Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

5. Annual Compliance Filings – Additional Filings (Program Materials)

Compliance filingFiled by Avangrid13 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files13

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of 2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdf

Extracted from the file · 147 pages · 342,741 characters

8 pages match
  1. Page 96 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 96 of 203 95
  2. Page 97 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 97 of 203 Section 2 – Applicant (Required) APPLICANT COMPANY INFORMATION Applicant Company Name Applicant Contact Name Applicant Company Address Street, City, State, Zip Contact Phone Target Customer Class Contact Email ☐ Residential ☐ Commercial & Industrial (C&I) ☐ Both What is Applicant Company’s role in deploying BESS? (Select all that apply) ☐ BESS Aggregator ☐ BESS Operator ☐ BESS OEM ☐ Inverter OEM ☐ Battery OEM ☐ Other (describe) Other role: Applicant Company Description 96
  3. Page 98 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 98 of 203 Section 3 – BESS Equipment (not required for BESS Aggregators) Note: If you are applying for a BESS with multiple size or inverter configurations, all configurations must be included under the same UL 9540 listing. If any configuration is part of another UL 9540 listing, you must submit separate applications for those configurations. Complete the section below for the battery portion of the BESS. BATTERY INFORMATION Battery Manufacturer Company Name Contact Name Contact Email Contact Phone Battery Model(s) Battery Nameplate Power (kW) Battery Nameplate Energy Capacity (kWh) Battery Maximum Continuous Discharge Rate (kW) Battery Nominal Voltage (VAC) Battery Round Trip Efficiency (%) Battery Warranty Term (Years) Battery model(s) certified to UL 1973? ☐ Yes ☐ No If no, expected date: Battery model(s) commercially available? ☐ Yes ☐ No If no, expected date Additional notes (if applicable) 97
  4. Page 99 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 99 of 203 Complete the section below for the inverter portion of the BESS. INVERTER INFORMATION Inverter and Battery are integrated as a single model Inverter Manufacturer Company Name Contact Name Contact Email Contact Phone Inverter Model(s) ☐ Yes ☐ No Inverter Nameplate Power (kW) Inverter Phase ☐ Single Phase Inverter Output Voltage (V) Inverter Maximum Continuous Current (A) Inverter Maximum Continuous Power (VA) Inverter Warranty Term (Years) Inverter model(s) received UL ☐ Yes ☐ 1741 SA? No Inverter model(s) commercially ☐ Yes ☐ available? No If no, expected date: If no, expected date: ☐ Multi Phase Additional notes (if applicable) 98
  5. Page 100 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 100 of 203 Complete the section below for the BESS. The BESS is defined as the combination of the above Battery(s) and Inverter(s). UL 9540 Certification is required for any BESS being installed after the CT Department of Administrative Services adopted the 2021 International Fire Code.55 BESS INFORMATION ☐ Yes BESS is certified to UL 9540? ☐ No If no, please explain reason and estimated timeline for UL 9540 certification: Section 4 – BESS Operator or Aggregator and DERMS Communication (Required) Provide information about the BESS Operator or Aggregator by completing the section below. The BESS Operator is the entity responsible for connecting the BESS equipment to the relevant DERMS provider. The BESS Aggregator is the entity responsible for the coordination of BESS participating in Active Dispatch events within the Program, working as an intermediary between the DERMS and the BESS Operator. The BESS Operator is often the inverter manufacturer but can also be a third-party integrator such as a developer or owner-operator. If the Applicant Company only manufactures batteries and the BESS utilizes an inverter made by a different company, you may need to coordinate with the inverter manufacturer to complete this section. This section will determine if the BESS: 1. Is capable of transmitting data to its respective DERMS platform, 2. Can meet Passive Dispatch requirements, and 3. Meets UL 9540 safety certification requirements. BESS OPERATOR INFORMATION BESS Operator or Aggregator Company Name Contact Name Contact Email Please list all complete DERMS integrations Communication Protocol Ex: EnergyHub Ex: OpenADR Battery Energy Storage Systems which passed all inspection requirements prior to the adoption of the 2021 International Fire Code do not require UL 9540 Certification. 55 99
  6. Page 101 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Does BESS Operator, Aggregator, or other party charge a Vendor Fee56? ☐ Yes Page 101 of 203 ☐ No If yes, describe fee and structure: COMMUNICATION CRITERIA 1. Can the BESS Operator or Aggregator receive a control signal from a DERMS and pass that control signal to the BESS at the customer site? 2. Can the BESS Operator or Aggregator communicate customer name, site address, utility account number, battery OEM, device universal unique identifier (UUID), and BESS kW and kWh capacities? 3. As part of the control signal, can the BESS Operator or Aggregator communicate start time, end time, and magnitude of discharge on a per-event basis for each BESS? 4. Does BESS Operator or Aggregator offer an outage protection mode? (i.e., mode that prevents the battery from discharging in anticipation of a severe weather event or outage possibility?) 5. 56 ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No If you answered Yes to 4 above, describe outage protection mode: See definition in Section 6 – Glossary of Terms 100
  7. Page 102 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 102 of 203 6. If you answered Yes to 4 above, can the BESS Operator or Aggregator communicate information about individual instances of BESSs entering an outage protection mode to the DERMS? If yes, describe: 7. Can the system dispatch and cancel/override an event if it receives notification from a DERMS provider? ☐ Yes ☐ No ☐ Yes ☐ No 8. Is the BESS Operator or Aggregator willing to commit to developing and maintaining 9. a communication pathway at their own expense to the DERMS platform through an API integration? Is the BESS Operator or Aggregator capable of integrating using Open ADR Protocol? ☐ Yes ☐ No ☐ N/A 10. If you answered No to 9 above, describe the resources you have available to commit to integration with the applicable DERMS, along with estimated timeline for integration: 101
  8. Page 103 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 103 of 203 TELEMETRY REQUIREMENTS 1. Does the BESS Operator or Aggregator maintain cloud storage of telemetry data? ☐ Yes ☐ No If so, describe: 2. 3. At what interval does the BESS Operator or Aggregator maintain telemetry data? (i.e. 15 minutes, 1 hour, 1 day, etc.). The Program requires a 15minute interval. At what latency does the BESS Operator or Aggregator communicate telemetry data with the DERMS? (i.e. 15 minutes, 1 hour, 1 day, etc.). The Program requires a one-month latency, at most. Additional notes on telemetry (if applicable): 102
  9. Page 104 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 104 of 203 Passive Dispatch is a requirement of the Program for customers receiving upfront incentives. The BESS Operator will be responsible for meeting the Passive Dispatch criteria. Note that Passive Dispatch and the associated upfront incentives will no longer be available after April 1st, 2026. SCHEDULING REQUIREMENTS - PASSIVE DISPATCH 1. BESS can be pre-programmed by BESS Operator to discharge to 20% rated capacity Monday through Friday (except holidays) during the months of June, July, and August uniformly between the hours of 5PM and 8PM. ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No If no, describe: 2. The BESS Operator will ensure BESS discharge is regulated to an even discharge over those 3 Passive Dispatch hours (Available capacity – 20% of nameplate capacity)/3. If no, describe: 3. BESS Operator can override Passive Dispatch events for BESS when Active Dispatch events are requested for those scheduled days or when requested by DERMS due to forecasted severe weather. If no, describe: Section 5 – Application Submission WHAT HAPPENS NEXT? 1. After the Application and supporting documents (UL Certifications and Product Specification Sheets) are submitted, you will receive an email confirmation including an application number (NTA-####). 2. The Program Administrators will request additional information, if necessary, and/or inform you of the decision, along with comments, to approve or deny the BESS in the Program. 3. Application resubmittal guidelines are stated in the Program Guidelines for Energy Storage Solutions. Contact [email removed] with any questions or concerns. 103
  10. Page 105 of 203

    The United Illuminating Company Docket No. 26-08-01 UI Attachment 5 ESS Program Manual and Additional Information Page 105 of 203 104

Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf

Extracted from the file · 2 pages · 6,256 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf

Extracted from the file · 2 pages · 3,261 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit A #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf

Extracted from the file · 1 page · 528 characters

Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf

Extracted from the file · 2 pages · 4,800 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)

This filing on the current system (opens in a new tab)