Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

5. Annual Compliance Filings – Additional Filings (Program Materials)

Compliance filingFiled by Avangrid13 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files13

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages
Words on different pages
  1. Page 15 of 147

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials Parcel of land that was not subdivided before January 1 of the year of the solicitation to which the Bidder is responding, or for which a subdivision was not recorded with the municipality in which such Parcel is located prior to January 1 of the year of the solicitation, only the lowest priced Bid will be eligible, and all other Bids will be disqualified. At the time of bidding, the Bidder offering multiple Bids at a Parcel must demonstrate such recording with the municipality to the appropriate EDC. 5.2.12 If an existing SCEF through PA 18-50, PA 19-35 or PA 22-14 or the pilot program, LREC/ZREC, or NRES or SCEF tariff project is present at the Project Site and uses the same technology, the existing project must be in-service before any additional Bids are eligible for selection under this Program. There are two exceptions to this requirement. The first is for a previously awarded project selected more than three (3) calendar years prior to submission of a Bid under this Program. The second is for projects issued a partial award in a previous SCEF solicitation. In such circumstances, a project will be eligible to submit a project bid up to five (5) MW minus the amount the project was awarded in the previous Tariff Terms Agreement. 5.2.13 A Shared Clean Energy Facility for a Selected Bid shall have three (3) calendar years from the date of PURA approval of the Tariff award to receive an InService Date from the EDC. If the Approval to Energize letter is not issued by such date, the EDC’s twenty-year purchase commitment will immediately and automatically terminate. No EDC-issued extensions will be granted to the three(3) year deadline for achieving the In-Service Date with the exception of extensions granted by either PURA or the SCEF ombudsperson as applicable. Extension requests shall be granted in proportion to the delay experienced and/or the amount of time that is needed, up to one year, to complete the project. A Shared Clean Energy Facility shall be eligible for an extension to the three (3) year deadline if at least one of the following five criteria are met: (1) the generation facility or project is unique and more complex than ordinary customer-sided distributed generation installation projects, such as having additional technology-specific regulatory or local siting requirements; (2) the project developer has worked diligently and in good faith in developing the project since inception; (3) the project is near completion or likely to begin commercial operation within the requested extended deadline; (4) a significant portion of the total project investment has already been made and would potentially be stranded if the contract is terminated; and/or (5) the interconnection process extended beyond the utilities’ initial estimates and/or significantly (e.g., one month) beyond the average interconnection process timeline. Any Shared Clean Energy Facility pursuing an extension request that does not meet at least one of the five criteria established shall be subject to a case-by-case review from the Program’s ombudsperson. 15 Page 15 of 147
  2. Page 16 of 147

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials 5.2.14 A SCEF that does not achieve its In-Service Date on a timely basis and has its purchase commitment terminated three (3) calendar years after PURA approval of the Tariff award, or any SCEF that becomes ineligible for the Tariff due to a Bidder event of default, may be re-offered into any solicitation for which bidding occurs one (1) calendar years after the date of termination of the purchase commitment. 5.2.15 A Shared Clean Energy Facility and its associated interconnection route cannot be located, in whole or in part, on Core Forest. The Bidder must demonstrate that locating the Shared Clean Energy Facility at the generation site will not significantly affect any endangered, threatened and special concern species, or significant natural communities based on DEEP’s Natural Diversity Data Base. This shall be provided to DEEP consistent with Appendix B. 5.2.16 Any solar photovoltaic Bidder must submit to DEEP on or before the Bid due date/time, documentation consistent with Appendix B that proves the generation site and interconnection route are not located along ridgelines or within ridgeline setback areas (as defined in Section 8-1aa of the General Statutes). A Bid for any solar project must include a commitment to pay for the relevant Connecticut Soil and Water Conservation District to perform site inspections on behalf of DEEP. 6 CODE OF CONDUCT/COMMUNICATIONS. 6.1 The evaluation of this RFP will be conducted in a manner to assure all Bidders are treated in a fair and consistent manner. The evaluation criteria and timing of the bidding process will be the same for all Bidders. 6.2 Bidder Questions: 6.2.1 6.2.2 The Companies will be available throughout this RFP process to receive questions. Such questions should be submitted directly to the program administrators at the following addresses and in accordance with the RFP Schedule (see Attachment 1, Table 1): Eversource: [email removed] UI: [email removed] Responses to written questions from Bidders may be posted in a blind Question and Response format on: 16 Page 16 of 147
  3. Page 17 of 147

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials Eversource: UI: 6.3 www.eversource.com/content/ct-c/residential/savemoney-energy/explore-alternatives/scef-program https://www.uinet.com/web/uinet/suppliers_and_partn ers/power_procurement/rfp-for-scef Each of the Companies adheres strictly to a Code of Conduct for affiliate transactions promulgated by the PURA. 17 Page 17 of 147
  4. Page 18 of 147

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials Page 18 of 147 Attachment 1 TABLE 1 – RFP Schedule* ACTION ITEM DATE Release of RFP January 21, 2026 Bidders Conference – Webinar Only On or about January 28, 2026 Deadline for Submission of Questions On or about February 4, 2026 Bid Forms Due March 4, 2026 by 1:00 p.m. (Eastern Prevailing Time “EPT”), at which time the Pricing shall become firm, irrevocable and binding. Selection and Notification of Winning Bidders On or about April 22, 2026 Tariff Terms Agreement Execution After Selection and Notification of Winning Bidders. Bidders will have to return partially executed Tariff Terms Agreements by the due date established by the Companies which is expected to be approximately 10 businesses days after selection and notification of winning bidders. Subsequent Rounds of Selection and Notification of Winning Bidders Approximately 5 business days after Tariff Terms Agreement Execution date (date on which executed Tariff Terms Agreement is due to the EDC for each round of selection). After each Tariff Terms Agreement Execution Date, each EDC will re-evaluate its available annual budget caps and reallocate to the next project(s) in the queue as necessary and notify selected Bidders accordingly. This process will continue until the earlier of 1) all available annual budget is allocated, or 2) May 1, to allow enough time for the EDCs to submit selected bids by July 1. Tariff Terms Agreement(s) Filed with PURA for review and approval Within two weeks following the completion of the annual Procurement process. Commencement of Service In accordance with Tariff Terms Agreements * Pursuant to Section 2.1 of the RFP, Schedule, the Companies, at their sole discretion, may modify the schedule at any time. 18
  5. Page 19 of 147

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials Appendix B: Submittal to DEEP [Link to be updated once Year 7 Appendix B is live on DEEP’s website] In addition to any complete Bid submitted to the EDCs as part of the application Procurement Plan(s), a Bidder is required to respond to each question in Appendix B [Link to be updated once Year 7 Appendix B is live on DEEP’s website]. Bidders must submit this information to DEEP at [email removed] on the Bid due date established by the EDCs in the applicable procurement. 19 Page 19 of 147
  6. Page 20 of 147

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials Page 20 of 147 Connecticut General Statutes §16-244z STATEWIDE SHARED CLEAN ENERGY FACILITY PROGRAM YEAR 7 PROGRAM MANUAL 1. BACKGROUND This Program Manual was initially developed by the Department of Energy and Environmental Protection ("DEEP"), and modified by the Connecticut Light and Power Company (“CL&P) and the United Illuminating Company (“UI”), together the Companies, and approved by the Public Utilities Regulatory Authority (“PURA”), for the Shared Clean Energy Facilities ("SCEF") program ("Program") consistent with Section 7 of Public Act 18-50, An Act Concerning Connecticut’s Energy Future, Section 3 of Public Act 19-35, An Act Concerning a Green Economy and Environmental Protection, Section 1 of Public Act 22-14, An Act Concerning Clean Energy Tariff Programs, Section 25 of Public Act 23-102, An Act Strengthening Protections for Connecticut’s Consumers of Energy, and Section 9 of Public Act 25-173, An Act Concerning Energy Affordability, Access, and Accountability ("the Acts") as codified in §16-244z of the Connecticut General Statutes. 2. DEFINITIONS The following definitions are applicable to the Program Manual and conform with §§ 16-244z(a) and 16-244x of the Connecticut General Statutes (“General Statutes”). “Acts” shall mean Connecticut Public Act 18-50, An Act Concerning Connecticut’s Energy Future, Public Act 19-35, An Act Concerning a Green Economy and Environmental Protection, Public Act 22-14, An Act Concerning Clean Energy Tariff Programs, Public Act 23-102, An Act Strengthening Protections for Connecticut’s Consumers of Energy, and Public Act 25-173, An Act Concerning Energy Affordability, Access, and Accountability. "Alternative Compliance Payment" or "ACP" means the compliance rate for failure to meet the renewable portfolio standards specified in Section 16-244c of the General Statutes or any similar compliance rate established; "Bid" means a responsive submission by a Bidder to the procurement under this Program; 1
  7. Page 21 of 147

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials Page 21 of 147 “Bid Certification Form” means a mandatory form which must accompany every Bid. The Bid Certification Form must contain three signatures, one by the Bidder (defined below), one by the Subscriber Organization (defined below), and one by the owner of the project site. The Bid Certification Form is an integral part of the Bid, and Bids that do not include a complete and executed Bid Certification Form, including all required signatures, and the appropriate notary will not be considered. Each Electric Distribution Company’s website contains a Bid Certification Form with the Electric Distribution Company-specific instructions as to how such form is to be submitted; “Bid Form” means the form each Electric Distribution Company (“EDC”) developed and maintain to be used for Bid submission. Each EDC website contains a link to the appropriate Bid Form for each EDC and EDCspecific instructions for Bid submission. Each EDC website also contains additional forms that Bidders may be required to complete; "Bid Preferences" means preferred policy criteria established by DEEP and approved by PURA to apply in the next procurement process under this Program, see Appendix B for definitions; "Bidder" means an entity that submits a Bid for a Subscriber Organization and the development and operation of the SCEF consistent with the requirements of this Program; “Brownfield” means a site that is either: (1) an address that is included on the Connecticut Brownfields Inventory maintained by DEEP and an attestation that such site has not achieved regulatory closure in the form of either a verification report from a licensed environmental professional or from DEEP; or (2) an address with a Phase 2 Environmental Site Assessment from a licensed environmental professional identifying that the site is contaminated with pollutants, unless such pollutants are present solely because soil at such address has been historically intermixed with coal ash, wood ash, coal fragments, coal slag, coal clinkers, asphalt paving fragments, or any combination thereof. For both (1) and (2), the Bidder must demonstrate, to DEEP’s sole satisfaction, the site is either abandoned or underutilized because of such contamination; “Core Forest” means unfragmented forest land of at least two hundred and fifty (250) acres that is three hundred (300) feet or greater from the boundary between forested land and non-forested land; "Delivery," "Deliver," "Delivered," or "Delivering" means with respect to (i) energy, that energy produced by a Shared Clean Energy Facility that is injected into the electric distribution system within the service territory 2
  8. Page 22 of 147

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials Page 22 of 147 of the receiving EDC for the benefit of such EDC, and (ii) RECs, those RECs associated with the delivered energy of the Shared Clean Energy Facility as a Connecticut Class I Renewable Energy Source 1; "DEEP" means the Connecticut Department of Energy and Environmental Protection; "Development Period Security" means collateral in the form of cash, which shall be provided by the Subscriber Organization to the EDC during the development of the SCEF; "Electric Distribution Company" or "EDC" has the same meaning as provided in Section 16-1 of the General Statutes; “Environmental Attributes” shall mean each of the following that exists under the laws and regulations of the state of Connecticut, or under any other international, federal, regional, state or other law, rule or regulation as of the Effective Date or may come into existence during the twenty-year term of the purchase commitment applicable to the selected Project: (i) GIS Certificates, (ii) credits, benefits, reductions, offsets and other beneficial allowances, including, to the extent applicable and without limitation, performance based incentives or renewable portfolio standard in the state in which the Project is located or in other jurisdictions (collectively, “Allowances”) attributable to the ownership or operation of the Project or the production or sale of Energy that avoids the emission of carbon into the air, soil or water, (iii) other Allowances howsoever named or referred to, with respect to any and all fuel, emissions, air quality, or other environmental characteristics, resulting from the production of electric generation or the production or sale of Energy that avoids the emission of carbon into the air, soil or water and in which Seller has good and valid title, including any credits to be evidenced by Renewable Energy Certificates or similar laws or regulations applicable in any jurisdiction as such may be amended during the term of the Tariff applicable to the selected Project, (iv) any such Allowances related to (A) oxides of carbon or (B) the United Nations Framework Convention on Climate Change (the “UNFCCC”) or the Kyoto Protocol to the UNFCCC or crediting “early action” with a view thereto, or involving or administered by the Clear Air Markets Division of the United States Environmental Protection Agency or any successor or other agency that is given jurisdiction over a Program involving transferability of specific Environmental Attributes, and (v) all reporting rights with respect to such allowances under Section 1605(b) of the Energy Policy Act of 1992, as amended from time to time or any successor statute, or any other current or future international, federal, state or local law, regulation or bill, or otherwise; “Environmental Justice Community” means (A) a United States census block group, as determined in accordance with the most recent United States census, for which thirty (30) per cent or more of the Consistent with the SCEF Program Manual, as specified in Section 3.4.1, the EDCs will obtain the CT Class I RPS qualification and will report the generation output to the NEPOOL GIS for creation of the RECs into EDC administered batches or tranches. 1 3
  9. Page 23 of 147

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials Page 23 of 147 population consists of low income persons who are not institutionalized and have an income below two hundred (200) per cent of the federal poverty level, or (B) a distressed municipality, as defined in subsection (b) of section 32-9p of the General Statutes; “Generation Footprint” means the land area occupied by the generation unit(s). For solar projects the “Generation Footprint” shall mean the land area occupied by the solar panels and the associated interrow spacing; “Hybrid Project” shall mean Projects that include those which are split between rooftops, ground-mounted systems, Solar Carports, and/or Solar Canopies. “Individual Billing Meter” is defined by Section 16-244x of the General Statutes as “an individual electric meter or a set of electric meters, when such meters are combined for billing purposes, within the service territory of the subscriber's electric distribution company.” Unmetered, temporary and seasonal electric accounts are ineligible to participate in the SCEF program. “In-Service Date” shall mean the Approval to Energize date listed on the EDC issued Approval to Energize letter to the System Owner; “Landfill” means any property that is listed on the Closed Landfills list, though this list is not intended to be exhaustive or an acknowledgement of ideal properties for renewable energy development. Only the closed, capped portion of the property is considered a “Landfill” for bid preference purposes; "LMI" means Low-income Customers and Moderate-income Customers; "Low-income Customer" means an in-state retail end user of an EDC (i) whose income does not exceed sixty per cent of the state median income, adjusted for family size, or (ii) that is an affordable housing facility; "Low-income Service Organization" means a for-profit or nonprofit organization that provides service or assistance to low-income individuals; "Market Price" means the hourly real-time Locational Marginal Price (as defined in the ISO-NE Tariff) for energy at the pricing node plus fifty (50) percent of the ACP for Prepaid RECs; "Maximum Hourly Purchase Amount" means the maximum quantity, in megawatt hours ("MWh") per hour, payable at the Purchase Price for any hour. This quantity will be the proposed nameplate capacity of the Shared Clean Energy Facility; "Moderate-income Customer" means an in-state retail end user of an EDC whose income is between sixty (60) percent and one hundred (100) percent of the state median income as defined by the United States Department of Housing and Urban Development, adjusted for family size; 4
  10. Page 24 of 147

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials Page 24 of 147 “Non-Residential Renewable Energy Solutions Program” or “NRES” means the Non-Residential Renewable Energy Solutions Program established pursuant to Public Acts 18-50, 19-35, 22-14, and 23-102; “Ombudsperson” shall mean an independent consultant directed by PURA to efficiently resolve disputes and with the electric distribution companies (EDCs) and review and approve extension requests beyond the three year in-service time period. "On-bill Credit" means a monetized credit equal to the Subscriber Savings Rate times the production allocated to the Subscriber for each month by the EDC and reflected on the Subscriber's monthly bill from the EDC; "Operating Period Security" means collateral in the form of cash which shall be provided by the Subscriber Organization to the EDC during the operation of the SCEF; “Parcel” means the clearly defined property boundaries registered with the local municipality before January 1 of the year of the solicitation; "Payment" means an amount paid by the EDC to the Subscriber Organization to purchase the output of the SCEF as a direct payment from the EDC to the Subscriber Organization; "Prepaid RECs" means RECs expected to be created in the future that are associated with Delivered Energy and paid for at the time of payment for Delivered Energy as part of the Purchase Price or Market Price, as applicable; “Prime Farmland” means as defined in 7 CFR 657, as amended. "Procurement Price Cap" means the maximum Purchase Price allowed as part of a Bid in any given solicitation year, as established by DEEP and approved by PURA; "Program" means the Shared Clean Energy Facilities program developed by DEEP and modified and approved by PURA pursuant to the Acts; "PURA" means the Public Utilities Regulatory Authority; “Project Site” means the Generation Footprint and any other acreage where activity and discharges occur that are associated with construction of the generation unit(s) and any associated structures, including, but not limited to, perimeter fencing, or where preparation for construction, including, but not limited to, clearing, grubbing, pile driving, soil disturbance, soil compaction by construction equipment, staging and stockpiling, cleaning and washout, grading, excavation, and dewatering occurs. "Purchase Price" means the price, as selected in the procurement and approved by PURA, to be applied to Delivered Energy and Prepaid RECs; 5

Text of 2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdf

Extracted from the file · 203 pages · 522,519 characters

Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf

Extracted from the file · 2 pages · 6,256 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf

Extracted from the file · 2 pages · 3,261 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf

Extracted from the file · 1 page · 528 characters

Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf

Extracted from the file · 2 pages · 4,800 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)

This filing on the current system (opens in a new tab)