Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

5. Annual Compliance Filings – Additional Filings (Program Materials)

Compliance filingFiled by Avangrid13 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files13

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of 2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdf

Extracted from the file · 147 pages · 342,741 characters

8 pages match
  1. Page 184 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 184 of 203 program benefits. These values suggest that Medium and Large C&I projects have more competing needs for storage, including demand charge management. In the BCA, Passive event performance is netted out of active event performance to avoid doublecounting benefits.27 As a result, Passive event performance is expected to increase (due to reduced event duration), while benefits attributed to the active program will decrease (as the larger Passive value will be netted out of measured active performance). Because the primary impact is to shift attribution from one event type to the other, the net impact on overall benefit cost ratios is negligible. Table 5-5. Average System Max Expected Peak Reduction Residential Residential Standard Underserved Residential Low Income Small C&I Medium C&I Large C&I Expected Backup Reserve (Active and Passive) 20% 20% 20% 20% 20% 20% Passive Max Expected Peak Reduction 80% 80% 80% 90% 60% 60% Active Max Expected Peak Reduction 78% 78% 78% 90% 80% 80% Note: See discussion above for source of these values. Source: CES analysis of interval data Program Deployment Targets. In its Final Decision in Docket No. 24-08-04,28 PURA ordered the reallocation of 140 MW of capacity from the residential projects to C&I, yielding the updated MW allocation illustrated in Table 5-6 below. Effective April 1, 2026, any remaining legacy Tranche capacity is reassigned to Construct 5. Table 5-6. Program Deployment Targets (MW) Customer Class Tranche 1 Tranche 2 Tranche 3 Tranche 4 TOTAL Residential Commercial 50 MW 50 MW 50 MW 113.9 MW 50 MW 126.1 MW 0 MW 140 MW 150 MW 430 MW Total* 100 MW 163.9 MW 176.1 MW 140 MW 580 MW *Note: On April 1, 2026, any remaining Tranche capacity will be reassigned to Construct 5. The BCA evaluates projects with commercial operation dates through the end of 2027, totaling 71.7 MW; as noted above, this is a decrease from the 300 MW that had previously been modeled For example, if a single system averaged a 5-kW peak reduction during active events and 3 kW during Passive events, the BCA would attribute a 2-kW reduction to the active events. 27 28 https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/5dfd10f7c319dfec85 258be90050bf9c/$FILE/240805-120424.pdf 67 | P a g e
  2. Page 185 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 185 of 203 to come online during this period.29 The updated projections total 72 MW of installed capacity by 2027. Aside from exceptions discussed below, other assumptions related to project deployment (e.g., assumption that 80% of projects will be in Eversource territory), remain unchanged. Table 5-7. Projected Program Enrollment (MW) Customer Type Residential Standard Residential Underserved Residential Low Income Residential Subtotal Small C&I Medium C&I Large C&I C&I Subtotal 2022 2023 2024 2025 Actual 0.1 0.0 0.0 0.1 0.0 0.0 0.0 0.0 Actual Actual 0.8 1.3 0.1 0.7 0.0 0.2 0.9 2.2 0.0 0.2 0.0 0.2 0.0 0.3 0.1 0.6 Actual 1.6 0.8 0.3 2.7 0.0 0.0 0.0 0.0 2026 2027 Forecast Forecast 6.3 7.2 3.2 3.6 1.1 1.2 10.5 12.0 4.2 6.0 5.3 7.6 8.0 11.4 17.6 25.0 Total 17.2 8.3 2.8 28.3 10.4 13.2 19.8 43.4 0.1 1.0 2.8 2.7 28.1 37.0 71.7 Total *It is assumed that 25% of residential ESS capacity installed in 2026 and 75% installed in 2027 will fall under Construct 5, with the remaining installations under the Legacy framework. Should the program fall short of projected MW goals, it will reduce both projected costs and benefits. Two primary factors will affect the resulting BCRs. First, fewer total installed MWs applied to fixed Program Administrative Costs will lead to higher per MW costs, reducing the RIM. Second, some levelized benefits streams (particularly capacity DRIPE) in the AESC can vary noticeably from one assumed COD to the next, which can lead to changes in resulting BCRs. Program Administration Costs The BCA model was updated with program costs for the year 2025. Program costs in the year 2025 were lower than had been projected in the BCA ($4.29 million projected vs. $2.38 million actual). Projected program administration costs for 2026 and later have been updated, based on feedback from the Program Administrators. Because the total MW included in the model was reduced, the approach to assigning program administration costs to different project vintages was updated; in essence, the model was updated to acknowledge that the program administration costs reflected in the table below would cover costs for the full program MW (i.e., up to 580 MW), while only a total of 72 MW of resources is included in the model, assigning administration costs on a pro-rata basis. The model evaluates the costs and benefits of these projects for a period of 10 years from their commercial operation date. 29 68 | P a g e
  3. Page 186 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 186 of 203 Table 5-8. Actual (through 2025) and Projected Program Administration Costs ($) Project Year 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 Residential Upfront/Passive Performance/Active Connecticut Green Eversource UI Bank $1,521,716 $124,658 $268,589 $1,478,092 $201,878 $176,545 $785,357 $261,965 $174,233 $828,740 $192,994 $166,893 $857,746 $202,237 $173,800 $887,767 $405,887 $181,010 $918,839 $456,806 $190,631 $950,998 $501,632 $201,956 $984,283 $543,565 $215,279 $556,226 $393,143 $152,683 $459,343 $330,164 $133,820 $457,612 $338,787 $140,715 $453,499 $345,815 $145,436 $447,734 $351,661 $148,829 $438,587 $354,811 $150,162 $431,009 $359,142 $151,031 C&I Upfront/Passive Performance/Active Connecticut Eversource UI Green Bank $0 $0 $0 $31,665 $205,138 $117,696 $785,357 $261,965 $174,233 $828,740 $192,994 $166,893 $857,746 $202,237 $173,800 $887,767 $405,887 $181,010 $918,839 $456,806 $190,631 $950,998 $501,632 $201,956 $984,283 $543,565 $215,279 $1,117,055 $789,539 $306,629 $1,213,939 $872,549 $353,657 $1,215,670 $900,007 $373,816 $1,219,783 $930,143 $391,181 $1,225,547 $962,576 $407,377 $1,234,694 $998,853 $422,730 $1,242,272 $1,035,132 $435,308 Notes: Evaluated and projected values provided by Program Administrators. Projected values are subject to change. Source: Program Administrators Benefits Inputs Most assumptions related to avoided costs and other benefits used in the BCA are derived from the Avoided Energy Supply Costs in New England (AESC) studies, which are commissioned by utilities, regulators, state energy offices, and other entities across New England, specifically for use in BCAs. Consistent with previous ESS BCAs, the BCA applies values from the 2021 AESC to projects with commercial operation dates of 2022-2024 and applies the 2024 AESC values to projects with commercial operation dates of 2025-2027.30 For the values sourced from the 2024 AESC, BCA results are provided using both Counterfactuals #1 and #6.31 The same approach was taken in the BCA filed in Docket No. 24-08-05.32 In its Final Decision in that docket, PURA, concluding that shifting to a new counterfactual would be As the 2024 AESC can be applied to projects with CODs in 2024, subsequent BCAs may be updated to apply 2024 AESC values to these projects, as opposed to sourcing inputs from the 2021 AESC. 31 The AESC counterfactuals are defined by whether they include the effects of different anticipated changes to the distribution system (e.g., increased energy efficiency, building electrification, BTM storage, transportation electrification, etc.). By excluding these different influences, the counterfactuals help estimate what the impact of a program might be, relative to a future in which such programs did not exist. Counterfactual #1 excludes impacts from most energy policies (e.g., energy efficiency, building electrification, demand response, etc.). Counterfactual #6 only excludes BTM storage, making it wellsuited for evaluating BTM storage programs. See Table 40 on p. 73 of the 2024 AESC: https://www.synapseenergy.com/sites/default/files/inline-images/AESC%202024%20May%202024.pdf 32 https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/ddbe0b811039ecbc 85258b6c006b2d61?OpenDocument 30 69 | P a g e
  4. Page 187 of 203Match

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 187 of 203 disruptive to consistent analysis of the program, ordered that future BCAs should rely on AESC Counterfactual #1, while allowing the Program Administrators to “include alternative RIM calculations using new counterfactuals… provided that counterfactual one remains the primary basis for RIM scores submitted to the Authority.” 33 CES has included selected results using Counterfactual #6, as this counterfactual was designed for use in evaluating BTM storage programs. As briefly noted above, depending on the timing of the study, next year’s BCA may incorporate updated AESC assumptions from the 2027 study. Table 5-9. Benefits Inputs Sources Benefit/Cost Stream 2022-2024 Install Yr Source 2025 and future Install Yr Avoided Generation Capacity DRIPE Capacity Impacts (Intrastate and Rest-of-Pool) Avoided Energy DRIPE Energy Impacts (Intrastate and Rest-of-Pool) Cross-DRIPE Impacts (Intrastate and Rest-of-Pool) Avoided Pool Transmission Facilities • 2021 AESC • Report and User Interfaces (source of values) available here: Link • Counterfactual #1 • State set to Connecticut; otherwise default inputs used • 2024 AESC • Report and User Interfaces (source of values) available here: Link • Counterfactuals #1 and #6 • State set to Connecticut; otherwise default inputs used Reliability Non-Embedded Emissions Avoided Local Transmission Capacity Avoided Distribution Capacity • Per Eversource and UI, and as incorporated into the filed 2025-2027 Conservation & Load Management Plan (see figure 62): Link 5.3. BCA Metrics Results from the BCA, including six different test perspectives, are provided below. Unless otherwise specified, the results are based on the use of the AESC 2024 Counterfactual #1 Figure 5-1 shows the overall program BCA. The PACT, SCT, TRC, and CTET have effectively identical benefits. The PACT and CTET have lower costs than the SCT and TRC, resulting in higher benefit-cost ratios (BCRs). The primary costs for the PACT and CTET are incentives, while the primary costs for the SCT and TRC are ESS technology costs. Technology costs are almost all realized in the year projects are installed, while performance incentives are spaced out over time and are then discounted; this is the primary reason that costs for these two sets of tests differ. The CTET includes emissions, while the PACT does not. The BCA currently projects an increase in emissions due to ESS; this varies from the finding in Table 4-11 for several reasons, including: 1) Table 4-11 uses hourly emissions rates while the BCA uses seasonal and on/off-peak emissions rates, which are less granular P. 46: https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/5dfd10f7c319dfec85 258be90050bf9c?OpenDocument 33 70 | P a g e
  5. Page 188 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 188 of 203 2) Most of the BCA charge/discharge behavior is projected (not evaluated), while Table 4-11 relies entirely upon evaluated charge/discharge data; there are differences in the shape of the projected and evaluated load shape 3) Table 4-11 is limited to one year of data, while the BCA considers emissions rates projected into the future The overall program RIM has decreased modestly relative to the last BCA, from 1.69 to 1.55. The primary drivers of this change are: 1) Decreased projected MW deployment increasing per unit program administration costs, primarily in the near term (decreases RIM) 2) Decreased program administration costs (increases RIM) 3) Increase in projected performance, as described in Table 5-5 (small increase in RIM) 4) Change in when projects are projected to come online (mixed impact – affects costs and benefits) 5) Introduction of assumed clawbacks (increases RIM) The impact of some of these changes, and others, are discussed below. The most significant contributor to the revised BCA results is the reduction in projected ESS deployment from approximately 300 MW to 72 MW by 2027. Since nearly all benefit streams— including participant bill savings, avoided capacity costs, energy savings, emissions reductions, and resilience benefits—are proportional to the deployed storage capacity, the lower deployment forecast substantially reduces total program benefits. As noted above, this decreases the RIM; it has a much more dramatic impact on the magnitude of costs and benefits, however. The introduction of the Construct 5 framework and revisions to the assumed participation of Priority and Grid-Edge customers have only a marginal influence on the BCA results. Construct 5 contributes only 9 MW of residential installations through 2027, representing a relatively small share of the total program deployment. Likewise, reducing the assumed participation of GridEdge and Priority customers from 50% to 48% and 43%, respectively, slightly modifies the incentive expenditures and associated benefits but does not materially alter the overall program economics. The revised analysis also incorporates lower program administrative costs, which improves the benefit-cost performance from the utility and societal perspectives. Since administrative expenses are treated as program costs in tests such as RIM, RIM-CT, PACT, CTET, SCT, and TRC, reducing these costs lowers the denominator of the benefit-cost calculations, resulting in modest improvements ranging from approximately 5–7%. In contrast, the Participant Cost Test (PCT) remains unaffected because program administrative expenditures are not borne directly by participating customers and therefore have no direct influence on participant economics. Conversely, the updated installed project costs relative to previous assumptions increase the capital investment required for ESS deployment, particularly within the C&I sector. Higher installed costs directly increase participant expenditures and total resource costs, leading to reductions in the PCT, SCT, and TRC. The PCT is especially sensitive because it evaluates the financial attractiveness of the program from the participant's perspective, while the SCT and TRC incorporate the total societal and resource costs associated with ESS deployment. Since these higher capital costs are not accompanied by proportional increases in program benefits, the overall cost-effectiveness under these tests decreases. While changes in projected installed cost do not directly affect the RIM, to the extent that they affect program deployment and lead to 71 | P a g e
  6. Page 189 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 189 of 203 changes in incentive rates, they may have future impacts on the RIM. As noted previously, these updated cost values do not reflect an anticipated increase in project costs in the future; instead, they reflect project costs anticipated to be higher than previously projected. Put differently, assumed project costs reflected in the previous BCA were likely too low. For residential systems, the revised assumptions related to third-party ownership rates and resulting access to the Section 48E tax credits improves the calculated PCT by approximately 5%. The BCA does not currently include differentiated assumptions related to discount rate, administration costs, or other financial distinctions between third-party vs. homeowner-owned systems. It is reasonable to assume that a third party owner would “capture” some of the value of the tax credit, reducing the impact of the credit on the ultimate financial proposition for the host customer. When all model revisions are considered collectively—including the updated deployment forecasts, Construct 5 implementation, participant mix, installed project costs, administrative cost assumptions, clawback revisions, updated peak active and passive load reduction metrics and additional structural enhancements to the BCA framework—the overall cost-effectiveness metrics decline modestly relative to the previous analysis. The RIM decreases by approximately 9%, PCT decreases by around 6%, PACT and CTET decline by approximately 8%, while the SCT and TRC exhibit the largest reductions of approximately 13%. Although reductions in administrative costs partially offset some of these impacts, the lower projected deployment and higher installed project costs remain the dominant factors influencing the revised BCA results. Figure 5-1. Overall Program BCA Source: CES analysis Figure 5-2 shows the BCA specifically for the residential sector. The updated residential BCA shows modest improvement across all tests: the RIM rises from 1.13 to 1.18, the PCT rises from 0.75 to 0.81, the PACT increases from 1.36 to 1.44, the SCT and TRC both improve from 0.88 to 0.94 and .095 respectively, and the CTET rises from 1.36 to 1.44. Most of this improvement is driven by a reduction in the residential battery reserve margin, from 50% to 20%, which increases the battery capacity available for dispatch and, with installed costs held constant, directly increases realized program benefits, improving the RIM and RIM-CT by 72 | P a g e
  7. Page 190 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 190 of 203 roughly 17–20%, the PACT, CTET, SCT, and TRC by over 15%, and the PCT by about 10%.34 While a reduction in total program costs helps cost-effectiveness, a shift in how costs are weighted between residential and commercial projects results in more costs being allocated to residential projects relative to commercial projects. It is projected that approximately 9 MW of residential ESS installations will be installed under Construct 5 by the end of 2027; previously, all of this capacity would have been under the Legacy framework. This has a comparatively modest effect, improving the RIM and RIM-CT by about 2% and the PCT and SCT by about 1%. This is by design – PURA, in revising enrollment and performance incentives for Construct 5, explicitly sought to ensure that overall compensation remained comparable. Figure 5-2. Residential Program BCA Source: CES analysis The C&I BCA results generally mirror the changes observed in the overall BCA, with the revised assumptions producing similar trends across the various benefit-cost tests. Commercial BCA results are displayed in Figure 5-3. For the commercial systems, the evaluated installed ESS project costs, derived from projects approved from 2025 onward, are the primary driver of the revised BCA results. Relative to the previous assumptions, the approximately 18% increase in assumed installed project cost per kWh increases participant and program costs without a corresponding increase in quantified benefits, reducing the PCT by approximately 8% and the SCT and TRC by 14–15%. Smaller reductions (5-6%) are observed in the RIM, PACT, and CTET tests. The updated program administration costs partially offset these impacts, as lower projected administrative expenditures reduce overall program costs and improve most BCA metrics. Similarly, the revised clawback assumptions result in modest improvements of approximately 2% in the RIM, PACT, and CTET tests, while having minimal influence on the remaining metrics. The remaining updates—including revised historical program performance and administrative data through 2025, updated dispatch assumptions, Priority C&I participation assumptions based on the project enrolment so far, updated energy and delivery tariffs, and other refinements to the BCA framework—collectively contribute to the overall reduction in the commercial cost34 Note that a part of this increase in performance is offset in the “Max Expected” values, as shown in Table 5-5. 73 | P a g e
  8. Page 191 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 191 of 203 effectiveness metrics. Despite the partially offsetting effect of lower program administration costs, the higher evaluated installed project costs remain the dominant factor influencing the revised non-residential BCA results. Figure 5-3. C&I Program BCA Source: CES analysis Finally, the full program BCA conducted using AESC 2024 Counterfactual #6 is provided in Figure 5-4. The use of Counterfactual #6 dramatically increases all tests except for the PCT. To the extent that the Program Administrators determine that currently planned incentive levels are insufficient to achieve program deployment goals, these results demonstrate that there would be the opportunity to increase incentive levels while maintaining a robustly cost-effective program, using a counterfactual designed for evaluating behind-the-meter storage programs. 74 | P a g e
  9. Page 192 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 192 of 203 Figure 5-4. Overall Program BCA - AESC Counterfactual 6 Source: CES analysis 5.4. Findings and Recommendations Table 5-10. BCA Findings and Recommendations Finding Recommendation The ability of residential customers to benefit from federal tax incentives through third-party ownership has a substantial impact on the economics of these projects. The Program Administrators should continue to monitor the level of third-party ownership in residential systems and, to the extent practical, evaluate the comparative economics of third-party- and homeowner-owned systems. The AESC Counterfactual 6 likely represents a more appropriate counterfactual for evaluating the ESS Program. PURA’s direction to continue to use Counterfactual 1 was based on a desire to maintain some consistency in how the program is evaluated; given that there are likely to be significant changes in the forthcoming 2027 AESC, it may be appropriate to switch to a counterfactual designed for evaluating distributed storage when the 2027 AESC is adopted in the ESS BCA. Source: CES analysis 3. Key Findings and Recommendations Below, CES provides key findings and recommendations, based on metrics compiled for this report and CES’ overall review of the program. 75 | P a g e
  10. Page 193 of 203

    The United Illuminating Company UI Attachment 5 Docket No. 26-08-01 ESS Program Manual and Additional Information Page 193 of 203 6.1. Key Findings The program continues to evolve with the implementation of Construct 5. As the program nears the end of its second three-year cycle, reevaluating higher-level goals may be appropriate. Key findings include: • • • • • • • The Program Administrators have worked diligently to improve the quality of telemetry data. While further improvements should still be made, the process has made real-time performance monitoring and evaluation more efficient and effective. The Program Administrators have also worked with OEMs to substantially improve residential performance. The data suggest that, because performance is largely dictated by how OEMs respond to program dispatch signals, improving the performance of individual OEMs with substantial numbers of enrolled systems can meaningfully improve the performance of the program as a whole. Despite improvements, there continue to be data quality challenges, both for enrollment and telemetry data. There are also data gaps in enrollment data, created primarily by customer self-enrollment. Program deployment continues to be slow relative to the goal of 580 MW by 2030. Revisiting the feasibility of achieving this target will help focus the program on achieving realistic goals. The commercial project pipeline is stymied both by a dearth of new applications as well as the slow pace of approved projects achieving commercial operation. Relative to last year, the tariff landscape, and its impact on energy storage costs, has calmed somewhat. Residential project unit costs appear to be declining, while commercial projects do not exhibit the same pattern. The program is falling short of the target of 40% participation by residential Low-Income and Underserved participants. A single affordable multifamily project makes up a significant portion of the overall volume of Low-Income participants. 6.2. Recommendations • • Because performance by OEM varies substantially, the Program Administrators should continue to seek opportunities to address poor performing OEMs. Increased transparency and data availability on the ESS dashboard are a positive step. The PAs should examine additional strategies, including continuing to work with the OEMs themselves, increasing information on the relative performance of OEMs for potential ESS participants, and considering proposing incentives or penalties for OEMs that perform poorly consistently. Of course, the Program Administrators must also consider the effort and cost of prolonged engagement with OEMs serving a very low volume of customers. Along these lines, the PAs should also consider whether DERMS providers can and should play a more prominent role in identifying performance challenges and working with OEMs to address them. DERMS providers work with OEMs across programs and states; this should create an opportunity for efficient monitoring and engagement around performance. The Program Administrators may even consider introducing performance mechanisms that encourage DERMS providers to more actively engage with OEMs, although careful consideration must be given to ensure that this would not provide a perverse incentive to report improved performance. 76 | P a g e

Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf

Extracted from the file · 2 pages · 6,256 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf

Extracted from the file · 2 pages · 3,261 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf

Extracted from the file · 1 page · 528 characters

Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf

Extracted from the file · 2 pages · 4,800 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)

This filing on the current system (opens in a new tab)