2026 Clean and Renewable Energy Program Data and Report

Files13

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of 2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdf

Extracted from the file · 147 pages · 342,741 characters

8 pages match
  1. Page 47 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 47 of 203 Discharge: BESS Operators will be provided with the requested discharge level for the event. Actual performance will be verified based on data captured by the Customer’s Operator and reported back to the DERMS. Active Dispatch Performance: To receive performance incentives, customers must participate in Active Dispatch events. If a customer does not participate in an event, they will receive 0 kW performance for that event. The Customer’s performance incentive is based on the average kW discharge from all events called during each dispatch season (i.e., summer or winter). Override Conditions During the term of this Operating Agreement, the EDCs may require an override (i.e., cancel or change the timing of an event) of a scheduled dispatch event based on the following circumstances: Overriding Legacy Passive Dispatch with Active Dispatch Events: If an Active Dispatch event is scheduled by the EDC during a day with Passive Dispatch already scheduled, the DERMS will send notification to the BESS Operator with start time, stop time, and duration of an Active event at least 24 hours in advance. The planned Passive Dispatch for the scheduled day will be cancelled at that time. The customer will also receive email notification that the Passive Dispatch was cancelled at least 24 hours in advance of the planned Active Dispatch. Other Override Conditions: EDCs may also override scheduled dispatch events for all Customer Classes for the following reasons: o Grid Safety and Reliability. Critical system events that impact system voltage levels, system stability and safety, or distribution system events that are considered emergencies by the EDCs may require override of a customer’s BESS. While such conditions are rare, the EDCs will attempt to provide advance notification whenever possible, dependent on the nature of the event. Notification would be provided to the Operator via established communication protocol. Customers will also receive an email notification that the scheduled event is being cancelled. o Forecasted Severe Weather Conditions. Known severe weather events that are anticipated to trigger the EDC’s Emergency Restoration Plan (ERP) level 1-5 activities may also generate conditions which require an override of scheduled events to ensure the customer’s backup capacity is available in case an outage is experienced by the customer. In such an event, EDCs will initiate cancellation notification to BESS Operators of all planned dispatch events 48 hours in advance whenever possible. Notification will also be provided to customers whose scheduled events are being cancelled due to severe weather conditions. The cancellation will continue until restoration of incurred outages has been completed or the weather event has ended. 5.2. Battery System Responsibility Maintenance, Internet Connection, and Durability Contractors and TPOs are responsible for maintaining the Customer’s BESS so that it can respond to dispatch events. Performance data is expected to come from the BESS, not a separate meter, 46
  2. Page 48 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 48 of 203 as dictated by the ANSI standard mentioned in Section 4.2.1 Technical Requirements. The incentive amount could be affected if: (1) a BESS is not properly maintained, (2) the internet connection to the BESS is not maintained, or (3) any other aspect that would cause the BESS to discharge less or be unable to properly report performance. Electric storage capacities degrade over time, causing them to be able to discharge less power and/or energy. This will also affect the incentive amount. Therefore, prior to enrolling in Energy Storage Solutions, customers and their Contractor or TPO should consider the possibility of smaller than anticipated incentives due to lifecycle management decisions combined with expected performance decreases over the life of the BESS. Remainder of this page intentionally left blank 47
  3. Page 49 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 49 of 203 Section 6: Program Dispatch and Incentive Structure On December 17, 2025, PURA directed the Program Administrators to eliminate Passive Dispatch from Energy Storage Solutions for new customers effective no later than April 1, 2026. Please read this section carefully and consider which Program design is in effect at the point of sale or the time of enrollment (Legacy Program or Construct 5). Visit energystorageCT.com for the current Program status. CGB will administer the Passive Dispatch declining-block Upfront Incentive (Legacy Program) and the Enrollment Incentive (Construct 5); and the EDCs will administer the Active Dispatch ongoing performance incentive (Legacy Program and Construct 5). To be eligible for Incentives, projects must meet the requirements defined in Section 4 on customer and technology eligibility. Additionally, to qualify for the Upfront Incentive, the BESS must be set to the Passive Dispatch default settings, or another acceptable use case determined by CGB and approved by the Authority, such as Active Dispatch. Systems installed prior to January 1, 2022 are not eligible for the Upfront or Enrollment Incentives but may apply to participate in the Active Dispatch portion of the Program and earn the Performance Incentive provided their application is approved pursuant to Section 3. Projects approved in Construct 5 on or after April 1, 2026 will not be enrolled in Passive Dispatch. Program Requirements (Legacy Program and Construct 5) The EDCs have developed the following Program requirements: There must be an appropriate interconnection agreement that meets the relevant EDC’s standard interconnection requirements. Ability to meet both the Passive and Active Dispatch needs of the Program, as applicable, including completing software integration with dispatch platforms utilized in the Program, and the ability for technology to receive remote software upgrades. Approved electric storage technologies (See Appendix A) will require completing the New Technology Application (Appendix C) to obtain eligibility from the EDCs to engage in the integration process with the DERMS vendors. Costs associated with the integration effort will be borne by the BESS Operator or OEM. The Program will allow for BESS to be both standalone and coupled with other energy resources (e.g., solar), if such configurations are also in compliance with EDC interconnection agreements. Both alternating current (AC)-coupled and direct current (DC)-coupled battery systems are eligible for Energy Storage Solutions. 6.1. Customer Classifications Sec 6.1 applies to both Legacy Program customers and Construct 5 Customers. Legacy Program Residential Customers enrolled prior to April 1, 2026 (including Priority customers) are eligible for Upfront Incentives, administered by CGB, as defined in Table 8. The 48
  4. Page 50 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 50 of 203 residential Upfront Incentive structure follows a declining block structure with decreasing $/kWh incentive offerings as Program participation meets stepped capacity milestones. Construct 5 Residential Customers enrolled on or after April 1, 2026 (including Priority customers) are eligible for Enrollment Incentives, administered by CGB, as defined in Table 9. Multifamily Affordable Housing (MFAH) Customers that meet all qualifications are eligible for the Low-Income Residential incentive rate(s) applicable to the Program structure in effect at the time of application (Legacy Program or Construct 5) (See MFAH definition in Sec. 1 Glossary), which may also access the Grid-Edge adder, if applicable (See Table 8). The owner of a BESS at a MFAH housing site must ensure that the project’s resiliency benefits are equitably shared with tenants. To enforce tenant resiliency sharing, applications for MFAH projects must demonstrate that tenants will receive a fair and equitable portion of the energy stored by the BESS during a power outage38 . Given the diversity of multifamily housing types across the state, the specific level of resiliency sharing will be determined at the discretion of the Program Administrators. Exceptions to resiliency benefit sharing may be granted in rare cases by the Program Administrators if compelling, data-driven evidence shows that a MFAH project would become financially unviable due to a direct tenant resiliency sharing requirement. Table 8: Legacy Program Residential Customer Upfront Incentive (1/1/25 through 3/31/26) Incentive Step Estimated No. of Participants Capacity Block (MW) Standard ($/kWh)* Underserved ($/kWh)* LowIncome ($/kWh)* Est. Avg. Upfront Incentive per System $600 $600 $600 $4,657 $4,353 $3,948 Step 1 2,000 10.0 $250 $450 Step 2 3,000 15.0 $212.5 $450 Step 3 5,000 25.0 $162.5 $450 Total 10,000 50.0 *Upfront incentives are defined based on rated energy capacity (kWh) † Projects that qualify as Multifamily Affordable Housing (MFAH) are eligible for the Low-Income incentive rate (See MFAH definition in Sec. 1) ‡Incentive rates were increased for program year 2024. Contractors with an existing reservation of funds are not permitted to cancel projects for the purpose of reapplying to receive higher incentive rates. Table 9: Construct 5 Residential Customer Enrollment Incentive (Effective 4/1/26) Customer Category Enrollment Incentive Rate* Residential (Non-Grid Edge) $30/kWh Residential (Grid Edge) $130/kWh *Enrollment incentives are defined based on rated energy capacity (kWh) 38 This may be demonstrated through system design narrative in contract and/or in site plan and electrical drawings. 49
  5. Page 51 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 51 of 203 Legacy Program Commercial Customers enrolled prior to April 1, 2026 (including Priority customers) are eligible for Upfront Incentives, administered by CGB as defined in Table 10. The designation between small, medium, and large is based on the customer’s annual peak demand. Customers installing an oversized battery system with a power rating greater than their annual peak demand will receive a prorated upfront incentive according to the Tiers described in Table 10. An incentive calculator is available at www.energystoragect.com/contractor-resources. Construct 5 Commercial Customers enrolled on or after April 1, 2026 may be eligible for Enrollment Incentives, administered by the CGB as defined in Table 11. Assigning the applicable Small, Medium, and Large Upfront Incentive will be determined based on a customer’s “annual peak demand”, defined as the highest peak demand billed for the twelve (12) months prior to application, as determined by the customer’s utility for billing purposes. In the event this calculation is not possible (e.g. no interval data available), Program Administrators may use the billing demand in a customer’s utility bill. Table 10: CGB C&I Customer Upfront Incentive Structure (Tranche 3) (1/1/25 through 3/31/26) Upfront Incentive ($/kWh)* Capacity Block (MW) 0-50 MW 50-75 MW 75-126.1 MW Small Commercial Tier $182.00 $164.00 $146.00 Medium Commercial Tier $159.25 $143.50 $127.75 Large Commercial Tier $91.00 $82.00 $73.00 Small Commercial is a C&I customer with annual peak demand <200 kW Medium Commercial is a C&I customer with annual peak demand 200 kW - 500 kW Large Commercial is a C&I customer with annual peak demand >500 kW *Upfront incentives are calculated based on rated energy capacity (kWh). Table 11: CGB C&I Customer Enrollment Incentive Structure (Effective 4/1/26) Customer Category Enrollment Incentive Rate* Commercial (Non-Priority) N/A Commercial (Priority) $10/kWh *Enrollment incentives are calculated based on rated energy capacity (kWh) In cases of mixed-use or where a customer’s classification as Residential, Commercial, or MFAH is not clear, the Program Administrators will use utility data or publicly available municipal data or contact the customer directly to make a determination. The Program Administrators will have final say in determining customer class. Priority Customer Designation Customers that qualify as one or more of the following priority class customers will be eligible for an additional incentive adder including Customers on the Grid Edge, Critical Facilities, C&I Customers 50
  6. Page 52 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 52 of 203 replacing Fossil Fuel Generators, and Small Business Customers. Definitions and limitations for each customer class are defined below39. Table 12: Legacy Program Upfront Incentive Priority Customer Adder Upfront Incentive Adder Customer Category +25%: Non-Residential Small Business Critical Facilities Customers Replacing Fossil Fuel Generators Grid Edge +50%: Residential Grid Edge Customers on the Grid Edge Customers on the Grid Edge are defined as (1) the top ten percent of circuits with the highest number of outages per customer during major storms since July 1, 2012, and (2) the top ten percent of circuits with the longest outages due to major storms since July 1, 2012. A map of circuits that meet grid edge criteria can be found in the Program’s website. Critical Facilities As of January 1, 2024 Critical Facilities shall be defined by the revised definition according to Gen. Stat. § 16-243y(a)(2)40. EDCs will confirm applicant’s qualification as a critical facility as part of the application process. Commercial and Industrial Customers Replacing Fossil Fuel Generators This category applies to C&I customers who are replacing an existing fossil fuel generators with an energy storage system of comparable size. Customers must demonstrate their plan to decommission the fossil fuel generator(s) with a Decommissioning Plan. A template Decommissioning Plan is included in Appendix F. Decommissioning Plans are subject to review and approval by Program Administrators in order to qualify for the Upfront Incentive adder. Customers must fully decommission the existing fossil fuel generator and may not sell or otherwise redeploy the fossil fuel generator. The Program Administrators reserve the right to audit and inspect the customer’s site to ensure the generator has been decommissioned. Small Business Customers Small business customers are commercial and industrial customers with less than 200 kW annual peak demand. Hybrid Incentives Hybrid projects are defined as those where a single BESS will be interconnected to a single utility account where the building is used for both multifamily affordable housing (MFAH) and other 39 Priority Customers that applied to ESS prior to January 1, 2023 may participate in ISO-NE Forward Capacity Markets with approval from Program Administrators. See ESS Program Manual dated January 2, 2022 for more information. 40 Critical Facilities Definition to be used as of January 1, 2024 https://www.cga.ct.gov/2023/act/pa/pdf/2023PA-00157-R00HB-06853PA.pdf 51
  7. Page 53 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 53 of 203 nonresidential activities. The method used to calculate Hybrid project Upfront Incentives is as follows: 1. PAs will review all available consumption and demand data to determine a proportion of the consumption and/or demand to be applied to each use case (ex: 40% MFAH, 60% C&I). 2. The C&I incentive portion will be calculated based on the proportion of the demand and/or consumption attributable to the commercial operations (ex: if 60% C&I, then the kW / kWh ratings of the BESS and the customer’s annual peak demand will be multiplied by 60% and entered into the then-current C&I incentive calculator). 3. The Residential portion will be calculated based on the remaining proportion of the BESS at the then-current incentive level for MFAH (ex: in the above case, 40% of the BESS kW and kWh entered into the low-income residential incentive calculator). The Residential portion cannot exceed $16,000 per residential unit. 4. The C&I and Residential incentive portions will be totaled for a final approved Upfront Incentive amount but cannot exceed 50% of the total project cost. 6.2. Passive Dispatch Sec 6.2 applies only to Legacy Program customers enrolled in Passive Dispatch. CGB, in consultation with the EDCs, is responsible for developing the guidelines governing Passive Dispatch. 41 Legacy customers that received an Upfront Incentive (Residential Customers, Commercial – Fully Enrolled Customers, and Priority Customers, collectively “Passive Dispatch Participants”) must participate in the Passive Dispatch portion of the Program. 42 This requires setting the BESS to automatically store and dispatch energy through the BESS to reduce demand during summer peak periods (see Table 3). Typically, Passive Dispatch participants will not need to take any action for their BESS to respond to a Passive discharge event, as the BESS shall be pre-programmed to participate in Passive events according to the Program schedule. The residential BESS participating in Energy Storage Solutions will be required to have capability to export to the grid in order to maximize benefits to the grid.43 The conditions that allow for exemption will be detailed in separate Program materials as the factors affecting those conditions evolve. As part of the Application process, the Program Administrators will require all Passive Dispatch Participants to sign the Data Release and Terms & Conditions Agreement (see Appendix B and G) asserting compliance with the Passive Dispatch guidelines. Customers may deviate from Passive Dispatch parameters (without penalty) only under the following circumstances: During emergency events as determined by the relevant EDC. During Active Dispatch events as determined by the relevant EDC. 41 Authority, Order No. 3 in Docket No. 21-08-05. “No later than October 1, 2021, the Program Administrators shall also develop and file for the Authority’s review and approval rules guiding the distribution of the upfront incentive payment to participating electric storage system owners in Docket No. 21-08-05 consistent with the direction provided in Section III.C.” 42 If such customers seek to receive the upfront incentive and/or the upfront incentive adder. 43 Unless exception is granted, as detailed in Sec. 4 (Customer Enrollment Process) 52
  8. Page 54 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 54 of 203 During severe weather events as determined by the relevant EDC or by the BESS Operator, Aggregator, or OEM where there is a high likelihood of a grid outage Approved BESS Operators, Aggregators, or OEMs participating in Passive Dispatch must report all Passive Dispatch event hours during which their batteries were unable to perform due to an OEMtriggered severe storm event occurring within an uncanceled Passive Dispatch period. Such reports shall be submitted to the Program Administrators after the end of the Program’s Passive Dispatch season by October 15 of each year. As supporting evidence, Approved BESS Operators, Aggregators or OEMs must provide clear rationale and relevant data (e.g., National Weather Service alerts for the specific dates when the battery did not perform) to justify the cancellation of the Passive Dispatch hour. During Passive Dispatch events, Passive Dispatch Participants are required to discharge down to 20% of the BESS rated capacity. The Passive Dispatch window is 3 hours in duration. For example: a fully-charged BESS with 15 kWh rated energy capacity will have a maximum of 12 kWh available for Passive Dispatch and 3 kWh for reserve. During Passive Dispatch, the BESS will discharge at an average rate of 4 kWh per hour for the 3-hour duration. This is illustrated in the chart below: Figure 1: 15 kWh Battery Passive Dispatch 6.2.1. Legacy Passive Dispatch Season Performance and Claw Back Passive Dispatch Participants will be required to participate in Passive Dispatch events for ten (10) full years beginning on the date their system is connected to its respective DERMS. Participants who enroll partway through a Passive Dispatch season will not be penalized for partial participation. Rather, they will participate in the remainder of the season for Year 1, and in the beginning of the season for Year 11, totaling 10 full seasons of participation. Exiting from Energy Storage Solutions before the end of this period, or non-performance in Passive events during this period, will result in 53
  9. Page 55 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 55 of 203 non-compliance with Program requirements and the system owner will be required to return a prorated portion of the un-earned incentive. The claw back evaluation process will commence at the end of each summer season. The evaluation will determine whether a participating BESS scored greater than 90% for the Passive Dispatch season.44 Passive Dispatch participants are expected to make all efforts to have their BESS perform in compliance with Passive Dispatch rules. Program Administrators may periodically audit BESS that consistently perform below expectations (whether or not they comply with the Passive Dispatch Season Performance calculation below) to ensure ratepayer benefits are maximized. Table 13 [continued on the next page] describes the formula that will be used to determine each Legacy Participant’s Passive Dispatch Season Performance. 44 Legacy Passive Dispatch Participants are expected to dispatch 80% of available energy over the 3-hour Passive Dispatch window as uniformly as possible in accordance with the Passive Dispatch Season Performance criteria. 54
  10. Page 56 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 56 of 203 Table 13: Legacy Passive Dispatch Season Performance Formula Purpose Formula Component To ensure participants still receive credit for dispatching less than the required amount and to relax the Program’s uniform dispatch requirements, values may be less than 1 but no greater than 2. These values will then be summed across all Passive Dispatch event hours. An optimal score would be 1 for each hour 45. Σ (the energy discharged during a Passive Dispatch called event hour) / ((1/3) * (system’s available capacity at the start of the respective Passive Dispatch event – 20% of nameplate capacity)) To fully incentivize peak reduction through Active Dispatch participation46. (all Active Dispatch event hours called to replace a cancelled Passive Dispatch event in which a BESS discharged at least some portion of its available energy) [The allowable range for each Passive Dispatch hour’s score is 0 to 2 and scores that calculate as greater than 2 will be capped at 2.] + + To ensure participants are not penalized for Passive events canceled by the Program Administrators. (all Passive Dispatch hours cancelled by the Program Administrators that were not replaced by an Active Dispatch event) + To prevent penalties for OEMtriggered storm events that are beyond the customer’s control, allowing system usage during power outages. (all Passive Dispatch event hours called, and all Active Dispatch event hours called to replace a Passive Dispatch event, in which a battery could not perform because it was responding to an OEMtriggered severe storm event, provided the dispatch hour was not also cancelled by the Program Administrators) / To include all possible Passive Dispatch hours, if no events were canceled. (total possible Passive Dispatch hours in a given season) 45 The total score for this component is the sum of all individual scores from all Passive event hours unaffected by other formula components. Energy storage systems enrolled in Passive Dispatch should discharge 1/3 of their available energy during each Passive Dispatch event hour. For example, the system should discharge approximately 26.67% of its energy per hour (80%/3), assuming the system is fully charged at the start of the Passive event and accounting for the Program’s 20% reserve requirement, in order to earn full credit (three points) for the event. However, if the same system only discharges 13.34% of its nameplate capacity during the first Passive Dispatch hour, it would receive a score of 0.5 for that hour instead of a score of one. 46 As long as a system contributes any amount of energy back to the grid during each Active Dispatch event hour that replaces a canceled Passive Dispatch event, the system will receive full participation credit for those hours under the Passive Dispatch event participation formula. 55

Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf

Extracted from the file · 2 pages · 6,256 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf

Extracted from the file · 2 pages · 3,261 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf

Extracted from the file · 1 page · 528 characters

Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf

Extracted from the file · 2 pages · 4,800 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)