Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

5. Annual Compliance Filings – Additional Filings (Program Materials)

Compliance filingFiled by Avangrid13 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files13

Search terms highlighted
Eversource rate increase is on 8 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of 2026-11-16 UI Attachment 3 - Shared Clean Energy Facility Program Program Materials #26-08-01.pdf

Extracted from the file · 147 pages · 342,741 characters

Text of 2026-11-16 UI Attachment 4 - ESS Program Materials #26-08-01.pdf

Extracted from the file · 203 pages · 522,519 characters

Text of 2026-11-16 UI Attachment 5 - EV Program Materials and Additional Information #26-08-01.pdf

Extracted from the file · 2 pages · 6,256 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report - Cover Ltr #26-08-01.pdf

Extracted from the file · 2 pages · 3,261 characters

Words on different pages

The searchable text of a spreadsheet keeps the sheet names, column headings and text cells. Download the file for the figures.

  1. Part 1

    [Sheet: Instruction Sheet] [Sheet: 25 RPS Annual Compliance Filing] Connecticut Annual RPS Compliance Report 2025 - Public Act 24-38 Version Compliance Year Supplier Security Requirement Details (Not Applicable for EDCs) Supplier must fill in all contact information and applicable GREEN boxes. All information in yellow boxes is calculated. | Carried Renewable Energy Portfolio Standard Security (Sec. 16-245a-1): | Minimum of $25k The following must be submitted with the Compliance Report: | Carried Financial Responsibility Security (Reg Sec. 16-245-4): | Minimum of $250k 1. Supporting documentation from NEPOOL-GIS, submitted as Excel spreadsheets | Total Carried Security: Electricity Supplier: | Name | Calendar/Forecast Year Full ACP: License Type: | Supplier or Utility | Rounded Calendar/Forecast Year Full ACP: Address: | Address Line 1 Address Line 2 | Preliminary Supplemental Security Increase: City, State Zip Code | 90% ACP Requirement -Sec. 16-245a-1(b)(2): Phone: Contact Person: | Required Financial Responsibility (License) Security (Reg Sec. 16-245-4): E-mail: | [email removed] Current Compliance Year Security Requirement: | Attestation Required Eversource ISO-NE Asset No. | RPS Class Requirements | NEPOOL GIS REC Settlement | Banked RECs | VRO RECs | Class Totals | Class Deficiency | Actual UI ISO-NE Asset No. | Class | Percent | RPS RECs | Q1 | Q2 | Q3 | Q4 | ACP | ACP Payment Eversource Load1* | Class I | Class I Eversource Exception Load1* | Class II | Class II UI Load1* | Class III | See Below | Class III UI Exception Load1* | Total | Totals Total Load* *Load in MWh | Public Act 24-38 - 2025 Annual RPS Percentage | Class III | ACP Payment & Allocation Total RPS Certificate Obligation | Class III (Exception) | ACP to Eversource ACP to UI 1 Total EDC Loads must match EDC filing in the RPS docket. | ACP to CT Green Bank The "Exception" applies to Public Act 24-38 and represents load that must comport with General Statutes § 16-243q(a)(4). Forecast Year Load (in MWh) (2026) REC Bank Beginning REC Balance From Past Years | Previously Banked RECs Used for Current Year Compliance | Calculated Excess RECs Available to be Banked for Future Use | Requested Excess RECs to be Banked for Future Use Two Years Prior to the Current Filing Year | One Year Prior to the Current Filing Year | Two Years Prior to the Current Filing Year | One Year Prior to the Current Filing Year | Total | One Year Prior to the Current Filing Year | Current Filing Year (Not to exceed 30% of Load Served) | One Year Prior to the Current Filing Year | Current Filing Year (Not to exceed 30% of Load Served) Class I Class II Class III TOTAL Note: Enter the total number of banked RECs that are intended to be applied before newly settled RECs. [Sheet: RPS Affidavit] [Sheet: License Security] Connecticut Annual RPS Compliance Report 2025 - Public Act 24-38 Version Licensing Security Calculation MWh's Low | High | Security | Load | Security Forecast Load: Calendar Year Load: Security Obligation: eRegulations - Browse Regulations of Connecticut State Agencies The Security Obligation is calculated using the greater of the forecast year load versus the prior calendar year load. Suppliers who are anticipating a significant reduction in the forecast year load and who wish to provide a lower Security should engage directly with EOE. The Suppliers will be required to provide supporting documentation before a reduced Security will be permitted. [Sheet: RPS Security] Connecticut Annual RPS Compliance Report 2025 - Public Act 24-38 Version RPS Security Calculation RPS Class Requirements Class | Percent | ACP | Calendar | Forecast Class I Class II Class III | See Below Total Total Calendar Year Load Forecast Year Load Calendar Year Full ACP: Forecast Year Full ACP:
  2. Part 2

    The Security Obligation is calculated using the greater of the forecast year load versus the prior calendar year load. Suppliers who are anticipating a significant reduction in the forecast year load and who wish to provide a lower Security should engage directly with EOE. The Suppliers will be required to provide supporting documentation before a reduced Security will be permitted. eRegulations - Browse Regulations of Connecticut State Agencies [Sheet: 25 EDC RPS Annual Compliance] Connecticut Annual RPS Compliance Report 2025 - EDCs ONLY Compliance Year Supplier must fill in all contact information and applicable GREEN boxes. All information in yellow boxes is calculated. The following must be submitted with the Compliance Report: 1. Supporting documentation from NEPOOL-GIS, submitted as Excel spreadsheets Electricity Supplier: | The United Illuminating Company License Type: | Utility Address: | 180 Marsh Hill Road Orange, CT 06477 Phone: | [phone removed] Contact Person: | John Stanley E-mail: | [email removed] Eversource ISO-NE Asset No. | RPS Class Requirements | NEPOOL GIS REC Settlement | Banked RECs | VRO RECs | Class Totals | Class Deficiency | Actual UI ISO-NE Asset No. | 10394 AAA, 12800 SOL | Class | Percent | RPS RECs | Q1 | Q2 | Q3 | Q4 | ACP | ACP Payment Annual Load* - Eversource1 | Class I | Class I Annual Load* - UI1 | Class II | Class II Total Load* | Class III | Class III *Load in MWh | Total | Totals Annual RPS Percentage Total RPS Certificate Obligation ACP Payment & Allocation 1 Must match EDC filing in the RPS docket. | ACP to Eversource ACP to UI ACP to CT Green Bank LRS Load pertaining to Last Resort Service for Electric Distribution Companies are exempt from Class III RPS (ACP) obligations, pursuant to General Stat. §16-243q. REC Bank Beginning REC Balance From Past Years | Previously Banked RECs Used for Current Year Compliance | Calculated Excess RECs Available to be Banked for Future Use | Requested Excess RECs to be Banked for Future Use Two Years Prior to the Current Filing Year | One Year Prior to the Current Filing Year | Two Years Prior to the Current Filing Year | One Year Prior to the Current Filing Year | Total | One Year Prior to the Current Filing Year | Current Filing Year (Not to exceed 30% of Load Served) | One Year Prior to the Current Filing Year | Current Filing Year (Not to exceed 30% of Load Served) Class I Class II Class III TOTAL Note: Enter the total number of banked RECs that are intended to be applied before newly settled RECs.

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit B C and D #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit E #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of 2026-11-16 UI Attachment 6 - Annual RPS Compliance Report RPS Template Exhibit F #26-08-01.pdf

Extracted from the file · 1 page · 528 characters

Text of 2026-11-16 UI Attachment 7 - Exhibit Y Ten Year Cost History - BETP-001 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Attachment 8 - CEOP-VRO Program Materials #26-08-01.pdf

Extracted from the file · 2 pages · 4,800 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / 5. Annual Compliance Filings – Additional Filings (Program Materials)

This filing on the current system (opens in a new tab)