Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

5. Annual Compliance Filings – Additional Filings (Program Materials)

Compliance filingFiled by Avangrid13 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files13

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of 2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdf

Extracted from the file · 147 pages · 342,741 characters

8 pages match
  1. Page 24 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 24 of 203 Residential customers enrolled in Legacy Passive Dispatch may elect to repay the unearned portion of the original Upfront Incentive in order to transition from Legacy Passive Dispatch to Construct 5 Active Dispatch, subject to the requirements of Section 3.8 and any other application Program rules. This option is not available to C&I customers. The unearned portion of the Upfront Incentive may be repaid by the System Owner, OEM, Eligible Contractor, financing entity, TPO, or another Program Administrator-approved third party on behalf of the Customer. Repayment of the required amount shall permit the project to transition from Legacy Passive Dispatch to Construct 5. Projects utilizing an Upfront Incentive Buyback to transition into Construct 5 are not eligible to receive Construct 5 Enrollment Incentives. Such projects may remain eligible for applicable Performance Incentives under Construct 5, subject to all other Program requirements. The required repayment amount shall be calculated based on the remaining term of the Customer’s original ten (10) year enrollment obligation, inclusive of any applicable Clawback amounts resulting from noncompliance that have been approved, or not waived, by PURA. For example, a Customer with five (5) years remaining in the original enrollment term shall repay fifty percent (50%) of the original Upfront Incentive, plus any outstanding non-waived Clawback Fees. The PAs will make an effort to accommodate mid-season switch requests, but program acceptance may be delayed due to other commitments at that time. Where repayment is proposed by a third party, the Program Administrators shall require written approval from the system owner prior to approving the transition to Construct 5. Any project transitioning from Legacy Passive Dispatch to Construct 5 is expected to remain operational and capable of participation in Active Dispatch for ten (10) years. Upon receipt and verification of the required repayment amount, and satisfaction of all other applicable Program requirements, the Customer’s enrollment will be transitioned from Legacy Passive Dispatch to Construct 5. Upon such transition, the Customer will no longer be subject to Legacy Passive Dispatch participation requirements or future Passive Dispatch clawback exposure.28 3.9. Extending Energy Storage Solutions Enrollment After 10 years of system operation, BESS may still have useful life. Customers wishing to continue participation in Active Dispatch (and associated performance incentives) may apply for an extension (subject to Program availability) and will be eligible to receive performance incentives at the rate applicable at the time of re-enrollment. 3.10. Transfer of Enrollment The Program Administrators will allow customers to transfer Program enrollment to other customers. If a customer moves out of their residence/facility leaving their BESS behind, the new occupant and BESS owner will be required to notify the EDCs of the change in ownership in order to ensure future performance payments will be processed to the new owner. The new owner will complete a BESS Ownership Transfer Form (See Appendix D) through the Enrollment Platform. Information required will include contact information (name, email, phone), address, and the new 28 https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/f443e4a4254e016585258dee0065d70c/$FILE/2508-05%20Motion%20No.%2018%20Ruling.pdf 23
  2. Page 25 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 25 of 203 utility electric account number. For installations where the seller financed a portion of the BESS and a direct payment recipient was named during the application process, the seller will be responsible for notifying the direct payment recipient of the transfer or decision to unsubscribe from the program. If a customer moves out of their residence/facility leaving their BESS behind, and the new occupant does not participate in Passive Dispatch (where applicable), then the original customer who entered into the Program Contract is responsible for returning a prorated portion of the Upfront Incentive (where applicable) upon property transfer. 3.11. Electronic Signatures Contractors and TPOs may use and allow their retail customers to use electronic signatures in lieu of wet signatures for contracts and other documents in the Program and create such contracts and other documents in electronic form. Electronic signatures must (a) use logically attached or associated with the electronic contract or other document being created and is verifiable, (b) include a date and time stamp of the electronic signature and an electronic audit trail of the electronic signature and the electronic contract or other document that is created, and (c) be sure the electronic contract or other document is created and retained in a secure electronic environment that preserves the integrity of the electronic contract and all the information contained therein and can be made available to the Program Administrators upon its request. Examples of electronic signature technology systems that are acceptable to the Program Administrators include DocuSign, HelloSign and Adobe Sign. Only commercially available thirdparty platforms are accepted. The Program Administrators will not accept electronic signatures that have been digitally altered, copied, or placed using computer software that does not provide a verifiable electronic audit trail. Remainder of this page intentionally left blank 24
  3. Page 26 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 26 of 203 Section 4: Eligibility 4.1. Customer and Site Eligibility To be eligible for Energy Storage Solutions, the customer must have a UI or Eversource electric service account located in Connecticut and the BESS must be located at the electric service account location.29 Additionally, the residential, commercial, or industrial building must be connected to the grid by agreement with the EDCs. Systems energized or installed prior to January 1, 2022 are not eligible for the Upfront Incentive but may apply to participate in Energy Storage Solutions as an Active Dispatch Only or Transfer Customer per Section 3. Such customers will only be eligible for Performance Incentives. Systems energized after January 1, 2022, but prior to the contractor or equipment receiving Program approval (for up to one year) may still qualify for an Upfront or Enrollment Incentive, ensuring that early adopters are not penalized for moving forward before contractor approval processes were finalized. Beyond this, only systems energized no more than six months prior to Program enrollment will remain eligible for the Construct 5 Enrollment Incentive. The Program Administrators reserve the right to audit such applications and decide whether the project meets the criteria for approval. Eligible customers can receive Upfront or Enrollment Incentives and Performance Incentives at the rates in effect at the time of Reservation of Funds or Reservation of Capacity. Add-On Systems Additional capacity added to existing BESS may be eligible for Energy Storage Solutions, subject to the discretion of the Program Administrators and an analysis of the proposed system to include age and functionality verification of the existing BESS components. Total Upfront Incentives provided for BESS(s) enrolled in Passive Dispatch at a single residential unit shall not exceed $16,000. There is no cap on Enrollment Incentives. Enrollment start/end dates may be adjusted at the Program Administrators’ discretion. Additionally, Customers who received an Upfront Incentive and install an additional complete BESS can qualify for an Enrollment Incentive under Construct 5 for the additional system at the discretion of the Program Administrators. Ownership BESS’s may be owned by: (1) the customer or (2) a third-party operator (TPO) with the customer’s permission as indicated in the Application. All Energy Storage Solutions rules must be met regardless of the BESS’s owner. In the instance that there is a change in TPO or Contractor, the Customer must notify the Program Administrators in writing to request an evaluation of the new agreement and/or new TPO. For customers purchasing a BESS from a qualified Contractor, the customer will retain title to the equipment purchased. The Contractor is responsible for ensuring all equipment is installed in accordance with manufacturer specifications and warranty provisions when system is placed in 29 New construction or new service customers may submit proof that a new service has been requested at application. Incentive payments will not be issued until the Program Administrators have confirmed that electric service has been established with Eversource or UI. 25
  4. Page 27 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 27 of 203 service. The Contractor will be held responsible for any actions that void equipment warranties due to workmanship. If the BESS is owned by a TPO, the equipment title shall remain with the TPO. Energy Efficiency Audits For residential customers at the time of Completion, the Customer must have either completed a Home Energy Solutions (HES), Home Energy Solutions Income-Eligible (HES-IE), or an equivalent energy assessment30 after 2011 or must have scheduled such an assessment. Information on scheduling HES and HES-IE assessments is available at: Home Energy Solutions-Income Eligible: https://energizect.com/your-home/solutionslist/save-energy-and-money-all-year-long/ Home Energy Solutions: https://energizect.com/your-home/solutions-list/home-energysolutions-core-services/ In certain limited circumstances, one-to-four family homes are not required to have HES or HES-IE assessments. Exemptions to the HES audit requirement are permitted in only the following instances: 1. BESS is co-located with solar and is participating in the Residential Renewable Energy Solutions (RRES) Program or the solar portion participated in the Residential Solar Investment Program (RSIP). 2. Homes built on or after January 1, 1980 are not required to have an energy assessment in order to apply for the Program. If the applicant would like to waive the energy assessment requirement due to the home being built in 1980 or more recently, the applicant needs to provide a property assessor’s card verifying the built date with the application submission. Partial new construction or renovations will not be considered for waiving the energy assessment requirement. 3. Gut Rehabilitation: if the home has been or will be completely stripped to its frame and rebuilt, then at minimum, Contractor or Homeowner may follow exception listed above, if applicable. 4. Health and Safety Concern: Technician cannot perform energy efficiency audit due to health and/or safety concerns (i.e., mold, asbestos, vermiculite, etc.). In this case, a letter should be provided specifying the issues that prevent the audit or certain measures from being performed. 5. If a home built before January 1, 1980 was not able to move forward with a HES or HES-IE assessment due to the existence of a Health and Safety Concern described above, or if the home is not eligible for efficiency measures to be installed due to the age of the home per HES technician documentation, the Program Administrators will accept proof of completion of a Department of Energy Home Energy Score (DOE HE Score) performed at the residence. In addition, the Program Administrators will also accept proof that a 30 Program Administrator will accept energy efficiency audits conducted in-person by a technician certified by the Building Performance Institute (BPI), HERS, or Home Performance with Energy Star. A copy of the audit report must be provided to the Program Administrator. The Program Administrators must approve “HES equivalent” energy audit types. 26
  5. Page 28 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 28 of 203 Weatherization Assistance Program (WAP) assessment was performed at the residence within 15 years of the Application. The Program Administrators recommend that commercial and industrial customers participating in Energy Storage Solutions have an energy efficiency audit performed by a qualified individual prior to system installation to ensure maximum resiliency benefits. 4.2. Storage System Eligibility While Energy Storage Solutions is primarily designed for electrochemical battery energy storage, the Program Administrators will consider enrollment of electric storage technologies beyond electrochemical battery energy storage systems (see Appendix A for complete list of Eligible Equipment). Other electric storage technologies eligible for the ESS Program include but are not limited to: mechanical storage; thermal storage; and pumped hydropower. Electric vehicles are not allowed in the ESS Program at this time. All technologies must use the same incentive calculation methodology with incentive rates based on kW and kWh measurements. The EDCs have detailed their technical and Program requirements below. 4.2.1. Technical Requirements The Program Administrators have developed the following technical requirements for eligible electric storage technologies with which all BESS OEMs, Operators, and Aggregators must comply in order to participate in the Program. Note that Program Administrators may modify these requirements for the case-by-case approval of certain mechanical, thermal, pumped hydropower, or V2G technologies. Required only for Legacy Passive Dispatch enrollment: For new BESS (installed after January 1, 2022): Commercially available, carrying at least a 10-year manufacturer warranty with customer service and technical support provided by the manufacturer. o Customers with already-installed BESS that qualify under Section 4.1 for Passive Dispatch must have at least 7 years remaining on their BESS warranty at the time of Application. The equipment supplier should maintain the rated Power Capacity for a 10-year service life of the project with an availability standard (>90% availability if possible). All Passive Dispatch participants should aim to discharge 80% of their nameplate capacity during Passive Dispatch whenever possible, to maximize the Program's peak reduction benefits. Thus, equipment that cannot achieve this standard (i.e.: inverter rating is too low for such dispatch to be possible) may not be accepted and enrolled in Passive Dispatch or may receive a prorated incentive for a lower energy capacity. The rated Energy Capacity shall be on an annual schedule over a 10-year period, or based on total energy throughput, to accomplish use-case objectives. Minimum 70% round-trip efficiency. Required for all systems (both Legacy Program and Construct 5): 27
  6. Page 29 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 29 of 203 The electric storage technologies shall be capable of and must comply with all relevant scheduling commands to provide Power Capacity, Energy Capacity, and Annual Cycle requirements. Permanently installed, grid connected, and behind the meter (BTM)31. Portable devices are not accepted. Adhere to all applicable structural, building, and local codes, laws and regulations. BESS design approved by the EDC as part of the interconnection process. BESS enrolling in Legacy Program and those interconnected on or after 1/1/26 must be approved to export power to the distribution grid. BESS must be capable of islanding from the grid during outage events32 The OEM (or BESS Aggregator or Operator or TPO) should offer service with capacities that include: o Customer enrollment into an approved DERMS platform o Record of customer name, site address, utility account number, battery OEM, device universal unique identifier (UUID), and BESS kW and kWh capacities o Charge and dispatch control of individual systems o Ability to send dispatch commands and receive inverter and critical operating data in real time (max of 15-minute intervals). Performance data upload to the DERMS must take place with no more than 1-month latency. o Any applicable Vendor Fees will be publicly available in the Eligible Equipment List referenced in Appendix A. There are numerous codes and standards that apply across the BESS technological landscape. Some of these standards apply across all the technologies such as electricity metering, communication standards, building, and electric codes. Individual technologies, such as different battery chemistries or mechanical energy storage, may have specific standards that apply while emerging technologies are pushing these standards to be constantly evolving. Systems installed under Energy Storage Solutions should adhere to all applicable standards including, but not limited to, the following list: American National Standards Institute (ANSI 62.41 – Surge suppression, ANSI C12.1 – AC Electric Metering) Institute of Electrical and Electronics Engineers (IEEE 519 - Harmonics, IEEE1547 – Inverters, Controls, etc.) 31 Program Administrators will consider front-of-the-meter (FTM) systems for qualified MFAH projects on a case-by-case basis only where 1) a BTM configuration is prohibitively expensive or unnecessary, 2) the site cannot benefit from demand management, and 3) the system can still provide resilience benefits to the customer. 32 The BESS must be able to provide back-up power to the customer within a reasonable time in the event of an outage. 28
  7. Page 30 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 30 of 203 Underwriters Laboratories (UL1741SA – Smart Inverters, UL 62109 – Inverter safety, UL 1642 – Standard for Lithium Batteries, UL1973 – Stationary Batteries, UL 9540 – Energy Storage Systems and Equipment, UL 9540a – Thermal Runaway and Flame Propagation) National Fire Protection Association (NFPA855 - Standard for the Installation of Stationary Energy Storage Systems), latest version National Electric Code, latest version Connecticut Building Code, latest version Local Building and Safety Codes, latest version Federal Communications Commission (FCC Part 15A) Cyber Security Framework (NIST 800-171, ISO 27001) Installations’ adherence to the applicable codes and standards assures safe and successful design, fabrication, procurement, and installation of a fully functional BESS that meets or exceeds all technical requirements, including protective and reverse-power relaying, and connection to the BESS step-up transformer secondary connections and the EDC’s Supervisory Control and Data Acquisition (SCADA) interface. All communications equipment/software within the BESS, which are necessary for integration of the existing SCADA network are also driven by these standards and the preference of the EDC. 4.2.2. Technology Updates During annual or Program review periods, the Program Administrators will provide an updated list of eligible electric storage technologies to the Authority. The list will include all relevant Program documentation on Green Bank, EnergizeCT, and the EDCs’ respective websites. If a Customer, Contractor, or TPO proposes to participate in Energy Storage Solutions using technologies not already approved, the Contractor or TPO must submit a New Technology Application form. The Program Administrators will evaluate all applications and the technology will be accepted or rejected at the Program Administrators’ discretion based on its conformance to the technical and Program requirements defined above (See Appendix C). The battery technology will not receive final approval and Eligible Equipment listing until the equipment is fully integrated with the respective DERMS vendor and is capable of meeting all program dispatch and telemetry requirements. Integration is completed at the applicant’s expense (OEM, BESS Operator, etc.). 4.3. Eligible Contractor, Third-Party Owner, and BESS Aggregator Requirements Eligible Contractors will design, sell, install, and/or service BESSs to customers in Eversource and UI territories. Eligible Third-Party Owners will own and operate BESSs to customers in Eversource and UI territories. To qualify, Eligible Contractors and Third-Party Owners must be properly insured and meet Connecticut’s occupational and professional licensing requirements, such as Connecticut Master Electrician (E-1) license and/or Connecticut Home Improvement Contractor (HIC) registration where necessary. Eligible BESS Aggregators are responsible for the coordination of BESS within the Program, working as an intermediary between the DERMS and the BESS Operator. Eligible BESS Aggregators will aggregate and enroll Eligible BESS into the Active Dispatch portion of the Program for qualified customers. 29
  8. Page 31 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 31 of 203 While the Eligibility applications are only submitted once, Contractors, Third-Party Owners, and BESS Aggregators, may be required to submit documentation agreeing to Program Manual updates and or Terms and Conditions updates as needed to maintain eligibility. 4.3.1. Required Documentation for Eligible Contractors This section is only applicable to Contractors intending to sell or sell and install a BESS for residential and/or commercial and industrial (C&I) customers or install for a TPO. To apply to become an Eligible Contractor in Energy Storage Solutions, applicants must provide the following documentation electronically or through the Program Administrator’s online Application when available: 1. Complete Application – submitted electronically via Program website. 2. Company Summary – Provide a brief description of the Applicant company, services and brands of energy storage equipment offered, and any Connecticut Green Bank programs the company currently participates in, to be utilized as the applicant company’s profile. 3. Bank Reference Letter – Provide verifiable evidence of financial solvency and health. Eligible Contractors should demonstrate their business is in good financial standing, has sufficient financial resources for their market, and is able to meet the cash flow requirements of managing multiple projects in the Program. Please submit a bank letter of reference/credit addressed to CGB on the bank’s letterhead, including the following details: a. Confirmation of good standing b. Length of time the applicant has been a customer of the bank c. Signature of appropriate bank officer If the financial capacity information is confidential, it must be labeled “CONFIDENTIAL” in the title of the document and be clearly marked “CONFIDENTIAL”. If the Applicant company indicates they currently participate in another Connecticut Green Bank program, they may forgo the Bank Reference Letter requirement at the PAs discretion 4. E-1 and/or HIC License(s) – Provide a copy of the E-1 license(s) and/or HIC registration(s) under which the applicant is registered. Please follow the guidance in Table 6 below to determine which license(s) must be held depending on type of sales. Note: all salespersons for HIC companies must be registered as Home Improvement Salespersons (HIS) with each company for which that salesperson is conducting sales. Energy Storage Solutions does not require submission of HIS licenses for individual salespersons but may request them at any time. An owner or principal of an HIC company does not need to have an HIS to conduct sales. 30
  9. Page 32 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 32 of 203 Table 6: Minimum Required Licensing for Eligible Contractors Residential BESS Company License Salesperson License Grid Interconnection Electrician’s License (Subcontractor or Employee) E-1 -- HIC HIS Commercial and Industrial BESS --- E-1 E-1 Solicitors’ Permit(s) – “Vendor”, “Peddler” or “Solicitor” permits may be required by certain Connecticut municipalities for canvassing and door-to-door sales or lead generation. Check with the municipalities in which you are doing business. Energy Storage Solutions does not require submission of these permits as part of the Application but may request them at any time. 5. Subcontractor Information – indicate whether the applicant company will use subcontractors to sell or install BESS under Energy Storage Solutions. Eligible Contractors will be held accountable for any and all work performed by their subcontractors. See Section 4.3.5 for further detail. 6. Residential BESS Sales Contract (if applicable) – Provide a sample or blank copy of your standard contract or sales agreement template exactly as provided to a residential customer for the sale of a BESS. These requirements apply only to agreements where the customer will own the BESS; not for PPA or lease agreements. All sales contracts between residential customers and Contractors participating in Energy Storage Solutions and requesting an Upfront or Enrollment Incentive must reference the incentive as an upfront cost reduction to the customer. Incentives must always be referred to as “estimated”. Each residential sales contract must be signed by the Eligible Contractor and the customer. In order to receive to Reservation of Funds, Program Administrators require all sales agreements to include, at minimum: a. Description of BESS components and specifications (e.g., make and model) b. Nameplate power (kW) and energy (kWh) output c. Reference to ten (10) year (or greater) Workmanship Warranty d. Total BESS system cost33 e. Estimated Upfront or Enrollment incentive amount or reference to Energy Storage Solutions Upfront or Enrollment Incentive 33 When executing a contract for other measures in addition to energy storage (such as solar PV), contractors shall itemize these costs in the contract whenever feasible. When submitting a Customer Enrollment application to request an upfront incentive, contractors must report energy storage costs separately from other measures. 31
  10. Page 33 of 203

    The United Illuminating Company Docket No. 26-08-01 f. UI Attachment 5 ESS Program Manual and Additional Information Page 33 of 203 Estimated net customer cost Note that additional items should be included in sales agreements to comply with applicable State and local laws, including, but not limited to: a. Company license or registration (E-1 and/or HIC) b. Home Improvement Salesperson (HIS) registration number (where applicable) c. Notice of cancellation (stated within contract and attached in duplicate) d. Payment schedule e. Start and completion dates The Program Administrators only review sales agreements for information relevant to the applicable incentive(s). The Program Administrators do not review sales agreements for compliance with applicable laws or standards and approval of such documents as part of the Reservation of Funds process does not imply that agreements are within State laws and standards. Contractors will work with the Department of Consumer Protection and/or appropriate legal counsel to ensure compliance as needed. 7. Commercial and Industrial BESS Sales Contract (Optional) – Provide a sample copy of your standard contract or sales agreement template as provided to a C&I customer for the sale of a BESS. These requirements apply only to agreements where the customer will own the BESS; not for PPA or lease agreements. All sales contracts between C&I customers and Contractors participating in Energy Storage Solutions and requesting an Upfront Incentive must reference the incentive as “estimated”. Each sales contract must be signed by the Eligible Contractor and the customer. All agreements will reference, at minimum: a. Description of BESS components and specifications (e.g., make and model), and components b. Nameplate power (kW) and energy (kWh) output a. Reference to ten (10) year (or greater) Workmanship Warranty c. Total BESS system cost, estimated upfront incentive amount, and estimated net customer cost 8. Workmanship Warranty – Provide a copy of Eligible Contractor’s workmanship warranty. Customers receiving an Upfront Incentive or Enrollment Incentive must receive a ten (10) year or longer workmanship warranty through their Eligible Contractor or TPO. The warranty must cover full costs of labor for repair or replacement of any defective system components or components that failed due to improper or insufficient design or installation. The workmanship warranty is separate and in addition to the manufacturer’s equipment warranty. 9. Proof of Insurance – All Eligible Contractors must carry and provide evidence of proper insurance coverage to participate in Energy Storage Solutions: at least one million dollars in general liability; auto insurance; and worker’s compensation. Additionally, all subcontractors 32

Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf

Extracted from the file · 2 pages · 6,256 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf

Extracted from the file · 2 pages · 3,261 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf

Extracted from the file · 1 page · 528 characters

Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf

Extracted from the file · 2 pages · 4,800 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)

This filing on the current system (opens in a new tab)