Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

5. Annual Compliance Filings – Additional Filings (Program Materials)

Compliance filingFiled by Avangrid13 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files13

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of 2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdf

Extracted from the file · 147 pages · 342,741 characters

8 pages match
  1. Page 44 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 44 of 203 Section 5: Operational Control All references to “Passive Dispatch” in this Section will apply to Legacy Program customers. All references to Active Dispatch in this section will apply to both Legacy and Construct 5 customers. In the event of an emergency within the customer’s facility, the customer should call the appropriate emergency services. Once the emergency is resolved, the customer should report the issue to the Connecticut Green Bank and their respective EDC’s customer care centers.34 Eligible BESS in Energy Storage Solutions must be connected to and controlled by the relevant residential or C&I DERMS. The DERMS will send dispatch signals for the Active program, while the BESS Operator or Aggregator will be responsible for managing signals for the Passive program, where applicable. Dispatch events will include Legacy Passive and all Active events as described in subsequent sections. The EDCs will require each system to include the following control and monitoring aspects, at minimum: 1. Telemetry. Telemetry requirements will include a minimum granular location, charge, discharge, state of charge, and schedule of events. This telemetry should meet the Program requirements of least 15-minute interval data at a minimum of 1-month latency. In addition, the DERMS platform should receive this telemetry from every discrete BESS and not at a fleet level. Additional details are provided below in Section 0. 2. Dispatching. The EDC will initiate the Active Dispatch events of the battery energy storage system through their DERMS platform(s) and the EDC can schedule the dispatch in advance or in real-time. 35 Event packages may include start/stop, charge/discharge, and level of charge/discharge. The BESS Operator or Aggregator will be responsible for “last-mile” operational instructions to the Customer System. Where applicable, the BESS Operator or Aggregator will also maintain the Passive Dispatch Schedule for Legacy participants. 3. Override. If required to maintain the safety and reliability of the grid, EDCs may also override or cancel dispatch events scheduled by the ISO-NE for battery energy storage systems participating in their programs and/or operations. The communication to the BESS may be a direct connection to the DERMS platform. However, other layered communications constructs are acceptable if the system meets the above minimum operational control requirements. This flexibility would allow a BESS Operator or Aggregator to control the “last-mile” communication to the BESS via a third-party system, if that system provided upwards telemetry, dispatching, and override capabilities to the respective DERMS. Notification will be provided to the customer’s BESS Operator or Aggregator via an approved API or OpenADR Protocol. BESS operation allows support of the grid with high-speed operations driven by the technology of the system components. While synced to the grid, the lithium-ion BESS has proven to respond with 34 Eversource Emergency Contact: [phone removed]; UI Emergency Contact: [phone removed]; CGB Contact: [phone removed] In most cases, the EDCs will schedule a dispatch in advance with a day-ahead notification; however, the EDCs also plan to conduct real-time dispatches. 35 43
  2. Page 45 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 45 of 203 full load capability from remote telemetry in the 1-2 second time range. From an offline state, the BESS can sync to the grid and provide full power in less than 30 seconds in most circumstances. The steps required to go from offline to an online state has a relatively simple control sequence and using the Power Conditionings System (PCS) or inverter/transformer to sync to the electrical characteristics of the grid. Operations Interfacing and communication of the BESS with PA networks will be critical to successful operation over the term of an agreement. 5.1.1. General Operating Standards The BESS Operator must provide the telemetry (i.e., data from the BESS) capable of communicating the minimum data elements as described in Table 7. Critical operating parameters that the Operator should monitor throughout the BESS include but are not limited to those specified in Table 7. Inverter AC and DC voltage, current, kW, kVA, state of charge and are subject to change over time. Table 7: Battery Storage System Telemetry Data Data Field Name Units or Data Type Data Format DeviceID String* Timestamp DateTime UTC Date and time of start of interval over which data measured on system, UTC Battery Stored Energy Float / Integer kWh Amount of energy stored in the battery, averaged over the interval (kWh), compared to 0% state of charge. This does not take into account any backup reserve, owner-configured minimum SOC limit, or battery health minimum SOC buffer set or recommended by the OEM (typically 10% for LFP batteries, for example) Onsite Power Demand Float / Integer kW Premise power consumption as measured at the utility meter, or by separate measurement equipment evaluating consumption at the same point. Battery Power Float / Integer kW Power in/out of the battery over the interval. Solar Energy Production Float / Integer kWh Amount of electrical energy output from any PV inverters over the interval. NA Definition Manufacturer’s ID that uniquely identifies the battery system when accessing telemetry or sending instructions via API. 44
  3. Page 46 of 203

    The United Illuminating Company Docket No. 26-08-01 Solar Power Production UI Attachment 5 ESS Program Manual and Additional Information Float / Integer kW Page 46 of 203 Electrical power output from any PV inverters over the interval. *String assuming value is alphanumeric BESS Operator or Aggregator’s telemetry must ensure data can be provided to the DERMS at 15 minutes intervals with a maximum latency of one month. Utility grade meters that were selected according to ANSI standards will need to be maintained throughout the lifetime. Inspection and testing of all meters will conform to Good Utility Practice, but not less often than every five (5) Contract Years at Customer, owner, or BESS Operator’s expense. Upon reasonable written request to the Customer, the EDC will request, at its own expense, inspection or testing of any such meters more frequently. 5.1.2. Dispatching Passive and Active Services The BESS installed through the Program must be capable of meeting the following dispatch requirements, as required by appropriate Customer Class. (Legacy Program Only) Passive Dispatch36 Notification: For BESS systems receiving upfront incentives, the BESS Operator will implement the following dispatch schedule for the Customer’s BESS: o Event Window and Frequency: Passive Dispatch will occur Monday through Friday in the months of June, July, and August, except for holidays. Passive Dispatch hours will be between 5 PM EST and 8 PM EST. Discharge: Operator will ensure the battery discharges its available energy capacity at a constant rate in each hour during the 3-hour dispatch window, while maintaining a minimum reserve of 20% of rated battery capacity. System performance will be evaluated according to the Passive Dispatch Season Performance formula set forth in Section 6.1.2. Participation Term: The Customer will participate in Passive Dispatch activities for the term of this agreement. (Legacy Program and Construct 5) Active Dispatch 36 Notification: When ISO New England forecasts electric grid capacity constraints, the EDCs will provide notification to the BESS Operator via the DERMS at least 24 hours in advance of the start of the Active Dispatch event o Event Windows and Frequency: The EDCs may initiate between 30-60 requests for Active Dispatch from June through September and up to 10 requests from November through March37. The Active Dispatch event will be a maximum of 3 hours between the hours of 12 PM to 9 PM. Applies only when the Customer is requesting an Upfront Incentive, not to be confused with Enrollment Incentive. 37 Legacy Active Dispatch will call 1-5 Winter events. Construct 5 Active Dispatch will call 1-10 Winter events. 45
  4. Page 47 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 47 of 203 Discharge: BESS Operators will be provided with the requested discharge level for the event. Actual performance will be verified based on data captured by the Customer’s Operator and reported back to the DERMS. Active Dispatch Performance: To receive performance incentives, customers must participate in Active Dispatch events. If a customer does not participate in an event, they will receive 0 kW performance for that event. The Customer’s performance incentive is based on the average kW discharge from all events called during each dispatch season (i.e., summer or winter). Override Conditions During the term of this Operating Agreement, the EDCs may require an override (i.e., cancel or change the timing of an event) of a scheduled dispatch event based on the following circumstances: Overriding Legacy Passive Dispatch with Active Dispatch Events: If an Active Dispatch event is scheduled by the EDC during a day with Passive Dispatch already scheduled, the DERMS will send notification to the BESS Operator with start time, stop time, and duration of an Active event at least 24 hours in advance. The planned Passive Dispatch for the scheduled day will be cancelled at that time. The customer will also receive email notification that the Passive Dispatch was cancelled at least 24 hours in advance of the planned Active Dispatch. Other Override Conditions: EDCs may also override scheduled dispatch events for all Customer Classes for the following reasons: o Grid Safety and Reliability. Critical system events that impact system voltage levels, system stability and safety, or distribution system events that are considered emergencies by the EDCs may require override of a customer’s BESS. While such conditions are rare, the EDCs will attempt to provide advance notification whenever possible, dependent on the nature of the event. Notification would be provided to the Operator via established communication protocol. Customers will also receive an email notification that the scheduled event is being cancelled. o Forecasted Severe Weather Conditions. Known severe weather events that are anticipated to trigger the EDC’s Emergency Restoration Plan (ERP) level 1-5 activities may also generate conditions which require an override of scheduled events to ensure the customer’s backup capacity is available in case an outage is experienced by the customer. In such an event, EDCs will initiate cancellation notification to BESS Operators of all planned dispatch events 48 hours in advance whenever possible. Notification will also be provided to customers whose scheduled events are being cancelled due to severe weather conditions. The cancellation will continue until restoration of incurred outages has been completed or the weather event has ended. 5.2. Battery System Responsibility Maintenance, Internet Connection, and Durability Contractors and TPOs are responsible for maintaining the Customer’s BESS so that it can respond to dispatch events. Performance data is expected to come from the BESS, not a separate meter, 46
  5. Page 48 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 48 of 203 as dictated by the ANSI standard mentioned in Section 4.2.1 Technical Requirements. The incentive amount could be affected if: (1) a BESS is not properly maintained, (2) the internet connection to the BESS is not maintained, or (3) any other aspect that would cause the BESS to discharge less or be unable to properly report performance. Electric storage capacities degrade over time, causing them to be able to discharge less power and/or energy. This will also affect the incentive amount. Therefore, prior to enrolling in Energy Storage Solutions, customers and their Contractor or TPO should consider the possibility of smaller than anticipated incentives due to lifecycle management decisions combined with expected performance decreases over the life of the BESS. Remainder of this page intentionally left blank 47
  6. Page 49 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 49 of 203 Section 6: Program Dispatch and Incentive Structure On December 17, 2025, PURA directed the Program Administrators to eliminate Passive Dispatch from Energy Storage Solutions for new customers effective no later than April 1, 2026. Please read this section carefully and consider which Program design is in effect at the point of sale or the time of enrollment (Legacy Program or Construct 5). Visit energystorageCT.com for the current Program status. CGB will administer the Passive Dispatch declining-block Upfront Incentive (Legacy Program) and the Enrollment Incentive (Construct 5); and the EDCs will administer the Active Dispatch ongoing performance incentive (Legacy Program and Construct 5). To be eligible for Incentives, projects must meet the requirements defined in Section 4 on customer and technology eligibility. Additionally, to qualify for the Upfront Incentive, the BESS must be set to the Passive Dispatch default settings, or another acceptable use case determined by CGB and approved by the Authority, such as Active Dispatch. Systems installed prior to January 1, 2022 are not eligible for the Upfront or Enrollment Incentives but may apply to participate in the Active Dispatch portion of the Program and earn the Performance Incentive provided their application is approved pursuant to Section 3. Projects approved in Construct 5 on or after April 1, 2026 will not be enrolled in Passive Dispatch. Program Requirements (Legacy Program and Construct 5) The EDCs have developed the following Program requirements: There must be an appropriate interconnection agreement that meets the relevant EDC’s standard interconnection requirements. Ability to meet both the Passive and Active Dispatch needs of the Program, as applicable, including completing software integration with dispatch platforms utilized in the Program, and the ability for technology to receive remote software upgrades. Approved electric storage technologies (See Appendix A) will require completing the New Technology Application (Appendix C) to obtain eligibility from the EDCs to engage in the integration process with the DERMS vendors. Costs associated with the integration effort will be borne by the BESS Operator or OEM. The Program will allow for BESS to be both standalone and coupled with other energy resources (e.g., solar), if such configurations are also in compliance with EDC interconnection agreements. Both alternating current (AC)-coupled and direct current (DC)-coupled battery systems are eligible for Energy Storage Solutions. 6.1. Customer Classifications Sec 6.1 applies to both Legacy Program customers and Construct 5 Customers. Legacy Program Residential Customers enrolled prior to April 1, 2026 (including Priority customers) are eligible for Upfront Incentives, administered by CGB, as defined in Table 8. The 48
  7. Page 50 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 50 of 203 residential Upfront Incentive structure follows a declining block structure with decreasing $/kWh incentive offerings as Program participation meets stepped capacity milestones. Construct 5 Residential Customers enrolled on or after April 1, 2026 (including Priority customers) are eligible for Enrollment Incentives, administered by CGB, as defined in Table 9. Multifamily Affordable Housing (MFAH) Customers that meet all qualifications are eligible for the Low-Income Residential incentive rate(s) applicable to the Program structure in effect at the time of application (Legacy Program or Construct 5) (See MFAH definition in Sec. 1 Glossary), which may also access the Grid-Edge adder, if applicable (See Table 8). The owner of a BESS at a MFAH housing site must ensure that the project’s resiliency benefits are equitably shared with tenants. To enforce tenant resiliency sharing, applications for MFAH projects must demonstrate that tenants will receive a fair and equitable portion of the energy stored by the BESS during a power outage38 . Given the diversity of multifamily housing types across the state, the specific level of resiliency sharing will be determined at the discretion of the Program Administrators. Exceptions to resiliency benefit sharing may be granted in rare cases by the Program Administrators if compelling, data-driven evidence shows that a MFAH project would become financially unviable due to a direct tenant resiliency sharing requirement. Table 8: Legacy Program Residential Customer Upfront Incentive (1/1/25 through 3/31/26) Incentive Step Estimated No. of Participants Capacity Block (MW) Standard ($/kWh)* Underserved ($/kWh)* LowIncome ($/kWh)* Est. Avg. Upfront Incentive per System $600 $600 $600 $4,657 $4,353 $3,948 Step 1 2,000 10.0 $250 $450 Step 2 3,000 15.0 $212.5 $450 Step 3 5,000 25.0 $162.5 $450 Total 10,000 50.0 *Upfront incentives are defined based on rated energy capacity (kWh) † Projects that qualify as Multifamily Affordable Housing (MFAH) are eligible for the Low-Income incentive rate (See MFAH definition in Sec. 1) ‡Incentive rates were increased for program year 2024. Contractors with an existing reservation of funds are not permitted to cancel projects for the purpose of reapplying to receive higher incentive rates. Table 9: Construct 5 Residential Customer Enrollment Incentive (Effective 4/1/26) Customer Category Enrollment Incentive Rate* Residential (Non-Grid Edge) $30/kWh Residential (Grid Edge) $130/kWh *Enrollment incentives are defined based on rated energy capacity (kWh) 38 This may be demonstrated through system design narrative in contract and/or in site plan and electrical drawings. 49
  8. Page 51 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 51 of 203 Legacy Program Commercial Customers enrolled prior to April 1, 2026 (including Priority customers) are eligible for Upfront Incentives, administered by CGB as defined in Table 10. The designation between small, medium, and large is based on the customer’s annual peak demand. Customers installing an oversized battery system with a power rating greater than their annual peak demand will receive a prorated upfront incentive according to the Tiers described in Table 10. An incentive calculator is available at www.energystoragect.com/contractor-resources. Construct 5 Commercial Customers enrolled on or after April 1, 2026 may be eligible for Enrollment Incentives, administered by the CGB as defined in Table 11. Assigning the applicable Small, Medium, and Large Upfront Incentive will be determined based on a customer’s “annual peak demand”, defined as the highest peak demand billed for the twelve (12) months prior to application, as determined by the customer’s utility for billing purposes. In the event this calculation is not possible (e.g. no interval data available), Program Administrators may use the billing demand in a customer’s utility bill. Table 10: CGB C&I Customer Upfront Incentive Structure (Tranche 3) (1/1/25 through 3/31/26) Upfront Incentive ($/kWh)* Capacity Block (MW) 0-50 MW 50-75 MW 75-126.1 MW Small Commercial Tier $182.00 $164.00 $146.00 Medium Commercial Tier $159.25 $143.50 $127.75 Large Commercial Tier $91.00 $82.00 $73.00 Small Commercial is a C&I customer with annual peak demand <200 kW Medium Commercial is a C&I customer with annual peak demand 200 kW - 500 kW Large Commercial is a C&I customer with annual peak demand >500 kW *Upfront incentives are calculated based on rated energy capacity (kWh). Table 11: CGB C&I Customer Enrollment Incentive Structure (Effective 4/1/26) Customer Category Enrollment Incentive Rate* Commercial (Non-Priority) N/A Commercial (Priority) $10/kWh *Enrollment incentives are calculated based on rated energy capacity (kWh) In cases of mixed-use or where a customer’s classification as Residential, Commercial, or MFAH is not clear, the Program Administrators will use utility data or publicly available municipal data or contact the customer directly to make a determination. The Program Administrators will have final say in determining customer class. Priority Customer Designation Customers that qualify as one or more of the following priority class customers will be eligible for an additional incentive adder including Customers on the Grid Edge, Critical Facilities, C&I Customers 50
  9. Page 52 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 52 of 203 replacing Fossil Fuel Generators, and Small Business Customers. Definitions and limitations for each customer class are defined below39. Table 12: Legacy Program Upfront Incentive Priority Customer Adder Upfront Incentive Adder Customer Category +25%: Non-Residential Small Business Critical Facilities Customers Replacing Fossil Fuel Generators Grid Edge +50%: Residential Grid Edge Customers on the Grid Edge Customers on the Grid Edge are defined as (1) the top ten percent of circuits with the highest number of outages per customer during major storms since July 1, 2012, and (2) the top ten percent of circuits with the longest outages due to major storms since July 1, 2012. A map of circuits that meet grid edge criteria can be found in the Program’s website. Critical Facilities As of January 1, 2024 Critical Facilities shall be defined by the revised definition according to Gen. Stat. § 16-243y(a)(2)40. EDCs will confirm applicant’s qualification as a critical facility as part of the application process. Commercial and Industrial Customers Replacing Fossil Fuel Generators This category applies to C&I customers who are replacing an existing fossil fuel generators with an energy storage system of comparable size. Customers must demonstrate their plan to decommission the fossil fuel generator(s) with a Decommissioning Plan. A template Decommissioning Plan is included in Appendix F. Decommissioning Plans are subject to review and approval by Program Administrators in order to qualify for the Upfront Incentive adder. Customers must fully decommission the existing fossil fuel generator and may not sell or otherwise redeploy the fossil fuel generator. The Program Administrators reserve the right to audit and inspect the customer’s site to ensure the generator has been decommissioned. Small Business Customers Small business customers are commercial and industrial customers with less than 200 kW annual peak demand. Hybrid Incentives Hybrid projects are defined as those where a single BESS will be interconnected to a single utility account where the building is used for both multifamily affordable housing (MFAH) and other 39 Priority Customers that applied to ESS prior to January 1, 2023 may participate in ISO-NE Forward Capacity Markets with approval from Program Administrators. See ESS Program Manual dated January 2, 2022 for more information. 40 Critical Facilities Definition to be used as of January 1, 2024 https://www.cga.ct.gov/2023/act/pa/pdf/2023PA-00157-R00HB-06853PA.pdf 51
  10. Page 53 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 53 of 203 nonresidential activities. The method used to calculate Hybrid project Upfront Incentives is as follows: 1. PAs will review all available consumption and demand data to determine a proportion of the consumption and/or demand to be applied to each use case (ex: 40% MFAH, 60% C&I). 2. The C&I incentive portion will be calculated based on the proportion of the demand and/or consumption attributable to the commercial operations (ex: if 60% C&I, then the kW / kWh ratings of the BESS and the customer’s annual peak demand will be multiplied by 60% and entered into the then-current C&I incentive calculator). 3. The Residential portion will be calculated based on the remaining proportion of the BESS at the then-current incentive level for MFAH (ex: in the above case, 40% of the BESS kW and kWh entered into the low-income residential incentive calculator). The Residential portion cannot exceed $16,000 per residential unit. 4. The C&I and Residential incentive portions will be totaled for a final approved Upfront Incentive amount but cannot exceed 50% of the total project cost. 6.2. Passive Dispatch Sec 6.2 applies only to Legacy Program customers enrolled in Passive Dispatch. CGB, in consultation with the EDCs, is responsible for developing the guidelines governing Passive Dispatch. 41 Legacy customers that received an Upfront Incentive (Residential Customers, Commercial – Fully Enrolled Customers, and Priority Customers, collectively “Passive Dispatch Participants”) must participate in the Passive Dispatch portion of the Program. 42 This requires setting the BESS to automatically store and dispatch energy through the BESS to reduce demand during summer peak periods (see Table 3). Typically, Passive Dispatch participants will not need to take any action for their BESS to respond to a Passive discharge event, as the BESS shall be pre-programmed to participate in Passive events according to the Program schedule. The residential BESS participating in Energy Storage Solutions will be required to have capability to export to the grid in order to maximize benefits to the grid.43 The conditions that allow for exemption will be detailed in separate Program materials as the factors affecting those conditions evolve. As part of the Application process, the Program Administrators will require all Passive Dispatch Participants to sign the Data Release and Terms & Conditions Agreement (see Appendix B and G) asserting compliance with the Passive Dispatch guidelines. Customers may deviate from Passive Dispatch parameters (without penalty) only under the following circumstances: During emergency events as determined by the relevant EDC. During Active Dispatch events as determined by the relevant EDC. 41 Authority, Order No. 3 in Docket No. 21-08-05. “No later than October 1, 2021, the Program Administrators shall also develop and file for the Authority’s review and approval rules guiding the distribution of the upfront incentive payment to participating electric storage system owners in Docket No. 21-08-05 consistent with the direction provided in Section III.C.” 42 If such customers seek to receive the upfront incentive and/or the upfront incentive adder. 43 Unless exception is granted, as detailed in Sec. 4 (Customer Enrollment Process) 52

Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf

Extracted from the file · 2 pages · 6,256 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf

Extracted from the file · 2 pages · 3,261 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf

Extracted from the file · 1 page · 528 characters

Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf

Extracted from the file · 2 pages · 4,800 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)

This filing on the current system (opens in a new tab)