Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

5. Annual Compliance Filings – Additional Filings (Program Materials)

Compliance filingFiled by Avangrid13 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files13

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages
  1. Page 55 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials o For both companies 24% of non-solar production is assumed to be onpeak as these Projects are assumed to operate with high capacity factors during both peak and off-peak periods. A similar methodology was used to calculate the blended on-peak and off-peak rates for non-solar Projects. • The Year 1 Energy Compensation will be escalated by 2.5% per year to determine a schedule of estimated Energy Compensation for the tariff life of the Project. • The 20-year average Energy Compensation will be calculated. For Netting Tariff Projects, the 20-year net present Energy Compensation will be added to the Bid REC price in order to determine the total Project Bid price. This total Project Bid price will be reduced by any applicable Bid Preferences in order to determine the final Bid price for solicitation evaluation purposes. The calculated Energy Compensation for Netting Tariff Bids are intended for Bid evaluation purposes only. Netting Tariff Projects will receive Netting credits and avoided energy costs based on the actual Retail Rates applicable to the Project Site host. Actual rates may be higher or lower than calculated Energy Compensation. For New Construction Projects, the EDCs will evaluate Bids using the Energy Compensation for Rate 30 for Eversource and Rate GST-SS for UI. The EDCs shall post the most recent version of the Bid Price Calculator filed in Docket 25-08-03 that allows Bidders to calculate final evaluated Bid prices based on their submitted Bid prices. The calculator will include the updated Energy Compensation that will be used by the EDCs in the evaluation process. Negative REC Bids In order to allow Bidders to submit Netting Tariff Bids that are lower than the calculated Energy Compensation, Bidders may submit negative price REC Bids. In the event a Project submitting a negative REC Bid is awarded a Tariff Agreement, the EDCs will invoice the Tariff Payment Beneficiary an annual negative REC charge based on the total production of the system as measured by the EDC-owned REC meter. Negative REC invoices will be sent annually in March. The EDCs are instituting a three-strike system for Tariff Payment Beneficiaries that fail to make timely negative REC payments. If the Tariff Payment Beneficiary misses their negative REC payment due date by more than six (6) months for three (3) consecutive years, the EDCs shall terminate the Project’s eligibility. Further, the EDCs will charge a late payment penalty of up to 50 percent of the missed negative REC payments for payments made more than six (6) months late. Example Rate Calculations Updated 1/9/2026 37 Page 55 of 100
  2. Page 56 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials Page 56 of 100 The following shows example rate comparisons for a solar Project under three Eversource rates 22. The highlighted cells are Bid prices provided by Bidders while all other cells are calculated based on the processes discussed in this guideline. Eversource Rate 30 Bid Price ($/REC) Buy-All NPV Retail Rate ($MWh) N/A Bid Price ($MWh+$/REC) Bid Preference Evaluated Bid Price ($/MWh+$/Rec) $ 145.00 20% $ 116.00 Netting $ 19.00 $148.72 $ 167.72 20% $ 134.17 Eversource Bid Price ($/REC) NPV Retail Rate ($MWh) Bid Price ($MWh+$/REC) Bid Preference Evaluated Bid Price ($/MWh+$/Rec) $ 145.00 20% $ 116.00 Rate 37 Buy-All N/A Netting $ 10.00 $168.11 $ 178.11 20% $ 142.49 Eversource Bid Price ($/REC) NPV Retail Rate ($MWh) Bid Price ($MWh+$/REC) Bid Preference Evaluated Bid Price ($/MWh+$/Rec) $ 145.00 20% $ 116.00 $ 158.86 20% $ 127.09 Rate 56 Buy-All Netting N/A $ 9.00 $149.86 Although some Bidders may obtain generation service through a retail supplier, the EDCs will not factor those rates into the Bid evaluation at this time. The EDCs will, however, allow Bidders to provide their actual generation rate in the Bid portal in accordance with the instructions in Section III.B.2. of PURA’s November 3, 2021 Decision in Docket No. 21-08-03 to “…add a data field for Customers to provide their actual generation service rate” in the bid portal. 22 Updated 1/9/2026 38
  3. Page 57 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials Appendix B – Non-Residential Renewable Energy Solutions Beneficial Electrification and New Construction Load Guidelines I. Certification of Future Beneficial Electrification Due to the variable nature of potential Projects in the Non-Residential sector there is no set of standard technologies or models that can be used to certify the oversizing of systems for future Beneficial Electrification. The EDCs require a Connecticut Licensed Professional Engineer Certification certifying the load expected to materialize over the five years following Bid submission attributable to transportation electrification and/or fuel switching. For every Project sized based on future beneficial electrification, the EDCs shall inquire at the time of the in-service notification if such beneficial electrification is still planned. Further, the EDCs shall request that a Project representative for each applicable Project send formal notice via email when the associated beneficial electrification load materializes, but no later than five years from the In-Service Date, and will contact the applicable party approximately four years and six months following the In-Service Date if such notification is not received to request proof of installation. II. Certification for New Construction Non-Rooftop Buy-All Projects For every New Construction Project that is not a Rooftop Buy-All Project, the EDCs shall inquire at the time of the in-service notification if the load indicated at the time of Bid submission is still planned to materialize within five years after the In-Service Date. Further, the EDCs shall request that a Project representative for each applicable Project send formal notice via email when the associated New Construction load materializes, but no later than five years from the In-Service Date, and contact the applicable party approximately four years and six months following the In-Service Date if such notification is not received to request proof of installation. III. Certification for New Construction Buy-All Rooftop Projects For every New Construction Buy-All Rooftop Project, the EDCs shall request that a Project representative for each applicable Project send formal notice to ascertain whether the Project was installed on a rooftop per the Tariff Agreement at the time of the in-service notification. If the Project is not installed on a rooftop, the EDC’s twenty-year purchase commitment will immediately and automatically terminate. IV. Non-Rooftop New Construction Compensation Adjustment In situations where the expected beneficial electrification or New Construction load does not materialize, the EDCs will reduce the compensation level of the RECs produced from the Project equal to the percent of the future beneficial electrification or New Construction load which never materialized when compared to overall Project capacity. The EDC will modify the Agreement with the counterparty to reflect a reduction in the Purchase Price for RECs in the case of a Netting Tariff Project or the Purchase Price of Energy and RECs in the case of a Buy-All Project based on the actual realized load for that Project. For the Netting Tariff, this will result in a reduction in the quarterly cash payment (the “REC payment”), which could possibly result in negative REC pricing. For the Buy-All tariff, this will result in a reduction in the overall price, as there is no separate REC price. For example, if a Project constructed to a Nameplate Capacity of 1000 kW with 100 kW of that being anticipated to offset future Updated 1/9/2026 39 Page 57 of 100
  4. Page 58 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials beneficial electrification that was never installed, the resulting reduction in compensation would be ten percent. Calculation 100kW/1000kW = .1 .1 X 100 = 10% V. Notification of Beneficial Electrification or New Construction load Not Materializing At any point before commercial operation a Project may inform the EDCs that the expected beneficial electrification load will no longer materialize and size the system based on the historical load instead. In such circumstances, the Project developer shall not be penalized, but shall only receive compensation for the energy and RECs that are generated once commercial operation begins. For every Project sized based on future beneficial electrification or New Construction load, the EDCs shall inquire at the time of the in-service notification if such beneficial electrification or New Construction load is still planned. If a counterparty or authorized representative thereof notifies the EDCs prior to the In-Service Date that part or all of the expected beneficial electrification load or New Construction load 23 will no longer materialize and is therefore sizing the system based on historical load instead in accordance with the paragraph above, the EDC will modify the Agreement with that counterparty to reflect a reduction in the system size based on the historical load provisions outlined in the Program Manual for that Project. Such notification shall be made via email to the email address for this Program to be established by the respective EDCs. 1. After the In-Service Date for the Project has occurred, the counterparty or an authorized representative thereof will be required to notify the respective EDC that their Project is in-service and is in compliance with the established Program Manual. An integral part of that notification will be a formal notice of the final installed capacity of the Project. 2. If such final installed capacity is less than the installed capacity listed on the original Agreement, the EDCs will ask at that time if the future beneficial electrification or New Construction load is still planned to be installed. If so, the EDCs will request that the counterparty send formal notice via email to the email address for this Program to be established by the respective EDCs when such load materializes, but no later than five years from the In-Service Date. If such notification is not received from the counterparty proactively, the EDCs will contact the counterparty on a date that is In the case of a New Construction Project that has less than the expected New Construction load materialize, the system will be sized to the realized load. 23 Updated 1/9/2026 40 Page 58 of 100
  5. Page 59 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials roughly equivalent to four years plus six months from the In-Service Date to follow up regarding the status of such future beneficial electrification or New Construction load and will require proof of installation including but not limited to equipment receipts, site plans or permits from the local municipality, an affidavit from the Customer that such beneficial electrification measures have occurred, and any other evidence deemed necessary by the EDC at that time. If such load does not materialize within five years from the In-Service Date, the EDCs will act according to the aforementioned Compensation Adjustment plan. Updated 1/9/2026 41 Page 59 of 100
  6. Page 60 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials Appendix C – Beneficial Account Credit Allocation Guidelines State, Agricultural, and Municipal Customers (“SAM Customers”) participating in the NonResidential Renewable Energy Solutions Program may allocate monthly excess bill credits from their qualified Project to other accounts of the Customer Host or to the accounts of other SAM Customers and certain critical facilities. These allocated monetary bill credits are used to offset the total costs charged to the Beneficial Accounts. Credit Allocation Process Customer Hosts must designate Beneficial Accounts and associated billing accounts through submission of the Beneficial Account Credit Allocation Form (“BACAF”) at the time of Bid Submission. The EDCs will allocate any net excess bill credits generated by the qualified Project per this form. Prior to receiving Approval to Energize from the EDC, the Customer Host may submit a revised Beneficial Account Credit Allocation Form (“BACAF”) to the relevant EDC. Forms can be emailed to: • Eversource: [email removed] • United Illuminating: [email removed] Any Beneficial Account may have multiple billing accounts associated with it. For Netting Tariff Projects, any monthly net excess generation at the Customer Host’s retail meter will be converted to monetary bill credits that will be allocated to the billing account(s) of the Beneficial Account as designated on the BACAF. Bill credits can be used to reduce the total bill on the associated billing account. For Buy-All Projects, the bill credits resulting from monthly net excess generation, as measured at the Production Meter, will be multiplied by the percentage of the Buy-All compensation that has been designated by the Customer Host for on-bill crediting. These bill credits will be allocated to each billing account listed on the Beneficial Account Credit Allocation Form. Credit Allocation Restrictions The following restrictions apply to the allocation of bill credits to Beneficial Accounts under the Program: • Each Customer Host account may be eligible to allocate a portion of the qualifying Non-Residential Renewable Energy Solutions Project’s excess generation to the following Beneficial Accounts: o The Customer Host account o 5 additional State, Agricultural, or Municipal Beneficial Accounts Updated 1/9/2026 42 Page 60 of 100
  7. Page 61 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials o 5 additional nonstate or municipal critical facility billing accounts physically connected to the same Microgrid as the Customer Host account • Due to billing system constraints, no more than 1,000 billing accounts may receive credit allocations from any one Customer Host. • Customer Hosts may only allocate bill credits to other accounts within the same Electric Distribution Company (“EDC”). REC or Direct Payments for Buy-All or Netting Tariff REC or direct payments can be assigned to one Tariff Payment Beneficiary. See sections 3.2.7 and 3.2.9.1 of the Program Manual for further guidance. Treatment of Closed Allocatee Accounts In the event that a billing account listed on a Beneficial Account Credit Allocation Form has been closed, the EDCs will permit Customer Hosts to reallocate credits accrued from cancelled billing accounts for a fee of $250. The Host Account may use the unallocated bill credits to offset any charges on the host account in future billing periods or may cash out the accumulated bill credits consistent with the credit cash out rules associated with the Qualified Project’s tariff structure. 24 Allocation Form Instructions Each Customer Host that seeks to allocate excess bill credits to Beneficial Accounts must submit a BACAF to the EDC in order to direct the allocation of bill credits. The following provides instructions for completing the BACAF. Customer Hosts must submit a complete BACAF during Bid Submission and may submit revised BACAF forms once per 12-month period. Each time a request is made to modify these allocations, the EDC may charge a $250 fee associated with such requested modifications. Such fee shall be due at the time the request is made. 1. Enter the necessary information in Row 4 of the excel spreadsheet as it pertains to the Host Account. 2. Each Customer Host account may be eligible to allocate a portion of the qualifying Non-Residential Renewable Energy Solutions Project’s excess generation to the following Beneficial Accounts: i. The Customer Host account ii. 5 additional State, Agricultural, or Municipal Beneficial Accounts Excess accumulated credits on a Customer Host’s account will be rolled over until the end of the 20-year term. At the end of the 20-year term, such credits may be cashed out. 24 Updated 1/9/2026 43 Page 61 of 100
  8. Page 62 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials iii. 5 additional nonstate or municipal beneficial critical facility accounts physically connected to the same Microgrid as the Customer Host account 3. For example, if the Beneficial Account is “Any Town”, and “Any Town” includes accounts for the Any Town Hall, Any Town High School, Any Town Middle School, and Any Town Elementary School, Any Town would be the “Beneficial Account Name” and the billing account numbers associated with Any Town Hall, Any Town High School, Any Town Middle School, and Any Town Elementary School would all be entered under the billing account #(‘s) column as follows: 4. Revised forms, once complete, can be sent via email to the correct EDC: i. Eversource: [email removed] ii. United Illuminating: [email removed] Beneficial Account Credit Allocation Form Screenshot below is for reference only. The Beneficial Account Credit Allocation Form will be available on the respective EDC’s websites. Updated 1/9/2026 44 Page 62 of 100
  9. Page 63 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials TARIFF AGREEMENT from Non-Residential Renewable Energy Solutions Projects by and between [The Connecticut Light and Power Company dba Eversource Energy] or [The United Illuminating Company (“UI”)] and dated as of 1 Page 63 of 100
  10. Page 64 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials Table of Contents COVER SHEET.............................................................................................................................. 3 1 Definitions............................................................................................................ 9 2 Term of Agreement; Delivery Term .................................................................. 15 3 Facility ............................................................................................................... 15 4 Prerequisites for Purchases ................................................................................ 16 5 Purchases............................................................................................................ 18 6 Metering; Interconnection .................................................................................. 19 7 Delivery.............................................................................................................. 19 8 Compensation Structure, Billing, and Payment ................................................. 20 9 Performance Assurance ..................................................................................... 23 10 Covenants, Representations and Warranties ...................................................... 24 11 Change to Customer of Record; Designation of Tariff Payment Beneficiaries; Assignment ........................................................................................................ 26 12 Regulatory Approval; Cost Recovery ................................................................ 27 13 Events of Default; Remedies ............................................................................. 27 14 Notices and Contact Information ....................................................................... 30 15 Force Majeure .................................................................................................... 30 16 Limitation of Liability........................................................................................ 31 17 Dispute Resolution ............................................................................................. 31 18 Miscellaneous .................................................................................................... 32 2 Page 64 of 100
Words on different pages

Text of 2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdf

Extracted from the file · 203 pages · 522,519 characters

Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf

Extracted from the file · 2 pages · 6,256 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf

Extracted from the file · 2 pages · 3,261 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf

Extracted from the file · 1 page · 528 characters

Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf

Extracted from the file · 2 pages · 4,800 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)

This filing on the current system (opens in a new tab)