Compliance Filing, Order No. 1
Annual Compliance Filings – Cross-Posted Compliance
Files22
2026-11-16 UI Cross-Posted Compliance - Cover Letter 4. Annual Compliance Filings #26-08-01.pdf
PDF · 239 KB · 2 pagesText searchable
Download 2026-11-16 UI Cross-Posted Compliance - Cover Letter 4. Annual Compliance Filings #26-08-01.pdfRead the text of 2026-11-16 UI Cross-Posted Compliance - Cover Letter 4. Annual Compliance Filings #26-08-01.pdf
2026-11-16 UI Cross-Posted Compliance - CT Energy Storage Solutions Annual Evaluation Report #26-08-05 #26-08-01.pdf
PDF · 251 KB · 10 pagesText searchable
Download 2026-11-16 UI Cross-Posted Compliance - CT Energy Storage Solutions Annual Evaluation Report #26-08-05 #26-08-01.pdfRead the text of 2026-11-16 UI Cross-Posted Compliance - CT Energy Storage Solutions Annual Evaluation Report #26-08-05 #26-08-01.pdf
2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report #25-08-06 #26-08-01.pdf
PDF · 2.4 MB · 86 pagesText searchable
Download 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report #25-08-06 #26-08-01.pdfRead the text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report #25-08-06 #26-08-01.pdf
2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2c #25-08-06 #26-08-01.xlsx
Excel · 220 KBText searchable
Download 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2c #25-08-06 #26-08-01.xlsxRead the text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2c #25-08-06 #26-08-01.xlsx
2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2d #25-08-06 #26-08-01.xlsx
Excel · 109 KBText searchable
Download 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2d #25-08-06 #26-08-01.xlsxRead the text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2d #25-08-06 #26-08-01.xlsx
2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2e #25-08-06 #26-08-01.pdf
PDF · 761 KB · 8 pagesText searchable
Download 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2e #25-08-06 #26-08-01.pdfRead the text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2e #25-08-06 #26-08-01.pdf
2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 3 #25-08-06 #26-08-01.xlsx
Excel · 21 KBText searchable
Download 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 3 #25-08-06 #26-08-01.xlsxRead the text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 3 #25-08-06 #26-08-01.xlsx
2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 4 #25-08-06 #26-08-01.xlsx
Excel · 20 KBText searchable
Download 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 4 #25-08-06 #26-08-01.xlsxRead the text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 4 #25-08-06 #26-08-01.xlsx
2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 6 REDACTED #25-08-06 #26-08-01.xlsx
Excel · 26 KBText searchable
Download 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 6 REDACTED #25-08-06 #26-08-01.xlsxRead the text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 6 REDACTED #25-08-06 #26-08-01.xlsx
2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 8 #25-08-06 #26-08-01.xlsx
Excel · 32 KBText searchable
Download 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 8 #25-08-06 #26-08-01.xlsxRead the text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 8 #25-08-06 #26-08-01.xlsx
2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 18) Exhibit A #25-08-03 #26-08-01.pdf
PDF · 226 KB · 5 pagesText searchable
Download 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 18) Exhibit A #25-08-03 #26-08-01.pdfRead the text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 18) Exhibit A #25-08-03 #26-08-01.pdf
2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 19) Exhibit B Public #25-08-03 #26-08-01.xlsx
Excel · 55 KBText searchable
Download 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 19) Exhibit B Public #25-08-03 #26-08-01.xlsxRead the text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 19) Exhibit B Public #25-08-03 #26-08-01.xlsx
2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 18) Form of State Tariff Agreement Exhibit C2 #25-08-03 #26-08-01.pdf
PDF · 358 KB · 31 pagesText searchable
Download 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 18) Form of State Tariff Agreement Exhibit C2 #25-08-03 #26-08-01.pdfRead the text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 18) Form of State Tariff Agreement Exhibit C2 #25-08-03 #26-08-01.pdf
2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 5) Attachment C Exhibit 1 #25-08-04 #26-08-01.pdf
PDF · 175 KB · 2 pagesText searchable
Download 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 5) Attachment C Exhibit 1 #25-08-04 #26-08-01.pdfRead the text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 5) Attachment C Exhibit 1 #25-08-04 #26-08-01.pdf
2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 6) Attachment B #25-08-04 #26-08-01.xlsx
Excel · 23 KBText searchable
Download 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 6) Attachment B #25-08-04 #26-08-01.xlsxRead the text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 6) Attachment B #25-08-04 #26-08-01.xlsx
2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment A #19-07-01, #25-08-04 #26-08-01.pdf
PDF · 796 KB · 9 pagesText searchable
Download 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment A #19-07-01, #25-08-04 #26-08-01.pdfRead the text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment A #19-07-01, #25-08-04 #26-08-01.pdf
2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment C #19-07-01, #25-08-04 #26-08-01.pdf
PDF · 136 KB · 3 pagesText searchable
Download 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment C #19-07-01, #25-08-04 #26-08-01.pdfRead the text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment C #19-07-01, #25-08-04 #26-08-01.pdf
2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 1 - CT RRES Public #26-08-02 #26-08-01.xlsx
Excel · 565 KBText searchable
Download 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 1 - CT RRES Public #26-08-02 #26-08-01.xlsxRead the text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 1 - CT RRES Public #26-08-02 #26-08-01.xlsx
2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 2 - CT RRES Public #26-08-02 #26-08-01.xlsx
Excel · 707 KBText searchable
Download 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 2 - CT RRES Public #26-08-02 #26-08-01.xlsxRead the text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 2 - CT RRES Public #26-08-02 #26-08-01.xlsx
2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 3 – CT RRES Averaged _ Aggregated Data Year #26-08-02 #26-08-01.xlsx
Excel · 61 KBText searchable
Download 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 3 – CT RRES Averaged _ Aggregated Data Year #26-08-02 #26-08-01.xlsxRead the text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 3 – CT RRES Averaged _ Aggregated Data Year #26-08-02 #26-08-01.xlsx
2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 4 - CT RRES Averaged _ Aggregated Data Town 1 #26-08-02 #26-08-01.xlsx
Excel · 75 KBText searchable
Download 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 4 - CT RRES Averaged _ Aggregated Data Town 1 #26-08-02 #26-08-01.xlsxRead the text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 4 - CT RRES Averaged _ Aggregated Data Town 1 #26-08-02 #26-08-01.xlsx
2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 5 - CT RRES Application Data Fields #26-08-02 #26-08-01.pdf
PDF · 165 KB · 4 pagesText searchable
Download 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 5 - CT RRES Application Data Fields #26-08-02 #26-08-01.pdfRead the text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 5 - CT RRES Application Data Fields #26-08-02 #26-08-01.pdf
Text of 2026-11-16 UI Cross-Posted Compliance - Cover Letter 4. Annual Compliance Filings #26-08-01.pdf
Extracted from the file · 2 pages · 3,636 characters
Page 61 of 86
The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 61 of 86 can extract additional value from the stack, if and how managed charging can be deployed in this way, and what challenges exist to doing so. The analysis recommendations include, 1. Continuing to target system peaks and capture system capacity and avoided energy and emissions benefits, 2. Analysis to estimate the potential for EVs to alleviate constraints at various areas of the distribution grid, and 3. Program sophistication should change with the maturity of the EV market. b) Distribution Value & Load Optimization Considerations The EDCs Managed Charging program reduces system peak by shifting load away from the ISO- NE system peak. The EV Charging Program currently uses a peak period of 3 pm - 9 pm, and non-holiday weekdays. Due to high coincidence of system and distribution system peaks, the current program already captures distribution value by shifting load away from that peak. The EDCs are evaluating the opportunity for advanced program designs to provide addition distribution system value, including engagement with their transmission and distribution planning teams as directed by PURA. For example, UI has collaborated with its transmission and distribution planning teams to map active Managed Charging participants to circuits with known constraints. This analysis is being used to identify opportunities for targeted participant recruitment and to evaluate whether managed charging can provide additional value on highly loaded circuits. Table 15: Count of UI Managed Charging Participants on Circuits by Highest Phase Loading Circuit ID Highest Phase Loading MC Program Participant Count 1 117.90% 2 2 112.60% 31 3 110.60% 20 4 110.20% 45 5 108.30% 20 6 107.10% 26 7 106.10% 10 8 105.20% 0Page 62 of 86
The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 62 of 86 9 104.30% 9 10 103.60% 29 11 103.60% 20 12 102.70% 49 13 101.50% 1 14 100.00% 9 15 99.70% 14 16 98.90% 14 17 98.80% 21 18 98.80% 22 19 98.60% 20 20 98.50% 11 21 96.40% 0 22 95.60% 4 23 95.30% 45 24 94.20% 0 25 94.00% 11 26 93.40% 28 27 93.10% 26 28 92.30% 14 29 92.30% 5 30 92.20% 42 31 91.10% 18 32 91.00% 0 33 90.60% 5 34 90.40% 8 Table 16: Top 20 UI Circuits by Number of Managed Charging Program Participants Circuit ID Highest Phase Loading MC Program Participant Count 12 102.70% 49 4 110.20% 45Page 63 of 86
The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 63 of 86 23 95.30% 45 35 62.40% 44 30 92.20% 42 36 79.70% 34 37 79.90% 34 38 87.50% 32 39 75.30% 31 40 59.10% 31 2 112.60% 31 41 40.70% 31 10 103.60% 29 26 93.40% 28 42 78.70% 28 43 73.10% 26 44 89.90% 26 6 107.10% 26 45 75.10% 26 27 93.10% 26 Note: red: peak load above 100% of the circuit normal rating, yellow: 90%-100% of the circuit normal rating, green: below 90% of the circuit normal rating. Circuit mapping enables the EDCs to identify participants located on constrained portions of the distribution system and evaluate opportunities for targeted managed charging strategies. Several circuits currently include 30 to 50 enrolled vehicles, demonstrating sufficient participation levels to support evaluation of localized loadmanagement approaches. As an initial step, the EDCs propose targeted participant recruitment on selected circuits to increase the potential distribution benefits of the existing Managed Charging Program. As another example of UI’s efforts to understand localized constraints and EV impacts on system load, UI is collaborating with Gridsight, an AMI disaggregation and analytics firm, through a CT IES Project. The collaboration uses Gridsight’s machine-learning platform to analyze UI’s AMI interval data and distributionPage 64 of 86
The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 64 of 86 system topology to identify premise-level EV charging and determine where and when charging coincides with system peaks and distribution asset constraints. UI expects the results to provide additional data-driven insights to support localized EV program design, targeting, and enrollment. In 2026, Eversource began testing localized flexibility programs designed to address specific distribution system needs in Massachusetts. These pilots include managed charging and demand response strategies that are testing the opportunity to leverage distributed energy resources, to alleviate localized constraints, absorb excess renewable generation, and potentially defer infrastructure investments. Insights from these pilots may help inform future Connecticut program designs where localized flexibility could provide measurable grid benefits14. Eversource plans to propose and deploy pilots in Connecticut, that can address specific distribution level challenges where load flexibility solutions can potentially provide relief and delay infrastructure replacement or build out. In addition, Eversource has been working with technology service providers to test if changes to active managed charging strategies (algorithms) can help to flatten EV charging load and mitigate the secondary peaks. Looking ahead, the EDCs believe targeted pilots and demonstrations may be appropriate where managed charging can address specific distribution-system needs. Potential approaches are described below and are intended to illustrate opportunities for future evaluation rather than commitments to implementation. c) Potential Opportunities for Evaluation The concepts below illustrate potential future managed charging strategies that could be evaluated where specific distribution-system conditions warrant. These concepts are generally listed from lower to higher implementation complexity and could be combined depending on local system needs. Any future implementation would require consideration of customer experience, participant acceptance, and the participant's ability to maintain control over vehicle charging. 14 Managed Charging+ and ConnectedSolutions+ are available to Eversource customers in specified Eversource Massachusetts electric service territory areas, in 2026.Page 65 of 86
The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 65 of 86 Circuit-level or substation-level demand response. While the EDCs have shown that continuous load shifting greatly diminishes the amount of available load for demand response, there may be localized opportunities to implement demand response events coincident with local system peaks that are outside of the standard 3PM to 9PM peak window. In this scenario, the EDCs would identify a circuit or substation, and a peak-period window. Demand response events would be dispatched to enrolled vehicles on that part of the system accordingly. Changes to or layered requirements inside the off-peak window. In this scenario, the existing peak period of 3PM to 9PM is preserved for Advanced Tier Participants who set a daily charging schedule and select a state of charge. Additionally, the existing off-peak charging period of 9PM to 3PM is also maintained. A new, narrowly defined off-peak charging window is then introduced, that would match the specific constraints of a substation or circuit, 10PM to 9AM for example. The system peak objective is preserved, but charging is repositioned more precisely within it. In this scenario, off-peak charging priorities are configurable, so the localized distribution layer can defer to the system objective or override it as the situation requires. This allows the program to continue optimizing for system peak reduction, while exploring capabilities of also optimizing for specific distribution constraints. Turn-up (e.g., EV charging) for generation absorption. For Advanced Tier Participants who set a daily charging schedule and select a state of charge. A preferential off-peak charging window may encourage charging during windows of excess generation from midday solar, to potentially help alleviate distribution constraints and solar curtailment. This scenario essentially operates in a similar manner to the previous scenario, but new charging preference introduced changes. With program design that encourages plug-in availability during these windows, connected vehicles become a dispatchable absorption resource, and programs designed around this objective have moved material shares of total charging into midday. Additional option for Advanced Tier for additional monthly incentive. This optimization strategy reprioritizes charging to avoid localized system events, overriding a participant’s charging schedule and selected state of charge. In this scenario, participants would be notified of events and would always retain the right to opt-out of the event. These events would be rare and occur mostly during summer peak demand periods.Page 66 of 86
The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 66 of 86 d) Testing New Opportunities Within the Value Stack As discussed in Section VI.C.3, the EDCs propose a Fast Track process to evaluate these concepts with existing program participants. Potential applications of EV load flexibility should be based on identified distribution system needs and assessed for cost-effectiveness relative to alternative solutions. The EDCs will work with technology providers and other partners to develop and implement limited-scale pilots, evaluate results, and, where warranted, advance recommendations for broader implementation through the Fast Track or Annual Report review process. 2. Incentive Flexibility to help Simplify Enrollment Flow (Eversource) Eversource is working with its EV implementation vendors to simplify the enrollment process for customers by reducing the number of steps customers take to sign up for managed charging. The workflow changes contemplated would allow all customers to enroll directly into managed charging through the DERMs, instead of routing all customers to and through the rebate portal first, and then to the DERMS. While the prior workflow made sense when a vast majority of customers were receiving EVSE and Wiring Rebates, under the 2026 eligibility requirements, a majority of customers are eligible only for managed charging offer. Eversource seeks flexibility to offer the enrollment incentive ($100) to all customers and adjust the current $1,500 EVSE and wiring rebate, to $1,400. This would not make it more cumbersome for a make-ready customer to receive their enrollment incentive; it would just be two separate transactions. In addition, this would not have any change to the upfront rebate that customers could earn but would enable the Companies to process managed charging enrollment incentives more efficiently and avoid customer delays that may result from building in additional review and a potential waiting period, with submitted residential EVSE and wiring rebate applications. 3. Residential Managed Charging Fast Track Proposal Managed charging programs are evolving rapidly as new technologies, customer behaviors, and grid needs emerge. To remain effective, program designs, incentive structures, and eligible technologies must be evaluated and updated more quickly than the current annual review cycle allows. The EDCs therefore propose a Fast Track process for managed charging pilots and tests that meet pre-approved criteria. This process would accelerate the evaluation of new technologies and program design elements, enabling timely implementation while maintaining appropriate regulatory oversightPage 67 of 86
The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 67 of 86 Emerging behind-the-meter technologies, including charger adapters, smart panels, subpanels, and advanced metering devices, may provide new pathways for managed charging participation. In addition, experience with existing programs has identified opportunities to refine incentive structures, enrollment strategies, and other program elements to increase participation and system value. The proposed Fast Track process would provide an efficient mechanism to test and validate these innovations before considering broader program adoption. a) The Fast Track Process The EDCs propose a Fast Track approval process for managed charging pilots and tests that satisfy established eligibility criteria. By May 1 of each annual program review proceeding, the EDCs may submit a joint or individual motion(s) seeking approval of an eligible pilot or test. Each proposal would include a clear objective, scope, budget, and evaluation metrics and would be subject to the Authority’s standard review process, including stakeholder comments, technical meetings, and discovery. The EDCs would seek a ruling from the Authority on the Fast Track proposal within the annual proceeding and in advance of the timeline that would otherwise apply to program recommendations submitted through the standard Annual Report process. The Fast Track process differs from the existing Annual Report program recommendation process by providing an earlier and more targeted regulatory review pathway for limited-scope pilots and tests. Under the current framework, the EDCs submit program recommendations as part of the Annual Report filing on August 1, and approval of those recommendations typically is not received until PURA issues a Final Decision at the conclusion of the following year’s associated regulatory proceeding, which may occur approximately sixteen months later. The Fast Track process would allow the EDCs to seek review and approval of eligible pilots and tests during the pendency of the annual proceeding, providing an opportunity to evaluate emerging technologies, customer offerings, and program design enhancements on an accelerated timeline while maintaining PURA oversight and stakeholder participation. Approved Fast Track activities would remain limited in scope and would not constitute approval of permanent program modifications, which would continue to be reviewed through the existing Annual Report process.Page 68 of 86
The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 68 of 86 The Fast Track process would supplement, rather than replace, the existing annual program recommendation process. Approved pilots and tests would be reported in subsequent Annual Reports, and successful results may inform future proposals for permanent program changes. b) Definitions of a Pilot and a Test For purposes of the Fast Track process, the EDCs propose the following definitions: • • Pilot: A pilot is the deployment of a technology, program design element, or combination thereof evaluated under real-world operating conditions to determine whether it should be considered for permanent implementation within a managed charging program. Test: A test is the trial of a technology, program design element, or combination thereof evaluated on a limited basis to assess feasibility, performance, or customer response and inform future pilots or program recommendations. c) Criteria for Pilot and Test Proposals Each Fast Track proposal shall include sufficient information to support regulatory review and evaluation, including: • • • • Objective: The purpose of the proposed pilot or test and the issue or opportunity it is intended to address. Scope: The proposed duration, participant population, and implementation scale Budget: Estimated costs associated with implementation and administration. Metrics: The criteria and methodology that will be used to evaluate performance and results. d) Eligible Activities for Fast Track Review Fast Track proposals may include the following activities. 1. Testing of new technologies that support managed charging and expand eligible participation pathways. 2. Evaluation of behind-the-meter solutions that enable managed charging through data access or direct load control. 3. Limited-scale testing of alternative incentives, enrollment strategies, peak-period designs, or other program features intended to improve program performance. e) Program Modifications Not Eligible for Fast Track Program modifications that materially change the structure, objectives, or core design of a PURA-authorized managed charging program, or that would broadly apply to all participants, are not eligible for Fast Track review. Such proposals shall be submitted through the existing Annual Report and program review process.Page 69 of 86
The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 69 of 86 Where applicable, the EDCs may use information obtained through approved Fast Track pilots and tests to support future recommendations for permanent program modifications. The EDCs recommend that the Authority adopt the EDCs’ Fast Track Proposal through the forthcoming draft decision in the instant docket. Section VI.F. of the Final Decision in Docket No. 17-12-03RE04 authorizes PURA to make strategic program adjustments to ensure continued alignment with the program objectives and that the program is on track to meet its deployment targets. Alternatively, the EDCs may instead submit the Fast Track Proposal as a standalone motion for modification of the Year 5 Decision. D. Commercial Program Recommendations 1. Recommendation 1- Level 2 Commercial Waitlist Process & Prioritization In PURA’s Annual EV Charging Program Review Final Decision (December 17, 2025) PURA directs the EDCs to prioritize any applications received from formerly waitlisted applicants above newly received applications in that Program Year. In other words, a 2026 waitlisted application that re-applies in 2027 should be prioritized for review above new applications received in 2027. To implement this directive in a consistent and transparent manner, the EDCs recommend establishing a standardized commercial Level 2 waitlist and prioritization process be developed for 2026 projects and beyond. • • • Any projects remaining on the waitlist at the end of the program year shall expire and may be resubmitted during a defined reapplication period in the following program year. Prioritization of projects would only apply to waitlisted applications that reapplied by March 1 of the following year. To provide administrative certainty and facilitate timely allocation of available funding, such priority status would apply only during the first 60 days of the subsequent program year. To promote broad market participation and ensure funding opportunities are distributed among multiple market actors, no single contractor on the waitlist may account for more than 40% of the estimated charging ports allocated for the program year through the waitlist prioritization process. The waitlist would be limited to the number of projects that can reasonably be supported by the estimated funding available in the subsequent program year. This approach is intended to prevent the accumulation of an unmanageable backlog of unfunded projects and provide applicants with realistic expectations regarding the likelihood of future funding.Page 70 of 86
The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 70 of 86 The EDCs recommend that standardizing the waitlist prioritization process will improve program transparency, create more predictable outcomes for applicants, and facilitate efficient administration of the commercial charging program. 2. Recommendation 2- Restrictions on sites receiving third party funding and/or stacked funding The EDCs recommend establishing restrictions on projects receiving funding from multiple incentive programs for the same EV charging infrastructure investment. Examples of such programs may include, but are not limited to, the Connecticut Department of Energy and Environmental Protection (DEEP) Volkswagen Settlement Program, the U.S. Department of Energy Efficiency and Conservation Block Grant (EECBG) Program, and other federal, state, or local funding opportunities. Currently, applicants may have access to multiple sources of funding for a single project. While these funding opportunities support EV charging development objectives, the absence of clear program guidance regarding incentive stacking may result in circumstances where available program funds are not allocated as efficiently as possible. To maximize the number of customers and charging ports supported through the CT EV Charging Program, the EDCs recommend that projects receiving funding from another source for the same eligible equipment or installation costs be ineligible for incentives through the commercial program. Alternatively, where PURA determines incentive stacking should be permitted, total funding received from all sources should not exceed total project costs, and applicants should be required to disclose all anticipated and awarded funding sources during the application process. Establishing clear restrictions regarding third-party funding will help ensure prudent use of ratepayer funds, reduce administrative complexity, prevent duplicate reimbursement of project costs, and enable the EDCs to support a greater number of charging infrastructure projects statewide. 3. Recommendation 3- Incentives for New Construction Stretch Building Codes Over the last several years, the Connecticut General Assembly has worked to pass legislation to help with encouraging and expanding EV infrastructure buildout across the state. Effective October 2022 Public Act 22-25,
Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2c #25-08-06 #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2d #25-08-06 #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 3 #25-08-06 #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 4 #25-08-06 #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 6 REDACTED #25-08-06 #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 8 #25-08-06 #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 19) Exhibit B Public #25-08-03 #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 18) Form of State Tariff Agreement Exhibit C2 #25-08-03 #26-08-01.pdf
Extracted from the file · 31 pages · 88,975 characters
Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 5) Attachment C Exhibit 1 #25-08-04 #26-08-01.pdf
Extracted from the file · 2 pages · 1,932 characters
Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 6) Attachment B #25-08-04 #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment A #19-07-01, #25-08-04 #26-08-01.pdf
Extracted from the file · 9 pages · 13,682 characters
Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment C #19-07-01, #25-08-04 #26-08-01.pdf
Extracted from the file · 3 pages · 5,725 characters
Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 1 - CT RRES Public #26-08-02 #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 2 - CT RRES Public #26-08-02 #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 3 – CT RRES Averaged _ Aggregated Data Year #26-08-02 #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 4 - CT RRES Averaged _ Aggregated Data Town 1 #26-08-02 #26-08-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 5 - CT RRES Application Data Fields #26-08-02 #26-08-01.pdf
Extracted from the file · 4 pages · 5,976 characters
As listed on the current system
Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / Annual Compliance Filings – Cross-Posted Compliance