Compliance Filing, Order No. 1
5. Annual Compliance Filings – Additional Filings (Program Materials)
Files13
2026-11-16 UI Cover Letter 5. Annual Compliance Filings – Additional Filings (Program Materials) #26-08-01.pdf
PDF · 221 KB · 3 pagesText searchable
Download 2026-11-16 UI Cover Letter 5. Annual Compliance Filings – Additional Filings (Program Materials) #26-08-01.pdfRead the text of 2026-11-16 UI Cover Letter 5. Annual Compliance Filings – Additional Filings (Program Materials) #26-08-01.pdf
2026-11-16 UI Attachment 1 - Residential Renewable Energy Solutions Program Manual #26-08-01.pdf
PDF · 763 KB · 59 pagesText searchable
Download 2026-11-16 UI Attachment 1 - Residential Renewable Energy Solutions Program Manual #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 1 - Residential Renewable Energy Solutions Program Manual #26-08-01.pdf
2026-11-16 UI Attachment 2 - Non-Residential Renewable Energy Solutions Program Materials #26-08-01.pdf
PDF · 1.7 MB · 100 pagesText searchable
Download 2026-11-16 UI Attachment 2 - Non-Residential Renewable Energy Solutions Program Materials #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 2 - Non-Residential Renewable Energy Solutions Program Materials #26-08-01.pdf
2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdf
PDF · 2.9 MB · 147 pagesText searchable
Download 2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdf
2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdf
PDF · 4.4 MB · 203 pagesText searchable
Download 2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdf
2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf
PDF · 115 KB · 2 pagesText searchable
Download 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf
2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf
PDF · 159 KB · 2 pagesText searchable
Download 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf
2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx
Excel · 100 KBText searchable
Download 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsxRead the text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx
2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx
Excel · 272 KBText searchable
Download 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsxRead the text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx
2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx
Excel · 3.5 MBText searchable
Download 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsxRead the text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx
2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf
PDF · 144 KB · 1 pageText searchable
Download 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf
2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx
Excel · 71 KBText searchable
Download 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsxRead the text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx
2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf
PDF · 152 KB · 2 pagesText searchable
Download 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf
Page 51 of 100
The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials 6.2.2.1. If the Approval to Energize letter is not issued by such date, the EDC’s twenty-year purchase commitment will immediately and automatically terminate. 6.2.2.2. No extensions will be granted to the 3-year deadline for achieving the InService Date with the exception of extensions granted by the Ombudsperson. 20 6.2.2.2.1. Any extension requests should be emailed to [email removed] or submitted through the Extension Request Information Form. 6.2.3. The purchase commitment has a term of 20 years at the Project-specific Tariff Rate approved by PURA. 7. AGGREGATION AND RESALE OF PRODUCTS Aggregation of RECs 7.1. 7.1.1. As discussed in Section 3.4 hereof, the EDCs will take title to all RECs at the time of production. For simplicity and ease in Program administration that minimizes overall costs and maximizes benefits to ratepayers, the EDCs will aggregate the RECs into “batches” (or “tranches”) in a manner similar to how the Green Bank currently aggregates RECs produced from Solar Home Renewable Energy Credit Facilities (SHREC Facilities). 21 7.1.2. Each REC batch will be created based on in-service vintage year (and/or quarter) and class of technology. To illustrate, for Projects that are successfully in-service in 2022, the EDC may have aggregation batches for “2022 Zero Emission” (or “Q4 2022 Zero Emission”) and “2022 Low Emission.” 7.1.3. The EDC will seek approval from the Authority to have a single NEPOOL GIS NONID (for example, “NON102218”) assigned to each of the full batches. Also, the EDC will submit one Connecticut Class I Renewable Energy Source Application per batch to the Authority. 7.1.4. The EDC will be responsible for the submission of aggregate Production Meter reads for each batch to NEPOOL GIS and the appropriate RECs will be created and NRES projects shall therefore be eligible for an extension if at least one of the following five criteria are met: (1) the generation facility or project is unique and more complex than ordinary customer-sided distributed generation installation projects, such as having additional technology-specific regulatory or local siting requirements; (2) the project developer has worked diligently and in good faith in developing the project since inception; (3) the project is near completion or likely to begin commercial operation within the requested extended deadline; (4) a significant portion of the total project investment has already been made and would potentially be stranded if the contract is terminated; and/or (5) the interconnection process extended beyond the utilities’ initial estimates and/or significantly (e.g., one month) beyond the average interconnection process timeline. Such extension requests shall be granted in proportion to the delay experienced and/or the amount of time demonstrated that is needed, up to one year, to complete the project. All extension requests shall be handled by the ombudsperson. 20 See, e.g., Bid of the Connecticut Green Bank for Qualification of Solar Home Renewable Energy Credit (SHREC) Facilities as Class I Renewable Energy Sources - Q3 2016 - 6.1 MW, PURA Docket No. 17-03-40 (filed Mar. 17, 2017). 21 Updated 1/9/2026 33 Page 51 of 100Page 52 of 100
The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials deposited into the EDC NEPOOL GIS account on the date of creation (the “creation date”) in accordance with the NEPOOL GIS Operating Rules. 7.1.5. Finally, pursuant to Section 3(d) of §16-244z of the Connecticut General Statutes and in accordance with Conn. Gen. Stat. Section 16-245a(h), the EDCs will manage RECs as directed by the Authority. The Authority shall determine, based on what is in the best interest of ratepayers, whether to direct the EDCs to dispose of RECs through retirement and related prospective reduction of supplier/EDC RPS requirements as determined by the Authority at least one year prior to the effective date of such annual RPS, or through resale into the regional market. 7.1.6. Any net revenues from the resale of RECs created from Customer facilities under §16-244z of the Connecticut General Statutes shall be credited to Customers through a non-bypassable fully reconciling component of electric rates for all Customers of the EDC, consistent with §16-244z of the Connecticut General Statutes. 7.1.7. The energy produced from Projects selected under this Program should reduce the need to draw power supply from other resources, which results in overall system benefits. 8. METERING EDC’s Ownership of Meters 8.1. 8.1.1. Generally, there must be a Production Meter to measure the amount of energy produced from Customer Projects, which will all be located at or behind the EDC’s Delivery Point. In addition, there is also a Revenue Meter that measures energy exports and imports, to and from the distribution system. For Buy-All Projects, the Production Meter and Revenue Meter may be the same meter. 8.1.2. The Production Meter may be used to measure the amount of energy generated from the Customer Project for purposes of REC creation, Buy-All calculations, and other compensation calculations. 8.1.3. It is necessary for EDCs to own both the Revenue and Production Meters. Participants shall be responsible for all incremental cost related to the procurement and installation of meters. Such costs will be recovered through a meter fee. 9. OMBUDSPERSON Extension Requests 9.1. 9.1.1. Requests for an extension of time for a project’s in-service date or resolution of Program disputes that do not require a ruling from the Authority will be addressed by the Authority’s selected Ombudsperson. 9.1.1.1. Any extension requests should be emailed to [email removed] or submitted through the Extension Request Information Form. 9.1.1.2. Following receipt of a project extension request, or a matter that is ripe for mediation or resolution of Program questions after contacting the EDCs, the Ombudsperson will subsequently contact the filer as needed to address the request. Updated 1/9/2026 34 Page 52 of 100Page 53 of 100
The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials 9.1.2. Any motions for an extension of a project’s in-service date filed with the Authority will be denied without prejudice with direction to file the request with the Ombudsperson. Dispute Resolution 9.2. 9.2.1. Matters involving program disputes should be emailed to [email removed]. 9.2.2. If the dispute can be handled by the Ombudsperson, the Ombudsperson will work to address a request or resolve the issue at hand. This may, as appropriate, include additional requests for clarification and documentation via email, phone call, shared screen meeting, etc. 9.2.3. If the Ombudsperson determines that the request or dispute should not or cannot be resolved by them, the Ombudsperson will direct the stakeholder to first bring the issue to the relevant EDC, or in other cases, work with the stakeholder to submit a filing to PURA requesting a ruling. Updated 1/9/2026 35 Page 53 of 100Page 54 of 100
The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials Appendix A – Non-Residential Renewable Energy Solutions Program Bid Comparison Guidelines Under the Non-Residential Renewable Energy Solutions Program Buy-All and Netting Tariff Bids compete in the same competitive solicitation. The following guidelines provide an overview of the EDC’s approach to comparing Bid for these tariff pricing structures within the same solicitation. Bid Price Submissions Buy-All Projects will submit a single, fixed-price Bid that will be inclusive of all energy and RECs generated by the Project. Netting Tariff Projects will provide a Bid solely for the rate of compensation for RECs generated by their Projects. Netting Tariff Projects will not provide a Bid for energy generated by the system but will benefit from reductions in on-site load due to system generation as well as Netting credits for energy exported to the grid. The value of reduced on-site load and Netting credit is referred to as the Energy Compensation. Note: Both Netting and Buy-All Bids are subject to the Bidding Price Caps. Evaluated Bid Prices The evaluated Bid price for each Buy-All Bid will be the price bid adjusted for any applicable Bid Preferences. The evaluated Bid price for each Netting Tariff Project will be the sum of the REC Bid price plus the average expected Energy Compensation over the 20-year Tariff Term reduced for any Bid Preferences. The Energy Compensation will be calculated in the following manner: • The published kWh rate for January 1, 2025 through December 31, 2025 for the Project Site’s billing account will be selected based on the current service tariff at that Netting Tariff Project Site. The rate will include all kWh charges inclusive of the average of the Standard Offer Service rates over the prior 12 months. For the purposes of the evaluation, this rate will be considered the Year 1 Energy Compensation of the 20-year Tariff Term. o For rates with differentiated on-peak and off-peak values, a weighted average will be calculated based on a reasonable approximation of the generation profile for solar and non-solar Bids. For Eversource solar Projects 34% of production is assumed to be on-peak with the remaining off peak. For UI, solar Projects 53% of production is assumed to be onpeak with the remaining off peak. These differences are due to differences in rate peak pricing windows between the Companies. o Peak periods are weekdays twelve PM to eight PM for Eversource, and are weekdays ten AM to six PM for UI. A PV Watts hourly simulation was run for a south facing Project in central Connecticut to determine the proportion of production during the on-peak window for each EDC. The hourly on-peak and off-peak production was then used to create a capacity weighted average price based on on-peak and off-peak rates for each company. Updated 1/9/2026 36 Page 54 of 100Page 55 of 100
The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials o For both companies 24% of non-solar production is assumed to be onpeak as these Projects are assumed to operate with high capacity factors during both peak and off-peak periods. A similar methodology was used to calculate the blended on-peak and off-peak rates for non-solar Projects. • The Year 1 Energy Compensation will be escalated by 2.5% per year to determine a schedule of estimated Energy Compensation for the tariff life of the Project. • The 20-year average Energy Compensation will be calculated. For Netting Tariff Projects, the 20-year net present Energy Compensation will be added to the Bid REC price in order to determine the total Project Bid price. This total Project Bid price will be reduced by any applicable Bid Preferences in order to determine the final Bid price for solicitation evaluation purposes. The calculated Energy Compensation for Netting Tariff Bids are intended for Bid evaluation purposes only. Netting Tariff Projects will receive Netting credits and avoided energy costs based on the actual Retail Rates applicable to the Project Site host. Actual rates may be higher or lower than calculated Energy Compensation. For New Construction Projects, the EDCs will evaluate Bids using the Energy Compensation for Rate 30 for Eversource and Rate GST-SS for UI. The EDCs shall post the most recent version of the Bid Price Calculator filed in Docket 25-08-03 that allows Bidders to calculate final evaluated Bid prices based on their submitted Bid prices. The calculator will include the updated Energy Compensation that will be used by the EDCs in the evaluation process. Negative REC Bids In order to allow Bidders to submit Netting Tariff Bids that are lower than the calculated Energy Compensation, Bidders may submit negative price REC Bids. In the event a Project submitting a negative REC Bid is awarded a Tariff Agreement, the EDCs will invoice the Tariff Payment Beneficiary an annual negative REC charge based on the total production of the system as measured by the EDC-owned REC meter. Negative REC invoices will be sent annually in March. The EDCs are instituting a three-strike system for Tariff Payment Beneficiaries that fail to make timely negative REC payments. If the Tariff Payment Beneficiary misses their negative REC payment due date by more than six (6) months for three (3) consecutive years, the EDCs shall terminate the Project’s eligibility. Further, the EDCs will charge a late payment penalty of up to 50 percent of the missed negative REC payments for payments made more than six (6) months late. Example Rate Calculations Updated 1/9/2026 37 Page 55 of 100Page 56 of 100
The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials Page 56 of 100 The following shows example rate comparisons for a solar Project under three Eversource rates 22. The highlighted cells are Bid prices provided by Bidders while all other cells are calculated based on the processes discussed in this guideline. Eversource Rate 30 Bid Price ($/REC) Buy-All NPV Retail Rate ($MWh) N/A Bid Price ($MWh+$/REC) Bid Preference Evaluated Bid Price ($/MWh+$/Rec) $ 145.00 20% $ 116.00 Netting $ 19.00 $148.72 $ 167.72 20% $ 134.17 Eversource Bid Price ($/REC) NPV Retail Rate ($MWh) Bid Price ($MWh+$/REC) Bid Preference Evaluated Bid Price ($/MWh+$/Rec) $ 145.00 20% $ 116.00 Rate 37 Buy-All N/A Netting $ 10.00 $168.11 $ 178.11 20% $ 142.49 Eversource Bid Price ($/REC) NPV Retail Rate ($MWh) Bid Price ($MWh+$/REC) Bid Preference Evaluated Bid Price ($/MWh+$/Rec) $ 145.00 20% $ 116.00 $ 158.86 20% $ 127.09 Rate 56 Buy-All Netting N/A $ 9.00 $149.86 Although some Bidders may obtain generation service through a retail supplier, the EDCs will not factor those rates into the Bid evaluation at this time. The EDCs will, however, allow Bidders to provide their actual generation rate in the Bid portal in accordance with the instructions in Section III.B.2. of PURA’s November 3, 2021 Decision in Docket No. 21-08-03 to “…add a data field for Customers to provide their actual generation service rate” in the bid portal. 22 Updated 1/9/2026 38Page 57 of 100
The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials Appendix B – Non-Residential Renewable Energy Solutions Beneficial Electrification and New Construction Load Guidelines I. Certification of Future Beneficial Electrification Due to the variable nature of potential Projects in the Non-Residential sector there is no set of standard technologies or models that can be used to certify the oversizing of systems for future Beneficial Electrification. The EDCs require a Connecticut Licensed Professional Engineer Certification certifying the load expected to materialize over the five years following Bid submission attributable to transportation electrification and/or fuel switching. For every Project sized based on future beneficial electrification, the EDCs shall inquire at the time of the in-service notification if such beneficial electrification is still planned. Further, the EDCs shall request that a Project representative for each applicable Project send formal notice via email when the associated beneficial electrification load materializes, but no later than five years from the In-Service Date, and will contact the applicable party approximately four years and six months following the In-Service Date if such notification is not received to request proof of installation. II. Certification for New Construction Non-Rooftop Buy-All Projects For every New Construction Project that is not a Rooftop Buy-All Project, the EDCs shall inquire at the time of the in-service notification if the load indicated at the time of Bid submission is still planned to materialize within five years after the In-Service Date. Further, the EDCs shall request that a Project representative for each applicable Project send formal notice via email when the associated New Construction load materializes, but no later than five years from the In-Service Date, and contact the applicable party approximately four years and six months following the In-Service Date if such notification is not received to request proof of installation. III. Certification for New Construction Buy-All Rooftop Projects For every New Construction Buy-All Rooftop Project, the EDCs shall request that a Project representative for each applicable Project send formal notice to ascertain whether the Project was installed on a rooftop per the Tariff Agreement at the time of the in-service notification. If the Project is not installed on a rooftop, the EDC’s twenty-year purchase commitment will immediately and automatically terminate. IV. Non-Rooftop New Construction Compensation Adjustment In situations where the expected beneficial electrification or New Construction load does not materialize, the EDCs will reduce the compensation level of the RECs produced from the Project equal to the percent of the future beneficial electrification or New Construction load which never materialized when compared to overall Project capacity. The EDC will modify the Agreement with the counterparty to reflect a reduction in the Purchase Price for RECs in the case of a Netting Tariff Project or the Purchase Price of Energy and RECs in the case of a Buy-All Project based on the actual realized load for that Project. For the Netting Tariff, this will result in a reduction in the quarterly cash payment (the “REC payment”), which could possibly result in negative REC pricing. For the Buy-All tariff, this will result in a reduction in the overall price, as there is no separate REC price. For example, if a Project constructed to a Nameplate Capacity of 1000 kW with 100 kW of that being anticipated to offset future Updated 1/9/2026 39 Page 57 of 100Page 58 of 100
The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials beneficial electrification that was never installed, the resulting reduction in compensation would be ten percent. Calculation 100kW/1000kW = .1 .1 X 100 = 10% V. Notification of Beneficial Electrification or New Construction load Not Materializing At any point before commercial operation a Project may inform the EDCs that the expected beneficial electrification load will no longer materialize and size the system based on the historical load instead. In such circumstances, the Project developer shall not be penalized, but shall only receive compensation for the energy and RECs that are generated once commercial operation begins. For every Project sized based on future beneficial electrification or New Construction load, the EDCs shall inquire at the time of the in-service notification if such beneficial electrification or New Construction load is still planned. If a counterparty or authorized representative thereof notifies the EDCs prior to the In-Service Date that part or all of the expected beneficial electrification load or New Construction load 23 will no longer materialize and is therefore sizing the system based on historical load instead in accordance with the paragraph above, the EDC will modify the Agreement with that counterparty to reflect a reduction in the system size based on the historical load provisions outlined in the Program Manual for that Project. Such notification shall be made via email to the email address for this Program to be established by the respective EDCs. 1. After the In-Service Date for the Project has occurred, the counterparty or an authorized representative thereof will be required to notify the respective EDC that their Project is in-service and is in compliance with the established Program Manual. An integral part of that notification will be a formal notice of the final installed capacity of the Project. 2. If such final installed capacity is less than the installed capacity listed on the original Agreement, the EDCs will ask at that time if the future beneficial electrification or New Construction load is still planned to be installed. If so, the EDCs will request that the counterparty send formal notice via email to the email address for this Program to be established by the respective EDCs when such load materializes, but no later than five years from the In-Service Date. If such notification is not received from the counterparty proactively, the EDCs will contact the counterparty on a date that is In the case of a New Construction Project that has less than the expected New Construction load materialize, the system will be sized to the realized load. 23 Updated 1/9/2026 40 Page 58 of 100Page 59 of 100
The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials roughly equivalent to four years plus six months from the In-Service Date to follow up regarding the status of such future beneficial electrification or New Construction load and will require proof of installation including but not limited to equipment receipts, site plans or permits from the local municipality, an affidavit from the Customer that such beneficial electrification measures have occurred, and any other evidence deemed necessary by the EDC at that time. If such load does not materialize within five years from the In-Service Date, the EDCs will act according to the aforementioned Compensation Adjustment plan. Updated 1/9/2026 41 Page 59 of 100Page 60 of 100
The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials Appendix C – Beneficial Account Credit Allocation Guidelines State, Agricultural, and Municipal Customers (“SAM Customers”) participating in the NonResidential Renewable Energy Solutions Program may allocate monthly excess bill credits from their qualified Project to other accounts of the Customer Host or to the accounts of other SAM Customers and certain critical facilities. These allocated monetary bill credits are used to offset the total costs charged to the Beneficial Accounts. Credit Allocation Process Customer Hosts must designate Beneficial Accounts and associated billing accounts through submission of the Beneficial Account Credit Allocation Form (“BACAF”) at the time of Bid Submission. The EDCs will allocate any net excess bill credits generated by the qualified Project per this form. Prior to receiving Approval to Energize from the EDC, the Customer Host may submit a revised Beneficial Account Credit Allocation Form (“BACAF”) to the relevant EDC. Forms can be emailed to: • Eversource: [email removed] • United Illuminating: [email removed] Any Beneficial Account may have multiple billing accounts associated with it. For Netting Tariff Projects, any monthly net excess generation at the Customer Host’s retail meter will be converted to monetary bill credits that will be allocated to the billing account(s) of the Beneficial Account as designated on the BACAF. Bill credits can be used to reduce the total bill on the associated billing account. For Buy-All Projects, the bill credits resulting from monthly net excess generation, as measured at the Production Meter, will be multiplied by the percentage of the Buy-All compensation that has been designated by the Customer Host for on-bill crediting. These bill credits will be allocated to each billing account listed on the Beneficial Account Credit Allocation Form. Credit Allocation Restrictions The following restrictions apply to the allocation of bill credits to Beneficial Accounts under the Program: • Each Customer Host account may be eligible to allocate a portion of the qualifying Non-Residential Renewable Energy Solutions Project’s excess generation to the following Beneficial Accounts: o The Customer Host account o 5 additional State, Agricultural, or Municipal Beneficial Accounts Updated 1/9/2026 42 Page 60 of 100
Text of 2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdf
Extracted from the file · 203 pages · 522,519 characters
Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf
Extracted from the file · 2 pages · 6,256 characters
Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf
Extracted from the file · 2 pages · 3,261 characters
Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf
Extracted from the file · 1 page · 528 characters
Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf
Extracted from the file · 2 pages · 4,800 characters
As listed on the current system
Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)