Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

5. Annual Compliance Filings – Additional Filings (Program Materials)

Compliance filingFiled by Avangrid13 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files13

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of 2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdf

Extracted from the file · 147 pages · 342,741 characters

8 pages match
  1. Page 162 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 162 of 203 events, indicating that dispatch is more appropriately factoring in event duration. Instead, the variation in performance is attributable to a range of factors including: • • • The impact of outage events, as some resources in outage protection mode will still discharge some energy during events, causing them to be counted as a participant Different starting state of charge, as, while the metric is based off of starting available energy, because most resources will not discharge down to 0% state of charge, a lower starting state of charge will tend to reduce the calculated performance (e.g., if a resource starts at 20% state of charge, it could score 100% by discharging to 0% state of charge, but, in practice, it may not discharge at all, which would yield a score of 0%) Failure to discharge available energy for other reasons Table 4-1. Residential Program Evaluation Metrics by Active Event Date-Summer 2025 Season Maximum Expected Battery Battery Energy Average Average Eligible Active Event Energy Participants Availability Power per Power Based Event Date Systems Participation Availability ² (kWh/ Event (kW/ on Energy ¹ % (kWh/ Participant)³ program) Availability Event) (kW/ Participant) Average Power per Event (kW/ Participant) % of Maximum Expected Power per Event (%) 15.6 10.1 65% 6/24/2025 333 257 77% 31 8007 2607 7/1/2025 341 329 96% 28 9114 1915 9.2 5.8 63% 7/2/2025 341 324 95% 27 8827 2955 13.6 9.1 67% 7/3/2025 341 248 73% 31 7759 1313 10.4 5.3 51% 7/5/2025 341 317 93% 28 8992 2056 9.5 6.5 69% 7/6/2025 341 314 92% 28 8870 2020 9.4 6.4 68% 7/7/2025 341 313 92% 27 8568 2915 13.7 9.3 68% 7/8/2025 300 219 73% 33 7286 1645 11.1 7.5 68% 7/9/2025 342 326 95% 28 9004 2974 13.8 9.1 66% 7/10/2025 342 330 96% 27 8808 2985 13.3 9.0 68% 7/11/2025 342 334 98% 27 9165 3073 13.7 9.2 67% 7/12/2025 347 336 97% 27 9218 2118 9.1 6.3 69% 7/13/2025 335 322 96% 28 8904 2074 9.2 6.4 70% 7/14/2025 347 293 84% 29 8360 1568 9.5 5.4 56% 7/15/2025 348 277 80% 31 8496 2739 15.3 9.9 64% 7/16/2025 348 270 78% 31 8400 2772 15.6 10.3 66% 7/17/2025 350 278 79% 30 8375 2760 15.1 9.9 66% 7/18/2025 350 343 98% 27 9426 3248 13.7 9.5 69% 7/20/2025 350 271 77% 31 8446 1741 10.4 6.4 62% 7/23/2025 350 293 84% 31 8939 2077 10.2 7.1 70% 7/24/2025 351 297 85% 30 9040 2961 15.2 10.0 66% 7/25/2025 351 273 78% 31 8543 2825 15.6 10.3 66% 7/26/2025 351 283 81% 31 8688 2886 15.3 10.2 66% 45 | P a g e
  2. Page 163 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 163 of 203 7/28/2025 351 285 81% 31 8707 1994 10.2 7.0 69% 7/29/2025 350 293 84% 30 8829 2888 15.1 9.9 65% 7/30/2025 350 275 79% 31 8544 2791 15.5 10.1 65% 7/31/2025 352 330 94% 27 8819 3004 13.4 9.1 68% 8/4/2025 307 300 98% 29 8763 2124 9.7 7.1 73% 8/5/2025 350 345 99% 27 9465 3315 13.7 9.6 70% 8/6/2025 351 312 89% 29 9021 1967 9.6 6.3 65% 8/7/2025 352 346 98% 28 9785 2355 9.4 6.8 72% 8/10/2025 354 349 99% 28 9805 2333 9.4 6.7 71% 8/11/2025 353 344 97% 28 9586 3368 13.9 9.8 70% 8/12/2025 354 347 98% 28 9668 3331 13.9 9.6 69% 8/13/2025 359 341 95% 28 9421 2713 13.8 8.0 58% 8/14/2025 358 349 97% 28 9667 3344 13.8 9.6 69% 8/15/2025 359 351 98% 28 9809 3398 14.0 9.7 69% 8/16/2025 359 353 98% 29 10140 3364 14.4 9.5 66% 8/17/2025 359 352 98% 29 10107 2362 9.6 6.7 70% 8/23/2025 365 362 99% 28 10290 2434 9.5 6.7 71% 8/24/2025 366 364 99% 29 10599 2381 9.7 6.5 67% 8/25/2025 366 360 98% 29 10502 2379 9.7 6.6 68% Summer 2022 Average 100% 17 17 3.9 5.7 3.9 69% Summer 2023 Average 74% 16 617 119 6.8 3.0 45% Summer 2024 Average 88% 18 3069 839 8.5 4.9 59% 90% 29 9066 2573 12.3 8.2 67% Summer 2025 Overall Average 348 314 Note: 1Eligible Systems represents a count of BESS able to participate in an event, established by determining if the system had begun providing interval data. 2 Participants, here, are defined as projects with a net discharge of greater than zero over the course of the event. Other fields denominated in per Participant only include resources that had a net discharge of greater than 0 over the course of the event (i.e., these metrics filter out resources that did not discharge during the event). 3 Battery Energy Availability is based on energy available at the beginning of the event; it is not adjusted to account for a potential reserve. Similarly, the Maximum Expected Average Power Based on Energy Availability metric assumes that the resources are discharged to a state of charge of 0. All averages represent simple averages of the per event values above; each event is not weighted. Source: CES analysis of telemetry data; 2022/2023 and 2023/2024 values from previous ESS Program EM&V annual report. Table 4-2 provides the same analysis, but for winter seasons. Unlike the 2024-2025 winter, participation across the two events is consistent and high. Performance (as measured by % of Maximum Expected Power) has increased substantially as well, with participation rates and performance at rates comparable to the Summer 2025 rates. This increased winter performance is valuable, given that winter dispatch will become more valuable to New England’s grid over time. More systems participated in these events relative to the summer 2025 because more systems had enrolled by the beginning of the winter events. 46 | P a g e
  3. Page 164 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 164 of 203 Table 4-2. Residential Program Evaluation Metrics by Active Event Date-Winter 2025-2026 Season Maximum % of Battery Average Expected Active Event Battery Energy Average Power Maximum Event Eligible Energy Power per Average Power Participants2Participation Availability per Event Expected Date Systems1 Availability Event Based on Energy % (kWh/Participant)3 (kW/Participant) Power per (kWh/Event)(kW/program) Availability Event (%) (kW/Participant) 1/20/2026 521 485 93% 26 12769 4258 13.2 8.8 67% 1/30/2026 551 515 93% 26 13475 4412 13.1 8.6 65% Winter 2022/2023 Average 79% 23 114 15 7.7 3 39% Winter 2023/2024 Average 79% 12 1366 213 4.1 1.9 44% Winter 2024/2025 Average 64% 27 3970 1046 13.7 7.3 54% Winter 2025/ 2026 Average 93% 26 13122 4335 13.1 8.7 66% 536 500 Note: 1Eligible Systems represents a count of BESS able to participate in an event, established by determining if the system had begun providing interval data. 2 Participants, here, are defined as projects with a net discharge of greater than zero over the course of the event. Other fields denominated in per Participant only include resources that had a net discharge of greater than 0 over the course of the event (i.e., these metrics filter out resources that did not discharge during the event). 3 Battery Energy Availability is based on energy available at the beginning of the event; it is not adjusted to account for a potential reserve. Similarly, the Maximum Expected Average Power Based on Energy Availability metric assumes that the resources are discharged to a state of charge of 0. All averages represent simple averages of the per event values above; each event is not weighted. Source: CES analysis of telemetry data; 2022/2023 and 2023/2024 values from previous ESS Program EM&V annual report. Table 4-3 shows performance during residential Passive events. All metrics have improved relative to the Summer 2024, which, itself already shows a significant increase in performance. Note that these metrics do not replicate the Passive scoring methodology, but are calculated in the same way as the Active metrics in this report, enabling comparison. Because no reserve is assumed, the highest score possible, while maintaining a 20% reserve capacity (as required by the Program Manual for Passive events), would be 80%. In its Year 4 Final Decision, PURA directed Passive events to be reduced to three hours long – this first went into effect with the summer 2025 season. Because of how the metrics in the table are calculated, this change in event duration should not, in and of itself, change performance. Thus, the improvement is due to improved operations, not just the change in event duration. Participation rates, per participant energy availability, and % of maximum expected power per event all are comparable to Active events. Table 4-3. Residential Program Evaluation Metrics by Passive Event Date Summer 2025 Maximum % of Passive Battery Average Expected Battery Energy Average Power Maximum Event Eligible Event Energy Power per Average Power Participants2 Availability per Event Expected Date Systems1 Participation Availability Event Based on Energy (kWh/Participant)3 (kW/Participant) Power per % (kWh/Event)(kW/program) Availability Event (%) (kW/Participant) 6/2/2025 261 250 96% 23 5806 1295 7.7 5.2 67% 47 | P a g e
  4. Page 165 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 165 of 203 6/3/2025 261 249 95% 24 5853 1333 7.8 5.4 68% 6/4/2025 261 243 93% 23 5683 1341 7.8 5.5 71% 6/5/2025 262 249 95% 23 5840 1335 7.8 5.4 69% 6/6/2025 262 245 94% 23 5750 1148 7.8 4.7 60% 6/9/2025 263 254 97% 23 5903 1324 7.7 5.2 67% 6/10/2025 267 251 94% 23 5704 1267 7.6 5.0 67% 6/11/2025 267 252 94% 23 5909 1359 7.8 5.4 69% 6/12/2025 270 257 95% 24 6049 1341 7.8 5.2 67% 6/13/2025 270 258 96% 24 6134 1348 7.9 5.2 66% 6/16/2025 270 258 96% 24 6143 1435 7.9 5.6 70% 6/17/2025 270 257 95% 22 5649 1278 7.3 5.0 68% 6/18/2025 272 249 92% 24 5955 1339 8.0 5.4 67% 6/20/2025 272 258 95% 23 6046 1430 7.8 5.5 71% 6/23/2025 272 245 90% 25 6071 1397 8.3 5.7 69% 6/25/2025 275 234 85% 25 5908 1179 8.4 5.0 60% 6/26/2025 275 261 95% 23 6077 1435 7.8 5.5 71% 6/27/2025 275 258 94% 24 6218 1396 8.0 5.4 67% 6/30/2025 275 225 82% 25 5684 1232 8.4 5.5 65% 7/8/2025 25 11 44% 21 232 15 7.0 1.4 20% 7/21/2025 292 271 93% 25 6640 1627 8.2 6.0 74% 7/22/2025 292 257 88% 25 6440 1517 8.4 5.9 71% 8/1/2025 293 272 93% 25 6713 1596 8.2 5.9 71% 8/4/2025 26 26 100% 19 483 116 6.2 4.5 72% 8/8/2025 296 276 93% 25 6889 1670 8.3 6.0 73% 8/18/2025 304 287 94% 25 7103 1746 8.2 6.1 74% 8/19/2025 304 278 91% 25 7000 1710 8.4 6.2 73% 8/20/2025 304 285 94% 24 6757 1581 7.9 5.5 70% 8/21/2025 310 286 92% 25 7092 1715 8.3 6.0 73% 8/22/2025 310 280 90% 25 7109 1717 8.5 6.1 72% 8/26/2025 310 295 95% 25 7490 1765 8.5 6.0 71% 8/27/2025 311 274 88% 26 7152 1630 8.7 5.9 68% 8/28/2025 309 248 80% 29 7100 1465 9.5 5.9 62% 8/29/2025 311 291 94% 25 7367 1764 8.4 6.1 72% Summer 2023 Average 76% 15 535 55 3 1.6 53% Summer 2024 Average 80% 16 2201 277 3.2 2.1 63% 91% 24 5999 1378 8.0 5.4 67% Summer 2025 Average 268 247 Note: 1Eligible Systems represents a count of BESS able to participate in an event, established by determining if the system had begun providing interval data. 2 Participants, here, are defined as projects with a net discharge of greater than zero over the course of the event. Other fields denominated in per Participant only include resources that had a net discharge of greater than 0 over the course of the event (i.e., these metrics filter out resources that did not discharge during the event). 48 | P a g e
  5. Page 166 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 166 of 203 Battery Energy Availability is based on energy available at the beginning of the event; it is not adjusted to account for a potential reserve. Similarly, the Maximum Expected Average Power Based on Energy Availability metric assumes that the resources are discharged to a state of charge of 0. It should be noted that the program rules directed participants to discharge to a state of charge of 20% during Passive events rather than discharge to 0%. All averages represent simple averages of the per event values above; each event is not weighted. 3 Source: CES analysis of telemetry data; 2022/2023 and 2023/2024 values from previous ESS Program EM&V annual report. The following set of tables provide the same metrics, but for C&I projects. In the commercial tables in the previous annual report, because of issues related to the reliability of the stored kWh field in the telemetry data, it was always assumed that the starting available energy was equal to the nameplate energy capacity (kWh). For this year’s report, Battery Energy Availability is based on telemetry data for both Active and Passive events, not an assumed 100% state of charge. This also affects the Maximum Expected Average Power Based on Energy Availability and % of Maximum Expected Power per Event fields, as the calculations for both fields use starting energy as an input. In general, this change will tend to reduce Battery Energy Availability, decrease Maximum Expected Average Power Based on Energy Availability, and increase % of Maximum Expected Power per Event. Table 4-4 below, provides information on the participation of C&I systems in active events during summer 2024. For most of the summer 2025 season, there were only 4 eligible systems, the same number as in the preceding summer. Given this limited number of projects, it is challenging to draw robust conclusions related to the anticipated performance of future systems. Still, the data show a remarkable improvement in performance, as measured by the % of Maximum Expected Power field, jumping from 34% to 64%, comparable to residential performance. As noted above, some of this is attributable to a change in the calculation; however, the relatively modest decrease in Battery Energy Availability (again, caused by using actual starting energy as opposed to assuming 100% state of charge at the beginning of the event) does not explain the increase in performance; thus, the majority of the improvement is attributable to improved dispatch. Note that some data quality issues which were addressed by removing the applicable system for a given event explain some of the events in which not all eligible systems participated as well as the considerable fluctuation in other metrics from event to event. Table 4-4. C&I Program Evaluation Metrics by Active Event Date - Summer 2025 Season Participants2 Active Event Participation % Battery Energy Availability (kWh/ Participant)3 Battery Energy Availability (kWh/ Event) Average Power per Event (kW/ program) 4 4 100% 418 1673 531 Maximum Expected Average Power Based on Energy Availability (kW/ Participant) 209 4 4 100% 585 2342 532 195 7/2/2025 4 4 100% 582 2328 600 7/3/2025 4 4 100% 593 2372 7/5/2025 4 4 100% 592 7/6/2025 4 4 100% 595 7/7/2025 4 4 100% 7/8/2025 4 4 7/9/2025 4 4 Event Date Eligible System`s1 6/24/2025 7/1/2025 Average Power per Event (kW/ Participant) % of Maximum Expected Power per Event (%) 133 63% 133 68% 291 150 52% 532 198 133 67% 2366 450 197 113 57% 2379 520 198 130 66% 577 2308 604 288 151 52% 100% 593 2370 472 198 118 60% 100% 538 2151 535 269 134 50% 49 | P a g e
  6. Page 167 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 167 of 203 7/10/2025 4 4 100% 533 2133 499 267 125 47% 7/11/2025 4 4 100% 511 2046 505 256 126 49% 7/12/2025 4 4 100% 538 2150 435 179 109 61% 7/13/2025 4 4 100% 560 2240 391 187 98 52% 7/14/2025 4 4 100% 470 1880 381 157 95 61% 7/15/2025 4 4 100% 507 2029 486 254 121 48% 7/16/2025 4 4 100% 566 2263 534 283 134 47% 7/17/2025 4 4 100% 520 2078 472 260 118 45% 7/18/2025 4 3 75% 604 1811 458 302 153 51% 7/20/2025 4 3 75% 610 1831 320 203 107 52% 7/23/2025 4 3 75% 602 1806 283 201 94 47% 7/24/2025 4 3 75% 604 1811 360 302 120 40% 7/25/2025 4 3 75% 605 1815 301 303 100 33% 7/26/2025 4 2 50% 642 1285 253 321 127 39% 7/28/2025 4 3 75% 608 1824 244 203 81 40% 7/29/2025 4 2 50% 642 1285 253 321 126 39% 7/30/2025 2 2 100% 642 1285 253 321 126 39% 7/31/2025 4 2 50% 504 1009 307 252 153 61% 8/4/2025 3 2 67% 533 1066 263 178 132 74% 8/5/2025 4 2 50% 470 939 342 235 171 73% 8/6/2025 3 2 67% 497 995 265 166 133 80% 8/7/2025 3 2 67% 518 1035 312 173 156 90% 8/10/2025 3 2 67% 516 1033 306 172 153 89% 8/11/2025 4 2 50% 515 1029 428 257 214 83% 8/12/2025 4 2 50% 507 1015 432 254 216 85% 8/13/2025 4 2 50% 502 1004 437 251 218 87% 8/14/2025 4 2 50% 508 1015 468 254 234 92% 8/15/2025 4 2 50% 508 1016 478 254 239 94% 8/16/2025 4 2 50% 509 1018 445 255 222 87% 8/17/2025 3 2 67% 517 1034 310 172 155 90% 8/23/2025 3 2 67% 512 1024 306 171 153 90% 8/24/2025 3 2 67% 514 1028 302 171 151 88% 8/25/2025 4 2 50% 510 1020 310 170 155 91% 100% 660 660 3.4 125 3.4 2% 79% 607 1274 201 286 96 34% 78% 547 1622 403 232 143 64% Summer 2023 Average Summer 2024 Average Summer 2025 Average 4 3 Note: 1Eligible Systems represents a count of BESS able to participate in an event, established by determining if the system had begun providing interval data. 2 Participants, here, are defined as projects with a net discharge of greater than zero over the course of the event. Other fields denominated in per Participant only include resources that had a net discharge of greater than 0 over the course of the event (i.e., these metrics filter out resources that did not discharge during the event). 3 Battery Energy Availability is based on energy available at the beginning of the event; it is not adjusted to account for a potential reserve. Similarly, the Maximum Expected Average Power Based on Energy Availability metric assumes that the resources are discharged to a state of charge of 0. 50 | P a g e
  7. Page 168 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 168 of 203 *As noted in the prose above, because of data quality issues, previous reports assumed that projects started with a 100% state of charge, instead of reporting the starting state of charge indicated by the telemetry data. This report shifts to using the actual starting state of charge. This change in approach makes direct comparisons between this year’s report and previous reports for the indicated metrics potentially misleading. All averages represent simple averages of the per event values above; each event is not weighted. Table 4-5 provides the same analysis, but for winter seasons. Participation improved, with all systems participating in both events. An increase in % of Maximum Expected Power per Event, however, is largely attributable to the change in how Battery Energy Availability was calculated for commercial projects. Table 4-5. C&I Program Evaluation Metrics by Active Event Date – Winter 2025-2026 Season Maximum % of Battery Average Expected Maximum Active Event Battery Energy Average Power Event Eligible Energy Power per Average Power Expected Participants2 Participation Availability per Event 1 Date Systems Availability Event Based on Energy Power 3 % (kWh/Participant) (kW/Participant) (kWh/Event)(kW/program) Availability per Event (kW/Participant) (%) 1/20/2026 4 4 100% 519 2076 601 259.6 150.1 58% 1/30/2026 4 4 100% 424 1697 550 212.1 137.6 65% Winter 2025/2026 Overall Average Winter 2023/2024 Average 100% 660 660 70 125 70 40% Winter 2024/2025 Average 75% 566 1644 450 283 142 51% 100% 472 1887 575 235.8 143.9 61% 4 4 Note: 1Eligible Systems represents a count of BESS able to participate in an event, established by determining if the system had begun providing interval data. 2 Participants, here, are defined as projects with a net discharge of greater than zero over the course of the event. Other fields denominated in per Participant only include resources that had a net discharge of greater than 0 over the course of the event (i.e., these metrics filter out resources that did not discharge during the event). 3 Battery Energy Availability is based on energy available at the beginning of the event; it is not adjusted to account for a potential reserve. Similarly, the Maximum Expected Average Power Based on Energy Availability metric assumes that the resources are discharged to a state of charge of 0. All averages represent simple averages of the per event values above; each event is not weighted. Table 4-6 shows a significant improvement in Passive event commercial participation rates, relative to Summer 2024. Other metrics, however, remain relatively stable, with the change in Battery Energy Availability being the primary driver of the increase in % of Maximum Expected Power. 51 | P a g e
  8. Page 169 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 169 of 203 Table 4-6. C&I Program Evaluation Metrics by Passive Event Date Summer 2025 Maximum % of Passive Battery Average Expected Maximum Battery Energy Average Power Event Eligible Event Energy Power per Average Power Expected Participants2 Availability per Event Date Systems1 Participation Availability Event Based on Energy Power (kWh/Participant)3 (kW/Participant) % (kWh/Event)(kW/program) Availability per Event (kW/Participant) (%) 6/2/2025 4 4 100% 492 1969 370 164.1 92.4 56% 6/3/2025 4 4 100% 493 1972 374 164.3 93.6 57% 6/4/2025 4 4 100% 490 1960 385 163.3 96.3 59% 6/5/2025 4 4 100% 504 2018 391 168.1 97.7 58% 6/6/2025 4 4 100% 500 2001 391 166.8 97.8 59% 6/9/2025 4 4 100% 498 1990 384 165.8 96.0 58% 6/10/2025 4 4 100% 499 1996 383 166.3 95.8 58% 6/11/2025 4 4 100% 503 2013 394 167.7 98.4 59% 6/12/2025 4 4 100% 500 2001 388 166.8 97.0 58% 6/13/2025 4 4 100% 496 1983 387 165.2 96.7 59% 6/16/2025 4 4 100% 494 1976 382 164.7 95.4 58% 6/17/2025 4 4 100% 463 1850 356 154.2 89.1 58% 6/18/2025 4 4 100% 473 1893 364 157.8 90.9 58% 6/20/2025 4 4 100% 493 1971 389 164.2 97.3 59% 6/23/2025 4 4 100% 493 1973 324 164.4 80.9 49% 6/25/2025 4 4 100% 446 1783 411 148.6 102.8 69% 6/26/2025 4 4 100% 398 1593 335 132.7 83.8 63% 6/27/2025 4 4 100% 440 1760 396 146.6 99.0 68% 6/30/2025 4 4 100% 494 1976 401 164.6 100.2 61% 7/21/2025 4 3 75% 551 1653 327 183.7 109.0 59% 7/22/2025 4 3 75% 527 1580 300 175.5 100.0 57% 8/1/2025 4 3 75% 312 935 212 103.9 70.6 68% 8/8/2025 4 3 75% 279 838 281 93.1 93.8 101% 8/18/2025 4 3 75% 278 835 276 92.8 92.0 99% 8/19/2025 4 3 75% 278 834 272 92.7 90.8 98% 8/20/2025 4 3 75% 278 833 254 92.6 84.5 91% 8/21/2025 4 3 75% 278 834 275 92.7 91.5 99% 8/22/2025 4 2 50% 366 732 170 122.0 85.1 70% 8/26/2025 4 2 50% 364 727 169 121.2 84.6 70% 8/27/2025 4 2 50% 366 733 172 122.1 86.2 71% 8/28/2025 4 2 50% 362 725 160 120.8 79.9 66% 8/29/2025 4 2 50% 365 730 157 121.7 78.7 65% Summer 2024 Average 73% 605 1133 117 121 63.0 52% 3 86% 430 1521 320 143.5 92.1 67% Summer 2025 Average 4 52 | P a g e
  9. Page 170 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 170 of 203 Note: 1Eligible Systems represents a count of BESS able to participate in an event, established by determining if the system had begun providing interval data. 2 Participants, here, are defined as projects with a net discharge of greater than zero over the course of the event. Other fields denominated in per Participant only include resources that had a net discharge of greater than 0 over the course of the event (i.e., these metrics filter out resources that did not discharge during the event). 3 Battery Energy Availability is based on energy available at the beginning of the event; it is not adjusted to account for a potential reserve. Similarly, the Maximum Expected Average Power Based on Energy Availability metric assumes that the resources are discharged to a state of charge of 0. It should be noted that the program rules directed participants to discharge to a state of charge of 20% during Passive events rather than discharge to 0%. All averages represent simple averages of the per event values above; each event is not weighted. Source: CES analysis of telemetry data; 2022/2023 and 2023/2024 values from previous ESS Program EM&V annual report. Table 4-7 evaluates delivered kW during specified periods of time, defined below. With the exception described below, the values are calculated based on the intersection of the specified period and events (e.g., only on-peak hours that occurred during an event). The Peak Periods defined below are based on the three-hour periods, by season, with the highest average ISO-NE load. The Average Power per Participant during the ISO-NE annual peak hour exceeded the Average Power during active events overall, even though the event was the first Active event of the season, with additional systems enrolling subsequently in the season. Power discharged during the peak hour also exceeded average discharge over the event. The rows below measuring “Total Dispatch…” yield significantly lower Average Power values, as they include hours during which there was neither an active nor Passive event. These low values should not be considered a problem to be solved, as the timing of active and Passive events is chosen to maximize the impact of storage discharging; low discharging (or charging) during other periods is appropriate. 53 | P a g e
  10. Page 171 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 171 of 203 Table 4-7. Evaluation Metrics by Seasonal Peak Event Evaluation Metric 2025 ISO- NE Peak Hour ( June 24, 2025, 6 p.m -7 p.m. ET) Active Dispatch during Summer Peak Period (non-holiday weekdays 6 p.m.-9 p.m. ET, June-August) Passive Dispatch during Summer Peak Period (nonholiday weekdays 6 p.m.-9 p.m. ET, June-August) Active or Passive Dispatch during Summer Peak Period (non-holiday weekdays 6 p.m.9 p.m. ET, June-August) Total Dispatch during Summer Peak Period (non-holiday weekdays 6 p.m.-9 p.m. ET, June-August) Active Dispatch During Winter Peak Period (non-holiday weekdays 5 p.m.-8 p.m. ET, December-January) Total Dispatch During Winter Peak Period (non-holiday weekdays 5 p.m.-8 p.m. ET, December-January) Residential Residential C&I C&I Residential C&I Average Power per Participant (kW) Average Power per Program (kW) Average Power per Participant (kW) Average Power per Program (kW) Count of Days Count of Days 14 3,384 155 620 1 1 8 2,365 163 485 31 31 5 1,355 93 321 34 32 6 1,946 127 401 63 63 3 831 66 224 63 63 9 4,335 144 575 2 2 1 305 70 252 45 45 Note: Average Power per Participant (kW) excludes systems that were enrolled and eligible to participate in an event, but did not have a net discharge of greater than 0 over the course of the event. "Total Dispatch" metrics consider all hours in the defined period, while other metrics only consider hours falling within the events being evaluated (active or passive). Source: CES analysis of telemetry data. Table 4-8 evaluates how active events lined up with key peak periods. Specifically, it considers how active events aligned with daily peak hours, seasonal peaks, and annual peaks. Eversource called events aligning with summer peaks in 2023, 2024, and 2025; UI did not call an event during the summer 2024 annual peak. The summer 2025 peak occurred unusually early in the season, on June 24th; it was the first event called by both EDCs. Neither utility called an event during the Winter 2025/2026 peak hour, which occurred on January 25 between 1:00 and 2:00 p.m. The EDCs did not call an event on this date; it’s also worth noting that it is unusual for the peak hour to have fallen in the early afternoon; the highest usage hours in the winter tend to be in the early evening. This peak demand also occurred in the midst of a prolonged cold snap, making it more challenging for the EDCs to determine when to call an event, given the maximum of five winter events for Legacy systems. Percentage of Active Events Aligned w/ Daily Peak Hour remained similar to the previous year. 54 | P a g e

Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf

Extracted from the file · 2 pages · 6,256 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf

Extracted from the file · 2 pages · 3,261 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf

Extracted from the file · 1 page · 528 characters

Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf

Extracted from the file · 2 pages · 4,800 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)

This filing on the current system (opens in a new tab)