Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

Annual Compliance Filings – Cross-Posted Compliance

Compliance filingFiled by Avangrid22 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files22

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting

Text of 2026-11-16 UI Cross-Posted Compliance - Cover Letter 4. Annual Compliance Filings #26-08-01.pdf

Extracted from the file · 2 pages · 3,636 characters

Words on different pages
1 page match
  1. Page 57 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 57 of 86 350kW 94 Total 747 Figure 18: Statewide DCFC Ports Installed by Year The Program has contributed funding to less than half of the ports deployed since its inception. d) Geographic Distribution The currently installed network of DCFC sites and ports is relatively distributed across the state, shown on this map of sites:
  2. Page 58 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 58 of 86 Figure 19: Geographic Distribution of DCFC Stations e) Robust Pipeline of Known Projects to Be Built In addition to the strong growth of DCFC deployment in the state since the inception of the Program, the EDCs are aware of a robust pipeline of DCFC ports that are yet to be electrified. These include the following: Table 14: Planned DCFC Sites and Ports 12 Planned Sites Ports NEVI Sites12 9 36 CFI Grant Awards13 8 96 UI Awarded Not Built 15 49 ES Awarded Not Built 37 182 EDC 2026 DCFC Cycle 9 46 National Electric Vehicle Infrastructure Formula Program is a federal initiative that provides funding for states to strategically deploy DCFC stations. 13 Charging and Fueling Infrastructure Program is a federal discretionary grant program that provides funding to deploy EV charging infrastructure in communities and along designated alternative fuels corridors.
  3. Page 59 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 59 of 86 Total 69 413 Added to the currently installed 747 DCFC ports, assuming these projects come to fruition, the state would have 1,160 DCFC ports at over 220 sites. This does not account for continued growth of DCFC ports installed without Program or other federal or state funding support. Given the current status of DCFC deployment, the robust pipeline of sites yet to be built, and the recent growth of sites independent of program support, the EDCs recommend that the DCFC Program Area be discontinued beginning in 2027. Ratepayer dollars are better spent on Level 2 charging, which has not demonstrated the same level of success, and for which there remains a need that can be supported by the Program. Whether it’s the infrastructure needed to support the state’s EV adoption goals, or the EDCs’ forecast of EV adoption – in either scenario the state already has the DCFC network to support EV adoption without relying on the subsidization by the Program. B. MUD Managed Charging Recommendations The EDCs’ MUD Managed Charging Pilot program was extended through the end of 2026, to allow the EDCs and their implementor more time to collect data and learnings. PURA also granted an extension until August 1, 2026, for the EDCs to propose a final MUD program design. In addition, through the Innovative Energy Solutions (IES) Pilot (Docket 22-08-07), PURA selected AmpUp to test an EV managed charging offering with public Level 2 charging stations providing peak load reduction. This pilot reached MUD and other Level 2 public charging sites, including workplaces and other public destinations. On July 1, 2026, PURA issued a Program Cycle 1 Final Decision directing the EDCs and AmpUp to jointly file a proposal that includes a scaled deployment of AmpUp’s project within the MUD managed charging final program design. The EDCs are actively working with both AmpUp and the pilot implementor to consider updates to the pilot program’s design. The MUD Pilot participation and results have been limited, which limits the conclusions the EDCs can draw about the scalability of managed charging facilitated by MUD EV chargers. Supporting MUD
  4. Page 60 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 60 of 86 EV customer participation in managed charging, through EV telematics may provide the greatest avenue for scalability in the near term. PURA has recommended the AmpUp pilot be considered in the CT EV Annual Review docket for potential scaling. The AmpUp pilot had success with enrolling MUD charger sites through an “opt-out” approach woven into the NSP and MUD site hosts’ terms and conditions. Additionally, the AmpUp app provided a simple customer interface that enabled EV charging deferment and load shifting. The EDCs believe both enhancements can be integrated, at least to some degree, into a revised MUD Pilot offering that provides opportunities and access to multiple NSP providers. The EDCs are actively engaged in advanced discussions with AmpUp and the Pilot’s technology provider to define a potential path forward. With this potential relationship in active development, the Companies have requested and subsequently received approval for an extension to both IES Order 1 and EV Order 6, to file updated program design recommendations by August 31, 2026. C. Residential Managed Charging Program Recommendations 1. Order 18d Value Stack of Managed Charging Order 18d of the Final Decision in Docket No. 25-08-06 states the following: No later than August 3, 2026, the EDCs shall include in their joint Annual Report filing in the 2026 Annual Review Docket: A report summarizing the EDCs’ analysis of the national, regional, and state studies provided by OCC and ChargeScape, recommendations made by ChargeScape and ev.energy regarding nearterm future steps to build upon the Program design, and conversations with EDC Transmission and distribution system operators as discussed in Section IV.F.1, Value Stack and Load Optimization. Additionally, the EDCs shall submit a proposal detailing the EDCs’ findings and recommended next steps. This proposal shall also provide details regarding the EDCs’ past, current, and planned future efforts towards load optimization. a) Analysis of National, Regional, and State Studies In Attachment 11 the EDCs and their EM&V partner reviewed relevant value stack literature and provide analysis of this literature which includes: the relevance of these studies to CT, under what conditions managed charging
  5. Page 61 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 61 of 86 can extract additional value from the stack, if and how managed charging can be deployed in this way, and what challenges exist to doing so. The analysis recommendations include, 1. Continuing to target system peaks and capture system capacity and avoided energy and emissions benefits, 2. Analysis to estimate the potential for EVs to alleviate constraints at various areas of the distribution grid, and 3. Program sophistication should change with the maturity of the EV market. b) Distribution Value & Load Optimization Considerations The EDCs Managed Charging program reduces system peak by shifting load away from the ISO- NE system peak. The EV Charging Program currently uses a peak period of 3 pm - 9 pm, and non-holiday weekdays. Due to high coincidence of system and distribution system peaks, the current program already captures distribution value by shifting load away from that peak. The EDCs are evaluating the opportunity for advanced program designs to provide addition distribution system value, including engagement with their transmission and distribution planning teams as directed by PURA. For example, UI has collaborated with its transmission and distribution planning teams to map active Managed Charging participants to circuits with known constraints. This analysis is being used to identify opportunities for targeted participant recruitment and to evaluate whether managed charging can provide additional value on highly loaded circuits. Table 15: Count of UI Managed Charging Participants on Circuits by Highest Phase Loading Circuit ID Highest Phase Loading MC Program Participant Count 1 117.90% 2 2 112.60% 31 3 110.60% 20 4 110.20% 45 5 108.30% 20 6 107.10% 26 7 106.10% 10 8 105.20% 0
  6. Page 62 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 62 of 86 9 104.30% 9 10 103.60% 29 11 103.60% 20 12 102.70% 49 13 101.50% 1 14 100.00% 9 15 99.70% 14 16 98.90% 14 17 98.80% 21 18 98.80% 22 19 98.60% 20 20 98.50% 11 21 96.40% 0 22 95.60% 4 23 95.30% 45 24 94.20% 0 25 94.00% 11 26 93.40% 28 27 93.10% 26 28 92.30% 14 29 92.30% 5 30 92.20% 42 31 91.10% 18 32 91.00% 0 33 90.60% 5 34 90.40% 8 Table 16: Top 20 UI Circuits by Number of Managed Charging Program Participants Circuit ID Highest Phase Loading MC Program Participant Count 12 102.70% 49 4 110.20% 45
  7. Page 63 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 63 of 86 23 95.30% 45 35 62.40% 44 30 92.20% 42 36 79.70% 34 37 79.90% 34 38 87.50% 32 39 75.30% 31 40 59.10% 31 2 112.60% 31 41 40.70% 31 10 103.60% 29 26 93.40% 28 42 78.70% 28 43 73.10% 26 44 89.90% 26 6 107.10% 26 45 75.10% 26 27 93.10% 26 Note: red: peak load above 100% of the circuit normal rating, yellow: 90%-100% of the circuit normal rating, green: below 90% of the circuit normal rating. Circuit mapping enables the EDCs to identify participants located on constrained portions of the distribution system and evaluate opportunities for targeted managed charging strategies. Several circuits currently include 30 to 50 enrolled vehicles, demonstrating sufficient participation levels to support evaluation of localized loadmanagement approaches. As an initial step, the EDCs propose targeted participant recruitment on selected circuits to increase the potential distribution benefits of the existing Managed Charging Program. As another example of UI’s efforts to understand localized constraints and EV impacts on system load, UI is collaborating with Gridsight, an AMI disaggregation and analytics firm, through a CT IES Project. The collaboration uses Gridsight’s machine-learning platform to analyze UI’s AMI interval data and distribution
  8. Page 64 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 64 of 86 system topology to identify premise-level EV charging and determine where and when charging coincides with system peaks and distribution asset constraints. UI expects the results to provide additional data-driven insights to support localized EV program design, targeting, and enrollment. In 2026, Eversource began testing localized flexibility programs designed to address specific distribution system needs in Massachusetts. These pilots include managed charging and demand response strategies that are testing the opportunity to leverage distributed energy resources, to alleviate localized constraints, absorb excess renewable generation, and potentially defer infrastructure investments. Insights from these pilots may help inform future Connecticut program designs where localized flexibility could provide measurable grid benefits14. Eversource plans to propose and deploy pilots in Connecticut, that can address specific distribution level challenges where load flexibility solutions can potentially provide relief and delay infrastructure replacement or build out. In addition, Eversource has been working with technology service providers to test if changes to active managed charging strategies (algorithms) can help to flatten EV charging load and mitigate the secondary peaks. Looking ahead, the EDCs believe targeted pilots and demonstrations may be appropriate where managed charging can address specific distribution-system needs. Potential approaches are described below and are intended to illustrate opportunities for future evaluation rather than commitments to implementation. c) Potential Opportunities for Evaluation The concepts below illustrate potential future managed charging strategies that could be evaluated where specific distribution-system conditions warrant. These concepts are generally listed from lower to higher implementation complexity and could be combined depending on local system needs. Any future implementation would require consideration of customer experience, participant acceptance, and the participant's ability to maintain control over vehicle charging. 14 Managed Charging+ and ConnectedSolutions+ are available to Eversource customers in specified Eversource Massachusetts electric service territory areas, in 2026.
  9. Page 65 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 65 of 86 Circuit-level or substation-level demand response. While the EDCs have shown that continuous load shifting greatly diminishes the amount of available load for demand response, there may be localized opportunities to implement demand response events coincident with local system peaks that are outside of the standard 3PM to 9PM peak window. In this scenario, the EDCs would identify a circuit or substation, and a peak-period window. Demand response events would be dispatched to enrolled vehicles on that part of the system accordingly. Changes to or layered requirements inside the off-peak window. In this scenario, the existing peak period of 3PM to 9PM is preserved for Advanced Tier Participants who set a daily charging schedule and select a state of charge. Additionally, the existing off-peak charging period of 9PM to 3PM is also maintained. A new, narrowly defined off-peak charging window is then introduced, that would match the specific constraints of a substation or circuit, 10PM to 9AM for example. The system peak objective is preserved, but charging is repositioned more precisely within it. In this scenario, off-peak charging priorities are configurable, so the localized distribution layer can defer to the system objective or override it as the situation requires. This allows the program to continue optimizing for system peak reduction, while exploring capabilities of also optimizing for specific distribution constraints. Turn-up (e.g., EV charging) for generation absorption. For Advanced Tier Participants who set a daily charging schedule and select a state of charge. A preferential off-peak charging window may encourage charging during windows of excess generation from midday solar, to potentially help alleviate distribution constraints and solar curtailment. This scenario essentially operates in a similar manner to the previous scenario, but new charging preference introduced changes. With program design that encourages plug-in availability during these windows, connected vehicles become a dispatchable absorption resource, and programs designed around this objective have moved material shares of total charging into midday. Additional option for Advanced Tier for additional monthly incentive. This optimization strategy reprioritizes charging to avoid localized system events, overriding a participant’s charging schedule and selected state of charge. In this scenario, participants would be notified of events and would always retain the right to opt-out of the event. These events would be rare and occur mostly during summer peak demand periods.
  10. Page 66 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 66 of 86 d) Testing New Opportunities Within the Value Stack As discussed in Section VI.C.3, the EDCs propose a Fast Track process to evaluate these concepts with existing program participants. Potential applications of EV load flexibility should be based on identified distribution system needs and assessed for cost-effectiveness relative to alternative solutions. The EDCs will work with technology providers and other partners to develop and implement limited-scale pilots, evaluate results, and, where warranted, advance recommendations for broader implementation through the Fast Track or Annual Report review process. 2. Incentive Flexibility to help Simplify Enrollment Flow (Eversource) Eversource is working with its EV implementation vendors to simplify the enrollment process for customers by reducing the number of steps customers take to sign up for managed charging. The workflow changes contemplated would allow all customers to enroll directly into managed charging through the DERMs, instead of routing all customers to and through the rebate portal first, and then to the DERMS. While the prior workflow made sense when a vast majority of customers were receiving EVSE and Wiring Rebates, under the 2026 eligibility requirements, a majority of customers are eligible only for managed charging offer. Eversource seeks flexibility to offer the enrollment incentive ($100) to all customers and adjust the current $1,500 EVSE and wiring rebate, to $1,400. This would not make it more cumbersome for a make-ready customer to receive their enrollment incentive; it would just be two separate transactions. In addition, this would not have any change to the upfront rebate that customers could earn but would enable the Companies to process managed charging enrollment incentives more efficiently and avoid customer delays that may result from building in additional review and a potential waiting period, with submitted residential EVSE and wiring rebate applications. 3. Residential Managed Charging Fast Track Proposal Managed charging programs are evolving rapidly as new technologies, customer behaviors, and grid needs emerge. To remain effective, program designs, incentive structures, and eligible technologies must be evaluated and updated more quickly than the current annual review cycle allows. The EDCs therefore propose a Fast Track process for managed charging pilots and tests that meet pre-approved criteria. This process would accelerate the evaluation of new technologies and program design elements, enabling timely implementation while maintaining appropriate regulatory oversight

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2c #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2d #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Words on different pages

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 3 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 4 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 6 REDACTED #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 8 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Words on different pages

Text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 19) Exhibit B Public #25-08-03 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 18) Form of State Tariff Agreement Exhibit C2 #25-08-03 #26-08-01.pdf

Extracted from the file · 31 pages · 88,975 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 5) Attachment C Exhibit 1 #25-08-04 #26-08-01.pdf

Extracted from the file · 2 pages · 1,932 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 6) Attachment B #25-08-04 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment A #19-07-01, #25-08-04 #26-08-01.pdf

Extracted from the file · 9 pages · 13,682 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment C #19-07-01, #25-08-04 #26-08-01.pdf

Extracted from the file · 3 pages · 5,725 characters

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 1 - CT RRES Public #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 2 - CT RRES Public #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 3 – CT RRES Averaged _ Aggregated Data Year #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 4 - CT RRES Averaged _ Aggregated Data Town 1 #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 5 - CT RRES Application Data Fields #26-08-02 #26-08-01.pdf

Extracted from the file · 4 pages · 5,976 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / Annual Compliance Filings – Cross-Posted Compliance

This filing on the current system (opens in a new tab)