Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

5. Annual Compliance Filings – Additional Filings (Program Materials)

Compliance filingFiled by Avangrid13 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files13

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages
Words on different pages
  1. Page 1 of 147

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials Year 7 Request for Proposals for the Shared Clean Energy Facility Program of The Connecticut Light and Power Company dba Eversource Energy (“Eversource”) and The United Illuminating Company (“UI”) Issue Date: January 21, 2026 EVERSOURCE AND UI RESERVE THE RIGHT TO REJECT ANY OR ALL OFFERS OR PROPOSALS 1 Page 1 of 147
  2. Page 2 of 147

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials THE COMPANIES ALSO RESERVE THE RIGHT TO ANNOUNCE CHANGES TO THIS RFP BASED ON PENDING REGULATORY DECISIONS. IN THE EVENT CHANGES ARE MADE, NOTICE OF SUCH CHANGES WILL BE POSTED AND HIGHLIGHTED ON THE COMPANIES’ RESPECTIVE WEBSITES. 2 Page 2 of 147
  3. Page 3 of 147

    The United Illuminating Company Docket No. 26-08-01 1 UI Attachment 3 - SCEF Program Materials GENERAL 1.1 INTRODUCTION TO THE RFP. The Connecticut Light and Power Company dba Eversource Energy (“Eversource”), and The United Illuminating Company (“UI”) (each a “Company” and collectively the “Companies”), are hereby issuing this joint Request for Proposals (“RFP”) in furtherance of the “Shared Clean Energy Facility Program” (the “Program” or “SCEF Program”) established pursuant to Public Act 1850, Public Act 19-35, Public Act 22-14, Public Act 23-102, Public Act 25-173 and Conn. Gen. Stat. § 16-244z. 1.2 PROGRAM SUMMARY. In accordance with the Public Acts, Conn. Gen. Stat. § 16-244z, and the December 17, 2025, Decision of the Public Utilities Regulatory Commission (“PURA” or “Authority”) in Docket No. 25-08-04 Annual Shared Clean Energy Facility Program Review – Year 7, the Companies have developed this Request for Proposals “for the purchase of any energy products and renewable energy certificates” produced by any eligible Class I Shared Clean Energy Facility, resulting in the issuance of this and subsequent RFPs. Section 4 of this RFP provides a description of eligible Shared Clean Energy Facilities, and the Program. 1.3 CAPITALIZED TERMS; HEADINGS. Capitalized terms used but not defined in the body of this RFP have the meanings given to such terms in the Program Manual and/or the Subscriber Organization Tariff Terms Agreement and the Subscriber Organization Terms and Conditions (collectively, the “Standard Agreement”), included as Attachment 2 to this RFP. The headings to articles and sections throughout this RFP are intended solely to facilitate reading and reference to all articles, sections and provisions of this RFP, and do not affect the meaning or interpretation of this RFP or the Terms and Conditions. 1.4 INVITATION TO BID. You are invited to submit a proposal (“Bid”) as a bidder (“Bidder”) to be considered for selection to be awarded a long-term agreement for the purchase of RECs and energy produced by your Facility pursuant to the terms and conditions of a fully executed Standard Agreement. Pursuant to applicable law and regulation, the Companies will not accept Bids which equal a production-weighted average Purchase Price in excess of $182.94 per MWh. For Bids claiming a Bid Preference for 100% of the Facility’s Capacity located on a Solar Canopy or Solar Carport, the Companies will accept Bids up to but not exceeding $304.90 per MWh 1. For purposes of clarification, if a Bid which does not qualify for the Bid Preference for 1 Pursuant to Section 7.3 of the Program Manual, “Purchase Prices must be bid on a fixed, dollar per megawatt-hour ($/MWh) basis for energy and RECs, subject to the Procurement Price Cap, over the Tariff term. In accordance with PURA’s December 17, 2025 Final Decision in Docket 25-08-04, the Year 7 Price Cap is $.18294 per kWh for all Bids. For Bids claiming that they will be constructed 100% on Solar Carports and/or Solar Canopies, Bid prices will be accepted up to but not exceeding $.3049 per kWh. Thus, the Companies have converted the $0.3049/kWh to $304.90/MWh and the $0.18294/kWh to $182.94/MWh 3 Page 3 of 147
  4. Page 4 of 147

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials 100% Solar Canopies and/or Solar Carports, including Hybrid Projects consisting of a Rooftop Project and a Solar Canopy/Solar Carport, is submitted with a Purchase Price in excess of $182.94, such Bid will be disqualified without opportunity to cure. 1.4.1 Purchase Prices must remain the same for the entire Tariff Term. The Purchase Prices shall not exceed the Procurement Price Cap for any year over the Tariff Term. Purchase Prices must be on a fixed, dollar per megawatt-hour ($/MWh) basis for energy and RECs, subject to the Procurement Price Cap, over the Tariff term. 1.4.2 Proposed Purchase Prices shall not include any Subscriber Savings or On-bill Credit and cannot be conditioned upon or subject to adjustment based upon the availability of the Federal Production Tax Credit or the Federal Investment Tax Credit, or the availability, receipt, or continuation of any other tax treatment or government grant or subsidy. 1.5 QUALIFICATION. To be considered for selection, a Bid must meet all of the requirements set forth in Section 4, (“Bidder Eligibility Requirements”), and adhere to the schedule and other requirements set forth in Section 2, RFP Process. 1.6 EVALUATION AND AWARD CRITERIA. Each Company will base its independent evaluation and award(s) on (i) qualified Bids, (ii) pricing, (iii) Bid Preference as defined by DEEP and approved by PURA if applicable and (iv) compliance with the RFP Process. 1.7 REGULATORY APPROVAL. Any agreement entered into for the purchase of energy and RECs pursuant to this solicitation is contingent upon obtaining Regulatory Approval by PURA as set forth in the Standard Agreement. Pursuant to applicable Connecticut General Statutes and PURA requirements, each Company will submit required information to PURA following the completion of each annual procurement process. If any of the Bids and/or Standard Agreements do not meet the objectives of PURA, PURA may reject the Bid(s) and Standard Agreement(s). Section 12 of the Subscriber Organization Terms and Conditions addresses the possibility that PURA may not approve the Bid(s), and/or Tariff Term Agreement(s), and/or individual awards. 1.8 NATURE OF SOLICITATION. The Companies will evaluate all conforming Bids, and DEEP will evaluate Appendix B for all conforming Bids, however, the Companies make no commitment to any Bidder that it will accept any Bid(s). The Companies reserve the right to discontinue the RFP process at any time for any reason whatsoever. This is a Request for Proposals and not a binding offer to contract. 1.9 STANDARD AGREEMENT. In the event of any inconsistency between the provisions of the Standard Agreement or any other part of this RFP or RFP Process, the provisions of 4 Page 4 of 147
  5. Page 5 of 147

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials the Standard Agreement are controlling. Bidders should review the Standard Agreement thoroughly and submit their Bids based upon the terms and conditions of the Standard Agreement, which will solely govern the transactions between the winning Bidders and their counterparty Company through the term of the resulting Tariffs. 1.10 CONFIDENTIALITY. The receiving Company agrees to treat Bids in a confidential manner and will use reasonable efforts, except as required by law or regulatory authority, not to disclose such information to any third party or use such information for any purpose other than in connection with its evaluation of Bidder’s participation in the solicitation process described herein. Bidders are hereby on notice that, subject to relevant PURA orders, all Bid submissions are subject to regulatory oversight and all Bids submitted by any Bidder may be publicly disclosed within the time periods set forth in such orders, as may any awarded Standard Agreement in its entirety. The Companies suggest that Bidders familiarize themselves with the relevant orders 2, as these regulatory orders may change from time to time. 2 RFP PROCESS. 2.1 SCHEDULE. Attachment 1 hereto provides the schedule for this RFP (“Table 1”). The Companies, at their sole discretion, may modify the schedule at any time. 2.2 BIDDER’S CONFERENCE. 3 The Companies will hold a Bidders Conference to answer questions about the RFP in accordance with the RFP Schedule. The purpose of the Bidders Conference is to provide the opportunity to clarify any aspects of the RFP. Prospective bidders may submit questions about the RFP prior to the Bidders Conference. The Companies will attempt to answer questions submitted prior to and during the Bidders Conference. While the Companies may respond orally to questions posed at the Bidders Conference, only written answers that are provided in response to written questions will be considered official responses. The Companies will post responses to Bidders’ questions on their web sites following the Bidders Conference. Please see Section 6 of this RFP for contact information, including Company websites. 2.3 BID SUBMISSION. 2.3.1 Bid Forms. Each Company will develop and maintain its own form to be used for Bid submission (“Bid Form”). Each Company’s website will contain a link to such Company’s Bid Form and Company-specific instructions for Bid submission. Each Company’s website contains additional forms that Bidders 2 PURA has established Docket No. 19-07-01 for matters pertaining to the SCEF program. 3 The Bidder’s Conference will be held as a Webinar only. 5 Page 5 of 147
  6. Page 6 of 147

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials may be required to complete. Bids are discussed in Sections 2.3.2 and 2.4 below. 2.3.2 Submission of Bids. Bids must be submitted in accordance with the Companyspecific instructions provided on each Company’s website. Bidders must comply with the instructions to ensure that their Bids are complete. In addition to completion of the Bid Form, Bidders must provide a Bid Certification Form, a Connecticut Licensed Professional Engineer Certification Form, and may be required to provide a(n) interconnection application confirmation receipt or other forms as necessary, based on the specifics of the Bid. Bidders must also submit all information filed with each Company, as well as the information requested in Appendix B to DEEP via email at [email removed], copying the relevant Company’s SCEF email address 4, on or before the Bid due date in accordance with the schedule outlined in Attachment 1. These documents are defined and explained in Section 2.4, below. DEEP reserves the right to seek clarifying or additional documentation at any point in the evaluation process as described in the Program Manual. Specific instructions for how to provide these additional documents may vary by Company and are set forth in the Company-specific instructions. TO EVERSOURCE: Bids must be submitted via the Eversource website. This website can be accessed by visiting www.eversource.com/content/ct-c/residential/save-moneyenergy/explore-alternatives/scef-program TO UI: To DEEP: 2.4 Bids must be submitted to UI in accordance with instructions to be provided on the UI website at https://www.uinet.com/web/uinet/suppliers_and_partners/po wer_procurement/rfp-for-scef Bidders must submit all information to DEEP via email at [email removed] BID DETAILS. Bidders must submit their Bids by using the Bid Form, which contains the majority of the information necessary for the Companies to evaluate Bids. Bidders must also submit a complete copy of Appendix B to DEEP. Additional/supplemental information is or may be required to be submitted to the Companies as set forth below. 2.4.1 “Bid Certification Form”. This form is mandatory. Every Bid must be accompanied by an executed Bid Certification Form, which must contain three signatures, one by the Bidder, one by the Subscriber Organization, and one by 4 Eversource SCEF email [email removed]; UI SCEF email [email removed] 6 Page 6 of 147
  7. Page 7 of 147

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials the owner of the Project Site. The Bid Certification Form is an integral part of the Bid, and Bids that do not include a complete and executed Bid Certification Form, including all required signatures, and the appropriate notary, will not be considered. Each Company’s website contains a Bid Certification Form with the Company-specific instructions as to how such form is to be submitted. The Bid Certification Form consists of the following: • Page 1 – Instructions for completion of Pages 2 through 4 • Page 2 – Bidder’s Signature, Commitment and Acceptance: By signing this page of the Certification form, the Bidder or a duly authorized representative of the Bidder is making a number of certifications, including that the information provided in the Bid is complete and accurate, and that the Bidder and the project meet the eligibility requirements set forth in this RFP as discussed in Section 4 below. • Page 3 – Subscriber Organization’s Signature, Commitment and Acceptance: By signing this page of the Certification form, the Subscriber Organization or a duly authorized representative of the Subscriber Organization is making a number of certifications, including that the Subscriber Organization has reviewed the statements and certifications of the Bidder, and that such statements and certifications as applicable to the project Bid are true and accurate to the best of the Subscriber Organization’s knowledge. • Page 4 – Affidavit of Owner of the Project Site’s Notarized Signature, Commitment and Acceptance: The owner of the Project Site must sign this affidavit, which is required to be witnessed by a Notary Public. By signing the affidavit, the owner of the Project Site or a duly authorized representative of the owner of the Project Site is making a number of affirmations and certifications, including that the owner of the Project Site has reviewed the statements and certifications of the Bidder, and that such statements and certifications as applicable to the Project Site are true and accurate to the best of the knowledge of the owner of the Project Site. • Eversource requires that the Bid Certification Form must be attached to the Bid as one single PDF (.pdf) file prior to submission as part of the completed Bid. Both the Bid and Bid Certification Form are submitted at the same time. 7 Page 7 of 147
  8. Page 8 of 147

    The United Illuminating Company Docket No. 26-08-01 • UI Attachment 3 - SCEF Program Materials UI requires that the Bid Certification Form and all other required documents be uploaded on the last page of the online Bid in accordance with UI’s bid form instructions, as posted on UI’s website. The most current form on UI’s website must be used. 2.4.2 “Connecticut Licensed Professional Engineer Certification”. This form is mandatory. Each Bid is required to include a calculation of the Average Annual Production for the Facility by a Connecticut licensed Professional Engineer “certifying” the average annual production for its project, based on the typical facility conditions for an average year (“PE Certification”). The Companies will not provide a form of PE Certification, but any such form must comply with the guidelines in this section and must include project-specific information including but not limited to project size, and a complete Project Site address. For purposes of Section 2.4.2 of this RFP, “certifying”, “certify” and/or “certification” means an expression of professional opinion by a Connecticut licensed Professional Engineer regarding facts or findings that are the subject of the certification and does not constitute an express or implied warranty or guarantee. For all other provisions of this RFP, the terms “certifying”, “certify” and/or “certification” have their typical and customary meanings. The Companies reserve the right to seek additional information related to a PE Certification, and to reject average annual production calculations that are not reasonable in the Companies’ sole judgment and discretion. 2.4.3 Interconnection Application Receipt: This is not required for submission of a Bid in this RFP, however, it may be required in future SCEF procurements. 2.4.4 Appendix B: Submittal to DEEP. This form is mandatory. In addition to any complete Bid submitted to the Electric Distribution Companies (“EDCs”) as part of the application Procurement Plan(s), a Bidder is required to respond to each question in Appendix B. Bidders must submit this information to DEEP via email at [email removed] on or before the Bid due date established by the EDCs in the applicable RFP, as noted in Attachment 1. Following the submission of proposals, DEEP may request clarifications and additional and documents from Bidders at any time during the evaluation process so long as such documents were available before the bid deadline and were not provided due to a clerical or other error that can reasonably be demonstrated, at DEEP’s sole discretion. DEEP will provide all Bidders with a uniform amount of time to respond to any such requests by DEEP. Bidders who do not respond within such timeframe to the information requests or do not provide all required information may be eliminated from further consideration at DEEP’s sole discretion. 8 Page 8 of 147
  9. Page 9 of 147

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials 2.4.4.1 If any Bid does not comply with the requirements established in Appendix B, DEEP will direct the EDCs to remove the Bid from the ranking. 2.4.4.2 DEEP will evaluate the information provided in Appendix B to determine whether the Bidder meets the criteria to qualify for the Bid Preferences as outlined in Section 3.1.5. DEEP, at their sole discretion, will determine which Bid Preference(s) the project qualifies for, and will notify the EDC’s accordingly. Bids that qualify for both the Brownfield and Landfill Bid Preference and the Solar Carports and Solar Canopies Bid Preference will only receive the preference for Solar Carports and Solar Canopies; i.e., Bid Preferences are not additive. The EDCs will then use the Bid Preferences to weight the Bid Price(s) based on the weighting established by DEEP and approved by PURA 5. Bidder will still receive their submitted Bid Price(s) under the Tariff if selected as a winning Bidder. 3 BID EVALUATION. 3.1 The Companies will base their evaluations on pricing, with any ties to be settled through a random selection process. 3.1.1 For winning Bids, upon notification by electronic mail of its selection as a winning Bidder, Bidder agrees that the Pricing component(s) and all other Facility Information of its Bid(s) shall remain binding until a Standard Agreement is fully executed by the respective Company and Bidder. 3.1.2 Each EDC will select Bids with the lowest unit price proposals first, after factoring in any applicable Bid Preferences as determined by DEEP and will continue until the annual budget cap allocated to the EDC is met. If, prior to reaching the budget cap 6 established in the December 17, 2025 Decision issued by the Authority, the next Bid in the queue would mean the total annual budget impact selected would exceed the annual budget cap, the EDC will offer the 5 Pursuant to the Final Decision issued in Docket No. 25-08-04 issued by PURA on December 17, 2025, the Year 7 Bid Preferences are 20% for Brownfields, and Landfills, and 40% for Solar Carports or Canopies. The Solar Canopy, 100% of the generation footprint must be included on the Solar Canopies to be eligible for the 40% bid preference. Further, (1) solar canopy SCEF projects can bid above the price cap to the point where the evaluated price, incorporating the bid preference, does not exceed the price cap, (2) the award price equals the bid price, not the evaluated price, and (3) when bid prices from Program Year 7 are considered for determining price caps for Program Year 8, it will be the evaluated prices, not the award prices, that will be considered. The Solar Carport or Solar Canopies Bid Preference is only available for solar photovoltaic (PV) projects. Additionally, Hybrid Projects solely consisting of Rooftop Projects and Solar Carport or Solar Canopy Projects are eligible for this Bid Preference. Such Bid Preference will be applied as a weighted percentage of the Solar Canopy/Solar Carport capacity relative to the total system capacity. For example, if a 1000 kW Project will consist of a 500 kW Solar Canopy Project and a 500 kW Rooftop Project, the Hybrid Project would be eligible for 50% of the 40% Bid Preference resulting in a 20% Bid Preference. 6 Respective EDC budget values are located in the table in Section 5.1.3. 9 Page 9 of 147
  10. Page 10 of 147

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials remaining available budget to the next Bidder in the queue, at the Purchase Price the Bidder offered in response to the procurement. 7 This process will continue until a Bidder accepts the offer, or until no Bids remain in the queue. 3.1.3 Each Bid will be assigned an average annual budget impact using the Bidder provided estimated average annual production value multiplied by the Bid price. 3.1.4 Bids that are not selected as winning Bids may remain active on “standby”. If one or more Bidders who were selected within a category do not execute the Standard Agreement, the next lowest cost Bid on standby may be offered an award. 3.1.5 As provided in Section IV of the Tariff Terms Agreement, Bidder(s) must provide Development Period Security and Operating Period Security equal to the amounts indicated on the Tariff Terms Agreement. Development Period Security must be provided to the EDC at the time of Bid submission. Operating Period Security must be provided to the EDC no more than thirty (30) days after a SCEF achieves commercial operation. Development Period Security may be converted to Operating Period Security at the Subscriber Organization’s election. These amounts shall be based upon the following formulas: Development Period Security: Project Size in kW (AC) * $25.00 Operating Period Security: Alternative Compliance Payment * fifty (50) percent of the expected average annual production of the facility (in MWh). 3.1.6 Through the information submitted to DEEP in Appendix B, DEEP will determine if any Bid Preferences applicable to the current solicitation apply to the Bid and will notify the EDCs as such. If applicable, the EDCs will use the Bid Preferences to weight the Bid prices based on the weighting established by DEEP. 4 BIDDER ELIGIBILITY REQUIREMENTS. All Bids must meet the following eligibility requirements set forth below. Specifically, Bids will be considered from a Qualified Bidder with respect to RECs and energy created or to be created from an Eligible Facility. Failure to 7 For purposes of clarification, if the Company has $5,000,000 to award, and has awarded $4,800,000, the Company is left with $200,000 of annual budget. If the next lowest priced Bid in the queue is for a project with an estimated annual budget impact of $400,000, that project will be offered only the remaining capacity corresponding to a $200,000 estimated annual budget impact at their submitted Bid price. Estimated budget impact shall be calculated in accordance with section 3.1.3. 10 Page 10 of 147

Text of 2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdf

Extracted from the file · 203 pages · 522,519 characters

Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf

Extracted from the file · 2 pages · 6,256 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf

Extracted from the file · 2 pages · 3,261 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf

Extracted from the file · 1 page · 528 characters

Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf

Extracted from the file · 2 pages · 4,800 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)

This filing on the current system (opens in a new tab)