Compliance Filing, Order No. 1
5. Annual Compliance Filings – Additional Filings (Program Materials)
Files13
2026-11-16 UI Cover Letter 5. Annual Compliance Filings – Additional Filings (Program Materials) #26-08-01.pdf
PDF · 221 KB · 3 pagesText searchable
Download 2026-11-16 UI Cover Letter 5. Annual Compliance Filings – Additional Filings (Program Materials) #26-08-01.pdfRead the text of 2026-11-16 UI Cover Letter 5. Annual Compliance Filings – Additional Filings (Program Materials) #26-08-01.pdf
2026-11-16 UI Attachment 1 - Residential Renewable Energy Solutions Program Manual #26-08-01.pdf
PDF · 763 KB · 59 pagesText searchable
Download 2026-11-16 UI Attachment 1 - Residential Renewable Energy Solutions Program Manual #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 1 - Residential Renewable Energy Solutions Program Manual #26-08-01.pdf
2026-11-16 UI Attachment 2 - Non-Residential Renewable Energy Solutions Program Materials #26-08-01.pdf
PDF · 1.7 MB · 100 pagesText searchable
Download 2026-11-16 UI Attachment 2 - Non-Residential Renewable Energy Solutions Program Materials #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 2 - Non-Residential Renewable Energy Solutions Program Materials #26-08-01.pdf
2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdf
PDF · 2.9 MB · 147 pagesText searchable
Download 2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdf
2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdf
PDF · 4.4 MB · 203 pagesText searchable
Download 2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdf
2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf
PDF · 115 KB · 2 pagesText searchable
Download 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf
2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf
PDF · 159 KB · 2 pagesText searchable
Download 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf
2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx
Excel · 100 KBText searchable
Download 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsxRead the text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx
2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx
Excel · 272 KBText searchable
Download 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsxRead the text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx
2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx
Excel · 3.5 MBText searchable
Download 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsxRead the text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx
2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf
PDF · 144 KB · 1 pageText searchable
Download 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf
2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx
Excel · 71 KBText searchable
Download 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsxRead the text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx
2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf
PDF · 152 KB · 2 pagesText searchable
Download 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf
Page 91 of 147
The United Illuminating Company Docket No. 26-08-01 19.5 UI Attachment 3 - SCEF Program Materials Page 91 of 147 deadline, location(s) for meeting(s), or procedure outlined herein. The procedure specified herein shall be the sole and exclusive procedure for the resolution of Disputes. Waiver of Jury Trial. EACH PARTY WAIVES TO THE FULLEST EXTENT PERMITTED BY APPLICABLE LAW, ANY RIGHT IT MAY HAVE TO A TRIAL BY JURY IN RESPECT OF ANY SUIT, ACTION OR PROCEEDING ARISING OUT OF, RESULTING FROM OR IN ANY WAY RELATING TO THIS AGREEMENT. 20. Miscellaneous 20.1 20.2 20.3 20.4 20.5 20.6 20.7 Records. The parties shall keep (or as necessary cause to be kept by their respective agents) for a period of at least (6) years such records as may be needed to afford a clear history of all deliveries of Payments, Credits, energy and RECs pursuant to the Tariff. For any matters in dispute, the Parties shall keep the records until the dispute is resolved. Audit Rights. The EDC and the Subscriber Organization have the right throughout the Tariff term and for a period of six (6) years following the end of the Term, upon reasonable prior notice, to audit copies of relevant portions of the books and records of the other party to the limited extent necessary to verify the basis for any claim by a party for payment from the other party or to determine a party’s compliance with the terms of the Tariff. The party requesting the audit shall pay the other party’s reasonable costs allocable to such audit. Accounting Information. Subscriber Organization shall provide to EDC, and in a timely fashion following its request, reasonably requested information that EDC requires for its accounting analysis or Securities and Exchange Commission reporting purposes. EDC agrees to treat any information that includes confidential information with the same degree of care that it accords its own confidential information. Amendment/Binding Effect. This Tariff may not be amended, changed, modified, or altered unless such amendment, change, modification, or alteration is in writing and signed by both of the Parties to this Tariff and, with respect to amendments only, receive Regulatory Approval. This Tariff shall inure to the benefit of and shall be binding upon the Parties and their respective successors and permitted assigns. Site Access. The EDC and its representatives shall have the right, but not the obligation, during business hours, upon reasonable notice to the Subscriber Organization, to visit and view the Facility site, including but not limited to, for the purpose of verifying compliance with the Facility’s description provided in the Tariff Terms Agreement, and final Facility size as of its In-Service Date. The EDC and the Subscriber Organization agree that it shall constitute a material breach by the Subscriber Organization to deny the EDC reasonable access to the site and the Facility and that such material breach shall constitute an Event of Default by the Subscriber Organization under Section 14. Severability. If any section, phrase or portion of these Terms and Conditions is for any reason, held or adjudged to be invalid, illegal or unenforceable by any court of competent jurisdiction such section, phrase or portion so adjudged will be deemed separate, severable and independent and the remainder of these Terms and Conditions shall remain in full force and effect and shall not be invalidated or rendered illegal or unenforceable or otherwise affected by such adjudication, provided that the basic purpose of these Terms and Conditions and the benefits and rights of the EDC and Subscriber Organization or Subscribers are not substantially impaired. Waiver. No delay or omission by a Party in the exercise of any right under this Tariff shall be taken, construed or considered as a waiver or relinquishment thereof, and any such right may be exercised from time to time and as often as may be deemed expedient. If any of the terms and conditions hereof Page 20 of 21Page 92 of 147
The United Illuminating Company Docket No. 26-08-01 20.8 20.9 20.10 20.11 20.12 20.13 UI Attachment 3 - SCEF Program Materials Page 92 of 147 are breached and thereafter waived by a Party, such waiver shall be limited to the particular breach so waived and is not deemed to waive any other breach hereunder. Governing Law; Venue; Waiver of Jury Trial. This Tariff and the rights and duties of the Parties hereunder shall be governed by and shall be construed, enforced and performed in accordance with the laws of the State of Connecticut, without regard to principles of conflicts of law. Parties waive the right to a trial by jury. Any dispute arising out of this Tariff shall be governed by Section 19 of this Tariff. Headings. The section titles in this Tariff are only for purposes of convenience and do not form a part of this Tariff and will not be taken to qualify, explain or affect any provision thereof. Indemnification. Each Party agrees to indemnify, defend and hold harmless the other Party, and any of said other Party’s Affiliates, directors, officers, employees, agents and permitted assigns, from and against all third party claims, losses, injuries, liabilities, damages, judgments, awards, fines, penalties, costs and expenses (including reasonable attorneys’ fees and disbursements) incurred in connection with, arising out of, or alleged to arise out of any event or circumstance first occurring or existing during the period when control and title to the Products is vested in such Party or which is in any manner connected with the performance of this Tariff by such Party, except to the extent that such Claim may be attributable to the gross negligence or willful misconduct of the Party seeking to be indemnified. This indemnity shall survive the expiration or termination of this Tariff for the full statutory period allowable by applicable law. No Third Party Beneficiaries. Nothing herein is intended to or should be construed to create any rights of any kind whatsoever in third persons not parties to this Tariff. Counterparts; Transmittal. This Tariff may be executed in several counterparts, each of which is an original and all of which constitute one and the same instrument. Facsimile or electronic transmission of this Tariff shall constitute good and valid delivery. Disputes. Any dispute arising out of these Terms and Conditions shall be governed by the Dispute Resolution provision herein. Page 21 of 21Page 93 of 147
The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials SHARED CLEAN ENERGY FACILITY (SCEF) PROGRAM YEAR 7 APPENDIX B: SUBMITTAL TO DEEP INSTRUCTIONS In addition to any complete Bid submitted to the electric distribution companies (EDCs) in response to the Request for Proposals (RFP) for Year 7 of the Shared Clean Energy Facility (SCEF) Program, Bidders must submit a complete Appendix B submission to the Department of Energy and Environmental Protection (DEEP). Bidders must provide written responses to all questions in sections B1-B6, below, and provide the necessary affidavits and forms. Bidders must use the affidavits and forms provided as Attachments herein. Complete Appendix B submissions must include: I. Responses to all questions in sections B1-B6, below, with all supporting information requested in both the main question and any question subparts. Each question must be answered in its entirety. If supplemental material is required in the form of an appendix, exhibit, table, map, or other documents, Bidders must provide each supplemental material directly below the applicable question or provide a link directly to that supplemental material. If any section or question is not applicable, this should be clearly stated with a full explanation as to why that section or question is not applicable. Do not skip any section or question. II. Attachment 1: An affidavit attesting to the Bidder’s control of the Project Site by the Bidder (Affidavit #1) III. Attachment 2: An affidavit attesting to the Bidder’s control of the Project Site by the owner of the Project Site (Affidavit #2) (required only if the Bidder is not the owner of the Project Site) IV. Attachment 3: An affidavit attesting the veracity of statements made to DEEP (Affidavit #3) V. Attachment 4: An Applicant Compliance Information form Bidders must submit their complete Appendix B submission to DEEP at [email removed] on or before the Bid due date established by the EDCs in the SCEF RFP for Year 7. DEEP reserves the right to seek clarifying or additional information and documents at any point in the evaluation process at its sole discretion as described in Section 3.4 of the SCEF Program Manual approved for Year 7 of the SCEF Program in Docket No. 25-08-04. Page 93 of 147Page 94 of 147
The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials Further, by submitting an Appendix B response to DEEP, Bidder consents to DEEP sharing such responses with the Department of Agriculture as necessary to assist DEEP in its evaluation of Appendix B responses. Page 94 of 147Page 95 of 147
The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials FREEDOM OF INFORMATION ACT All information submitted to DEEP may be subject to disclosure under the Connecticut Freedom of Information Act (FOIA). All information submitted to DEEP will be publicly posted on its Energy Filings page, unless a Bidder claims confidentiality over portions of information submitted in response to Appendix B. When a Bidder submits confidential information to DEEP, the Bidder acknowledges that the FOIA governs the public’s accessibility to that information. If a Bidder believes portions of information submitted in response to Appendix B are exempt from FOIA disclosure, the Bidder must submit: One complete, redacted response to Appendix B for public posting, which must be clearly labeled PUBLIC, AND One complete, unredacted response to Appendix B for DEEP’s internal review, which must be clearly labeled CONFIDENTIAL. The Bidder must also specifically identify which FOIA exemption may be applicable to the specific information claimed confidential. Examples of FOIA exemptions include, but are not limited to: Trade secrets, § 1‐210(b)(5)(A) of the General Statutes of Connecticut (C.G.S.); Commercial and Financial information given in confidence, not required by statute, C.G.S. § 1‐ 210(b)(5)(B); Responses to any request for proposals or bid solicitation issued by a public agency or any record or file made by a public agency in connection with the contract award process, until such contract is executed or negotiations for the award of such contract have ended, whichever occurs earlier provided the chief executive officer of such public agency certifies that the public interest in the disclosure of such responses, record or file is outweighed by the public interest in the confidentiality of such responses, record or file, C.G.S. § 1‐210(b)(24); and Public records exempt under federal law or state statute, C.G.S. § 1‐210(a). In addition, Bidders must submit a detailed explanation of why the relevant FOIA exemption is applicable to the specific information requested to be redacted. A unique explanation is required for each response to a question in which a Bidder wishes to redact Page 95 of 147Page 96 of 147
The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials information; a blanket justification is prohibited. Failure to provide such explanation will lead to a disqualification of the project for failure to comply with Appendix B. DEEP will not redact proposals submitted on behalf of Bidders. Only legitimate non‐public proprietary or sensitive information may be considered confidential. Bidders may not submit a response to Appendix B that is entirely redacted. If the redaction is challenged in any forum, it is the responsibility of the Bidder to defend the confidentiality of the information. If a Bidder is not claiming any FOIA exemptions and is not providing a redacted, confidential version of their responses to Appendix B, please confirm in your email submission of Appendix B that you understand your Appendix B response will be made public when you send it to DEEP. Page 96 of 147Page 97 of 147
The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials DEFINITIONS “Brownfield” means a site that is either: (1) an address that is included on the Connecticut Brownfields Inventory maintained by DEEP and an attestation that such site has not achieved regulatory closure in the form of either a verification report from a licensed environmental professional or from DEEP; or (2) an address with a Phase 2 Environmental Site Assessment from a licensed environmental professional identifying that the site is contaminated with pollutants, unless such pollutants are present solely because soil at such address has been historically intermixed with coal ash, wood ash, coal fragments, coal slag, coal clinkers, asphalt paving fragments, or any combination thereof. For both (1) and (2), the Bidder must demonstrate, to DEEP’s sole satisfaction, the site is either abandoned or underutilized because of such contamination. “Core Forest” means unfragmented forested land of at least two hundred and fifty (250) acres that is three hundred (300) feet or greater from the boundary between forested land and nonforested land. “Environmental Justice Community” means the same as C.G.S. 22a-20a: “(A) a United States census block group, as determined in accordance with the most recent United States census, for which thirty per cent or more of the population consists of low income persons who are not institutionalized and have an income below two hundred per cent of the federal poverty level, or (B) a distressed municipality, as defined in subsection (b) of section 32-9p.” DEEP maintains a publicly accessible map of Environmental Justice Communities. “Generation Footprint” means the land area occupied by the generation unit(s). For solar projects the “Generation Footprint” shall mean the land area occupied by the solar panels and the associated inter-row spacing. “Hybrid Project” shall mean Projects that include those which are split between rooftops and ground-mounted systems, including carports and solar canopies. “Prime Farmland” shall have the same meaning as in 7 CFR 657, as amended. “Landfill” means any property that is listed on the Closed Landfills list, though this list is not intended to be exhaustive or an acknowledgement of ideal properties for renewable energy development. Only the closed, capped portion of the property is considered a “Landfill” for bid preference purposes. Page 97 of 147Page 98 of 147
The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials “Project Site” means the Generation Footprint and any other acreage where activity and discharges occur that are associated with construction of the generation unit(s) and any associated structures, including, but not limited to, perimeter fencing, or where preparation for construction, including, but not limited to, clearing, grubbing, pile driving, soil disturbance, soil compaction by construction equipment, staging and stockpiling, cleaning and washout, grading, excavation, and dewatering occurs. “Solar Canopy” “Solar Canopies” or “Solar Carport” means a solar generation Project where the alternating current (AC) Nameplate Capacity of a Project used for generating power is installed above a permeable and/or nonpermeable existing or new parking/driving area, pedestrian walkway, courtyard, canal, or other utilized surface that requires shade, which is installed in a manner that maintains the function of the area beneath the structure and continues to be used or available for use for such purposes for the term of Program participation. Page 98 of 147Page 99 of 147
The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials APPENDIX B QUESTIONS B1. PROJECT OVERVIEW B1.1. Provide an overview of the proposed project, including but not limited to: i. Resource type ii. Project size in kW (AC) iii. Project size in kW (DC) iv. Location of Project Site, specifically: a. Municipality b. Census tract number c. Approximate address v. State whether the proposed project is located in an Environmental Justice Community vi. State whether the proposed project site is located, in whole or in part, on Prime Farmland vii. Estimated average annual output viii. Bid price/kWh B1.2. Identify whether the proposal is claiming a qualitative bid preference, and if so, which qualitative bid preference. If claiming a qualitative bid preference, provide documentation and evidence supporting your claim for the qualitative bid preference. B1.3 Confirm the bid complies with Public Act 25-173’s requirement that SCEF projects “emit no pollutants.” B2. FINANCIAL EXPERIENCE B2.1. Provide the following cost estimates for developing and operating the project for the duration of the program term: i. Estimated equipment costs; ii. Estimated labor and other installation costs; Page 99 of 147Page 100 of 147
The United Illuminating Company Docket No. 26-08-01 UI Attachment 3 - SCEF Program Materials iii. Estimated land and/or Project Site development costs. If the Project Site is located on a brownfield, landfill, or the Generation Footprint is on a canopy, provide an estimated premium paid, broken out from the estimated standard development costs, for purchasing and/or developing on the landfill, brownfield, or canopy, including but not limited to compliance costs; iv. Estimated interconnection costs; v. Estimated financing costs; vi. Estimated permitting costs; vii. Estimated operations and maintenance costs for the duration of the commercial operation of the facility; viii. Estimated cost of any decommissioning bond, if required by Public Act 23-163 or other legislation; and ix. Other estimated expenses associated with development and operation of the project not otherwise reflected above, including an explanation of such other costs. B3. PROJECT SITE B3.1. Provide a single site plan with the following all on one map: i. Scale ii. North arrow iii. Parcel(s) boundary iv. Legend v. Generation footprint overlay vi. Road names vii. Anticipated interconnection route viii. USGS Topo map with project site outline ix. Acreage of the generation footprint Page 100 of 147
Text of 2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdf
Extracted from the file · 203 pages · 522,519 characters
Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf
Extracted from the file · 2 pages · 6,256 characters
Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf
Extracted from the file · 2 pages · 3,261 characters
Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf
Extracted from the file · 1 page · 528 characters
Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf
Extracted from the file · 2 pages · 4,800 characters
As listed on the current system
Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)