Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

Annual Compliance Filings – Cross-Posted Compliance

Compliance filingFiled by Avangrid22 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files22

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting

Text of 2026-11-16 UI Cross-Posted Compliance - Cover Letter 4. Annual Compliance Filings #26-08-01.pdf

Extracted from the file · 2 pages · 3,636 characters

Words on different pages
1 page match
  1. Page 11 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 11 of 86 4. Evaluation Activities As needed for evaluation activities, the Evaluator requests additional data from both EDCs to support survey sampling, participant characterization, or cost-benefit analyses. B. Implementation Metrics Various Orders have directed the EDCs to file implementation metrics for each EDC, Program Year, and Program Area. This section summarizes all Program metrics relevant to this Annual Report. 1. Metrics Included & Their Definitions Order 20e in the Program Year 3 Decision directed the EDCs to provide definitions for each metric to provide consistency and clarity surrounding the specific data summarized. The definitions are included below: • • • • • • • • • • • • • • Applications Received: Total applications submitted during specified time period (e.g. Year 2023: January 1, 2023, through December 31, 2023). Applications Cancelled: Total applications cancelled at any point during specified period. Applications Approved: Total applications approved for incentives during specified period. Ports Reserved: Total ports from applications approved during specified period. Sites Installed: Total sites completed during specified period. Ports Installed: Total ports completed during specified period. Average Approved Ports per Site: Total number of ports divided by total number of sites from applications approved during specified period. Average Number of Sites: Total number of sites divided by total applications approved during specified period. Approved Light-Duty Fleets Sites: Total Workplace sites designated as Fleet, approved during specified period. Approved Light-Duty Fleet Ports: Total ports from Workplace sites designated as fleet, approved during specified period. Program Funds Reserved/Awarded ($): Total incentives awarded from applications approved during specified period. Total Project Costs: Total make ready and EVSE costs submitted from applications approved during specified period. Average Project Costs (per Site): Total make ready and EVSE costs divided by total sites from applications approved during specified period. Average Project Costs (per Port): Total make ready and EVSE costs divided by total ports from applications approved, during specified period.
  2. Page 12 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 12 of 86 • • • • • • • • • • • • • • • • 2. Future Proofing Applications Received: Total applications submitted during specified period that include futureproofing. Future Proofing Applications Approved: Total applications approved during specified period that include futureproofing. Average Futureproofing Costs: Total futureproofing costs divided by total sites approved during specified period that include futureproofing. Residential EVSE Rebates: Total EVSE and connected vehicles approved during the specified period Residential Wiring Rebates: Total wiring rebates approved during the specified period EVSE Rebates Awarded ($): Total rebates awarded for EVSEs in the specified period Wiring Upgrade Awarded ($): Total wiring rebates awarded in the specified period Enrollment Awarded ($): Total rebates awarded for connected vehicles in the specified period Managed Charging Enrolled: Total enrolled in managed charging by EVSE or connected vehicle during the specified period. Residential Managed Charging Participants: Total enrolled in managed charging by managed charging tier during the specified period. Total Number Premature Cancellation: Total number of managed charging participants that opt out of the program Total DR Events: Total number of residential DR events Managed Charging Incentives Awarded ($): Total residential incentives awarded Total kWh dispensed: Total kWh dispensed by EVSEs or connected vehicles Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles: Total CO2 avoided. Calculated by comparing the marginal emissions (AESC 2021 emissions data) from EV charging data and the tailpipe emissions of an average ICE vehicle assuming the same miles driven. Charging Load Profiles and Characteristics: Weekday hourly load profiles, by community, managed charging tier, and time period. Ports Approved in Each Program Year Compared to Goal Table 3 and Table 4 summarize total ports reserved in each Program Year, as well as provide a running total over the course of the Program compared to the updated goal in each Program Year. In 2025, the second Program Cycle began, with new port targets for the EDCs over the coming three years. At the halfway point in the second Program Cycle, port reservations lag Program goals across all Areas, excluding DCFC at UI. Current port reservations are 97% of Program Cycle I goals for Eversource and 99% for UI. Including both Program Cycle I and II port goals, current port reservations are 42% of the goal at Eversource and
  3. Page 13 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 13 of 86 43% at UI. Residential Single Family, MUD, and Workplace are undersubscribed compared to DCFC and Destination Level 2 Program Areas.
  4. Page 14 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 14 of 86 Table 3: Eversource Ports Reserved by Year, Cumulatively, Compared to Goal (Updated Through September 30, 2026) Reserved In Cycle 1 Total Reserved By 2025 2026 Cycle 1 2025 Program Cycle Ports Total Targets 2026 Cycle I Cycle II Total Cycle I + II Residential Single Family 7,253 2,542 1,478 7,253 9,795 11,273 12,000 14,000 26,000 Residential Multi Family 2,444 422 296 2,444 2,866 3,126 2,910 7,200 10,110 DCFC 185 123 27 185 308 330 357 138 495 Destination 1,206 236 84 1,206 1,442 1,524 1,262 1,323 2,585 Workplace & LDV Fleet 1,425 225 65 1,425 1,650 1,685 1,851 2,017 3,868 Table 4: UI Ports Reserved by Year, Cumulatively, Compared to Goal (Updated Through September 30, 2026) Reserved In Cycle 1 Total Reserved By 2025 2026 Cycle 1 2025 Program Cycle Ports Total Targets 2026 Cycle I Cycle II Total Cycle I + II Residential Single Family 785 554 417 785 1,339 1,756 3,000 3,500 6,500 Residential Multi Family 764 493 336 764 1,257 1,593 729 1,800 2,529 DCFC 86 35 3 86 121 124 81 34 115 Destination 342 100 91 342 442 529 316 331 647
  5. Page 15 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 15 of 86 Workplace & LDV Fleet 294 192 93 294 486 579 463 504 967
  6. Page 16 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 16 of 86 3. Metric Summary by Program Year and Month Program metrics for each Program Year and for the last 18 months (i.e. January 2025 through June 2026) are provided as Attachment 2: • • • • • 4. Eversource Monthly Metrics for Last 18 Months (Attachment 2a) Eversource Annual Metrics by Program Year (Attachment 2b) UI Monthly Metrics for Last 18 Months (Attachment 2c) UI Annual Metrics by Program Year (Attachment 2d) Residential Program Load Shapes (Attachment 2e) Demand Response Event Participation for Baseline and Advanced Tier Participants Demand response metrics for the summer 2025 events have been included as an attachment to this document (see Attachment 3). In addition, the deferred short tons of CO2 associated with each event has been included. 5. Residential Rebate Recipients and Managed Charging Participants by Town Order 20e in Decision 23-08-06 directed the EDCs to provide a summary of residential rebate recipients and their managed charging participation technology. An Excel file summarizing these results is provided as Attachment 4. 6. DCFC Program Area Application Details Order 20a in Decision 23-08-06 directs the EDCs to prepare, “for the preceding program year and current program year, all application details for the project applications received in the DCFC Program Area, including but not limited to the bid amounts and whether the application was for baseline versus underserved community incentives; and a description of which applications were approved and provide a detailed narrative explanation as to why projects were disqualified”. The application details are attached for both Eversource and UI (see Attachments 5 and 6). For the 2026 program year, Eversource had 44 DCFC ports available out of the 138 ports that were authorized by PURA during Phase 2. Furthermore, no additional DCFC ports became available as a result of project cancellations from Program Phase 1 (2022-2024) because PURA ruled that DCFC ports could not be carried over from previous cycles.
  7. Page 17 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 17 of 86 In summary, Eversource had a total of 44 DCFC ports available for deployment in 2026. Eversource received 37 DCFC applications in 2026 for a total of 149 ports. Eversource has preliminary awarded 8 of the 37 applications which contain a total of 43 ports and has waitlisted 4 applications totaling 22 ports. Eversource anticipates canceling twenty-seven applications due to insufficient port availability. Two applications in this program cycle were cancelled because the customer was uncertain as to project feasibility related to high costs. For the 2026 program year, United Illuminating (UI) had three (3) DCFC ports available for award. These ports became available as a result of a DCFC project that was awarded in 2025 but was cancelled. UI received 13 DCFC applications in 2026 for a total of 39 ports. UI has awarded 1 of the 13 applications totaling 3 ports. The remaining 12 DCFC applications were not awarded due to insufficient port availability. Customers whose applications were not awarded due to limited port availability were contacted to advise of such. Project total costs per port are shown in Figure 1 below. In general, approved projects have a lower cost per port than waitlisted projects, due to the additional points scored for total project costs that do not trigger the maximum site incentive cap. In Eversource’s 2026 project costs, project costs are roughly equivalent between awarded and waitlisted projects but note that the project costs in 2026 are lower compared to prior years for Eversource projects. Further, note that no UI applications in 2026 or 2026 were waitlisted.
  8. Page 18 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 18 of 86 Figure 1: Average and Median Project Costs per kW for DCFC Applications in 2023 to 2026 A further summary of detailed program costs is shown in Table 5 for DCFC applications approved in the 2025 round of scoring. Note that, because applications vary in the number of planned ports, both a simple and portweighted average value is shown in the table below in addition to the median.
  9. Page 19 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 19 of 86 Table 5: Distributions of Mean and Median DCFC Applications in 2025 Metric Applications Received Applications Cancelled Applications Approved Ports Reserved Sites Installed Ports Installed Total Program Funds Reserved/Awarded Average Program Funds Reserved/Awarded Average (Weighted by Ports) Program Funds Reserved/Awarded Median Program Funds Reserved/Awarded Make Ready Costs Average Make Ready Costs Average (Weighted by Ports) Make Ready Costs Median Make Ready Costs EVSE Costs Average EVSE Costs Average (Weighted by Port) EVSE Costs Median EVSE Costs Eversource UI All Baseline Underserved All Baseline Underserved 57 37 23 101 9 28 $4,311,361 $187,451 $190,788 26 15 12 55 5 16 $1,796,310 $149,693 $149,866 31 22 11 46 4 12 $2,515,051 $228,641 $239,717 12 4 9 35 4 1 3 17 8 3 6 18 $2,650,911 $220,909 $198,117 $432,279 $144,093 $146,873 $2,218,632 $246,515 $246,515 $150,000 $6,873,282 $298,838 $378,893 $188,278 $6,892,081 $299,656 $417,082 $189,000 $150,000 $3,809,919 $317,493 $421,594 $135,742 $4,126,728 $343,894 $520,608 $186,148 $250,000 $3,063,363 $278,488 $327,838 $205,743 $2,765,353 $251,396 $293,300 $197,500 $246,763 $2,512,423 $209,369 $301,760 $162,363 $1,635,361 $136,280 $232,316 $95,041 $150,000 $884,988 $294,996 $429,808 $164,159 $781,162 $260,387 $377,804 $108,902 $247,769 $1,627,436 $180,826 $180,826 $162,034 $854,199 $94,911 $94,911 $94,652
  10. Page 20 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 20 of 86 Futureproofing Applications Received Futureproofing Applications Approved Average Futureproofing Cost Average (by Port) Futureproofing Cost Median Futureproofing Cost 49 22 $21,556 $31,878 $11,932 21 12 $27,916 $45,079 $14,432 28 10 $13,925 $14,994 $9,500 6 6 $38,788 $38,788 $38,720 0 0 6 6 $38,788 $38,788 $38,720

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2c #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2d #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Words on different pages

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 3 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 4 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 6 REDACTED #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 8 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Words on different pages

Text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 19) Exhibit B Public #25-08-03 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 18) Form of State Tariff Agreement Exhibit C2 #25-08-03 #26-08-01.pdf

Extracted from the file · 31 pages · 88,975 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 5) Attachment C Exhibit 1 #25-08-04 #26-08-01.pdf

Extracted from the file · 2 pages · 1,932 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 6) Attachment B #25-08-04 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment A #19-07-01, #25-08-04 #26-08-01.pdf

Extracted from the file · 9 pages · 13,682 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment C #19-07-01, #25-08-04 #26-08-01.pdf

Extracted from the file · 3 pages · 5,725 characters

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 1 - CT RRES Public #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 2 - CT RRES Public #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 3 – CT RRES Averaged _ Aggregated Data Year #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 4 - CT RRES Averaged _ Aggregated Data Town 1 #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 5 - CT RRES Application Data Fields #26-08-02 #26-08-01.pdf

Extracted from the file · 4 pages · 5,976 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / Annual Compliance Filings – Cross-Posted Compliance

This filing on the current system (opens in a new tab)