Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

Annual Compliance Filings – Cross-Posted Compliance

Compliance filingFiled by Avangrid22 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files22

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting

Text of 2026-11-16 UI Cross-Posted Compliance - Cover Letter 4. Annual Compliance Filings #26-08-01.pdf

Extracted from the file · 2 pages · 3,636 characters

Words on different pages
1 page match
  1. Page 31 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 31 of 86 observe no charging behavior and identical timing of events means the counterfactual load is identical. In general, for UI, individual event results are not statistically significant. Table 7: Eversource Individual Event Results Average per Participant Reduction (kW) Standard Error (kW) Aggregate Reduction (kW) Percent Reduction Event Date Event Hours Total Participant Count 6/24/2025 5pm to 8pm 2 6.653 1.184 13.3 100.0% 7/2/2025 5pm to 8pm 2 4.949 0.284 9.9 87.1% 7/7/2025 5pm to 8pm 2 3.863 0.954 7.7 68.0% 7/15/2025 5pm to 8pm 2 5.685 0.979 11.4 100.0% 7/16/2025 5pm to 8pm 2 5.685 0.979 11.4 100.0% 7/17/2025 6pm to 8pm 2 4.716 0.387 9.4 100.0% 7/25/2025 5pm to 8pm 2 5.685 0.979 11.4 100.0% 7/28/2025 5pm to 8pm 2 5.685 0.979 11.4 100.0% 7/29/2025 5pm to 8pm 2 5.685 0.979 11.4 100.0% 7/30/2025 5pm to 8pm 2 5.685 0.979 11.4 100.0% 8/7/2025 5pm to 8pm 2 -0.942 3.185 -1.9 -12.3% 8/12/2025 5pm to 8pm 2 7.464 3.168 14.9 97.3% 8/13/2025 5pm to 8pm 2 -0.173 4.199 -0.3 -2.2% Average per Participant Reduction (kW) Standard Error (kW) Aggregate Reduction (kW) Percent Reduction 0.181 0.070 0.2 75.1% Table 8: UI Individual Event Results Event Date Event Hours Total Participant Count 6/30/2025 6pm to 9pm 1
  2. Page 32 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 32 of 86 7/2/2025 5pm to 8pm 1 0.073 0.069 0.1 100.0% 7/7/2025 6pm to 9pm 1 -0.051 0.106 -0.1 -178.4% 7/8/2025 5pm to 8pm 1 0.070 0.068 0.1 95.4% 7/15/2025 5pm to 8pm 1 0.073 0.069 0.1 100.0% 7/16/2025 5pm to 8pm 1 0.073 0.069 0.1 100.0% 7/24/2025 5pm to 8pm 1 0.073 0.069 0.1 100.0% 7/25/2025 4pm to 7pm 1 0.360 0.224 0.4 99.1% 7/28/2025 5pm to 8pm 1 0.073 0.069 0.1 100.0% 7/29/2025 5pm to 8pm 1 -2.654 0.430 -2.7 -3641.4% 7/30/2025 5pm to 8pm 1 0.073 0.069 0.1 100.0% 8/12/2025 6pm to 9pm 1 0.253 0.155 0.3 73.8% 8/13/2025 5pm to 8pm 1 -3.586 1.329 -3.6 -1292.3% In addition, load shapes from this analysis show the diversity of fleet use cases. The Evaluator for this program analyzed other Workplace and Fleet participant data to understand by how much charging patterns differed by business type. 2. Fleet and Workplace Charging Patterns and Characteristics Data for 155 Workplace and Fleet sites were analyzed to support characterization of potential fleet-managed charging participants. Summary statistics were computed based on available interval and session data and by using a combination of site host information and address, a business type was imputed from the available characteristics. Hourly interval data was then aggregated to the overall station owner across one or more sites to provide a comprehensive overview of the fleet itself. Summary statistics for these sites included the following variables: • • • • • Location and business type Available data start and end dates Number of included chargers and ports, total observations in the dataset Average kW per hour Standard deviation of charging kW
  3. Page 33 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 33 of 86 • • • • • Distribution of charging by hour: minimum hourly kW, 1st, 2nd, 5th, 35th, 50th, 75th, 95th, 98th, and 99th percentiles of charging kW, maximum hourly kW Site load factor Average charging session duration (hours) % of days with at least one charging session Average number of sessions per weekday for the fleet and for the average charger in the fleet. Some of these summary statistics are shown in Figure 8 for Eversource and UI fleets, respectively. The number of fleets in this analysis is low, so differences across categories should be interpreted with caution. For average session duration, some categories are skewed by outliers. Nevertheless, some results are intuitive and worth noting. On average, hotels and police had the longest session duration and among the smallest session count per weekday for Eversource. Utilization is high at tourist attractions, police, municipal, utilities, and healthcare (hospitals, clinic, nursing homes) settings. Utilization tends to be the lowest at retail locations. Figure 8: Eversource Charging Characteristics for Workplace and Fleet Sites by Business Type (Data Through September 30, 2026)
  4. Page 34 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 34 of 86 Figure 9: UI Charging Characteristics for Workplace and Fleet Sites by Business Type (Data Through September 30, 2026) Investigating load profiles within each business categorization shows the degree to which fleets have both characteristics of a particular type of operation and can still have unique business needs that result in fleet-specific operating patterns. Dealerships, offices, and municipal organizations have the most heterogeneous use cases compared to manufacturing facilities which tend to be the most predictable.
  5. Page 35 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 35 of 86 Figure 10: Eversource Workplace and Fleet Site Load Patterns by Business Type (Data Through September 30, 2026)
  6. Page 36 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 36 of 86 Figure 11: UI Workplace and Fleet Site Load Patterns by Business Type (Data Through September 30, 2026) From this analysis, it is clear that each business has unique charging patterns. While there are typically weekly schedules, the time and duration of peak charging vary, both across business types and within them. C. Residential Single Family Managed Charging Program 1. Summary of Single-Family Managed Charging Key Findings This evaluation estimated the impacts of the Electric Vehicle Managed Charging program for Eversource and UI for the period from June 2025 through May 2026. Due to the complexity of the evaluation and length of this section, it has been included as Attachment 13 to this document. The main research questions addressed were: • • • What was the effect of demand response (DR) events in the summer of 2025 on participant EV load for Eversource and United Illuminating (UI)? What was the effect of the Off-Peak Program on percent of EV charging that occurred during the peak period at Eversource and UI? What was the effect of using a Load Research Sample as a comparison group versus the previous comparison group?
  7. Page 37 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 37 of 86 Below are the key takeaways of this evaluation. • • • • • • • There is an inherent tradeoff between high event-based DR impacts and the operation of a daily program to shift charging load away from peak periods. The more load that is shifted away from likely event periods on a daily basis, the smaller the event-based impacts. On average, UI participants reduced load by 0.02 kW during DR event hours, mitigated by the higher prevalence of daily off-peak shifting and charge scheduling. The impact of DR at UI is not statistically significant at the 5% level. Eversource participants provided average load reductions of 0.01 kW. Eversource estimates are precisely estimated and statistically significant at the 5% level. For Eversource, Baseline Tier customers reduced load by 0.03 kW less than DR only customers. Using the Load Research Sample (LRS) and Grandfathered DR customers as comparison groups, managed charging at Eversource reduced the share of charging occurring on peak by 10.7 percentage points and peak charging time by 6.4 percentage points over June 2025–May 2026. These reductions correspond to an average peak load reduction of 0.27 kW and are statistically significant at the 1% level. These results are somewhat smaller than the 2023 & 2024 impacts but still meaningful peak reductions. Tier-specific estimates using the LRS show that both Baseline and Advanced Tier customers at Eversource deliver meaningful peak reductions. Advanced Tier customers achieve larger impacts than Baseline Tier customers consistent with the effects of direct utility control of charging. For UI, managed charging participants reduced peak charging consumption and peak charging time by 9.0 and 4.0 percentage points, respectively, when compared against the LRS. Estimated reductions in average peak load at UI was 0.20 kW and significant at the 1% level. During ISO-NE’s 2025 peak hour on June 24 at HE19, Eversource had an active DR event and produced an estimated charging-load reduction of 0.009 kW per device, equivalent to approximately 0.030 MW in aggregate. The single-hour estimate was not statistically significant at the 5 percent level. Note that UI did not call an event on June 24th. Peak impacts for the daily load shifting program in the ISO-NE peak hour were 0.35 kW per enrolled participant for Eversource and 0.3 kW for UI. Robustness checks comparing LRS and Grandfathered DR comparison groups yield similar estimates for peak consumption and average peak load at Eversource. While estimates of peak charging time among the LRS are smaller than the Grandfathered DR customers, the results support the use of the Load Research Sample as a valid and appropriate comparison group for observational analyses. More detail can be found in the attached evaluation report, Figure 12 presents regression-adjusted hourly load impacts for Off-Peak Program participants over the full June 2025 through May 2026 evaluation period to illustrate the magnitude of the available load shifting associated with this program. The solid line shows observed average participant load, while the dashed line shows estimated reference load in the absence of the Off-Peak
  8. Page 38 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 38 of 86 Program. The bars represent the estimated hourly program impact, calculated as observed load minus reference load, and the error bars show 95 percent confidence intervals. Negative impacts indicate that participants reduced charging load relative to the comparison group. The ISO NE 2025 peak hour occurred in hour ending 19. On average, for hour ending 19, we estimate that Eversource and UI Off-Peak Program participants reduced load by 0.35 kW and 0.3 kW, respectively. Figure 12: Hourly Observed, Reference Load, and Off-Peak Program Impacts 2. Bidirectional Electric Vehicle Working Group In 2026, the EDCs, including the managed charging team, participated in a Bidirectional Electric Vehicle (EV) Working Group. This working group was charged by PURA, with exploring the integration of bidirectional EVs electric vehicles into Connecticut's Energy Storage Solutions (ESS) Program and filed a final
  9. Page 39 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 39 of 86 report.7 The ESS Program Administrators (the EDCs and the Connecticut Green Bank) are recommending a phased approach beginning first with commercial bidirectional equipment that meets new ESS qualification criteria. The bidirectional vehicle market for light duty vehicles is still nascent, and the report outlines various technical, regulatory and market-readiness milestones to meet, and pilot learnings8 to integrate, before further expanding bidirectional incentives to this class of vehicles. The working group’s discussions explored potential interactions associated with cross-program participation, including the interactions between managed charging and the discharge of bidirectional EVs where there are still unresolved issues and decisions about customer enrollment, DERMS coordination for supporting both managed charging and bidirectional grid services, and evaluation considerations. In the Bidirectional EV Working Group Final Report, the ESS Program Administrators have also recommended PURA consider establishing a V2G –specific docket that could tackle unresolved policy and program issues intersect with a range of different topics, including EV managed charging. D. EVSE Tariff Participation Rates Order 20b of the Program Year 3 Decision9 directs the EDCs to provide “Participation rates for each Company’s respective EVSE tariffs, as discussed in Section IV.B.5, EVSE Tariffs for DCFCs & Light-Duty Fleets “. • • Eversource billed 145 accounts on the EVSE rates as of June 2026. The breakdown of rate participation is: ▪ 71 on EV-S, ▪ 36 on EV-M, and ▪ 38 on EV-L UI has a total of 35 customers on its EV Rate Rider. Of these: ▪ 10 are on Rate GS-EVSE and ▪ 25 are on Rate GST-EVSE. A Final Report and recommendations in compliance with Order 20 of Public Utility Regulatory Authority’s (PURA)'s Year 5 ESS Program Review Final Decision will be filed at the end of August 2026 in Docket No. 25-08-05. 8 Including the IES Bidirectional Energy V2X Residential Pilot and MassCEC V2X demonstration. 9 Final Decision in Docket 23-08-06 7
  10. Page 40 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 40 of 86 E. Analysis in Support of D.25-08-0 Order 18 1. Participation rates, application trends, market impact Analysis in this section includes a review of the first six months of the Program’s Residential Single Family incentive structure change and a summary of likely changes associated with proposed Commercial Program incentive changes. A larger treatment of the market impacts of proposed Commercial Program changes can be found in Attachment 9. (1) Residential Program In January 2026, the EDCs, in accordance with D.25-08-06 Order 9, adjusted the Residential upfront rebate requirement and Managed Charging Program participation requirements. Residential participants receiving Program rebates for wiring or EVSE installation must now meet certain income requirements, while the Managed Charging Program remains open to residential EV driving customers with compatible equipment. Order 18c of the same Decision directs the EDCs to provide an analysis of “the effects, if any, of the reduced pool of Residential Single-Family upfront EVSE and wiring upgrade incentives…”. To address this order, the EDCs analyzed: • • • Overall enrollment trends in 2026 compared to historic trends The trend in the percent of customers participating in managed charging with no equipment or wiring rebate Average project and rebate costs over time Figure 13 and Figure 14 show the overall trend in applications; including those for only managed charging, by month. Grey bars indicate applications received during or after January 2026 when the new Program design went into effect. Enrollments for Eversource dropped while overall enrollments for UI continued at comparable levels to 2025. Managed Charging program average monthly enrollment in 2026 have averaged approximately 100 for Eversource and 60 for UI. Note that June data for Eversource reflects partial month data only.

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2c #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2d #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Words on different pages

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 3 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 4 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 6 REDACTED #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 8 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Words on different pages

Text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 19) Exhibit B Public #25-08-03 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 18) Form of State Tariff Agreement Exhibit C2 #25-08-03 #26-08-01.pdf

Extracted from the file · 31 pages · 88,975 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 5) Attachment C Exhibit 1 #25-08-04 #26-08-01.pdf

Extracted from the file · 2 pages · 1,932 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 6) Attachment B #25-08-04 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment A #19-07-01, #25-08-04 #26-08-01.pdf

Extracted from the file · 9 pages · 13,682 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment C #19-07-01, #25-08-04 #26-08-01.pdf

Extracted from the file · 3 pages · 5,725 characters

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 1 - CT RRES Public #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 2 - CT RRES Public #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 3 – CT RRES Averaged _ Aggregated Data Year #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 4 - CT RRES Averaged _ Aggregated Data Town 1 #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 5 - CT RRES Application Data Fields #26-08-02 #26-08-01.pdf

Extracted from the file · 4 pages · 5,976 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / Annual Compliance Filings – Cross-Posted Compliance

This filing on the current system (opens in a new tab)