Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

5. Annual Compliance Filings – Additional Filings (Program Materials)

Compliance filingFiled by Avangrid13 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files13

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of 2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdf

Extracted from the file · 147 pages · 342,741 characters

8 pages match
  1. Page 157 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 157 of 203 Table 3-21. Average Total Energy Storage System Costs ($/kWh and $/kW) Customer Type Submitted ($/kW) Approved Completed Submitted ($/kW) ($/kW) ($/kWh) Approved Completed ($/kWh) ($/kWh) $1,741 $2,013 $2,303 $973 $1,165 $1,283 $1,573 $2,835 $2,440 $1,166 $1,340 $1,310 Residential Standard Residential Underserved Residential LowIncome Residential Average Small C&I Medium C&I Large C&I C&I Average N/A $3,524 $2,832 N/A $1,489 $1,367 $1,702 N/A N/A N/A N/A $2,329 $2,039 $2,131 $1,602 $1,745 $2,345 $5,106 $3,343 $1,808 $3,595 $1,009 N/A N/A N/A N/A $1,246 $633 $837 $665 $703 $1,291 $1,043 $1,504 $792 $1,014 Overall Average $1,702 $1,759 $2,465 $1,009 $713 $1,243 Note: Total energy storage system costs include the battery module as well as associated balance of system components, inverters, engineering and design, interconnection, monitoring, and permitting expenses. These costs do not include solar PV modules; however, some balance-of-system and installation costs may overlap due to PV pairing and would not have been incurred otherwise. Because of the limited installed cost data collected for projects only participating in active dispatch, the table above includes only those projects participating in active and passive events (i.e., those that have received an upfront incentive). As detailed in Section 3.1.5, the hybrid project is treated as a single Large C&I system for the purposes of this table. Additionally, due to the relatively low number of completed or submitted projects within certain customer segments (e.g., submitted project statuses), average cost estimates for those segments may not be fully representative. Source: CES analysis of Connecticut Green Bank program tracking data through June 30, 2026. Figure 3-1 illustrates how average costs have evolved over time, based on application approval date. Given that there is the greatest number (by count) of Residential Standard systems, this set of systems may provide the best view of how costs have evolved, based on date of completed application. This would suggest that there has been a monotonic decline in average kWh costs over time. The chosen metric ($/kWh) is a good indicator, but also an imperfect metric, as increased project sizes and durations would decrease $/kWh costs. Still, because project performance is generally energy-limited (that is, project performance during events is limited by available kWh as opposed to power (kW)), this is a key indicator for project costs. There is not a clear trend for C&I projects. 40 | P a g e
  2. Page 158 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 158 of 203 Figure 3-1. Average Total Energy Storage System Cost by Application Year ($/kWh) Note: For the commercial systems, no small or medium projects with a 2023 approval date are included in the dataset; the dip in the lines indicates an absence of data, not a decrease in costs. Only projects in the submitted, approved, or completed categories are included. Total energy storage system costs include the battery module as well as associated balance of system components, inverters, engineering and design, 41 | P a g e
  3. Page 159 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 159 of 203 interconnection, monitoring, and permitting expenses. These costs do not include solar PV modules; however, some balance-of-system and installation costs may overlap due to PV pairing and would not have been incurred otherwise. As detailed in Section 3.1.5, the hybrid project is treated as a single Large C&I system for the purposes of this table. Missing data points indicate no projects had applications approved during the applicable year. Source: CES analysis of Connecticut Green Bank program tracking data through June 30, 2026. Table 3-22 provides similar information, but for battery-only costs. The trends generally mirror those demonstrated in the previous table. Given the number of participating contractors and the variations in project configuration, it is likely that inconsistent cost categorization would make drawing conclusions about trends in battery costs challenging. Table 3-22. Average Battery-Only Costs ($/kWh and $/kW) Customer Type Submitted Approved Completed Submitted Approved Completed ($/kW) ($/kW) ($/kW) ($/kWh) ($/kWh) ($/kWh) Residential Standard Residential Underserved Residential Low-Income Residential Average Small C&I Medium C&I Large C&I C&I Average $3,437 N/A N/A $3,437 N/A N/A N/A N/A $1,598 $2,208 $2,919 $1,901 $1,287 $1,327 $904 $1,020 $1,496 $1,662 $2,172 $1,548 $3,729 $2,678 $1,188 $2,602 $2,640 N/A N/A $2,640 N/A N/A N/A N/A $906 $1,075 $1,232 $998 $399 $521 $375 $411 $830 $882 $1,037 $848 $762 $1,205 $521 $734 Overall Average $3,437 $1,037 $1,651 $2,640 $420 $828 Note: Battery-only costs are intended to only include costs associated with the battery modules themselves, excluding costs balance of system components, inverters, engineering and design, interconnection, monitoring, and permitting expenses. These costs do not include solar PV modules; however, some balance-of-system and installation costs may overlap due to PV pairing and would not have been incurred otherwise. Where battery modules and inverters are integrated, costs may not be accurately allocated across these categories. As detailed in Section 3.1.5, the hybrid project is treated as a single Large C&I system for the purposes of this table. Additionally, due to the relatively low number of completed or submitted projects within certain customer segments (e.g., submitted project statuses), average cost estimates for those segments may not be fully representative. Source: CES analysis of Connecticut Green Bank program tracking data through June 30, 2026. 3.3. Findings and Recommendations Table 3-23. Program Tracking Metrics Findings and Recommendations Finding Recommendation The C&I pipeline appears to have stagnated, with new applications slowing, including no applications since the implementation of Construct 5. The Program Administrators should continue to monitor the pace of incoming C&I applications and continue to remain engaged with contractors, developers, and host customers to understand barriers to participation. The Program Administrators should explicitly seek feedback on the viability of projects under Construct 5. The Program Administrators 42 | P a g e
  4. Page 160 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Finding Page 160 of 203 Recommendation may consider focus groups or other structured feedback to identify barriers to development that could be addressed, outside of increased incentive levels. Building on the recommendation above, the Program Administrators should consider a more detailed evaluation of commercial project cost drivers. For example, the greater Decreases in per unit residential heterogeneity of commercial sites and customer needs, costs are not mirrored in relative to residential sites, may be a cost driver. The Program commercial cost data. Administrators should consider tools that could be used to help address these soft costs (or other mechanisms for driving down commercial costs). While significant attrition in the commercial pipeline has been Attrition of the commercial pipeline expected, the Program Administrators should review the is outpacing new applications. characteristics of canceled commercial projects. This could help refine future projections and identify key barriers. Affordable multifamily buildings provide significant numbers of participants, but only one has progressed through the program. The Program Administrators should evaluate any new potential strategies or program improvements for The program is falling short of its increasing Low-Income and Undeserved participation rates target of 40% Low-Income and and opine on whether they are likely to be able to reach the Underserved residential 40% target without additional affordable multifamily housing participation rates. projects. In addition, ongoing efforts, such as third-party ownership support and technical assistance programs (including Solar Marketplace Assistant Program Plus or Solar MAP+), offered by the Green Bank, should be continued and improved. Gaps in the data for certain project categories (e.g., self-enrolling The Program Administrators should consider other methods participants, Active Only for collecting data from ESS participants. When data cannot participants, and projects be collected, the Program Administrators should increase the transferred from consistency in how data gaps are represented in the ConnectedSolutions) are leading to enrollment data. some challenges in evaluating data. Source: CES analysis 1. Program Evaluation Metrics This section provides program evaluation metrics, based on the evaluated performance of systems participating in the ESS program. 4.1. Program Evaluation Metrics The first set of tables (4-1 through 4-6) evaluate performance of participants for Active summer events, Active winter events, and Passive events, by residential and C&I. These tables are intended to illustrate trends in participant performance (evaluating how systems perform relative to their hypothetical output) as well as total enrollment and kW reductions. In these tables, per 43 | P a g e
  5. Page 161 of 203Match

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 161 of 203 participant metrics are evaluated exclusively for systems that had a net discharge of greater than 0 kWh over the course of the evaluated event, filtering out resources that did not discharge during the event. It should also be noted that Expected Average Power is equal to the Battery Energy Availability (available energy reported at the beginning of the event) divided by the duration of the event (varies for active events, always 3 hours for Passive events). While the calculation does not account for resources which may be limited by their power rating, given the duration of systems (which are less than the duration of events in most instances, even with a fully charged battery) participating in the program, this is not likely to significantly impact the results. This calculation also does not apply an assumed reserve; said differently, it assumes that participants discharge all available energy down to zero by the end of the event. This approach is applied to both Active and Passive events, to aid in making direct comparisons. The data shows that, in most instances, resources do not discharge to a state of charge below 20%; this is attributable to several factors, including the methodology for scoring Passive performance, the desire for systems to retain some energy in case of an outage event, and the reduced degradation associated with not fully discharging a BESS. Because Eversource and UI did not always call events on the same days (or during the same hours), the number of eligible systems fluctuates, as events may include both utilities, or just one of them. Also note that, in cases where data for an individual resource on an individual event day was eliminated, this would reduce the number of participants, but not the number of eligible systems. Eliminated data is ignored in other fields (e.g., it is not considered in Battery Energy Availability). Table 4-1, below, evaluates residential performance during summer Active events. As additional systems enroll, the expected and delivered kW reductions increase over the course of the season. Participation rates (again, defined as count of systems with net discharge during the event divided by the number of systems enrolled and capable of participating in the event) are consistently high and have improved from an average of 74% in summer 2024 to 88% in summer 2025. Significant changes in participation rates from day to day within the data set are, in part, explained by outage protection events. For example, Enphase implemented outage protection on July 8, 2025 for the majority of its systems causing them to not discharge during the Active event on that day; this is reflected by a significant decrease in participating systems on that date. Battery availability per participant is also reasonably consistent and indicates that most systems are starting with a reasonably high state of charge. This value has also increased considerably from last year’s data. This is attributable primarily to an increase in the nameplate capacity of participating systems; however, starting state of charge for participating systems also increased, from approximately 88% to 96%. Because other columns are based on available energy (as opposed to nameplate energy capacity), this increase in starting state of charge is an improvement in performance that is incremental to the improvement in performance reflected in the final column (% of Maximum Expected Power per Event). Per participant average power per event is also reasonably stable. Performance relative to expected performance, as measured in the final column, has increased significantly from the previous evaluation, from 59% to 67%. Interestingly, this value also fluctuates significantly over the course of summer 2025. This is not clearly attributable to a single factor. In the last evaluation, there was a clear difference in participation between two-hour and three-hour events, with participation higher in three-hour events, indicating that systems may not be changing their dispatch strategy based on whether an event was two or three hours long. This is no longer the case as performance (as % of maximum possible) is higher for two-hour events than three-hour 44 | P a g e
  6. Page 162 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 162 of 203 events, indicating that dispatch is more appropriately factoring in event duration. Instead, the variation in performance is attributable to a range of factors including: • • • The impact of outage events, as some resources in outage protection mode will still discharge some energy during events, causing them to be counted as a participant Different starting state of charge, as, while the metric is based off of starting available energy, because most resources will not discharge down to 0% state of charge, a lower starting state of charge will tend to reduce the calculated performance (e.g., if a resource starts at 20% state of charge, it could score 100% by discharging to 0% state of charge, but, in practice, it may not discharge at all, which would yield a score of 0%) Failure to discharge available energy for other reasons Table 4-1. Residential Program Evaluation Metrics by Active Event Date-Summer 2025 Season Maximum Expected Battery Battery Energy Average Average Eligible Active Event Energy Participants Availability Power per Power Based Event Date Systems Participation Availability ² (kWh/ Event (kW/ on Energy ¹ % (kWh/ Participant)³ program) Availability Event) (kW/ Participant) Average Power per Event (kW/ Participant) % of Maximum Expected Power per Event (%) 15.6 10.1 65% 6/24/2025 333 257 77% 31 8007 2607 7/1/2025 341 329 96% 28 9114 1915 9.2 5.8 63% 7/2/2025 341 324 95% 27 8827 2955 13.6 9.1 67% 7/3/2025 341 248 73% 31 7759 1313 10.4 5.3 51% 7/5/2025 341 317 93% 28 8992 2056 9.5 6.5 69% 7/6/2025 341 314 92% 28 8870 2020 9.4 6.4 68% 7/7/2025 341 313 92% 27 8568 2915 13.7 9.3 68% 7/8/2025 300 219 73% 33 7286 1645 11.1 7.5 68% 7/9/2025 342 326 95% 28 9004 2974 13.8 9.1 66% 7/10/2025 342 330 96% 27 8808 2985 13.3 9.0 68% 7/11/2025 342 334 98% 27 9165 3073 13.7 9.2 67% 7/12/2025 347 336 97% 27 9218 2118 9.1 6.3 69% 7/13/2025 335 322 96% 28 8904 2074 9.2 6.4 70% 7/14/2025 347 293 84% 29 8360 1568 9.5 5.4 56% 7/15/2025 348 277 80% 31 8496 2739 15.3 9.9 64% 7/16/2025 348 270 78% 31 8400 2772 15.6 10.3 66% 7/17/2025 350 278 79% 30 8375 2760 15.1 9.9 66% 7/18/2025 350 343 98% 27 9426 3248 13.7 9.5 69% 7/20/2025 350 271 77% 31 8446 1741 10.4 6.4 62% 7/23/2025 350 293 84% 31 8939 2077 10.2 7.1 70% 7/24/2025 351 297 85% 30 9040 2961 15.2 10.0 66% 7/25/2025 351 273 78% 31 8543 2825 15.6 10.3 66% 7/26/2025 351 283 81% 31 8688 2886 15.3 10.2 66% 45 | P a g e
  7. Page 163 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 163 of 203 7/28/2025 351 285 81% 31 8707 1994 10.2 7.0 69% 7/29/2025 350 293 84% 30 8829 2888 15.1 9.9 65% 7/30/2025 350 275 79% 31 8544 2791 15.5 10.1 65% 7/31/2025 352 330 94% 27 8819 3004 13.4 9.1 68% 8/4/2025 307 300 98% 29 8763 2124 9.7 7.1 73% 8/5/2025 350 345 99% 27 9465 3315 13.7 9.6 70% 8/6/2025 351 312 89% 29 9021 1967 9.6 6.3 65% 8/7/2025 352 346 98% 28 9785 2355 9.4 6.8 72% 8/10/2025 354 349 99% 28 9805 2333 9.4 6.7 71% 8/11/2025 353 344 97% 28 9586 3368 13.9 9.8 70% 8/12/2025 354 347 98% 28 9668 3331 13.9 9.6 69% 8/13/2025 359 341 95% 28 9421 2713 13.8 8.0 58% 8/14/2025 358 349 97% 28 9667 3344 13.8 9.6 69% 8/15/2025 359 351 98% 28 9809 3398 14.0 9.7 69% 8/16/2025 359 353 98% 29 10140 3364 14.4 9.5 66% 8/17/2025 359 352 98% 29 10107 2362 9.6 6.7 70% 8/23/2025 365 362 99% 28 10290 2434 9.5 6.7 71% 8/24/2025 366 364 99% 29 10599 2381 9.7 6.5 67% 8/25/2025 366 360 98% 29 10502 2379 9.7 6.6 68% Summer 2022 Average 100% 17 17 3.9 5.7 3.9 69% Summer 2023 Average 74% 16 617 119 6.8 3.0 45% Summer 2024 Average 88% 18 3069 839 8.5 4.9 59% 90% 29 9066 2573 12.3 8.2 67% Summer 2025 Overall Average 348 314 Note: 1Eligible Systems represents a count of BESS able to participate in an event, established by determining if the system had begun providing interval data. 2 Participants, here, are defined as projects with a net discharge of greater than zero over the course of the event. Other fields denominated in per Participant only include resources that had a net discharge of greater than 0 over the course of the event (i.e., these metrics filter out resources that did not discharge during the event). 3 Battery Energy Availability is based on energy available at the beginning of the event; it is not adjusted to account for a potential reserve. Similarly, the Maximum Expected Average Power Based on Energy Availability metric assumes that the resources are discharged to a state of charge of 0. All averages represent simple averages of the per event values above; each event is not weighted. Source: CES analysis of telemetry data; 2022/2023 and 2023/2024 values from previous ESS Program EM&V annual report. Table 4-2 provides the same analysis, but for winter seasons. Unlike the 2024-2025 winter, participation across the two events is consistent and high. Performance (as measured by % of Maximum Expected Power) has increased substantially as well, with participation rates and performance at rates comparable to the Summer 2025 rates. This increased winter performance is valuable, given that winter dispatch will become more valuable to New England’s grid over time. More systems participated in these events relative to the summer 2025 because more systems had enrolled by the beginning of the winter events. 46 | P a g e
  8. Page 164 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 164 of 203 Table 4-2. Residential Program Evaluation Metrics by Active Event Date-Winter 2025-2026 Season Maximum % of Battery Average Expected Active Event Battery Energy Average Power Maximum Event Eligible Energy Power per Average Power Participants2Participation Availability per Event Expected Date Systems1 Availability Event Based on Energy % (kWh/Participant)3 (kW/Participant) Power per (kWh/Event)(kW/program) Availability Event (%) (kW/Participant) 1/20/2026 521 485 93% 26 12769 4258 13.2 8.8 67% 1/30/2026 551 515 93% 26 13475 4412 13.1 8.6 65% Winter 2022/2023 Average 79% 23 114 15 7.7 3 39% Winter 2023/2024 Average 79% 12 1366 213 4.1 1.9 44% Winter 2024/2025 Average 64% 27 3970 1046 13.7 7.3 54% Winter 2025/ 2026 Average 93% 26 13122 4335 13.1 8.7 66% 536 500 Note: 1Eligible Systems represents a count of BESS able to participate in an event, established by determining if the system had begun providing interval data. 2 Participants, here, are defined as projects with a net discharge of greater than zero over the course of the event. Other fields denominated in per Participant only include resources that had a net discharge of greater than 0 over the course of the event (i.e., these metrics filter out resources that did not discharge during the event). 3 Battery Energy Availability is based on energy available at the beginning of the event; it is not adjusted to account for a potential reserve. Similarly, the Maximum Expected Average Power Based on Energy Availability metric assumes that the resources are discharged to a state of charge of 0. All averages represent simple averages of the per event values above; each event is not weighted. Source: CES analysis of telemetry data; 2022/2023 and 2023/2024 values from previous ESS Program EM&V annual report. Table 4-3 shows performance during residential Passive events. All metrics have improved relative to the Summer 2024, which, itself already shows a significant increase in performance. Note that these metrics do not replicate the Passive scoring methodology, but are calculated in the same way as the Active metrics in this report, enabling comparison. Because no reserve is assumed, the highest score possible, while maintaining a 20% reserve capacity (as required by the Program Manual for Passive events), would be 80%. In its Year 4 Final Decision, PURA directed Passive events to be reduced to three hours long – this first went into effect with the summer 2025 season. Because of how the metrics in the table are calculated, this change in event duration should not, in and of itself, change performance. Thus, the improvement is due to improved operations, not just the change in event duration. Participation rates, per participant energy availability, and % of maximum expected power per event all are comparable to Active events. Table 4-3. Residential Program Evaluation Metrics by Passive Event Date Summer 2025 Maximum % of Passive Battery Average Expected Battery Energy Average Power Maximum Event Eligible Event Energy Power per Average Power Participants2 Availability per Event Expected Date Systems1 Participation Availability Event Based on Energy (kWh/Participant)3 (kW/Participant) Power per % (kWh/Event)(kW/program) Availability Event (%) (kW/Participant) 6/2/2025 261 250 96% 23 5806 1295 7.7 5.2 67% 47 | P a g e
  9. Page 165 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 165 of 203 6/3/2025 261 249 95% 24 5853 1333 7.8 5.4 68% 6/4/2025 261 243 93% 23 5683 1341 7.8 5.5 71% 6/5/2025 262 249 95% 23 5840 1335 7.8 5.4 69% 6/6/2025 262 245 94% 23 5750 1148 7.8 4.7 60% 6/9/2025 263 254 97% 23 5903 1324 7.7 5.2 67% 6/10/2025 267 251 94% 23 5704 1267 7.6 5.0 67% 6/11/2025 267 252 94% 23 5909 1359 7.8 5.4 69% 6/12/2025 270 257 95% 24 6049 1341 7.8 5.2 67% 6/13/2025 270 258 96% 24 6134 1348 7.9 5.2 66% 6/16/2025 270 258 96% 24 6143 1435 7.9 5.6 70% 6/17/2025 270 257 95% 22 5649 1278 7.3 5.0 68% 6/18/2025 272 249 92% 24 5955 1339 8.0 5.4 67% 6/20/2025 272 258 95% 23 6046 1430 7.8 5.5 71% 6/23/2025 272 245 90% 25 6071 1397 8.3 5.7 69% 6/25/2025 275 234 85% 25 5908 1179 8.4 5.0 60% 6/26/2025 275 261 95% 23 6077 1435 7.8 5.5 71% 6/27/2025 275 258 94% 24 6218 1396 8.0 5.4 67% 6/30/2025 275 225 82% 25 5684 1232 8.4 5.5 65% 7/8/2025 25 11 44% 21 232 15 7.0 1.4 20% 7/21/2025 292 271 93% 25 6640 1627 8.2 6.0 74% 7/22/2025 292 257 88% 25 6440 1517 8.4 5.9 71% 8/1/2025 293 272 93% 25 6713 1596 8.2 5.9 71% 8/4/2025 26 26 100% 19 483 116 6.2 4.5 72% 8/8/2025 296 276 93% 25 6889 1670 8.3 6.0 73% 8/18/2025 304 287 94% 25 7103 1746 8.2 6.1 74% 8/19/2025 304 278 91% 25 7000 1710 8.4 6.2 73% 8/20/2025 304 285 94% 24 6757 1581 7.9 5.5 70% 8/21/2025 310 286 92% 25 7092 1715 8.3 6.0 73% 8/22/2025 310 280 90% 25 7109 1717 8.5 6.1 72% 8/26/2025 310 295 95% 25 7490 1765 8.5 6.0 71% 8/27/2025 311 274 88% 26 7152 1630 8.7 5.9 68% 8/28/2025 309 248 80% 29 7100 1465 9.5 5.9 62% 8/29/2025 311 291 94% 25 7367 1764 8.4 6.1 72% Summer 2023 Average 76% 15 535 55 3 1.6 53% Summer 2024 Average 80% 16 2201 277 3.2 2.1 63% 91% 24 5999 1378 8.0 5.4 67% Summer 2025 Average 268 247 Note: 1Eligible Systems represents a count of BESS able to participate in an event, established by determining if the system had begun providing interval data. 2 Participants, here, are defined as projects with a net discharge of greater than zero over the course of the event. Other fields denominated in per Participant only include resources that had a net discharge of greater than 0 over the course of the event (i.e., these metrics filter out resources that did not discharge during the event). 48 | P a g e
  10. Page 166 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 166 of 203 Battery Energy Availability is based on energy available at the beginning of the event; it is not adjusted to account for a potential reserve. Similarly, the Maximum Expected Average Power Based on Energy Availability metric assumes that the resources are discharged to a state of charge of 0. It should be noted that the program rules directed participants to discharge to a state of charge of 20% during Passive events rather than discharge to 0%. All averages represent simple averages of the per event values above; each event is not weighted. 3 Source: CES analysis of telemetry data; 2022/2023 and 2023/2024 values from previous ESS Program EM&V annual report. The following set of tables provide the same metrics, but for C&I projects. In the commercial tables in the previous annual report, because of issues related to the reliability of the stored kWh field in the telemetry data, it was always assumed that the starting available energy was equal to the nameplate energy capacity (kWh). For this year’s report, Battery Energy Availability is based on telemetry data for both Active and Passive events, not an assumed 100% state of charge. This also affects the Maximum Expected Average Power Based on Energy Availability and % of Maximum Expected Power per Event fields, as the calculations for both fields use starting energy as an input. In general, this change will tend to reduce Battery Energy Availability, decrease Maximum Expected Average Power Based on Energy Availability, and increase % of Maximum Expected Power per Event. Table 4-4 below, provides information on the participation of C&I systems in active events during summer 2024. For most of the summer 2025 season, there were only 4 eligible systems, the same number as in the preceding summer. Given this limited number of projects, it is challenging to draw robust conclusions related to the anticipated performance of future systems. Still, the data show a remarkable improvement in performance, as measured by the % of Maximum Expected Power field, jumping from 34% to 64%, comparable to residential performance. As noted above, some of this is attributable to a change in the calculation; however, the relatively modest decrease in Battery Energy Availability (again, caused by using actual starting energy as opposed to assuming 100% state of charge at the beginning of the event) does not explain the increase in performance; thus, the majority of the improvement is attributable to improved dispatch. Note that some data quality issues which were addressed by removing the applicable system for a given event explain some of the events in which not all eligible systems participated as well as the considerable fluctuation in other metrics from event to event. Table 4-4. C&I Program Evaluation Metrics by Active Event Date - Summer 2025 Season Participants2 Active Event Participation % Battery Energy Availability (kWh/ Participant)3 Battery Energy Availability (kWh/ Event) Average Power per Event (kW/ program) 4 4 100% 418 1673 531 Maximum Expected Average Power Based on Energy Availability (kW/ Participant) 209 4 4 100% 585 2342 532 195 7/2/2025 4 4 100% 582 2328 600 7/3/2025 4 4 100% 593 2372 7/5/2025 4 4 100% 592 7/6/2025 4 4 100% 595 7/7/2025 4 4 100% 7/8/2025 4 4 7/9/2025 4 4 Event Date Eligible System`s1 6/24/2025 7/1/2025 Average Power per Event (kW/ Participant) % of Maximum Expected Power per Event (%) 133 63% 133 68% 291 150 52% 532 198 133 67% 2366 450 197 113 57% 2379 520 198 130 66% 577 2308 604 288 151 52% 100% 593 2370 472 198 118 60% 100% 538 2151 535 269 134 50% 49 | P a g e

Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf

Extracted from the file · 2 pages · 6,256 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf

Extracted from the file · 2 pages · 3,261 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf

Extracted from the file · 1 page · 528 characters

Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf

Extracted from the file · 2 pages · 4,800 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)

This filing on the current system (opens in a new tab)