Compliance Filing, Order No. 1

5. Annual Compliance Filings – Additional Filings (Program Materials)

Compliance filingFiled by Avangrid13 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files13

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of 2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdf

Extracted from the file · 147 pages · 342,741 characters

8 pages match
  1. Page 94 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 94 of 203 Appendix C: New Technology Application NEW TECHNOLOGY APPLICATION Version January 27, 2026 Energy Storage Solutions is overseen by the Public Utilities Regulatory Authority (PURA), is paid for by ratepayers, and is administered by the Connecticut Green Bank, Eversource, and United Illuminating (Program Administrators). ALL SUBMITTED INFORMATION IS PUBLIC RECORD DO NOT SUBMIT ANY PROPRIETARY OR CONFIDENTIAL INFORMATION 93
  2. Page 95 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 95 of 203 Section 1 – Introduction Thank you for your interest in Connecticut Energy Storage Solutions (Program). The New Technology Application (NTA) is for the quali cation of complete Battery Energy Storage Systems (BESS52) in the Program. The resulting approval to the Eligible Equipment List will be for a battery and inverter combination that holds all necessary UL certi cations and has a means of communicating with the Distributed Energy Resource Management System (DERMS) associated with the BESS’s target customer sector. A complete Glossary of Terms is provided at the end of this document. Additionally, this application may also be used for BESS Aggregators who wish to become Eligible to integrate with the DERMS to enroll existing Eligible Equipment in the Energy Storage Solutions for quali ed customers. See the current Program Manual for more information, available at energystorageCT.com/contractor-resources. NTAs submitted for a battery only (with no inverter listed or integrated) or for an inverter only (with no battery listed) will be rejected. The intent of this document is to qualify complete BESS for use in Energy Storage Solutions. Applications are to be submitted on a per-UL 9540 listing basis. If a BESS holds multiple UL 9540 listings for multiple con gurations, you must submit an additional application per UL listing. Before completing this Application, first confirm if the BESS is already eligible by visiting energystoragect.com/submitted_ess_system_status_list/. If the equipment is not on the Eligible Equipment List or requires revision, follow these steps: 1. Complete this Application: Approval will be based on your responses. Make certain to answer ALL required and applicable questions. Obtain and attach all UL certifications from Nationally Recognized Testing Laboratories (NRTL)53, where applicable. The following UL listings are required for Eligible Equipment status: 2. 3. 4. UL 1973 UL 1741 SA (with reference to IEEE 1547-2018 2nd ed.) UL 954054 Additional UL certifications relevant to technology Obtain and attach all product data specification sheets, where applicable. Obtain and attach documentation of any processes for customer lead applications through a OEM, BESS Operator, or Aggregator app. Submit the Application and supporting documents at https://energystoragect.com/technologyapplication/. ALL BESS, BESS OPERATORS AND BESS AGGREGATORS MUST BE ABLE TO COMMUNICATE WITH THE APPLICABLE DISTRIBUTED ENERGY RESOURCE MANAGEMENT SYSTEM (DERMS) PLATFORM TO RECEIVE FINAL APPROVAL. 52 See definition in Section 6 – Glossary of Terms Program Administrators reserve the right to request additional and new certifications as they become available in the markets. All certifications must be current. 53 Battery Energy Storage Systems which passed all inspection requirements prior to the adoption of the 2021 International Fire Code do not require UL 9540 Certification. 54 94
  3. Page 96 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 96 of 203 95
  4. Page 97 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 97 of 203 Section 2 – Applicant (Required) APPLICANT COMPANY INFORMATION Applicant Company Name Applicant Contact Name Applicant Company Address Street, City, State, Zip Contact Phone Target Customer Class Contact Email ☐ Residential ☐ Commercial & Industrial (C&I) ☐ Both What is Applicant Company’s role in deploying BESS? (Select all that apply) ☐ BESS Aggregator ☐ BESS Operator ☐ BESS OEM ☐ Inverter OEM ☐ Battery OEM ☐ Other (describe) Other role: Applicant Company Description 96
  5. Page 98 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 98 of 203 Section 3 – BESS Equipment (not required for BESS Aggregators) Note: If you are applying for a BESS with multiple size or inverter configurations, all configurations must be included under the same UL 9540 listing. If any configuration is part of another UL 9540 listing, you must submit separate applications for those configurations. Complete the section below for the battery portion of the BESS. BATTERY INFORMATION Battery Manufacturer Company Name Contact Name Contact Email Contact Phone Battery Model(s) Battery Nameplate Power (kW) Battery Nameplate Energy Capacity (kWh) Battery Maximum Continuous Discharge Rate (kW) Battery Nominal Voltage (VAC) Battery Round Trip Efficiency (%) Battery Warranty Term (Years) Battery model(s) certified to UL 1973? ☐ Yes ☐ No If no, expected date: Battery model(s) commercially available? ☐ Yes ☐ No If no, expected date Additional notes (if applicable) 97
  6. Page 99 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 99 of 203 Complete the section below for the inverter portion of the BESS. INVERTER INFORMATION Inverter and Battery are integrated as a single model Inverter Manufacturer Company Name Contact Name Contact Email Contact Phone Inverter Model(s) ☐ Yes ☐ No Inverter Nameplate Power (kW) Inverter Phase ☐ Single Phase Inverter Output Voltage (V) Inverter Maximum Continuous Current (A) Inverter Maximum Continuous Power (VA) Inverter Warranty Term (Years) Inverter model(s) received UL ☐ Yes ☐ 1741 SA? No Inverter model(s) commercially ☐ Yes ☐ available? No If no, expected date: If no, expected date: ☐ Multi Phase Additional notes (if applicable) 98
  7. Page 100 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 100 of 203 Complete the section below for the BESS. The BESS is defined as the combination of the above Battery(s) and Inverter(s). UL 9540 Certification is required for any BESS being installed after the CT Department of Administrative Services adopted the 2021 International Fire Code.55 BESS INFORMATION ☐ Yes BESS is certified to UL 9540? ☐ No If no, please explain reason and estimated timeline for UL 9540 certification: Section 4 – BESS Operator or Aggregator and DERMS Communication (Required) Provide information about the BESS Operator or Aggregator by completing the section below. The BESS Operator is the entity responsible for connecting the BESS equipment to the relevant DERMS provider. The BESS Aggregator is the entity responsible for the coordination of BESS participating in Active Dispatch events within the Program, working as an intermediary between the DERMS and the BESS Operator. The BESS Operator is often the inverter manufacturer but can also be a third-party integrator such as a developer or owner-operator. If the Applicant Company only manufactures batteries and the BESS utilizes an inverter made by a different company, you may need to coordinate with the inverter manufacturer to complete this section. This section will determine if the BESS: 1. Is capable of transmitting data to its respective DERMS platform, 2. Can meet Passive Dispatch requirements, and 3. Meets UL 9540 safety certification requirements. BESS OPERATOR INFORMATION BESS Operator or Aggregator Company Name Contact Name Contact Email Please list all complete DERMS integrations Communication Protocol Ex: EnergyHub Ex: OpenADR Battery Energy Storage Systems which passed all inspection requirements prior to the adoption of the 2021 International Fire Code do not require UL 9540 Certification. 55 99
  8. Page 101 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Does BESS Operator, Aggregator, or other party charge a Vendor Fee56? ☐ Yes Page 101 of 203 ☐ No If yes, describe fee and structure: COMMUNICATION CRITERIA 1. Can the BESS Operator or Aggregator receive a control signal from a DERMS and pass that control signal to the BESS at the customer site? 2. Can the BESS Operator or Aggregator communicate customer name, site address, utility account number, battery OEM, device universal unique identifier (UUID), and BESS kW and kWh capacities? 3. As part of the control signal, can the BESS Operator or Aggregator communicate start time, end time, and magnitude of discharge on a per-event basis for each BESS? 4. Does BESS Operator or Aggregator offer an outage protection mode? (i.e., mode that prevents the battery from discharging in anticipation of a severe weather event or outage possibility?) 5. 56 ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No If you answered Yes to 4 above, describe outage protection mode: See definition in Section 6 – Glossary of Terms 100
  9. Page 102 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 102 of 203 6. If you answered Yes to 4 above, can the BESS Operator or Aggregator communicate information about individual instances of BESSs entering an outage protection mode to the DERMS? If yes, describe: 7. Can the system dispatch and cancel/override an event if it receives notification from a DERMS provider? ☐ Yes ☐ No ☐ Yes ☐ No 8. Is the BESS Operator or Aggregator willing to commit to developing and maintaining 9. a communication pathway at their own expense to the DERMS platform through an API integration? Is the BESS Operator or Aggregator capable of integrating using Open ADR Protocol? ☐ Yes ☐ No ☐ N/A 10. If you answered No to 9 above, describe the resources you have available to commit to integration with the applicable DERMS, along with estimated timeline for integration: 101
  10. Page 103 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 103 of 203 TELEMETRY REQUIREMENTS 1. Does the BESS Operator or Aggregator maintain cloud storage of telemetry data? ☐ Yes ☐ No If so, describe: 2. 3. At what interval does the BESS Operator or Aggregator maintain telemetry data? (i.e. 15 minutes, 1 hour, 1 day, etc.). The Program requires a 15minute interval. At what latency does the BESS Operator or Aggregator communicate telemetry data with the DERMS? (i.e. 15 minutes, 1 hour, 1 day, etc.). The Program requires a one-month latency, at most. Additional notes on telemetry (if applicable): 102

Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf

Extracted from the file · 2 pages · 6,256 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf

Extracted from the file · 2 pages · 3,261 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf

Extracted from the file · 1 page · 528 characters

Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf

Extracted from the file · 2 pages · 4,800 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)

This filing on the current system (opens in a new tab)