and Bids that do not include a complete and executed Bid Certification Form, including all signatures as required pursuant to the specifics of the Bid, will not be considered. For purposes of clarification, for all Bids, pages 2, 3, and 4 are mandatory and page 5 is mandatory only if a Tariff Payment Beneficiary is elected. Each Company’s website contains a Bid Certification Form with the Company-specific instructions as to how such form is to be submitted. • The five-plus page Bid Certification Form consists of the following: o Page 1 – Instructions for completion of Pages 2 through 5 o Page 2 – Bidder’s Signature, Commitment and Acceptance: By signing this page of the Certification form, the Bidder or a duly authorized representative of the Bidder is making a number of certifications, including that the information provided in the Bid is complete and accurate, and that the Bidder and the project meet the eligibility requirements set forth in this RFP as discussed in Section 5 herein. o Page 3 - Tariff Agreement Customer’s Signature, Commitment and Acceptance: By signing this page of the Certification form, the Tariff Agreement Customer or a duly authorized representative of the Tariff Agreement Customer is making a number of certifications, including that the Tariff Agreement Customer has reviewed the statements and certifications of the Bidder, and that such statements and certifications as applicable to the Project Bid are true and accurate to the best of the Tariff Agreement Customer’s knowledge. o Page 4 - Affidavit of Owner of the Project Site’s Notarized Signature, Commitment and Acceptance: The Bidder must have and certify site control to the EDC prior to submitting such Bid. Signing this affidavit along with providing documentation as additional attachments to the Bid 11 Page 11 of 100
  10. Page 12 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials Certification Form proving site control such as deeds (including but not limited to, Warranty Deeds, Quit Claim Deeds, Executor’s Deeds, Trustee’s Deeds, any other valid proof of ownership), written leases, options to lease, memorandums of lease, memorandums of options to lease, and contracts to purchase, represents certification of site control. The Owner of the Project Site must sign this affidavit, which is required to be witnessed by a Notary Public. By signing the affidavit, the Owner of the Project Site or a duly authorized representative of the Owner of the Project Site is making a number of affirmations and certifications, including that the Owner of the Project Site has reviewed the statements and certifications of the Bidder, and that such statements and certifications as applicable to the Project Site are true and accurate to the best of the knowledge of the Owner of the Project Site. • For projects where the SAM Customer Host is not the Owner of the Project Site, the Bidder must provide the following documentation at the time of Bid submission: • An affidavit signed by the Owner of the Project Site demonstrating that the SAM Customer Host: (1) has control of the Project Site or an unconditional right to obtain site control; (2) has authorized the Bidder, if different than the Customer Host, to submit a NRES bid for the Project Site; and 3) is authorized to participate in the NRES Program for the entire 20-year Tariff Term should the Bid be selected; and • Documentation proving site control for the entire 20year Tariff Term including but not limited to written leases, options to lease, memoranda of lease, options of memorandum to lease, and contracts to purchase. o Page 5 – Tariff Payment Beneficiary Signature, Commitment, and Acceptance (If Applicable): By signing this page of the Certification form, the Tariff Payment Beneficiary is making a number of certifications, including that the Tariff Payment Beneficiary has reviewed the requirements, terms and conditions, and obligations of the Tariff Payment Beneficiary as they pertain to this Program. • Both EDCs require that the five-plus (5+) page Bid Certification Form must be attached to the Bid as one single PDF (.pdf) file prior to submission as part of the completed Bid. Both the Bid and Bid Certification Form are submitted at the same time. The most current Bid Certification form must be used. Other previous versions of the Bid Certification Form are not acceptable. 12 Page 12 of 100
Words on different pages

Text of 2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdf

Extracted from the file · 203 pages · 522,519 characters

Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf

Extracted from the file · 2 pages · 6,256 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf

Extracted from the file · 2 pages · 3,261 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf

Extracted from the file · 1 page · 528 characters

Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf

Extracted from the file · 2 pages · 4,800 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)