2026 Clean and Renewable Energy Program Data and Report

Files13

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages
  1. Page 9 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials Buy-All Tariff and subject to the Tariff Rates outlined in Section 1.4 herein for the Netting Tariff. 2.3.5 2.4 Each EDC will separately submit selected Projects to PURA for Regulatory Approval. BID SUBMISSION 2.4.1 Bid Forms: Each EDC will develop and maintain its own form to be used for Bid submission (“Bid Form”). Each EDC will provide a website link containing such EDC’s Bid Form and EDC-specific instructions for Bid submission, as well as any additional forms that Bidders may be required to complete. 2.4.2 Submission of Bids: Bids must be submitted in accordance with the EDCspecific instructions. Bidders must comply with the instructions to ensure that their Bids are complete. In addition to completion of the Bid Form, Bidders must provide a Bid Certification Form, and may be required to provide a Connecticut Licensed Professional Engineer Certification Form, or other forms as necessary based on the specifics of the Bid. Bidders who claim the designation of any of the Bid Preferences as designated by PURA may also be required to submit additional documentation proving such qualification. Specific instructions for how to provide these additional documents may vary by EDC, and are set forth in the EDC-specific bid instructions. 2.4.3 Bid Details: Bidders must submit their Bids by using the EDC-specific Bid Form, which contains the majority of the information necessary for the Companies to evaluate Bids. At a minimum, the information listed below may be required for Bid submission. However, additional/supplemental information is or may be required as set forth herein: Bid Form Information • Bid Certification Form from the current Program Year • Bidder name • Customer name • Owner of the Project Site • Customer billing account number • Project Site Address • An affidavit that the Project has not received grants and/or rebates from the CT Green Bank • An affidavit that the Project is not a Shared Clean Energy Facility • An affidavit of site control • An affidavit that the Project has not received an agreement under the LREC/ZREC Program that is not in-service at the time of the bid • An affidavit attesting that Bidder represents that the proposed NonResidential Renewable Energy Solutions project has not been split to qualify for a different Program category • An affidavit attesting that Project splitting is for the purposes of the NonResidential Renewable Energy Solutions Program only and does not 9 Page 9 of 100
  2. Page 10 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials affect how the Projects will be reviewed under other regulatory processes not within PURA’s jurisdiction, such as DEEP permitting processes or Connecticut Siting Council review • Tariff Payment Beneficiary Name (if applicable) • Indicated percentage of payments to be allocated to Tariff Payment Beneficiary and Customer of Record (if applicable) • System size in kW (AC) • Historical load data to demonstrate that a system meets applicable sizing requirements in Section 4.2 of the NRES Program Manual. • If a Bidder seeks to qualify a technology other than Solar PV, such as small hydro or wind, then such Bidder must submit a Connecticut Licensed Professional Engineer certification that includes the average annual production of the Project. • Copy of the most recent Customer bill • For New Construction Projects, a copy of documentation certified by a Connecticut Licensed Professional Engineer certifying the Customer load estimated to materialize over the five years following Bid submission attributable to these items will be required, with the exception of Buy-All Rooftop Projects • For Projects indicating at the time of Bid submission that they meet any of the Bid Preference criteria, an explanation with supporting description and/or documentation is necessary for each such Bid Preference at the time of Bid Submission to the respective EDC via the Bid Preference Explanation and Description form • For State, Agricultural, or Municipal (“SAM”) Projects seeking to qualify for the Distressed Municipality Bid Preference using a Municipal Beneficial Account whose electric service is not physically located within a Distressed Municipality, the Bidder must provide evidence to the applicable EDC that such Beneficial Account is owned by a Distressed Municipality and has an electric account that is paid for by a Distressed Municipality. A nonexhaustive list of such evidence includes electric bills for the Beneficial Account showing that a Distressed Municipality pays for the account’s electricity, deeds or titles for the land that the Beneficial Account is on proving Distressed Municipality ownership, or lease agreements or options to lease signed by a Distressed Municipality. The EDC may accept alternative evidential documentation at their sole discretion if such alternative documentation is approved by the EDC prior to bid submission. • Projects seeking to participate in the School Solar program must provide a completed School Solar Pre-Application Checklist. The Project’s Interconnection Agreement must be fully executed before Bid submission. • Other Bid requirements as determined by the EDCs • Specific instructions for how to provide all bid documents may vary by Company, and are set forth in the Company-specific instructions. 10 Page 10 of 100
  3. Page 11 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials • TO EVERSOURCE: Bids must be submitted to Eversource via the Eversource Bid Portal which can be found on the Eversource NRES Program page linked here. • TO UI: Bids must be submitted to UI via the UI Bid Portal which can be found on the UI NRES Program page linked here. 2.4.3.1 “Bid Certification Form”. This five (5) page form is mandatory. Every Bid must be accompanied by an executed Bid Certification Form, which must contain four signatures, one by the Bidder, one by the Owner of the Project Site, one from the Customer of Record, and one from the Tariff Payment Beneficiary. The Bid Certification Form is an integral part of the Bid, and Bids that do not include a complete and executed Bid Certification Form, including all signatures as required pursuant to the specifics of the Bid, will not be considered. For purposes of clarification, for all Bids, pages 2, 3, and 4 are mandatory and page 5 is mandatory only if a Tariff Payment Beneficiary is elected. Each Company’s website contains a Bid Certification Form with the Company-specific instructions as to how such form is to be submitted. • The five-plus page Bid Certification Form consists of the following: o Page 1 – Instructions for completion of Pages 2 through 5 o Page 2 – Bidder’s Signature, Commitment and Acceptance: By signing this page of the Certification form, the Bidder or a duly authorized representative of the Bidder is making a number of certifications, including that the information provided in the Bid is complete and accurate, and that the Bidder and the project meet the eligibility requirements set forth in this RFP as discussed in Section 5 herein. o Page 3 - Tariff Agreement Customer’s Signature, Commitment and Acceptance: By signing this page of the Certification form, the Tariff Agreement Customer or a duly authorized representative of the Tariff Agreement Customer is making a number of certifications, including that the Tariff Agreement Customer has reviewed the statements and certifications of the Bidder, and that such statements and certifications as applicable to the Project Bid are true and accurate to the best of the Tariff Agreement Customer’s knowledge. o Page 4 - Affidavit of Owner of the Project Site’s Notarized Signature, Commitment and Acceptance: The Bidder must have and certify site control to the EDC prior to submitting such Bid. Signing this affidavit along with providing documentation as additional attachments to the Bid 11 Page 11 of 100
  4. Page 12 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials Certification Form proving site control such as deeds (including but not limited to, Warranty Deeds, Quit Claim Deeds, Executor’s Deeds, Trustee’s Deeds, any other valid proof of ownership), written leases, options to lease, memorandums of lease, memorandums of options to lease, and contracts to purchase, represents certification of site control. The Owner of the Project Site must sign this affidavit, which is required to be witnessed by a Notary Public. By signing the affidavit, the Owner of the Project Site or a duly authorized representative of the Owner of the Project Site is making a number of affirmations and certifications, including that the Owner of the Project Site has reviewed the statements and certifications of the Bidder, and that such statements and certifications as applicable to the Project Site are true and accurate to the best of the knowledge of the Owner of the Project Site. • For projects where the SAM Customer Host is not the Owner of the Project Site, the Bidder must provide the following documentation at the time of Bid submission: • An affidavit signed by the Owner of the Project Site demonstrating that the SAM Customer Host: (1) has control of the Project Site or an unconditional right to obtain site control; (2) has authorized the Bidder, if different than the Customer Host, to submit a NRES bid for the Project Site; and 3) is authorized to participate in the NRES Program for the entire 20-year Tariff Term should the Bid be selected; and • Documentation proving site control for the entire 20year Tariff Term including but not limited to written leases, options to lease, memoranda of lease, options of memorandum to lease, and contracts to purchase. o Page 5 – Tariff Payment Beneficiary Signature, Commitment, and Acceptance (If Applicable): By signing this page of the Certification form, the Tariff Payment Beneficiary is making a number of certifications, including that the Tariff Payment Beneficiary has reviewed the requirements, terms and conditions, and obligations of the Tariff Payment Beneficiary as they pertain to this Program. • Both EDCs require that the five-plus (5+) page Bid Certification Form must be attached to the Bid as one single PDF (.pdf) file prior to submission as part of the completed Bid. Both the Bid and Bid Certification Form are submitted at the same time. The most current Bid Certification form must be used. Other previous versions of the Bid Certification Form are not acceptable. 12 Page 12 of 100
  5. Page 13 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials 2.4.3.2 “Customer Disclosure Form”. A filled out and signed Customer Disclosure Form is required to ensure that NRES customers are not subject to deceptive marketing practices or solar agreements. The Third-Party Ownership Customer Disclosure Form should be used when the Customer of Record is not the System Owner and the Direct Ownership Customer Disclosure Form should be used when the Customer of Record is also the System Owner. 2.4.3.3 “Connecticut Licensed Professional Engineer Certification”. A Connecticut Licensed Professional Engineer Certification is required to validate system sizing eligibility requirements pursuant to Sections 4.2.4 and 4.2.5 of the NRES Program Manual. 2.4.3.4 “Copy of the most recent Customer Bill”. For any projects proposed at a site with existing customer electric service, a copy of the most recent customer bill must be included. 2.4.3.5 “Historical Load”. Program participants must provide 12 consecutive months of load from the prior five years during the Bid submission process. When 12 consecutive months of load data is not available, the Bidders shall provide as much historical load data as available. For SAM customers, load data for up to five Beneficial Accounts must be provided to support the Bid. The percentage of load being used for Project sizing must be provided for each Beneficial Account. 2.4.3.5.1 The EDCs will perform the load analysis review during eligibility screening for the given NRES RFP Bid submission and will consider current loads associated with the Beneficial Accounts for a given SAM Project Bid. 2.4.3.6 “Proof of Agricultural Customer Status”. For Agricultural Projects, Program participants must provide the following 5 during the Bid submission process: 3 • One Year of Tax Returns with a Schedule F • A Farmer’s Tax Exemption Permit • A NAICS Classification Code beginning with an 11 COMPENSATION STRUCTURES 3.1 The Compensation Structures are described in Section 3.2 of the NRES Program Manual and will be selected at the time of Bid submission. Compensation Structure 5 Any of the proposed requirements may be fulfilled with documentation that was valid at any point in the last three years per Final Decision in Docket No. 23-08-03 from November 8, 2023. 13 Page 13 of 100
  6. Page 14 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials selections cannot be modified following Bid submission, either before or after the system receives Approval to Energize from the utility. 4 BID EVALUATION 6 4.1 5 BID ELIGIBILITY REQUIREMENTS 5.1 6 The evaluation and selection of Bids will be independently and separately performed by each EDC for Projects in their respective service territories pursuant to Section 5.3 of the NRES Program Manual. All Bids must meet the eligibility requirements set forth in Section 4 of the NRES Program Manual and Bidders must submit both the Non-Refundable Bid Fee and Performance Assurance at the time of Bid submission as follows: 5.1.1 Non-Refundable Bid Fee: Bidders will be required to pay a non-refundable Bid fee of $450 at the time of Bid submission. The Bid fees will be used to offset the costs to administer the Program. 5.1.2 Performance Assurance: Performance Assurance based on Project Size is required for all Projects at the time of Bid submission in the amount of $25.00 per kW (AC). 5.1.2.1 Performance Assurance shall not accrue interest. 5.1.2.2 Failure by a Bidder to provide Performance Assurance in a form acceptable to the EDC at the time of Bid submission as required shall result in immediate and automatic disqualification of the Bid without opportunity to cure. CODE OF CONDUCT/COMMUNICATIONS. 6.1 The evaluation of this RFP will be conducted in a manner to ensure all Bidders are treated in a fair and consistent manner. The evaluation criteria and timing of the bidding process will be the same for all Bidders. 6.2 Bidder Questions: 6.2.1 The Companies will be available throughout this RFP process to receive questions. Such questions should be submitted directly to the program administrators at the following addresses and in accordance with the RFP Schedules (Table 5 and Table 6): Eversource: [email removed] UI: [email removed] Refer to Appendix A - Non-Residential Renewable Energy Solutions Program Guidelines for Bid Price Comparison for further clarification including guidance on Negative REC Bids. 6 14 Page 14 of 100
  7. Page 15 of 100

    The United Illuminating Company Docket No. 26-08-01 6.2.2 UI Attachment 2 - NRES Program Materials Responses to written questions from Bidders may be posted in a blind Question and Answer format on: Eversource: Eversource’s Renewable Energy Solutions webpage is linked here. UI: UI’s NRES Program webpage is linked here. 6.3 Each of the Companies adheres strictly to a Code of Conduct for affiliate transactions promulgated by PURA. 15 Page 15 of 100
  8. Page 16 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials TABLE 5 – February RFP Schedule* Action Item Date Bidders Conference – Webinar Only January 20, 2026 Deadline for Submission of Questions January 27, 2026 Release of RFP and Opening of Bid Window for All Project Size Categories, and Opening of Two-Week Window for Small Zero Emission Category February 2, 2026 at 1:00:00 p.m. (Eastern Prevailing Time “EPT”) Close of Two-Week Window for Small Zero Emission Category February 17, 2026 at 1:00:00 p.m. (Eastern Prevailing Time “EPT”), at which time the Pricing shall become firm, irrevocable and binding. Bid Forms Due for All Categories March 16, 2026 by 1:00 p.m. (Eastern Prevailing Time “EPT”), at which time the Pricing shall become firm, irrevocable and binding. Selection and Notification of Winning Bidders for All Categories On or about May 4, 2026 Tariff Agreement Execution After Selection and Notification of Winning Bidders. Bidders will have to return partially executed contracts by the date established by the Companies which is expected to be approximately 10 business days. Tariff Agreement(s) Filed with PURA Date to be determined at the Authority’s discretion Commencement of Service In accordance with Tariff Agreements * Pursuant to Section 2.1, Schedule, the Companies, at their sole discretion, may modify the schedule at any time. 16 Page 16 of 100
  9. Page 17 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials TABLE 6 – August RFP Schedule* Action Item Date Bidders Conference – Webinar Only July 21, 2026 Deadline for Submission of Questions July 28, 2026 Release of RFP and Opening of Bid Window for All Project Size Categories, and Opening of TwoWeek Window for Small Zero Emission Category August 3, 2026 at 1:00:00 p.m. (Eastern Prevailing Time “EPT”) Close of Two-Week Window for Small Zero Emission Category August 17, 2026 at 1:00:00 p.m. (Eastern Prevailing Time “EPT”), at which time the Pricing shall become firm, irrevocable and binding. Bid Forms Due for All Categories September 14, 2026 by 1:00 p.m. (Eastern Prevailing Time “EPT”), at which time the Pricing shall become firm, irrevocable and binding. Selection and Notification of Winning Bidders for All Categories On or about November 2, 2026 Tariff Agreement Execution After Selection and Notification of Winning Bidders. Bidders will have to return partially executed contracts by the date established by the Companies which is expected to be approximately 10 business days. Tariff Agreement(s) Filed with PURA Date to be determined at the Authority’s discretion * Pursuant to Section 2.1 of the RFP, Schedule, the Companies, at their sole discretion, may modify the schedule at any time. 17 Page 17 of 100
  10. Page 18 of 100

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 2 - NRES Program Materials Attachment 1 Tariff Agreement for the Purchase and Sale of Connecticut Class I Renewable Energy Credits and Energy from Non-Residential Renewable Energy Solutions Projects (“Tariff Agreement”) 1. Cover Sheet inclusive of Tariff Payment Beneficiary Form as applicable 2. Terms and Conditions 18 Page 18 of 100
Words on different pages

Text of 2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdf

Extracted from the file · 203 pages · 522,519 characters

Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf

Extracted from the file · 2 pages · 6,256 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf

Extracted from the file · 2 pages · 3,261 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf

Extracted from the file · 1 page · 528 characters

Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf

Extracted from the file · 2 pages · 4,800 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)