Compliance Filing, Order No. 1
5. Annual Compliance Filings – Additional Filings (Program Materials)
Files13
2026-11-16 UI Cover Letter 5. Annual Compliance Filings – Additional Filings (Program Materials) #26-08-01.pdf
PDF · 221 KB · 3 pagesText searchable
Download 2026-11-16 UI Cover Letter 5. Annual Compliance Filings – Additional Filings (Program Materials) #26-08-01.pdfRead the text of 2026-11-16 UI Cover Letter 5. Annual Compliance Filings – Additional Filings (Program Materials) #26-08-01.pdf
2026-11-16 UI Attachment 1 - Residential Renewable Energy Solutions Program Manual #26-08-01.pdf
PDF · 763 KB · 59 pagesText searchable
Download 2026-11-16 UI Attachment 1 - Residential Renewable Energy Solutions Program Manual #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 1 - Residential Renewable Energy Solutions Program Manual #26-08-01.pdf
2026-11-16 UI Attachment 2 - Non-Residential Renewable Energy Solutions Program Materials #26-08-01.pdf
PDF · 1.7 MB · 100 pagesText searchable
Download 2026-11-16 UI Attachment 2 - Non-Residential Renewable Energy Solutions Program Materials #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 2 - Non-Residential Renewable Energy Solutions Program Materials #26-08-01.pdf
2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdf
PDF · 2.9 MB · 147 pagesText searchable
Download 2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdf
2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdf
PDF · 4.4 MB · 203 pagesText searchable
Download 2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdf
2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf
PDF · 115 KB · 2 pagesText searchable
Download 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf
2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf
PDF · 159 KB · 2 pagesText searchable
Download 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf
2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx
Excel · 100 KBText searchable
Download 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsxRead the text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx
2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx
Excel · 272 KBText searchable
Download 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsxRead the text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx
2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx
Excel · 3.5 MBText searchable
Download 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsxRead the text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx
2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf
PDF · 144 KB · 1 pageText searchable
Download 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf
2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx
Excel · 71 KBText searchable
Download 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsxRead the text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx
2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf
PDF · 152 KB · 2 pagesText searchable
Download 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdfRead the text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf
Text of 2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdf
Extracted from the file · 147 pages · 342,741 characters
Page 177 of 203
The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 177 of 203 2. Benefit-Cost Analysis PURA and the Program Administrators have relied upon benefit cost analysis (BCA) to evaluate the performance of the program and inform its design and changes since the original conception of the program. Since the original BCA20, the analysis has evolved to consider new test perspectives, account for different costs and benefits, incorporate updated assumptions (both based on actual results and changes in projected values), and reflect changes to the design in the program. This section provides a description of the BCA methodology, highlights key changes to the analysis relative to the analysis filed in Docket No. 25-08-0521, presents results from the BCA, and highlights associated findings and recommendations. 5.1. Benefit-Cost Model – Design and Use Fundamentally, BCA is intended to enable policymakers, regulators, and program implementers to make informed decisions about the design and implementation of policies. Connecticut has used BCAs to inform the design of a variety of energy policies, including the Conservation & Load Management plans. Where practical and applicable, and where PURA has not specifically directed otherwise, the overall methodology and key assumptions used for the ESS BCA are based on the approach to BCAs conducted for the Conservation & Load Management plans and is in line with previous ESS Program BCAs. Test Perspective/Cost Tests Central to conducting BCA is the establishment of test perspectives. There are a diverse array of costs and benefits that are considered in the ESS Program, varying across dimensions such as which parties they accrue to, whether or not they are monetizable, and whether or not they affect electricity rates in Connecticut. Test perspectives help define a coherent set of costs and benefits to compare. For example, what are the net benefits of the program from the perspective of the Connecticut ratepayers (the Ratepayer Impact Measure or RIM) or society at large (the Societal Cost Test or SCT)? The BCA includes a total of seven cost tests: • • • • • • • Program Administrator Cost Test (PACT) Connecticut Efficiency Test (CTET) Participant Cost Test (PCT) Societal Cost Test (SCT) Total Resource Cost Test (TRC) Ratepayer Impact Measure (RIM) Connecticut Ratepayer Impact Measure (RIM-CT) See Connecticut Green Bank Order 7 Compliance filing in Docket No. 21-08-05: https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/06045b22997703bc8 525876400540604?OpenDocument 21 See Program Administrators Orders 3 and 8 Compliance filings, including the previous Annual Report (Attachment 2) and the Excel model (Attachment 1): https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/e8c1272ed4c4e9a58 5258cdc00487590?OpenDocument 20 60 | P a g ePage 178 of 203
The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 178 of 203 The costs and benefits applicable to each of these tests are summarized in the table below. In last year’s Annual Report, based on recurring themes in PURA interrogatories, the BCA was updated to include a seventh test, the RIM-CT. Historically, two tests have been given greater weight in the development of the program, namely the RIM and the Participant Cost Test (PCT). The RIM is effectively a measure of costs and benefits associated with the ESS program that impact non-participants through changes in electricity rates. In its Final Decision in Docket No. 17-12-01RE0322, PURA cites PA 21-53’s objective for PURA to “provide positive net present value to all ratepayers, or a subset of ratepayers paying for the benefits that accrue to that subset of ratepayers” in setting a target RIM of 1.4 for the ESS Program. A number of the benefits (particularly Demand Reduction Induced Price Effect or DRIPE benefits) yield benefits that would affect electricity prices for consumers across New England. Historically, the RIM has included benefits that would benefit ratepayers in Connecticut as well as other ISONE customers. In response to periodic requests from PURA to calculate the RIM excluding benefits that would accrue to ISO-NE customers outside of Connecticut (referred to as interstate or rest-of-pool benefits), 23 the BCA filed Docket No. 25-08-05 was updated to include a seventh test perspective, the RIM-CT, that excludes interstate benefits where the AESC provides values that can be differentiated by intrastate vs. interstate. PURA and the Program Administrators also carefully consider the PCT, as it is intended to evaluate whether projects participating in the ESS Program are likely to yield net financial benefits to the participant. For example, in its Final Decision in Docket No. 23-08-05,24 PURA’s Order 23 directed the Program Administrators to file proposed upfront incentive levels for C&I projects in Tranches 2 and 3, such that “the commercial upfront incentive recommendation will achieve a PCT at or slightly above 1.” Like all cost tests, PCT has limitations, including: • • • The PCT does not replicate the more detailed financial analysis that would be undertaken by entities pursuing commercial projects. The PCT also varies significantly by project, based on characteristics such as customer segment (which affects incentive levels), ability to monetize federal tax credits, presence or absence of on-site distributed generation, rate class, load profile, and project-specific cost. The current ESS BCA evaluates projects over a 10-year project life; in reality, projects are likely to have both costs and benefits that extend beyond this 10-year term. These limitations do not negate the value of considering the PCT; they are only mentioned to highlight what the PCT can and cannot reliably tell us and what that implies for how to apply interpretations of the PCT. For this report, there are two changes to how costs and benefits are applied to different tests. First, the model has been updated to include projected clawbacks. These appear as a cost in the https://www.dpuc.state.ct.us/2nddockcurr.nsf/8e6fc37a54110e3e852576190052b64d/6991ef77ba07b ae185258752007994f7?OpenDocument 23 See, most recently, Interrogatory CAE-5 filed in Docket No. 25-08-05. https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/36efe91c4b4230c38 5258cc00063db22?OpenDocument 24 https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/d7b4cb81bf3765ea 85258a7600551890?OpenDocument 22 61 | P a g ePage 179 of 203
The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 179 of 203 PCT, and a benefit in most other tests, as clawbacks effectively reduce the total amount of incentives paid out by the program. Second, an adjustment has been made to how participant bill savings are treated. Previously, participant bill savings had been considered a benefit in the PCT and a cost in the RIM. Counting bill savings as a cost in the RIM is based on the understanding that the electric power system is effectively a fixed cost system25 – to the extent that one customer pays less for service, that cost will have to be recovered from other customers. For delivery costs, which are largely based on revenue requirements established in rate cases, this assumption is largely valid, as under recovery will generally lead to increased rates. This same assumption likely does not apply to energy supply costs, as wholesale market costs are not tied to a “revenue requirement.” Thus, the Participant Bill Savings impact is now separated into delivery charges vs. energy supply; both are benefits for the PCT, but only delivery charges are a cost in the RIM. All else being equal, this change marginally increases the RIM and leaves the PCT unchanged. Table 5-1. BCA Cost Tests Category Benefit/Cost Stream PACT PCT SCT RIM RIM-CT Benefit Benefit - Benefit Benefit Benefit Benefit Avoided T&D Capacity Benefit Benefit - Benefit Benefit Benefit Benefit Benefit Benefit - Benefit Benefit Benefit Benefit Benefit Benefit - Benefit Benefit Benefit Benefit* Benefit Benefit - Benefit Benefit Benefit DRIPE Energy Impacts Benefit Benefit - Benefit Benefit Benefit Benefit* Cross-DRIPE Impacts Benefit Benefit - Benefit Benefit Benefit Benefit* Avoided Generation Capacity Utility Benefits - Peak Savings Utility Benefits Energy Savings Reliability DRIPE Capacity Impacts Avoided Energy CTET TRC Benefit Societal Benefits GHG Savings Non-Embedded Emissions - Benefit - Benefit - - - Program Administrative Costs Program Administration Cost Cost - Cost Cost Cost Cost Participant Bill Savings - - Benefit - - Cost** Cost** Program Incentives Cost Cost Benefit - - Cost Cost Performance Incentive Aggregator Fee¹ - - Cost - - - - Cost - - Benefit Benefit Participant Bill Savings Incentives Upfront incentive clawbacks Benefit Benefit ESS Technology Costs Participant Incremental DER Costs - - Cost Cost Cost - - Avoided Backup Generator Net Avoided Backup Generator - - Benefit - - - - * Only benefits that accrue to Connecticut are included. Note that the BCA still accounts for net savings in other places, e.g., through avoided T&D capacity. Viewing participant bill savings as a cost in the RIM can be thought of as a pie of a fixed size, with participant bill savings increasing the size of the pie for non-participants. Other impacts (again, like avoided T&D capacity), can be thought of as reducing the total size of the pie. 25 62 | P a g ePage 180 of 203
The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 180 of 203 **Participant bill savings pertaining to Transmission and Distribution services are included; Power Supply savings are not included. 1 This represents fees charged by entities enabling the participation of resources in active dispatch events, taken out of the total payment delivered to the project owner. These costs are considered a cost in the PCT, and netted out of the incentive category. Period Evaluated The ESS BCA currently evaluates the life of projects installed through the inception of the program through 2027. Currently, in previous BCAs, this included a total of 300 MW of installed capacity; however, given historical and projected enrollments, this has been reduced to a total of 72 MW of installed capacity. This change in total modeled volume reduces the magnitude of costs and benefits included in the BCA. The BCA evaluates projects over a 10-year period; thus, the model currently evaluates costs and benefits through the end of 2036. As discussed in greater detail below, the model includes both historical data (e.g., participation data through winter 2025-2026) as well as projected values. As noted above, CES would expect that the life of most BESS installed through ESS would exceed 10 years; thus, this assumed project life may underestimate total programmatic benefits, both to ratepayers (affecting tests such as the RIM) and to project owners (affecting the PCT). Note that CES anticipates expanding the BCA model to include CODs through 2030 in the next plan. This expansion would be facilitated by the availability of the 2027 Avoided Energy Supply cost study, as the 2024 study does not include values for resources with CODs through 2030. 5.2. Benefit-Cost Model Inputs A review of key updated inputs and assumptions is provided below. Given the number of inputs embedded in the BCA, not every change has been identified, though those changes with substantive impacts have been identified. In general, the approach to updating assumptions has been to use evaluated data (that is, based on actual program data) when such data is available and reliable, make changes to projected inputs when there is a specific rationale for doing so (e.g., trends indicate a change is appropriate or a specific, exogenous change has occurred), and to otherwise retain assumptions used in previous rounds of BCA. Evaluated Project Cost, Performance, and Incentive Inputs CES updated the BCA model with evaluated data for project enrollment and performance through the Winter 2025-2026 Active dispatch season. Although the enrollment data used to inform assumptions in this section are the same as those presented in Section 3, the evaluated project cost assumptions are derived primarily from projects approved in 2025 and later. These projects better represent the current program characteristics and are therefore used to inform the updated project cost and evaluation metrics applied in this BCA. CES has also used its discretion in establishing the values, in some instances eliminating or reducing the weight of outliers. Project Cost and Sizing. Table 5-2 below shows the project sizes and costs reflected in the BCA model, applied to projected projects with a commercial operation date of 2026 or 2027. On a per kWh of installed capacity basis, these numbers have increased modestly from last year’s evaluation. As illustrated in Table 3-21, average unit costs have generally decreased. Thus, the increase in assumed project costs reflects assumed project costs in the previous BCA that may have been slightly too low. The fluctuation in tariffs over the past 18 months has made projecting pricing for domestically-installed storage challenging. For commercial systems, the wide range of interconnection costs and other site-specific costs compounds the challenge in projecting 63 | P a g ePage 181 of 203
The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 181 of 203 costs accurately. Given this uncertainty, the BCA model relies primarily upon cost data included in ESS applications for the BCA data, with an emphasis on the most recently approved and completed projects. Table 5-2. Project Size and Cost Assumptions Customer Segment Metric Average Total System Cost per Participant ($) Average System kW per Participant Average System kWh per Participant Average Duration per Participant (hours) Average $ per kWh (2026 Install Value) Residential Small C&I Medium C&I Large C&I $28,825 $472,076 $831,694 $1,594,200 15.3 200 500 1000 25.25 460 1150 2900 1.65 2.30 2.30 2.90 $1,142 $1,026 $723 $550 Source: CES analysis of enrollment data Federal Tax Credits. Changes stemming from the 2025 federal budget reconciliation legislation enacted in 2025 are reflected in the BCA. Specifically, the bill phases out the Section 25D credit, under which residential customers qualified for a 30% tax credit for solar and energy storage installations. The credit was no longer available, starting with projects placed in service starting in 2026. Third party owned (TPO) residential systems may also benefit from the Section 48E credit; over time this may result in a shift towards more TPO residential systems. While residential third party ownership levels are still low, based on conversations with installers, the Program Administrators expect for third party ownership to increase over time. The BCA assumes that residential third party ownership rates (indicating eligibility for the 30% tax credit) will be 20% of projects installed in 2026, 40% in 2027 and 60% in 2028. The updated BCA assumes that, starting in 2026, no residential systems will be eligible for a 30% tax credit. Commercial storage installations, which qualify under Section 48E, will still be eligible for a 30% federal tax credit; under current law, the credit won’t begin to phase out until 2033. Foreign Entity of Concern (FEOC) provisions, which place limitations on project ownership interests and the amount of content that can be sourced from identified countries, including China, will challenge the ability of commercial projects to qualify for Section 48E credits. Based on its understanding of the market and discussions with developers, CES understands that many commercial projects will still qualify for Section 48E credits - given this, the BCA still assumes that C&I projects will be able to take advantage of Section 48E credits. While developers may struggle to meet FEOC provisions, these projects are less likely to proceed, supporting the assumption that most commercial projects benefit from the tax credit. O&M. The BCA had previously assumed an O&M cost for both residential and C&I systems. Based on CES’ understanding of the market, this value was reduced to $0 for residential systems starting in the BCA filed last year. For C&I systems, the model had previously assumed no O&M costs for 64 | P a g ePage 182 of 203
The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 182 of 203 evaluated years (i.e., 2022 and 2023 in the previous version); this was also updated last year such that O&M costs apply to all operating C&I systems. Construct 5 Updates. The BCA has been updated to reflect the transition to the Construct 5 program approved in the Final Decision in Docket No. 25-08-05.26 Under the revised program design, only Legacy projects enrolled prior to April 1, 2026, remain eligible for upfront incentives, while projects enrolled on or after that date are eligible for Construct 5 Enrollment Incentives. Accordingly, the BCA assumes that upfront incentives apply only to the expected Legacy installations through the program transition, using the approved residential and C&I incentive schedules shown in Table 5-3 and Table 5-4. This structure dispenses with the declining block incentive used for the Legacy upfront incentives. The BCA model also incorporates the updated performance incentives for Construct 5 systems. Effective April 1, 2026, the Construct 5 program replaces the Legacy Upfront Incentive with an Enrollment Incentive for newly enrolled projects. The model requires adopting an assumption related to how much of the capacity installed in 2026 and 2027 will be Construct 5 vs. Legacy. For commercial systems, because there are no approved Construct 5 systems and because of the typical development timeline for these systems, it is assumed that no Construct 5 systems will be deployed by the end of 2027 (the last COD incorporated into the BCA model). Table 5-3. Residential and C&I Legacy Upfront Incentive Levels ($/installed kWh) Capacity Block (Cumulative MW) Tranche, Step Residential Standard Residential Underserved Residential Low Income Up to 10 MW 10-25 MW* Tranche 1, Step 1 Tranche 1, Step 2 $250 $212.5 $450 $450 $600 $600 Capacity Block (Cumulative MW) Tranche, Step Small C&I Medium C&I Large C&I Up to 163.9 MW* Tranches 1 and 2 $200 $175 $100 *Note: Upfront incentive values are shown only for the initial Legacy tranches, as future enrollments will be subject to Construct 5. Table 5-4. Assumed Residential and C&I Enrollment Incentive Levels ($/installed kWh) Framework Construct 5 Residential Grid Edge Residential Others C&I - Priority C&I - Others $130 $30 $10 $0 Previous BCAs assumed that a portion of the upfront incentive dollars would be funded through Greenhouse Gas Reduction Funds (GHGRF). Starting in last year’s report, the BCA was updated 26 https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/b1de90d5e52b43d18 5258d630056a8bf?OpenDocument 65 | P a g ePage 183 of 203
The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 183 of 203 to assume that no GHGRF funding will become available, and that all incentive dollars are funded by ratepayers (thus, a cost in the RIM). Upfront Incentive Clawbacks. Previous iterations of the BCA did not include projections for upfront incentive clawbacks. The current version has been updated to incorporate projected clawbacks; it assumes that in 2026, 40% of residential Legacy systems are subject to a clawback, falling to 35% in 2027. For commercial systems, it assumes 25% in 2026 and 20% in 2027. The model also assumes that, in addition to fewer systems being subject to any clawback over time, for those subjected to a clawback, the amount clawed back decreases over time as performance improves. Given the significant and rapid increase in Passive scoring in the program, these assumed improvements seem feasible. As noted above, clawbacks decrease the PCT, and increase most other tests, including the RIM. Performance Incentive OEM Aggregator Fee. Two OEMs currently retain a portion of the residential performance incentives as a performance incentive aggregator fee. Specifically, Tesla charges a 20% fee and Franklin began charging a 10% fee starting with Summer 2025. Based on the current market share of these two providers and their fees, the BCA has been updated to assume that residential customers pay, on average, a 6% fee to OEMs. This is realized in the BCA as a reduction in the PCT; it does not affect other tests. Peak Reduction. Section 4 provides analysis of the performance of projects enrolled in the ESS Program. For prospective performance, the BCA calculates expected kW performance during active and Passive events, determined by: • • • • System power (kW) System energy (kWh) Percent of nameplate energy expected to be dispatched during passive and active events (%) The duration of passive and active events (hours) These expected performance values are used to develop the “Max Expected Peak Reduction” values shown in Table 5-5, below, which, in turn, dictate how nameplate capacity in the BCA model translates into projected benefits. For residential systems, the values are based on a combination of observed performance and expectations for how performance may evolve. Previous BCAs had assumed that residential systems would maintain a 50% backup reserve during both Active and Passive events; this was maintained in last year’s BCA to provide consistency with previous analyses. Because systems did not, in practice, maintain such a large reserve, an assessment of performance based on this assumption yielded some expected reduction values that exceeded 100%. In this year’s BCA, the residential reserve assumption has been updated to 20%, matching program guidance for passive events as well as the patterns observed in the telemetry data. Reducing the assumed backup value reduces the calculated performance values (as they are expected to have more kWh available to discharge). This updated reserve assumption yields an expectation that residential projects will deliver 80% of their maximum peak reduction during Passive events and 78% during Active events. For C&I projects, the adopted Passive Max Expected Peak Reduction values are 90% for Small C&I and 60% for Medium and Large C&I projects, while the adopted Active Max Expected Peak Reduction values are 90% for Small C&I and 80% for Medium and Large C&I projects. These values are applied in the BCA to estimate expected peak demand reductions and the associated 66 | P a g ePage 184 of 203
The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 184 of 203 program benefits. These values suggest that Medium and Large C&I projects have more competing needs for storage, including demand charge management. In the BCA, Passive event performance is netted out of active event performance to avoid doublecounting benefits.27 As a result, Passive event performance is expected to increase (due to reduced event duration), while benefits attributed to the active program will decrease (as the larger Passive value will be netted out of measured active performance). Because the primary impact is to shift attribution from one event type to the other, the net impact on overall benefit cost ratios is negligible. Table 5-5. Average System Max Expected Peak Reduction Residential Residential Standard Underserved Residential Low Income Small C&I Medium C&I Large C&I Expected Backup Reserve (Active and Passive) 20% 20% 20% 20% 20% 20% Passive Max Expected Peak Reduction 80% 80% 80% 90% 60% 60% Active Max Expected Peak Reduction 78% 78% 78% 90% 80% 80% Note: See discussion above for source of these values. Source: CES analysis of interval data Program Deployment Targets. In its Final Decision in Docket No. 24-08-04,28 PURA ordered the reallocation of 140 MW of capacity from the residential projects to C&I, yielding the updated MW allocation illustrated in Table 5-6 below. Effective April 1, 2026, any remaining legacy Tranche capacity is reassigned to Construct 5. Table 5-6. Program Deployment Targets (MW) Customer Class Tranche 1 Tranche 2 Tranche 3 Tranche 4 TOTAL Residential Commercial 50 MW 50 MW 50 MW 113.9 MW 50 MW 126.1 MW 0 MW 140 MW 150 MW 430 MW Total* 100 MW 163.9 MW 176.1 MW 140 MW 580 MW *Note: On April 1, 2026, any remaining Tranche capacity will be reassigned to Construct 5. The BCA evaluates projects with commercial operation dates through the end of 2027, totaling 71.7 MW; as noted above, this is a decrease from the 300 MW that had previously been modeled For example, if a single system averaged a 5-kW peak reduction during active events and 3 kW during Passive events, the BCA would attribute a 2-kW reduction to the active events. 27 28 https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/5dfd10f7c319dfec85 258be90050bf9c/$FILE/240805-120424.pdf 67 | P a g ePage 185 of 203
The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 185 of 203 to come online during this period.29 The updated projections total 72 MW of installed capacity by 2027. Aside from exceptions discussed below, other assumptions related to project deployment (e.g., assumption that 80% of projects will be in Eversource territory), remain unchanged. Table 5-7. Projected Program Enrollment (MW) Customer Type Residential Standard Residential Underserved Residential Low Income Residential Subtotal Small C&I Medium C&I Large C&I C&I Subtotal 2022 2023 2024 2025 Actual 0.1 0.0 0.0 0.1 0.0 0.0 0.0 0.0 Actual Actual 0.8 1.3 0.1 0.7 0.0 0.2 0.9 2.2 0.0 0.2 0.0 0.2 0.0 0.3 0.1 0.6 Actual 1.6 0.8 0.3 2.7 0.0 0.0 0.0 0.0 2026 2027 Forecast Forecast 6.3 7.2 3.2 3.6 1.1 1.2 10.5 12.0 4.2 6.0 5.3 7.6 8.0 11.4 17.6 25.0 Total 17.2 8.3 2.8 28.3 10.4 13.2 19.8 43.4 0.1 1.0 2.8 2.7 28.1 37.0 71.7 Total *It is assumed that 25% of residential ESS capacity installed in 2026 and 75% installed in 2027 will fall under Construct 5, with the remaining installations under the Legacy framework. Should the program fall short of projected MW goals, it will reduce both projected costs and benefits. Two primary factors will affect the resulting BCRs. First, fewer total installed MWs applied to fixed Program Administrative Costs will lead to higher per MW costs, reducing the RIM. Second, some levelized benefits streams (particularly capacity DRIPE) in the AESC can vary noticeably from one assumed COD to the next, which can lead to changes in resulting BCRs. Program Administration Costs The BCA model was updated with program costs for the year 2025. Program costs in the year 2025 were lower than had been projected in the BCA ($4.29 million projected vs. $2.38 million actual). Projected program administration costs for 2026 and later have been updated, based on feedback from the Program Administrators. Because the total MW included in the model was reduced, the approach to assigning program administration costs to different project vintages was updated; in essence, the model was updated to acknowledge that the program administration costs reflected in the table below would cover costs for the full program MW (i.e., up to 580 MW), while only a total of 72 MW of resources is included in the model, assigning administration costs on a pro-rata basis. The model evaluates the costs and benefits of these projects for a period of 10 years from their commercial operation date. 29 68 | P a g ePage 186 of 203
The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 186 of 203 Table 5-8. Actual (through 2025) and Projected Program Administration Costs ($) Project Year 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 Residential Upfront/Passive Performance/Active Connecticut Green Eversource UI Bank $1,521,716 $124,658 $268,589 $1,478,092 $201,878 $176,545 $785,357 $261,965 $174,233 $828,740 $192,994 $166,893 $857,746 $202,237 $173,800 $887,767 $405,887 $181,010 $918,839 $456,806 $190,631 $950,998 $501,632 $201,956 $984,283 $543,565 $215,279 $556,226 $393,143 $152,683 $459,343 $330,164 $133,820 $457,612 $338,787 $140,715 $453,499 $345,815 $145,436 $447,734 $351,661 $148,829 $438,587 $354,811 $150,162 $431,009 $359,142 $151,031 C&I Upfront/Passive Performance/Active Connecticut Eversource UI Green Bank $0 $0 $0 $31,665 $205,138 $117,696 $785,357 $261,965 $174,233 $828,740 $192,994 $166,893 $857,746 $202,237 $173,800 $887,767 $405,887 $181,010 $918,839 $456,806 $190,631 $950,998 $501,632 $201,956 $984,283 $543,565 $215,279 $1,117,055 $789,539 $306,629 $1,213,939 $872,549 $353,657 $1,215,670 $900,007 $373,816 $1,219,783 $930,143 $391,181 $1,225,547 $962,576 $407,377 $1,234,694 $998,853 $422,730 $1,242,272 $1,035,132 $435,308 Notes: Evaluated and projected values provided by Program Administrators. Projected values are subject to change. Source: Program Administrators Benefits Inputs Most assumptions related to avoided costs and other benefits used in the BCA are derived from the Avoided Energy Supply Costs in New England (AESC) studies, which are commissioned by utilities, regulators, state energy offices, and other entities across New England, specifically for use in BCAs. Consistent with previous ESS BCAs, the BCA applies values from the 2021 AESC to projects with commercial operation dates of 2022-2024 and applies the 2024 AESC values to projects with commercial operation dates of 2025-2027.30 For the values sourced from the 2024 AESC, BCA results are provided using both Counterfactuals #1 and #6.31 The same approach was taken in the BCA filed in Docket No. 24-08-05.32 In its Final Decision in that docket, PURA, concluding that shifting to a new counterfactual would be As the 2024 AESC can be applied to projects with CODs in 2024, subsequent BCAs may be updated to apply 2024 AESC values to these projects, as opposed to sourcing inputs from the 2021 AESC. 31 The AESC counterfactuals are defined by whether they include the effects of different anticipated changes to the distribution system (e.g., increased energy efficiency, building electrification, BTM storage, transportation electrification, etc.). By excluding these different influences, the counterfactuals help estimate what the impact of a program might be, relative to a future in which such programs did not exist. Counterfactual #1 excludes impacts from most energy policies (e.g., energy efficiency, building electrification, demand response, etc.). Counterfactual #6 only excludes BTM storage, making it wellsuited for evaluating BTM storage programs. See Table 40 on p. 73 of the 2024 AESC: https://www.synapseenergy.com/sites/default/files/inline-images/AESC%202024%20May%202024.pdf 32 https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/ddbe0b811039ecbc 85258b6c006b2d61?OpenDocument 30 69 | P a g e
Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf
Extracted from the file · 2 pages · 6,256 characters
Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf
Extracted from the file · 2 pages · 3,261 characters
Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf
Extracted from the file · 1 page · 528 characters
Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf
Extracted from the file · 2 pages · 4,800 characters
As listed on the current system
Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)