Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

5. Annual Compliance Filings – Additional Filings (Program Materials)

Compliance filingFiled by Avangrid13 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files13

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of 2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdf

Extracted from the file · 147 pages · 342,741 characters

8 pages match
  1. Page 31 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 31 of 203 While the Eligibility applications are only submitted once, Contractors, Third-Party Owners, and BESS Aggregators, may be required to submit documentation agreeing to Program Manual updates and or Terms and Conditions updates as needed to maintain eligibility. 4.3.1. Required Documentation for Eligible Contractors This section is only applicable to Contractors intending to sell or sell and install a BESS for residential and/or commercial and industrial (C&I) customers or install for a TPO. To apply to become an Eligible Contractor in Energy Storage Solutions, applicants must provide the following documentation electronically or through the Program Administrator’s online Application when available: 1. Complete Application – submitted electronically via Program website. 2. Company Summary – Provide a brief description of the Applicant company, services and brands of energy storage equipment offered, and any Connecticut Green Bank programs the company currently participates in, to be utilized as the applicant company’s profile. 3. Bank Reference Letter – Provide verifiable evidence of financial solvency and health. Eligible Contractors should demonstrate their business is in good financial standing, has sufficient financial resources for their market, and is able to meet the cash flow requirements of managing multiple projects in the Program. Please submit a bank letter of reference/credit addressed to CGB on the bank’s letterhead, including the following details: a. Confirmation of good standing b. Length of time the applicant has been a customer of the bank c. Signature of appropriate bank officer If the financial capacity information is confidential, it must be labeled “CONFIDENTIAL” in the title of the document and be clearly marked “CONFIDENTIAL”. If the Applicant company indicates they currently participate in another Connecticut Green Bank program, they may forgo the Bank Reference Letter requirement at the PAs discretion 4. E-1 and/or HIC License(s) – Provide a copy of the E-1 license(s) and/or HIC registration(s) under which the applicant is registered. Please follow the guidance in Table 6 below to determine which license(s) must be held depending on type of sales. Note: all salespersons for HIC companies must be registered as Home Improvement Salespersons (HIS) with each company for which that salesperson is conducting sales. Energy Storage Solutions does not require submission of HIS licenses for individual salespersons but may request them at any time. An owner or principal of an HIC company does not need to have an HIS to conduct sales. 30
  2. Page 32 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 32 of 203 Table 6: Minimum Required Licensing for Eligible Contractors Residential BESS Company License Salesperson License Grid Interconnection Electrician’s License (Subcontractor or Employee) E-1 -- HIC HIS Commercial and Industrial BESS --- E-1 E-1 Solicitors’ Permit(s) – “Vendor”, “Peddler” or “Solicitor” permits may be required by certain Connecticut municipalities for canvassing and door-to-door sales or lead generation. Check with the municipalities in which you are doing business. Energy Storage Solutions does not require submission of these permits as part of the Application but may request them at any time. 5. Subcontractor Information – indicate whether the applicant company will use subcontractors to sell or install BESS under Energy Storage Solutions. Eligible Contractors will be held accountable for any and all work performed by their subcontractors. See Section 4.3.5 for further detail. 6. Residential BESS Sales Contract (if applicable) – Provide a sample or blank copy of your standard contract or sales agreement template exactly as provided to a residential customer for the sale of a BESS. These requirements apply only to agreements where the customer will own the BESS; not for PPA or lease agreements. All sales contracts between residential customers and Contractors participating in Energy Storage Solutions and requesting an Upfront or Enrollment Incentive must reference the incentive as an upfront cost reduction to the customer. Incentives must always be referred to as “estimated”. Each residential sales contract must be signed by the Eligible Contractor and the customer. In order to receive to Reservation of Funds, Program Administrators require all sales agreements to include, at minimum: a. Description of BESS components and specifications (e.g., make and model) b. Nameplate power (kW) and energy (kWh) output c. Reference to ten (10) year (or greater) Workmanship Warranty d. Total BESS system cost33 e. Estimated Upfront or Enrollment incentive amount or reference to Energy Storage Solutions Upfront or Enrollment Incentive 33 When executing a contract for other measures in addition to energy storage (such as solar PV), contractors shall itemize these costs in the contract whenever feasible. When submitting a Customer Enrollment application to request an upfront incentive, contractors must report energy storage costs separately from other measures. 31
  3. Page 33 of 203

    The United Illuminating Company Docket No. 26-08-01 f. UI Attachment 5 ESS Program Manual and Additional Information Page 33 of 203 Estimated net customer cost Note that additional items should be included in sales agreements to comply with applicable State and local laws, including, but not limited to: a. Company license or registration (E-1 and/or HIC) b. Home Improvement Salesperson (HIS) registration number (where applicable) c. Notice of cancellation (stated within contract and attached in duplicate) d. Payment schedule e. Start and completion dates The Program Administrators only review sales agreements for information relevant to the applicable incentive(s). The Program Administrators do not review sales agreements for compliance with applicable laws or standards and approval of such documents as part of the Reservation of Funds process does not imply that agreements are within State laws and standards. Contractors will work with the Department of Consumer Protection and/or appropriate legal counsel to ensure compliance as needed. 7. Commercial and Industrial BESS Sales Contract (Optional) – Provide a sample copy of your standard contract or sales agreement template as provided to a C&I customer for the sale of a BESS. These requirements apply only to agreements where the customer will own the BESS; not for PPA or lease agreements. All sales contracts between C&I customers and Contractors participating in Energy Storage Solutions and requesting an Upfront Incentive must reference the incentive as “estimated”. Each sales contract must be signed by the Eligible Contractor and the customer. All agreements will reference, at minimum: a. Description of BESS components and specifications (e.g., make and model), and components b. Nameplate power (kW) and energy (kWh) output a. Reference to ten (10) year (or greater) Workmanship Warranty c. Total BESS system cost, estimated upfront incentive amount, and estimated net customer cost 8. Workmanship Warranty – Provide a copy of Eligible Contractor’s workmanship warranty. Customers receiving an Upfront Incentive or Enrollment Incentive must receive a ten (10) year or longer workmanship warranty through their Eligible Contractor or TPO. The warranty must cover full costs of labor for repair or replacement of any defective system components or components that failed due to improper or insufficient design or installation. The workmanship warranty is separate and in addition to the manufacturer’s equipment warranty. 9. Proof of Insurance – All Eligible Contractors must carry and provide evidence of proper insurance coverage to participate in Energy Storage Solutions: at least one million dollars in general liability; auto insurance; and worker’s compensation. Additionally, all subcontractors 32
  4. Page 34 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 34 of 203 must meet this requirement, but proof of insurance for subcontractors is not required since Eligible Contractors will be held accountable for any and all work performed by their subcontractors. Certificates of Insurance (COI) must list "Connecticut Green Bank, 75 Charter Oak Ave, Suite 1 – 103, Hartford, CT 06106" as the “Certificate Holder” (not additionally insured). 4.3.2. Required Documentation for Eligible TPOs This section is only applicable to entities which intend to own and operate BESS with lease or PPA to customers in Energy Storage Solutions. Companies may apply as both an Eligible Contractor and TPO if they intend to sell, install, own, and operate BESS to customers. TPOs will own and operate BESS in agreement with customers in Eversource and UI territories. To qualify as a TPO, companies applying to Energy Storage Solutions must be financially solvent and able to own and operate a fleet of BESS and be properly insured and meet Connecticut’s occupational and professional licensing requirements, such as Connecticut E-1 and/or HIC licenses where necessary. All prospective TPOs must provide the following documentation: 1. Complete Application – submitted electronically or online at Program website. 2. Company Summary – Provide a summary of the Applicant company’s experience and training with electric storage systems, related technologies, and any CGB and EDC programs; to be utilized as the applicant company’s profile. 3. Two (2) Years of Audited Financials – Provide verifiable evidence of financial solvency and health. TPOs should demonstrate their business is in good financial standing, has sufficient financial resources, and is able to meet the cash flow requirements of managing multiple projects in Energy Storage Solutions. Please submit the most recent two years of audited company financials. At their sole discretion, Program Administrators may request additional supporting information to complete an in-depth financial review. If the financial capacity information is confidential, it must be labeled “CONFIDENTIAL” in the title of the document and be clearly marked “CONFIDENTIAL”. 4. Agreement(s) with Eligible Contractor(s) – TPOs are required to use Eligible Contractors to install BESS under Energy Storage Solutions or become an Eligible Contractor. If applicant company is applying only as a TPO, submit a copy of each agreement, if applicable, which should be on the TPO’s letterhead, and include the following details: a. Eligible Contractor’s name and contact b. Primary responsibilities of each party c. Term of agreement d. Any other relevant terms e. Signatures of all parties 33
  5. Page 35 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 35 of 203 If the TPO changes, cancels, or adds agreements with Eligible Contractors, the Program Administrators must be notified in writing within five (5) business days of the change. The TPO must also submit an updated agreement, and any other applicable documents. The Program Administrators reserve the right to request additional information regarding agreements with Eligible Contractors. TPOs may also apply as Eligible Contractors to coordinate or subcontract their own installations. 5. Residential Lease / PPA Contract and Terms (If applicable) – Provide a sample of the TPO’s standard contract or sales agreement template for residential BESS Leases or PPAs. 6. Commercial and Industrial Lease / PPA Contract and Terms (optional) – Provide a sample of the TPO’s standard contract or sales agreement template for commercial and industrial BESS Leases or PPAs. 7. Proof of Insurance – All Eligible TPOs must carry and provide evidence of proper insurance coverage to participate in Energy Storage Solutions: at least one million dollars in general liability; auto insurance; and worker’s compensation. Additionally, all subcontractors must meet this requirement, but proof of insurance for subcontractors is not required since Eligible Contractors will be held accountable for any and all work performed by their subcontractors. Certificates of Insurance (COI) must list "Connecticut Green Bank, 75 Charter Oak Ave, Suite 1 – 103, Hartford, CT 06106" as the “Certificate Holder” (not additionally insured). 8. Warranty – Provide a copy of the warranty Eligible TPO will offer to customers. Customers must receive a ten (10) year or longer warranty through their Eligible Contractor or TPO. The warranty must cover full costs of labor for repair or replacement of any defective system components or components that failed due to improper or insufficient design or installation. The warranty is separate and in addition to the manufacturer’s equipment warranty. 9. Data Release and Terms and Conditions – New and existing TPOs must sign and submit any applicable Data Release and Terms and Conditions for their fleet prior to the disbursement of any Upfront, enrollment, or Performance incentives. When BESS participating in ESS are acquired through mergers, acquisitions, or consolidation of third-party owners (TPOs) or asset managers, etc. the acquiring entity must become an Eligible TPO in the ESS Program through the process described above. The acquirer must also demonstrate to the Green Bank that it has assumed full operational, maintenance, and performance responsibilities for the acquired BESS. The acquiring entity must also provide evidence of financial and technical capacity to manage the systems in compliance with all ESS Program guidelines. The acquirer must notify the Green Bank of such transactions within 30 days and complete all required administrative updates, including the transfer of project registration, incentive agreements, and complete integration with DERMS providers participating in the Program. The Program Administrators reserve the right to request additional documentation, such as asset purchase agreements, merger filings, fleet lists, or operational transition plans, before accepting the applicant in the Program. 34
  6. Page 36 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 36 of 203 Once all Program requirements are met, including completion of all necessary transfer documents and verification of the acquirer’s eligibility, the acquiring entity will become the eligible TPO of record for the acquired systems. From that point forward, the acquirer may be entitled to receive performance incentive payments, provided that the systems continue to meet all operational and performance criteria outlined in this Program Manual. Any historical performance obligations or claw back provisions associated with upfront incentives will also transfer to the acquirer as part of the Program participation obligations. 4.3.3. Required Documentation for Eligible BESS Aggregators This section is only applicable to BESS Aggregators intending to aggregate and enroll Eligible Equipment into Energy Storage Solutions for qualified customers. BESS Aggregators who wish to enroll customers in Active Dispatch only should follow the requirements set forth below. BESS Aggregators who wish to enroll customers in Passive Dispatch + Active Dispatch should follow the requirements set forth for Eligible Contractors plus the requirements set forth below. To apply to become an Eligible BESS Aggregator in Energy Storage Solutions, applicants must provide the following documentation electronically or through the Program Administrator’s online Application when available: 1. New Technology Application – submitted electronically via Program website. BESS Aggregators work directly with Eligible Equipment and maintain a data connection with the applicable DERMS.. 2. Company Summary – Provide a summary of the Applicant company’s experience and training with electric storage systems, related technologies, and any CGB and EDC programs; to be utilized as the applicant company’s profile. 3. Description of Enrollment Process – Provide a summary of the enrollment process used or intended to be used for enrolling prospective customers into the Program. Include information about any existing data integration(s) with the applicable DERMS. 4. Customer Terms – Provide copies of all relevant documentation that prospective customers will review and agree to as part of their enrollment. 5. Other Information as requested by the Program Administrators 4.3.4. Eligible Contractor, TPO, and BESS Aggregator Application Process The Application process is as follows: 1. Prospective Contractor, TPO, or Aggregator will submit a complete Application to the Program Administrators at the Energy Storage Solutions website. The Program 35
  7. Page 37 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 37 of 203 Administrators shall determine what constitutes a complete Application based on the requirements set forth in this document. 2. Each Application will be evaluated for completeness and consistency with the requirements outlined in this document within five (5) business days of submission. The Program Administrators will review the Application and may request additional documentation or information, if needed. Incomplete Applications may take longer to process and may be rejected. If applicants do not respond to rejection notice within 60 days, the Application may be considered “inactive” by the Green Bank and withdrawn. Rejected Applicants may resubmit a complete Application at any time. 3. When a complete Application has been submitted, Program Administrators will review the Application. Applications can be rejected at the sole discretion of the Program Administrators. Reasons for rejection include but are not limited to: a. Principal(s), executive(s) or staff (including but not limited to: managers, directors, executive staff, subcontractors or salespersons) of Applicant company have been associated with misconduct within Connecticut Green Bank or EDC programs, or have been associated with misconduct within other state or utility programs. b. Principal(s), executive(s) or staff (including but not limited to: managers, directors, executive staff, subcontractors or salespersons) of Applicant company have been associated with illegal activity—criminal or misdemeanor—or unethical behavior that may cast Energy Storage Solutions in negative light or call into question the integrity or workmanship or salesmanship of the Contractor or TPO. c. Complaints or negative references from customers, current or past employees or other agencies or organizations. d. Other reasons the Contractor or TPO may not be capable of successfully participating in the Program or meeting the Program’s consumer protection standards, at the Program Administrators’ sole discretion. 4. An email notifying the Applicant of the Program Administrators’ approval (Approval Letter) or denial (Denial Letter) of the Application will be sent electronically. If approved as a Provisional Eligible Contractor, the letter will stipulate the provisions and note any users to receive login credentials for the Enrollment Platform. If denied, Applicant may reapply (correcting for deficiencies noted in Denial Letter). 5. Contractor, TPO, or Aggregator must attend a training with a Program representative. Trainings will be scheduled on a regular basis and posted at https://www.ctgreenbank.com/news-events/events-calendar/ and are available ad-hoc as needed. Program Administrators may require a Contractor, TPO, or Aggregator to attend additional trainings if deemed necessary (i.e. high application rejection rate, improper incentive activity, etc.). 6. Once approved and trained, Contractor, TPO, or Aggregator may begin submitting incentive reservation requests pursuant to their status (Eligible or Provisional), (Residential and/or 36
  8. Page 38 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 38 of 203 C&I) sales type (PPA, Lease, Purchase), and enrollment type (Active Dispatch or Passive + Active Dispatch). 4.3.5. Eligible Contractor, TPO, Responsibilities and Conduct OEM and BESS Aggregator Eligible Contractors, Third-Party Owners, OEMs, and BESS Aggregators’ Primary Responsibilities are as follows: 1. Provide responsible, accurate and transparent sales and marketing information to customers 2. Uphold a professional degree of workmanship and work collaboratively with the Program Administrators in the best interests of customers 3. Follow all rules of Energy Storage Solutions including, but not limited to, those outlined in this document and in training guides and notices. 4. Submit complete and accurate incentive applications on behalf of customers via the Program workflow platforms. 5. Comply with current Program processes for submission of incentive applications, inspection reports and project completion documents, as outlined in training materials provided by the Program Administrators. 6. Facilitate access to an Approved DERMS for each project receiving a Program incentive. 7. Understand the public policy objectives of Connecticut Public Act No. 21-53 and Docket No. 17-12-03RE03 In addition to the above Responsibilities, Eligible Contractors’ and Third-Party Owners’ additional Primary Responsibilities are as follows: 8. Obtain all appropriate local and state permits and approvals to facilitate the installation of the BESS. 9. Maintain all required insurance, licenses, registrations, and certifications as required by Energy Storage Solutions and by applicable local and state law. 10. Comply with all national, state, and local codes and standards, rules and regulations including but not limited to those related to home improvement contracting, electrical work and construction. 11. Coordinate installation of grid-tied BESS through direct employees or subcontractors. 12. Complete and maintain active interconnection applications for UI and Eversource customers and obtain interconnection approval before commissioning. 13. Collaborate with the Program Administrator’s third-party inspectors, as needed. 14. Complete system installation (if applicable) and pass all required inspections (if opted-in) within a reasonable timeframe. 37
  9. Page 39 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 39 of 203 15. Honor a required minimum ten (10) year workmanship warranty. 16. Respond to BESS outages and other BESS performance and monitoring issues within a reasonable timeframe and in accordance with warranty and contract terms. 17. Configure and maintain access to an Approved Performance Data Provider for each project receiving a Program incentive. 18. Hold responsibility for and present a plan for disposal of storage assets at the end of their useful life. 19. TPOs are required to work with Eligible Contractors to fulfill the above responsibilities. Contractors and TPOs will be held directly accountable for work performed by their staff, subcontractors or other representatives. 20. TPOs, OEMs, and Aggregators will work with Program Administrators and respond to requests to provide updates on company financial health and solvency if needed and as requested 4.3.6. Eligible Contractor, TPO, BESS Aggregator, BESS Operator, or Eligible OEM Non-Performance, Misconduct, Improper and Illegal Behavior The Program Administrators can, at their sole discretion, impose a probation, suspension, or termination of a Contractor, TPO, Aggregator, Operator, or OEM’s eligibility to participate in Energy Storage Solutions, and/or may put on hold, suspend, or terminate incentive payments at any time if Program requirements are not met, or for misconduct, improper, or illegal behavior in connection with Energy Storage Solutions (alleged or convicted), including but not limited to the following: 1. Complaints regarding sales, workmanship, and/or service, including, but not limited to: a. Misleading or high-pressure sales tactics b. Providing false, deceptive, or inaccurate information c. Poor customer service d. Poor, improper, or unsafe installation quality e. Billing for equipment not installed, services not rendered or charges that should not be borne by a customer based on Program rules, agreements, or similar circumstances 2. Failure to ensure that all applicable employees and/or subcontractors are properly licensed according to Connecticut State law and adhere to the requirements of Energy Storage Solutions. 3. Failure to comply with current State and local laws and ordinances pertinent to home improvement contracting, building, and electrical work, including but not limited to: a. Obtaining proper permits for lead generation, sales, and installations b. Following Occupational Safety and Health Administration (OSHA) regulations 38
  10. Page 40 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 40 of 203 c. Following National Electric Code (NEC), Connecticut State Building Code(s), municipal building code(s) and ordinance(s). 4. Improper incentive activity, including, but not limited to: a. Failure to return cancelled incentive funds to the Program Administrators within a thirty (30) day period b. Failure to return overpaid or otherwise owed incentive funds to the Program Administrators within a thirty (30) day period. (For example, an incentive could be overpaid due to an incentive reduction based on inspection findings occurring after incentive payment, or premature unenrollment from dispatch programs). c. Failure to pass 100% of Upfront Incentive or Enrollment Incentive as upfront cost reduction to the customer 5. Misrepresentation of BESS capabilities and benefits in sales or marketing materials to obtain competitive advantage, including, but not limited to: a. Presentation of inaccurate, deceptive, incomplete, or misleading power and energy estimates, including backup power b. Presentation of inaccurate, deceptive, incomplete, or misleading economic and environmental benefits c. Actions against a customer’s best interests (including, but not limited to design and/or sale of a BESS that is not ideal or suited for the customer’s property, energy, or economic needs) d. Misrepresentation of incentives and credits (i.e., Program incentives, federal ITC, tax liability, etc.) e. Presentation of inaccurate or misleading information about utility electricity rates including assumptions regarding rate escalation and Time of Use (TOU) rates and schedules f. Presentation of inaccurate or misleading information regarding incentives, project payback, return on investment or other measures of customer project economics 6. Consistent inspection failures, including, but not limited to: a. Municipal inspections b. Utility inspections or witness tests c. Program field inspections 7. Failure to submit or respond to requests for information, including but not limited to: a. Program documentation or information b. Proof of Company financial health and solvency (if requested) c. Certificate of insurance 39

Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf

Extracted from the file · 2 pages · 6,256 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf

Extracted from the file · 2 pages · 3,261 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf

Extracted from the file · 1 page · 528 characters

Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf

Extracted from the file · 2 pages · 4,800 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)

This filing on the current system (opens in a new tab)