Compliance Filing, Order No. 1
5. Annual Compliance Filings – Additional Filings (Program Materials)
Files13
2026-11-16 UI Cover Letter 5. Annual Compliance Filings – Additional Filings (Program Materials) #26-08-01.pdf
PDF · 221 KB · 3 pagesText searchable
Download 2026-11-16 UI Cover Letter 5. Annual Compliance Filings – Additional Filings (Program Materials) #26-08-01.pdfRead the text of 2026-11-16 UI Cover Letter 5. Annual Compliance Filings – Additional Filings (Program Materials) #26-08-01.pdf
2026-11-16 UI Attachment 1 - Residential Renewable Energy Solutions Program Manual #26-08-01.pdf
PDF · 763 KB · 59 pagesText searchable
Download 2026-11-16 UI Attachment 1 - Residential Renewable Energy Solutions Program Manual #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 1 - Residential Renewable Energy Solutions Program Manual #26-08-01.pdf
2026-11-16 UI Attachment 2 - Non-Residential Renewable Energy Solutions Program Materials #26-08-01.pdf
PDF · 1.7 MB · 100 pagesText searchable
Download 2026-11-16 UI Attachment 2 - Non-Residential Renewable Energy Solutions Program Materials #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 2 - Non-Residential Renewable Energy Solutions Program Materials #26-08-01.pdf
2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdf
PDF · 2.9 MB · 147 pagesText searchable
Download 2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdf
2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdf
PDF · 4.4 MB · 203 pagesText searchable
Download 2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdf
2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf
PDF · 115 KB · 2 pagesText searchable
Download 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf
2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf
PDF · 159 KB · 2 pagesText searchable
Download 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf
2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx
Excel · 100 KBText searchable
Download 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsxRead the text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx
2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx
Excel · 272 KBText searchable
Download 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsxRead the text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx
2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx
Excel · 3.5 MBText searchable
Download 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsxRead the text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx
2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf
PDF · 144 KB · 1 pageText searchable
Download 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf
2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx
Excel · 71 KBText searchable
Download 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsxRead the text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx
2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf
PDF · 152 KB · 2 pagesText searchable
Download 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf
Text of 2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdf
Extracted from the file · 147 pages · 342,741 characters
Page 154 of 203
The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 154 of 203 Table 3-18. Average Total Project Upfront Incentive for Construct 5 Projects ($/Participant) Utility Customer Type Residential Standard Residential Underserved Residential Low-Income Residential Average Eversource Small C&I Medium C&I Large C&I C&I Average Eversource Average Residential Standard Residential Underserved Residential Low-Income Residential Average United Illuminating Small C&I Medium C&I Large C&I C&I Average UI Average Average Incentives Encumbered by Residential Participants Average Incentives Encumbered by C&I Participants Average Project Incentive Average Upfront Incentive ($/Participant) $2,156 $4,998 $3,140 $2,480 N/A N/A N/A N/A $2,480 $1,125 $745 N/A $935 N/A N/A N/A N/A $935 $2,372 N/A $2,372 Note: The analysis of average total project incentives includes only Construct 5 projects in the "approved" or "completed" stages. Source: CES analysis of Connecticut Green Bank program tracking data through June 30, 2026. Table 3-19 provides project costs per participant. Residential costs have remained relatively stable. Interestingly, for residential projects, average total costs have decreased slightly more than battery only costs. While the underlying cost data may not be sufficiently reliable to draw conclusions, this would suggest a reduction in balance of system costs, which could include interconnection, profit, and soft costs. Average commercial costs have come down, though this is primarily attributable to the reduction in average project size. 37 | P a g ePage 155 of 203
The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 155 of 203 Table 3-19. Average Project Cost ($/Participant) Residential Standard Residential Underserved Residential Low-Income Residential Average Small C&I Medium C&I Large C&I C&I Average Eversource Average Residential Standard $20,038 $20,179 $20,298 $20,081 $792,126 $2,098,373 $2,386,498 $1,985,988 $132,205 $20,622 Total Energy Storage System Cost ($/Participant) $32,302 $30,626 $27,144 $31,599 $1,268,454 $3,411,557 $4,211,877 $3,396,435 $223,510 $31,904 Residential Underserved $19,680 $28,662 Residential Low-Income $7,463 $12,306 Residential Average $13,041 $20,318 $820,610 $968,965 $944,036 $1,345,099 Utility Eversource Customer Type United Illuminating Small C&I Medium C&I Large C&I Battery Only Cost ($/Participant) $2,445,395 $4,418,848 $1,549,031 $2,563,139 UI Average Average Cost for Residential Participants Average Cost for C&I Participants $70,283 $18,405 $1,913,162 $115,082 $28,913 $3,257,552 Average Cost per Participant $117,694 $198,100 C&I Average Note: Average system cost estimates are based solely on projects in the "approved" or "completed" stages. Because of the limited installed cost data collected for projects only participating in active dispatch, the table above includes only those projects participating in active and passive events (i.e., those that have received an upfront incentive). Total energy storage system costs include the battery module as well as associated balance of system components, inverters, engineering and design, interconnection, monitoring, and permitting expenses. These costs do not include solar PV modules, although some shared balance-of-system and installation costs may be reflected due to PV pairing. The hybrid project’s energy storage system cost, further detailed in Section 3.1.5, has been fractionalized per guidance from the Green Bank, with 48% to United Illuminating’s Residential Low-Income and 52% to United Illuminating’s Large C&I. The project is counted as 161 participants under United Illuminating’s Residential Low-Income and 1 participant under United Illuminating’s Large C&I. Source: CES analysis of Connecticut Green Bank program tracking data through June 30, 2026. Table 3-20 provides total installed costs by project status, utility, and customer type. As of June 30, 2026, the ESS Program has incentivized the installation of more than $33 million of energy storage systems, with an additional $239.5 million of projects in the approved stage. 38 | P a g ePage 156 of 203
The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 156 of 203 Table 3-20. Total Installed Costs Allocated to Participants by Project Status ($) Utility Eversource Project Status as of June 30, 2026 Submitted Approved Completed Total ($) ($) ($) ($) $405,709 $4,090,610 $20,860,202 $25,356,521 Residential Standard $3,225,231 $4,352,909 Residential Underserved $95,838 $1,031,840 $0 $896,556 $1,546,394 $2,442,950 Residential Low-Income $501,547 $6,019,006 $25,631,827 $32,152,380 Residential Subtotal $0 $12,030,160 $3,191,283 $15,221,443 Small C&I $0 $57,996,464 $0 $57,996,464 Medium C&I $0 $129,652,099 $916,103 $130,568,202 Large C&I $0 $199,678,723 $4,107,386 $203,786,109 C&I Subtotal Eversource Subtotal $501,547 $205,697,729 $29,739,213 $235,938,489 $22,595 $706,244 $2,094,047 $2,822,886 Residential Standard Customer Type Residential Underserved $21,353 $0 Residential Low-Income $741,863 $705,459 $1,468,675 $2,153,599 $0 $2,153,599 $43,948 $3,601,706 $2,799,506 $6,445,160 $0 $1,937,930 $0 $1,937,930 Medium C&I $0 $6,207,997 $517,500 $6,725,497 Large C&I $0 $22,094,242 $0 $22,094,242 $0 $30,240,169 $517,500 $30,757,669 Residential Subtotal United IlluminatingSmall C&I C&I Subtotal $43,948 $33,841,875 $3,317,006 $37,202,829 UI Subtotal Total Allocated Installed Costs: Residential $545,495 $9,620,712 $28,431,333 $38,597,540 $0 $229,918,892 $4,624,886 $234,543,778 Total Allocated Installed Costs: C&I Total Installed Costs ($) $545,495 $239,539,604 $33,056,219 $273,141,318 Note: Total installed costs reflect costs associated with the battery module, balance of system components, inverter, engineering and design, interconnection, monitoring, and permitting. These figures do not include the cost of solar PV modules, although some balance-of-system and installation costs presented here may overlap with those associated with co-located solar PV systems. The hybrid project’s installed cost, further detailed in Section 3.1.5, has been fractionalized per guidance from the Green Bank, with 48% to United Illuminating’s Residential Low-Income and 52% to United Illuminating’s Large C&I. Source: CES analysis of Connecticut Green Bank program tracking data through June 30, 2026. Table 3-21 highlights per unit ($/kW and $/kWh) energy storage system costs. Most residential $/kWh costs have remained effectively flat or have decreased. These costs are somewhat lower for approved projects than for completed projects, suggesting that average program costs will decrease somewhat. Commercial $/kWh costs for approved applications are effectively flat. For approved and completed projects, residential Underserved and Low-Income unit costs are higher than Standard; while, as shown in Table 3-12, residential Standard projects are, on average, somewhat larger, it is unclear that the difference in project size and implied economies of scale would explain the differences in per unit costs. On the other hand, Figure 3-1 indicates that these differences in costs may be declining over time. While the cost of completed commercial projects has increased noticeably, the small sample size makes extrapolating from this change dubious. 39 | P a g ePage 157 of 203
The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 157 of 203 Table 3-21. Average Total Energy Storage System Costs ($/kWh and $/kW) Customer Type Submitted ($/kW) Approved Completed Submitted ($/kW) ($/kW) ($/kWh) Approved Completed ($/kWh) ($/kWh) $1,741 $2,013 $2,303 $973 $1,165 $1,283 $1,573 $2,835 $2,440 $1,166 $1,340 $1,310 Residential Standard Residential Underserved Residential LowIncome Residential Average Small C&I Medium C&I Large C&I C&I Average N/A $3,524 $2,832 N/A $1,489 $1,367 $1,702 N/A N/A N/A N/A $2,329 $2,039 $2,131 $1,602 $1,745 $2,345 $5,106 $3,343 $1,808 $3,595 $1,009 N/A N/A N/A N/A $1,246 $633 $837 $665 $703 $1,291 $1,043 $1,504 $792 $1,014 Overall Average $1,702 $1,759 $2,465 $1,009 $713 $1,243 Note: Total energy storage system costs include the battery module as well as associated balance of system components, inverters, engineering and design, interconnection, monitoring, and permitting expenses. These costs do not include solar PV modules; however, some balance-of-system and installation costs may overlap due to PV pairing and would not have been incurred otherwise. Because of the limited installed cost data collected for projects only participating in active dispatch, the table above includes only those projects participating in active and passive events (i.e., those that have received an upfront incentive). As detailed in Section 3.1.5, the hybrid project is treated as a single Large C&I system for the purposes of this table. Additionally, due to the relatively low number of completed or submitted projects within certain customer segments (e.g., submitted project statuses), average cost estimates for those segments may not be fully representative. Source: CES analysis of Connecticut Green Bank program tracking data through June 30, 2026. Figure 3-1 illustrates how average costs have evolved over time, based on application approval date. Given that there is the greatest number (by count) of Residential Standard systems, this set of systems may provide the best view of how costs have evolved, based on date of completed application. This would suggest that there has been a monotonic decline in average kWh costs over time. The chosen metric ($/kWh) is a good indicator, but also an imperfect metric, as increased project sizes and durations would decrease $/kWh costs. Still, because project performance is generally energy-limited (that is, project performance during events is limited by available kWh as opposed to power (kW)), this is a key indicator for project costs. There is not a clear trend for C&I projects. 40 | P a g ePage 158 of 203
The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 158 of 203 Figure 3-1. Average Total Energy Storage System Cost by Application Year ($/kWh) Note: For the commercial systems, no small or medium projects with a 2023 approval date are included in the dataset; the dip in the lines indicates an absence of data, not a decrease in costs. Only projects in the submitted, approved, or completed categories are included. Total energy storage system costs include the battery module as well as associated balance of system components, inverters, engineering and design, 41 | P a g ePage 159 of 203
The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 159 of 203 interconnection, monitoring, and permitting expenses. These costs do not include solar PV modules; however, some balance-of-system and installation costs may overlap due to PV pairing and would not have been incurred otherwise. As detailed in Section 3.1.5, the hybrid project is treated as a single Large C&I system for the purposes of this table. Missing data points indicate no projects had applications approved during the applicable year. Source: CES analysis of Connecticut Green Bank program tracking data through June 30, 2026. Table 3-22 provides similar information, but for battery-only costs. The trends generally mirror those demonstrated in the previous table. Given the number of participating contractors and the variations in project configuration, it is likely that inconsistent cost categorization would make drawing conclusions about trends in battery costs challenging. Table 3-22. Average Battery-Only Costs ($/kWh and $/kW) Customer Type Submitted Approved Completed Submitted Approved Completed ($/kW) ($/kW) ($/kW) ($/kWh) ($/kWh) ($/kWh) Residential Standard Residential Underserved Residential Low-Income Residential Average Small C&I Medium C&I Large C&I C&I Average $3,437 N/A N/A $3,437 N/A N/A N/A N/A $1,598 $2,208 $2,919 $1,901 $1,287 $1,327 $904 $1,020 $1,496 $1,662 $2,172 $1,548 $3,729 $2,678 $1,188 $2,602 $2,640 N/A N/A $2,640 N/A N/A N/A N/A $906 $1,075 $1,232 $998 $399 $521 $375 $411 $830 $882 $1,037 $848 $762 $1,205 $521 $734 Overall Average $3,437 $1,037 $1,651 $2,640 $420 $828 Note: Battery-only costs are intended to only include costs associated with the battery modules themselves, excluding costs balance of system components, inverters, engineering and design, interconnection, monitoring, and permitting expenses. These costs do not include solar PV modules; however, some balance-of-system and installation costs may overlap due to PV pairing and would not have been incurred otherwise. Where battery modules and inverters are integrated, costs may not be accurately allocated across these categories. As detailed in Section 3.1.5, the hybrid project is treated as a single Large C&I system for the purposes of this table. Additionally, due to the relatively low number of completed or submitted projects within certain customer segments (e.g., submitted project statuses), average cost estimates for those segments may not be fully representative. Source: CES analysis of Connecticut Green Bank program tracking data through June 30, 2026. 3.3. Findings and Recommendations Table 3-23. Program Tracking Metrics Findings and Recommendations Finding Recommendation The C&I pipeline appears to have stagnated, with new applications slowing, including no applications since the implementation of Construct 5. The Program Administrators should continue to monitor the pace of incoming C&I applications and continue to remain engaged with contractors, developers, and host customers to understand barriers to participation. The Program Administrators should explicitly seek feedback on the viability of projects under Construct 5. The Program Administrators 42 | P a g ePage 160 of 203
The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Finding Page 160 of 203 Recommendation may consider focus groups or other structured feedback to identify barriers to development that could be addressed, outside of increased incentive levels. Building on the recommendation above, the Program Administrators should consider a more detailed evaluation of commercial project cost drivers. For example, the greater Decreases in per unit residential heterogeneity of commercial sites and customer needs, costs are not mirrored in relative to residential sites, may be a cost driver. The Program commercial cost data. Administrators should consider tools that could be used to help address these soft costs (or other mechanisms for driving down commercial costs). While significant attrition in the commercial pipeline has been Attrition of the commercial pipeline expected, the Program Administrators should review the is outpacing new applications. characteristics of canceled commercial projects. This could help refine future projections and identify key barriers. Affordable multifamily buildings provide significant numbers of participants, but only one has progressed through the program. The Program Administrators should evaluate any new potential strategies or program improvements for The program is falling short of its increasing Low-Income and Undeserved participation rates target of 40% Low-Income and and opine on whether they are likely to be able to reach the Underserved residential 40% target without additional affordable multifamily housing participation rates. projects. In addition, ongoing efforts, such as third-party ownership support and technical assistance programs (including Solar Marketplace Assistant Program Plus or Solar MAP+), offered by the Green Bank, should be continued and improved. Gaps in the data for certain project categories (e.g., self-enrolling The Program Administrators should consider other methods participants, Active Only for collecting data from ESS participants. When data cannot participants, and projects be collected, the Program Administrators should increase the transferred from consistency in how data gaps are represented in the ConnectedSolutions) are leading to enrollment data. some challenges in evaluating data. Source: CES analysis 1. Program Evaluation Metrics This section provides program evaluation metrics, based on the evaluated performance of systems participating in the ESS program. 4.1. Program Evaluation Metrics The first set of tables (4-1 through 4-6) evaluate performance of participants for Active summer events, Active winter events, and Passive events, by residential and C&I. These tables are intended to illustrate trends in participant performance (evaluating how systems perform relative to their hypothetical output) as well as total enrollment and kW reductions. In these tables, per 43 | P a g ePage 161 of 203
The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 161 of 203 participant metrics are evaluated exclusively for systems that had a net discharge of greater than 0 kWh over the course of the evaluated event, filtering out resources that did not discharge during the event. It should also be noted that Expected Average Power is equal to the Battery Energy Availability (available energy reported at the beginning of the event) divided by the duration of the event (varies for active events, always 3 hours for Passive events). While the calculation does not account for resources which may be limited by their power rating, given the duration of systems (which are less than the duration of events in most instances, even with a fully charged battery) participating in the program, this is not likely to significantly impact the results. This calculation also does not apply an assumed reserve; said differently, it assumes that participants discharge all available energy down to zero by the end of the event. This approach is applied to both Active and Passive events, to aid in making direct comparisons. The data shows that, in most instances, resources do not discharge to a state of charge below 20%; this is attributable to several factors, including the methodology for scoring Passive performance, the desire for systems to retain some energy in case of an outage event, and the reduced degradation associated with not fully discharging a BESS. Because Eversource and UI did not always call events on the same days (or during the same hours), the number of eligible systems fluctuates, as events may include both utilities, or just one of them. Also note that, in cases where data for an individual resource on an individual event day was eliminated, this would reduce the number of participants, but not the number of eligible systems. Eliminated data is ignored in other fields (e.g., it is not considered in Battery Energy Availability). Table 4-1, below, evaluates residential performance during summer Active events. As additional systems enroll, the expected and delivered kW reductions increase over the course of the season. Participation rates (again, defined as count of systems with net discharge during the event divided by the number of systems enrolled and capable of participating in the event) are consistently high and have improved from an average of 74% in summer 2024 to 88% in summer 2025. Significant changes in participation rates from day to day within the data set are, in part, explained by outage protection events. For example, Enphase implemented outage protection on July 8, 2025 for the majority of its systems causing them to not discharge during the Active event on that day; this is reflected by a significant decrease in participating systems on that date. Battery availability per participant is also reasonably consistent and indicates that most systems are starting with a reasonably high state of charge. This value has also increased considerably from last year’s data. This is attributable primarily to an increase in the nameplate capacity of participating systems; however, starting state of charge for participating systems also increased, from approximately 88% to 96%. Because other columns are based on available energy (as opposed to nameplate energy capacity), this increase in starting state of charge is an improvement in performance that is incremental to the improvement in performance reflected in the final column (% of Maximum Expected Power per Event). Per participant average power per event is also reasonably stable. Performance relative to expected performance, as measured in the final column, has increased significantly from the previous evaluation, from 59% to 67%. Interestingly, this value also fluctuates significantly over the course of summer 2025. This is not clearly attributable to a single factor. In the last evaluation, there was a clear difference in participation between two-hour and three-hour events, with participation higher in three-hour events, indicating that systems may not be changing their dispatch strategy based on whether an event was two or three hours long. This is no longer the case as performance (as % of maximum possible) is higher for two-hour events than three-hour 44 | P a g ePage 162 of 203
The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 162 of 203 events, indicating that dispatch is more appropriately factoring in event duration. Instead, the variation in performance is attributable to a range of factors including: • • • The impact of outage events, as some resources in outage protection mode will still discharge some energy during events, causing them to be counted as a participant Different starting state of charge, as, while the metric is based off of starting available energy, because most resources will not discharge down to 0% state of charge, a lower starting state of charge will tend to reduce the calculated performance (e.g., if a resource starts at 20% state of charge, it could score 100% by discharging to 0% state of charge, but, in practice, it may not discharge at all, which would yield a score of 0%) Failure to discharge available energy for other reasons Table 4-1. Residential Program Evaluation Metrics by Active Event Date-Summer 2025 Season Maximum Expected Battery Battery Energy Average Average Eligible Active Event Energy Participants Availability Power per Power Based Event Date Systems Participation Availability ² (kWh/ Event (kW/ on Energy ¹ % (kWh/ Participant)³ program) Availability Event) (kW/ Participant) Average Power per Event (kW/ Participant) % of Maximum Expected Power per Event (%) 15.6 10.1 65% 6/24/2025 333 257 77% 31 8007 2607 7/1/2025 341 329 96% 28 9114 1915 9.2 5.8 63% 7/2/2025 341 324 95% 27 8827 2955 13.6 9.1 67% 7/3/2025 341 248 73% 31 7759 1313 10.4 5.3 51% 7/5/2025 341 317 93% 28 8992 2056 9.5 6.5 69% 7/6/2025 341 314 92% 28 8870 2020 9.4 6.4 68% 7/7/2025 341 313 92% 27 8568 2915 13.7 9.3 68% 7/8/2025 300 219 73% 33 7286 1645 11.1 7.5 68% 7/9/2025 342 326 95% 28 9004 2974 13.8 9.1 66% 7/10/2025 342 330 96% 27 8808 2985 13.3 9.0 68% 7/11/2025 342 334 98% 27 9165 3073 13.7 9.2 67% 7/12/2025 347 336 97% 27 9218 2118 9.1 6.3 69% 7/13/2025 335 322 96% 28 8904 2074 9.2 6.4 70% 7/14/2025 347 293 84% 29 8360 1568 9.5 5.4 56% 7/15/2025 348 277 80% 31 8496 2739 15.3 9.9 64% 7/16/2025 348 270 78% 31 8400 2772 15.6 10.3 66% 7/17/2025 350 278 79% 30 8375 2760 15.1 9.9 66% 7/18/2025 350 343 98% 27 9426 3248 13.7 9.5 69% 7/20/2025 350 271 77% 31 8446 1741 10.4 6.4 62% 7/23/2025 350 293 84% 31 8939 2077 10.2 7.1 70% 7/24/2025 351 297 85% 30 9040 2961 15.2 10.0 66% 7/25/2025 351 273 78% 31 8543 2825 15.6 10.3 66% 7/26/2025 351 283 81% 31 8688 2886 15.3 10.2 66% 45 | P a g ePage 163 of 203
The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 163 of 203 7/28/2025 351 285 81% 31 8707 1994 10.2 7.0 69% 7/29/2025 350 293 84% 30 8829 2888 15.1 9.9 65% 7/30/2025 350 275 79% 31 8544 2791 15.5 10.1 65% 7/31/2025 352 330 94% 27 8819 3004 13.4 9.1 68% 8/4/2025 307 300 98% 29 8763 2124 9.7 7.1 73% 8/5/2025 350 345 99% 27 9465 3315 13.7 9.6 70% 8/6/2025 351 312 89% 29 9021 1967 9.6 6.3 65% 8/7/2025 352 346 98% 28 9785 2355 9.4 6.8 72% 8/10/2025 354 349 99% 28 9805 2333 9.4 6.7 71% 8/11/2025 353 344 97% 28 9586 3368 13.9 9.8 70% 8/12/2025 354 347 98% 28 9668 3331 13.9 9.6 69% 8/13/2025 359 341 95% 28 9421 2713 13.8 8.0 58% 8/14/2025 358 349 97% 28 9667 3344 13.8 9.6 69% 8/15/2025 359 351 98% 28 9809 3398 14.0 9.7 69% 8/16/2025 359 353 98% 29 10140 3364 14.4 9.5 66% 8/17/2025 359 352 98% 29 10107 2362 9.6 6.7 70% 8/23/2025 365 362 99% 28 10290 2434 9.5 6.7 71% 8/24/2025 366 364 99% 29 10599 2381 9.7 6.5 67% 8/25/2025 366 360 98% 29 10502 2379 9.7 6.6 68% Summer 2022 Average 100% 17 17 3.9 5.7 3.9 69% Summer 2023 Average 74% 16 617 119 6.8 3.0 45% Summer 2024 Average 88% 18 3069 839 8.5 4.9 59% 90% 29 9066 2573 12.3 8.2 67% Summer 2025 Overall Average 348 314 Note: 1Eligible Systems represents a count of BESS able to participate in an event, established by determining if the system had begun providing interval data. 2 Participants, here, are defined as projects with a net discharge of greater than zero over the course of the event. Other fields denominated in per Participant only include resources that had a net discharge of greater than 0 over the course of the event (i.e., these metrics filter out resources that did not discharge during the event). 3 Battery Energy Availability is based on energy available at the beginning of the event; it is not adjusted to account for a potential reserve. Similarly, the Maximum Expected Average Power Based on Energy Availability metric assumes that the resources are discharged to a state of charge of 0. All averages represent simple averages of the per event values above; each event is not weighted. Source: CES analysis of telemetry data; 2022/2023 and 2023/2024 values from previous ESS Program EM&V annual report. Table 4-2 provides the same analysis, but for winter seasons. Unlike the 2024-2025 winter, participation across the two events is consistent and high. Performance (as measured by % of Maximum Expected Power) has increased substantially as well, with participation rates and performance at rates comparable to the Summer 2025 rates. This increased winter performance is valuable, given that winter dispatch will become more valuable to New England’s grid over time. More systems participated in these events relative to the summer 2025 because more systems had enrolled by the beginning of the winter events. 46 | P a g e
Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf
Extracted from the file · 2 pages · 6,256 characters
Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf
Extracted from the file · 2 pages · 3,261 characters
Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf
Extracted from the file · 1 page · 528 characters
Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf
Extracted from the file · 2 pages · 4,800 characters
As listed on the current system
Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)