Compliance Filing, Order No. 1

5. Annual Compliance Filings – Additional Filings (Program Materials)

Compliance filingFiled by Avangrid13 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files13

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of 2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdf

Extracted from the file · 147 pages · 342,741 characters

8 pages match
  1. Page 141 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 141 of 203 Table 3-6. Indication of Participation in the ISO-NE FCM for C&I Participants Upfront Incentive Received Qualified & Expected to Bid Qualified & Not Bidding Not Qualified Percentage by Expected Installed Capacity (MW) Percentage by Number of Participants 28% 19% 16% 13% 56% 67% Note: This table includes all approved and completed C&I projects, whether or not they qualified to retain capacity rights. “Not Qualified” capacity and participant figures include systems that either failed to meet the eligibility criteria prior to 2023 or were enrolled in 2023 or later. The hybrid project, which does not qualify to retain its capacity rights and is detailed further in Section 3.1.5, has been allocated with 52% of its capacity classified under C&I, as directed by the Green Bank. It accounts for one participant under the C&I category. Source: CES analysis of Connecticut Green Bank program tracking data through June 30, 2026. The table below shows counts of applications by project stage, including pipeline applications (application has been submitted but not completed) and cancelled applications. Reasons for cancellations include projects failing to meet eligibility criteria and project sponsors choosing to no longer pursue the project. Residential cancellation rates (as measured by count of canceled applications divided by total count of all statuses included in the table) remain relatively steady. Commercial cancellation rates have increased considerably, however: of the 151 commercial applications (including approved or completed) in the table, 77 (51%) are cancellations; this is up from 25% in last year’s report. This is particularly concerning given that the number of approved or completed commercial projects is unchanged since last year, and the number of pipeline or submitted but not completed commercial projects is down from 11 to 2. 24 | P a g e
  2. Page 142 of 203Match

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 142 of 203 Table 3-7. Project Approval Rates Utility Customer Type Residential Standard Residential Underserved Residential Low-Income Residential Overall Eversource Small C&I Medium C&I Large C&I C&I Overall Eversource Overall Residential Standard Project Status as of June 30, 2026 Approved or Pipeline Submitted Cancelled Complete (Applications) (Applications) (Applications) (Applications) 8% (130/1639) 1% (23/1639) 73% (1194/1639) 18% (292/1639) 10% (23/230) 4% (9/230) 72% (166/230) 14% (32/230) 3% (3/115) 0% (0/115) 88% (101/115) 10% (11/115) 8% (156/1984) 2% (32/1984) 74% (1461/1984) 17% (335/1984) 5% (1/21) 0% (0/21) 57% (12/21) 38% (8/21) 0% (0/43) 0% (0/43) 40% (17/43) 60% (26/43) 0% (0/60) 0% (0/60) 52% (31/60) 48% (29/60) 1% (1/124) 0% (0/124) 48% (60/124) 51% (63/124) 7% (157/2108) 2% (32/2108) 72% (1521/2108) 19% (398/2108) 6% (11/172) 3% (5/172) 67% (116/172) 23% (40/172) Residential Underserved 7% (6/92) 1% (1/92) 66% (61/92) 26% (24/92) Residential Low-Income 0% (0/178) 0% (0/178) 98% (175/178) 2% (3/178) Residential Overall United Small C&I Illuminating Medium C&I 4% (17/442) 1% (6/442) 80% (352/442) 15% (67/442) 0% (0/6) 0% (0/6) 33% (2/6) 67% (4/6) 8% (1/12) 0% (0/12) 42% (5/12) 50% (6/12) Large C&I C&I Overall 0% (0/9) 0% (0/9) 56% (5/9) 44% (4/9) 4% (1/27) 0% (0/27) 44% (12/27) 52% (14/27) 17% (81/469) 4% (18/469) UI Overall Percentage of Residential Applications 7% (173/2426) 1% (2/151) Percentage of C&I Applications 1% (6/469) 78% (364/469) 2% (38/2426) 75% (1813/2426) 17% (402/2426) Percentage of Total Applications 1% (38/2577) 7% (175/2577) 0% (0/151) 48% (72/151) 51% (77/151) 73% (1885/2577) 19% (479/2577) Note: Note that “Canceled” applications does not include projects labeled as “withdrawn,” as withdrawn applications were never officially submitted and/or may have never received a reservation of funds letter. Percentages presented above are based on the number of applications, not the number of participants associated with each application. As such, the hybrid project, detailed in Section 3.1.5, is considered a single Large C&I application for the purposes of this table. Note that withdrawn applications are excluded from the table above. Source: CES analysis of Connecticut Green Bank program tracking data through June 30, 2026. Table 3-8 lends insight into the time required for upfront incentive applications to be reviewed and for projects to achieve commercial operation (complete status). Results are shown by the year in which they were submitted. Note that, for applications submitted through 2022, some of the processing times have changed somewhat, due to project cancellations and other changes to project statuses – an issue with the calculation of processing times for projects with missing data that affected the previous year’s report has also been corrected. Notably, the time to approve residential applications has consistently fallen over time. Days to approve C&I applications have generally decreased over time; time to approve C&I applications is influenced by the need for the Green Bank to seek approval from its Board of Directors for upfront incentives greater than $500,000. The days for residential projects to move to completed status have decreased over time, demonstrating increasing maturity in the residential storage space. There is insufficient data for commercial projects to draw conclusions about changes in the pace of 25 | P a g e
  3. Page 143 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 143 of 203 development; the available data highlights, however, that commercial projects take a long time to move from application approval to project completion. Table 3-8. Average Days to Approve and Complete Project Application Customer Type Application Submittal Year Residential 2022 2023 2024 2025 2026 Residential Overall C&I 2022 2023 2024 2025 2026 Average Days to Approve Application 58 65 56 24 16 42 246 88 42 61 22 Average Days to Completion 546 292 209 160 87 247 732 N/A 480 243 N/A C&I Overall 93 590 Total Program Average Days 38 45 Note: All figures presented reflect simple averages across applications and are not weighted by system size or number of participants. Accordingly, the hybrid project, discussed in Section 3.1.5, is treated as a single C&I application in this table. Estimates for average days to application approval and project completion may differ from previous reports due to changes in program enrollment (e.g., unenrollments). The application review process may involve multiple rounds of communication with project developers to ensure completeness and accuracy, which can extend approval timelines. Source: CES analysis of Connecticut Green Bank program tracking data through June 30, 2026. Table 3-9 provides metrics related to the share of systems and participants that are paired with on-site PV. The vast majority of residential projects continue to be paired with PV. However, Large C&I projects have a significantly lower PV pairing rate, which reduces the solar pairing rate when calculated using battery energy (kWh). Most BTM solar plus storage systems will be able to charge either from the grid or from solar depending on their tariff structure; however, in instances in which the solar and storage share an inverter, energy storage discharge may be limited during hours of solar production based on the rating of the inverter. While Passive and Active events occur later in the day, after the peak solar production hours, there still may be limited instances in which energy storage discharge during ESS events is inverter-limited (i.e., storage cannot discharge at rated or desired capacity because the inverter does not have the capacity for both solar output and desired storage discharge). 26 | P a g e
  4. Page 144 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 144 of 203 Table 3-9. Share of Energy Storage Paired with PV Customer Type By Number of Systems By Number of Participants By System's kWh By Allocated kWh Residential Standard Residential Underserved Residential Low-Income Residential Average Small C&I Medium C&I Large C&I C&I Average 89% 91% 99% 90% 57% 55% 36% 46% 89% 91% 100% 91% 57% 55% 36% 46% 89% 90% 99% 89% 29% 35% 26% 29% 89% 90% 100% 90% 29% 35% 26% 28% Overall Average 88% 89% 34% 34% Note: The analysis of energy storage systems paired with solar PV includes only projects in the “Approved” or “Completed” stages. Due to rounding, table values may not sum to 100%. The hybrid project, which includes a fuel cell and is discussed in Section 3.1.5, is counted as a single Large C&I application in the “by system” columns and as 161 participants under Residential Low-Income and 1 participant under Large C&I in the “by participants” column, and is fractionalized for the “allocated kWh” column with 48% of its energy capacity attributed to Residential Low-Income and 52% to Large C&I, based on guidance from the Green Bank. Source: CES analysis of Connecticut Green Bank program tracking data through June 30, 2026. Table 3-10 shows total kW of project capacity by project status, utility, and customer segment. This table highlights how, on a kW basis, C&I projects dominate expected future kW (as reflected in projects with an approved status), while residential projects continue to dominate the completed kW operating in the program. The total kW has decreased by approximately 1 MW since the previous report; this is primarily a result of a reduction in approved C&I capacity of 13 MW resulting primarily from cancelled projects (as opposed to projects moving from approved to completed). For residential, the total values represent 15% of the program’s target of 150 MW; for commercial projects, it is 31% of 430 MW. Comparing these numbers is likely misleading, however, given that commercial projects have seen significantly higher levels of attrition. 27 | P a g e
  5. Page 145 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 145 of 203 Table 3-10. Total Allocated Power Capacity (kW) by Project Status Utility Eversource Customer Type Project Status as of June 30, 2026 Submitted Approved Completed Total (kW) (kW) (kW) (kW) Residential Standard Residential Underserved Residential Low-Income Residential Subtotal Small C&I Medium C&I Large C&I C&I Subtotal Eversource Subtotal Residential Standard 279 2,088 13,875 16,242 88 389 1,636 2,113 0 259 651 910 367 2,736 16,161 19,264 0 6,088 625 6,713 0 27,859 0 27,859 0 86,835 507 87,342 0 120,782 1,132 121,914 367 123,518 17,293 141,178 32 295 1,079 1,406 Residential Underserved 10 236 323 569 Residential Low-Income 0 576 0 576 42 1,107 1,402 2,552 0 764 0 764 Medium C&I 0 2,268 155 2,423 Large C&I 0 8,509 0 8,509 0 11,541 155 11,696 Residential Subtotal United IlluminatingSmall C&I C&I Subtotal UI Subtotal Total Power Capacity: Residential (kW) Total Power Capacity: C&I (kW) 42 12,648 1,557 14,248 409 3,843 17,564 21,816 0 132,323 1,287 133,610 Total Power Capacity (kW) 409 136,166 18,850 155,426 Note: The “Total” column represents the sum of submitted, approved, and completed projects, excluding any cancelled and pipeline projects, as defined in Section 3.1.1. The hybrid project’s capacity, further detailed in Section 3.1.5, has been fractionalized per guidance from the Green Bank, with 48% to United Illuminating’s Residential Low-Income and 52% to United Illuminating’s Large C&I. Source: CES analysis of Connecticut Green Bank program tracking data through June 30, 2026. Table 3-11 provides similarly structured data, calculated for kWh of storage capacity instead of kW. This table illustrates many of the same trends as the previous table, particularly, that C&I projects dominate the program’s approved kWh. 28 | P a g e
  6. Page 146 of 203Match

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 146 of 203 Table 3-11. Total Allocated Energy Capacity (kWh) by Project Status Utility Eversource Customer Type Project Status as of June 30, 2026 Submitted Approved Completed Total (kWh) (kWh) (kWh) (kWh) Residential Standard Residential Underserved Residential Low-Income Residential Subtotal Small C&I Medium C&I Large C&I C&I Subtotal Eversource Subtotal Residential Standard 508 3,604 28,321 32,433 113 802 3,253 4,167 0 612 1,415 2,027 620 5,018 32,989 38,627 0 20,350 3,060 23,410 0 70,994 0 70,994 0 201,176 1,156 202,332 0 292,520 4,216 296,736 620 297,538 37,205 335,364 68 515 1,970 2,553 Residential Underserved 15 521 713 1,249 Residential Low-Income 0 2,102 0 2,102 83 3,138 2,683 5,904 0 1,732 0 1,732 Medium C&I 0 5,718 344 6,062 Large C&I 0 27,658 0 27,658 0 35,108 344 35,452 Residential Subtotal United IlluminatingSmall C&I C&I Subtotal UI Subtotal Total Energy Capacity: Residential (kWh) Total Energy Capacity: C&I (kWh) 83 38,246 3,027 41,356 703 8,156 35,673 44,531 0 327,628 4,560 332,188 Total Energy Capacity (kWh) 703 335,784 40,233 376,720 Note: The “Total” column represents the sum of submitted, approved, and completed projects, excluding any cancelled and pipeline projects, as defined in Section 3.1.1. The hybrid project’s capacity, further detailed in Section 3.1.5, has been fractionalized per guidance from the Green Bank, with 48% to United Illuminating’s Residential Low-Income and 52% to United Illuminating’s Large C&I. Source: CES analysis of Connecticut Green Bank program tracking data through June 30, 2026. Table 3-12 highlights average system size (in kW and kWh) per participant for approved and completed projects. Residential project sizes have remained relatively stable, with a modest increase in average kW from 10 to 12, with project duration remaining stable. The average kWh for residential standard projects in Eversource territory is significantly larger than in UI territory, likely a reflection of the housing stock served by the two utilities. The UI low-income average duration is an outlier, driven by the 4-hour durations of the multifamily project allocated to these customers. Relative to last year, commercial systems have seen a small decrease in size (2,015 kW to 1,856 kW) and duration (2.6 hours to 2.5 hours). Commercial systems have a longer average duration than residential systems; this is likely driven by the equipment available to the two different segments (i.e., more opportunity to customized duration for commercial systems than residential) as well as the value proposition (e.g., C&I customers may seek longer duration to manage demand charges and more aggressively engage in retail rate arbitrage). 29 | P a g e
  7. Page 147 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 147 of 203 Table 3-12. Average Project Size Average System Size Utility Eversource Weighted Power Capacity Energy Capacity Average Nominal (kW/participant) (kWh/participant) Duration (hrs) 13 27 2.0 Residential Standard 12 24 2.0 Residential Underserved 9 20 2.2 Residential Low-Income 13 26 2.0 Residential Average 559 1,951 3.5 Small C&I 13 27 2.0 Medium C&I 12 24 2.0 Large C&I 9 20 2.2 C&I Average 13 26 2.0 Eversource Average 559 1,951 3.5 Residential Standard 1,639 4,176 3 Residential Underserved Customer Type Residential Low-Income 2,817 6,527 2.3 Residential Average 2,032 4,946 2.4 93 220 2.4 Medium C&I 12 21 2 Large C&I 9 20 2.2 C&I Average 3 12 3.6 United Illuminating Small C&I UI Average Average System Size for Residential Systems Average System Size for C&I Systems 7 17 2.3 12 1,856 24 4,614 2.0 2.5 Average System Size 82 199 2.4 Note: The average system size analysis includes only projects in the “approved” or “completed” stages. The hybrid project’s capacity, further detailed in Section 3.1.5, has been fractionalized per guidance from the Green Bank, with 48% to United Illuminating’s Residential Low-Income and 52% to United Illuminating’s Large C&I. For reporting purposes, it accounts for 161 participants under United Illuminating’s Residential Low-Income and 1 participant under United Illuminating’s Large C&I. Source: CES analysis of Connecticut Green Bank program tracking data through June 30, 2026. Table 3-13 shows the number of systems and battery units by manufacturer. Tesla replaced FranklinWH as the manufacturer with the most participating residential systems, followed by FranklinWH which also saw significant growth compared to last year. On the C&I side, Tesla continues to have the largest number of systems. Note that canceled applications have led to some previously-listed manufacturers not being included in this year’s table. 30 | P a g e
  8. Page 148 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 148 of 203 Table 3-13. Number of Systems and Batteries by Manufacturer Customer Type Residential C&I Make Number of Systems Number of Battery Units Tesla FranklinWH Enphase Energy Generac Power Systems SunPower Fortress Power LLC SolarEdge Technologies Ltd. HomeGrid EndurEnergy Systems, Inc. ESP PointGuard Energy Pylon Technologies StackRack Battery Systems Cadenza Innovation LG Chem Sigenergy EG4 Electronics Panasonic Corporation Tesla ELM Fieldsight LLC Narada Power Yotta Energy Lithtech Socomec American Energy Storage Innovations (AESI) Cadenza Innovation Cornex Generac Power Systems PurePoint Energy LLC Waldron Engineering & Construction, Inc. 616 475 194 191 93 26 19 11 10 3 3 3 2 2 2 1 1 33 15 11 5 2 2 1 1 1 1 1 1 2250 1869 958 387 209 105 64 21 67 14 16 11 6 4 11 4 4 45 73 22 555 9 2 3 2 2 2 2 2 Note: Counts of “system” and “battery unit” reflect only those projects in the “approved” or “completed” stages. As detailed in Section 3.1.5, the hybrid project is treated as a single C&I application for the purposes of this table. Source: CES analysis of Connecticut Green Bank program tracking data through June 30, 2026. Table 3-14 provides data on applications by contractor. Most contractors serve only residential or only C&I customers. Earthlight Technologies has the largest share of residential applications, at 25%. For commercial systems, Scale Microgrid Solutions has the largest share, at 25%. The total number of contractors with at least one application has grown from 54 to 68. 31 | P a g e
  9. Page 149 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 149 of 203 Table 3-14. Number of Approved or Completed Applications by Contractor Contractor Earthlight Technologies, LLC Posigen, CT Tesla Venture Home Solar, LLC Earth Smart Solar SAVKAT, Inc. Green Power Energy, LLC Helio Solar LLC West Electric LLC Eastern CT Solar LLC Tesla Energy Operations, Inc. Aegis Solar Energy Ion Solar Pros CES Danbury LLC DBA Ross Solar Group EcoSmart Home Services Infinity Solar Systems Scale Microgrid Solutions LLC Premier Improvements Solar Sunrun Installation Services Inc. Honeywell International, Inc. EcoSolar Installations, LLC Synergy Smart Homes Summer Hill Solar Connecticut Solar Power LLC Sunlight Solar Energy, Inc. CPower RWE Clean Energy, LLC Shoreline Solar Kinsley Group, Inc. Trinity Solar, Inc. Daisy Solutions, LLC Apex Electrical Contractors LLC Efficient Lighting Consultants, Inc. (ELC) Son Energy Systems PurePoint Energy LLC Evergreen Energy. LLC Powur PBC Shoreline Solar LLC SunTegra Energy LLC Synergy Electrical Contracting LLC Bright Light Energy Corp Residential Applications C&I Applications Total Applications 325 159 154 79 75 75 70 38 32 31 27 25 23 21 19 18 0 16 14 0 11 10 9 8 7 0 0 6 0 5 0 4 4 4 3 3 3 3 3 3 2 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18 0 0 14 0 0 0 0 0 7 7 0 6 0 5 0 0 0 1 0 0 0 0 0 0 333 159 154 79 75 75 70 38 32 31 27 25 23 21 19 18 18 16 14 14 11 10 9 8 7 7 7 6 6 5 5 4 4 4 4 3 3 3 3 3 2 32 | P a g e
  10. Page 150 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Contractor Crocker Consulting Inc DBA Omega Energy Franklin WH Newport Electric Construction Corp. Shedd Technologies LLC Cadenza Innovation, Inc. HQCA Energy Solutions, LLC Beacon Solar Construction INC BigEnergy USA LLC CSS On Demand Electrical LLC Dyna Electric Elite Electrical Contractors, LLC Griffin Electrical Contractors Inc. Harvest Power LLC Insight Solar Jack Rabbit Energy Independence LLC Momentum Solar Ovanova Porticade Construction LLC, DBA Action Solar Sol Power LLC SunBug Solar Sunrise Solar Consulting LLC Sunrite Solar LLC TotalEnergies Distributed Generation USA, LLC West Hartford Solar, LLC DownEast Renewable Energy LLC EPC Energy Inc Waldron Engineering & Construction, Inc. Page 150 of 203 Residential Applications C&I Applications Total Applications 2 2 2 2 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Note: Counts include only projects in the “approved” or “completed” stages. As detailed in Section 3.1.5, the hybrid project is treated as a single C&I application for the purposes of this table. Additionally, CES Danbury LLC DBA Ross Solar Group was purchased by RWE Clean Energy, LLC (formerly ConEdison Solutions); therefore, its 21 residential applications are attributed to RWE Clean Energy, LLC. Additionally, 328 residential projects transferred into ESS from ConnectedSolutions, for which the contractor field was labeled “ConnectedSolutions,” have been excluded from this table. Source: CES analysis of Connecticut Green Bank program tracking data through June 30, 2026. Administrative costs associated with the ESS Program for 2024 are provided in Table 3-15 below. Costs are largely in line with last year, with declines primarily in evaluation, measurement, and verification and IT costs. 33 | P a g e

Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf

Extracted from the file · 2 pages · 6,256 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf

Extracted from the file · 2 pages · 3,261 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf

Extracted from the file · 1 page · 528 characters

Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf

Extracted from the file · 2 pages · 4,800 characters