Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

Annual Compliance Filings – Cross-Posted Compliance

Compliance filingFiled by Avangrid22 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files22

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting

Text of 2026-11-16 UI Cross-Posted Compliance - Cover Letter 4. Annual Compliance Filings #26-08-01.pdf

Extracted from the file · 2 pages · 3,636 characters

Words on different pages
1 page match
  1. Page 71 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 71 of 86 also known as the Connecticut Clean Air Act, established minimum building code requirements for the installation of electric vehicle charging stations when constructing new state facilities, commercial and multifamily buildings or schools. (b) On and after January 1, 2023, the Commissioner of Administrative Services shall require each new construction of a state facility, the total project costs of which exceed one hundred thousand dollars, to be installed with level two electric vehicle charging stations in at least twenty per cent of the designated parking spaces for cars or light duty trucks at such facility. (c) On and after January 1, 2023, a municipality shall require each new construction of a commercial building or multiunit residential building with thirty or more designated parking spaces for cars or light duty trucks to include electric vehicle charging infrastructure that is capable of supporting level two electric vehicle charging stations or direct current fast charging stations in at least ten per cent of such parking spaces. A municipality may, through its legislative body, require any such commercial building or multi-unit residential building to include such electric vehicle charging infrastructure in more than ten per cent of such parking spaces. As a result of these requirements, the EDCs have observed an increase in commercial EV program applications associated with new construction projects that are already required to incorporate EV charging infrastructure or EV-ready electrical infrastructure as part of their building design and permitting process. From the program’s inception, incentives were established to accelerate the deployment of EV charging infrastructure by encouraging business owners to build EV charging at new locations. To maximize the impact of limited program funds, incentives were not available for replacing or retrofitting existing charging equipment or for adding chargers at sites that already received incentive funding. The program’s primary objective was to expand Connecticut’s charging network by supporting new sites, as existing locations were already contributing to statewide charging availability and had demonstrated a commitment to EV infrastructure without the benefit of incentive funding. A similar consideration applies to new construction projects where EV charging infrastructure is already required by code or development standards. Like property owners who independently installed EV charging equipment before incentives were available and now seek funding to upgrade their equipment, these developers have already made the decision to install EVSE. In both cases, the installation is driven by an existing obligation or commitment rather than by the availability of an incentive. This raises an important policy question: if the project
  2. Page 72 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 72 of 86 would move forward regardless of incentive funding, is the incentive influencing the investment decision, or is it simply subsidizing an activity that would have occurred anyway. Since the program was launched, market conditions have evolved. Current building codes increasingly require new construction projects to be designed and built with EV charging infrastructure in mind. As a result, these projects may already be obligated to install charging equipment independent of program incentives. Traditionally, changes in codes and standards have been measures of market transformation, particularly in the case of energy efficiency. Given the changes in code, it is appropriate to consider whether the use of ratepayer funds is still necessary to support installations required by code. The EDCs recommend that PURA consider the eligibility of projects subject to EV-ready building code requirements. Specifically, PURA should consider whether: • • Projects required by code to install EV-ready infrastructure should remain eligible for EV Program incentives; and Incentives should be limited to infrastructure installed beyond minimum code requirements The EDCs believe this approach would help ensure that limited program funds are directed toward projects where incentives are a material driver of deployment, while continuing to support the expansion of Connecticut’s EV charging network in a cost-effective manner. VII. Summary of Education & Outreach The EDCs’ Education & Outreach activities for the Program are pivotal to drive customer awareness of Program incentives, leading to Program adoption and participation. The EDCs target their Education & Outreach efforts to ensure key stakeholders have a clear understanding of the Program’s offerings. Marketing programs and strategic outreach are developed and conducted based on approvals, goals and budgets, as established by the RAM. In 2025 and 2026, the EDCs conducted strategic outreach and community engagement through webinars and other events, paid digital advertising, website content, and engagement with key business partners, including our installer networks. These efforts maintain awareness and engagement with the Program offerings and deliver optimal results when deployed together. Multi-tactic education and outreach are important to launch in tandem since it takes multiple touch points to build awareness, convert to program participation, and achieve shared success.
  3. Page 73 of 86

    The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Dated 11/15/2026 Page 73 of 86 The following details reflect Education & Outreach activities and engagement from July 1, 2025, through June 30, 2026. A. Webinars & Other Events Eversource and United Illuminating continue to host and participate in virtual (Table 17) and in-person (Table 18) presentations and events to educate customers, business partners, contractors and other stakeholders on the program offerings and requirements, as well as showcase staff as thought leaders in the electric vehicle charging industry. To maximize customer engagement and streamline the event experience, the Companies shared electric vehicle program information on energy efficiency and other events. The Companies tailor conversations to each customer's interests, creating a more integrated and customer-focused experience while increasing awareness of available energy programs. Positioning program experts as thought leaders is important for program adoption because it builds credibility and trust within the organization and with external stakeholders. When staff members are recognized as experts in their field, their endorsement of a program carries more weight and can significantly influence others' perceptions and acceptance of the initiative. Thought leadership demonstrates a deep understanding and commitment to the program, fostering confidence among potential adopters that it is wellconceived and beneficial. This strategy also encourages a culture of innovation and knowledge-sharing, which can further expand the program's success and sustainability. Events hosted, attended, or exhibited by the EDCs’ staff are as follows. Additionally, customers can visit the EDCs’ websites for accessible, educational content, at any time. Table 17: Summary of Webinars and Other Speaking Engagements Date Company Event Name or Topic Attendance 7/23/25 UI Southern CT Regional Council of Government EV Program Presentation Participated as a speaker: Hosted by SCRCOG 9/23/25 Eversource Managed Charging 101 140 70 10/2/25 Eversource First Thursdays – Resi 61 45 11/5/25 Eversource Tips for Closing out a project in PowerClerk 28 22
  4. Page 74 of 86

    74 1/27/26 UI Advanced Managed Charging Insights: Case Studies from Leaders in EV Load Management Participated as a speaker, hosted: Hosted by ev.energy 2/27/26 Eversource 2026 CT Resi Changes/ Updates 12 8 3/26/26 Eversource 2026 Updates to the CT Commercial program 91 66 4/23/26 Eversource/ UI Tips for Preparing a 2026 CT DC Fast Charging Application 30 25 5/28/26 Eversource Inspections (MA & CT) 29 62 6/2/26 Eversource CDBG Application Workship – CT Department of Housing Participated as a speaker, hosted by CDBG Table 18: Conference and Community Event Attendances Date Company Event Name or Topic Event Type Involvement 7/26/25 UI West Haven Savin Rock Festival Community Exhibitor 8/15/258/16/25 UI Milford Oyster Festival Community Exhibitor 8/16/25 UI Milford Fair on the Half Shell Community Exhibitor 8/25/25 UI NHPS Lighthouse: Park Back to School Chill and Grill Community Exhibitor 8/26/258/27/25 UI PLMA (Peak Load Management Alliance) Conference Presenter 9/14/2025 Eversource Town of Coventry Going Green Event Community Exhibitor 10/25/25 Eversource Saukiog Harvest Festival, Windsor Community Smart Energy Living Mobile Exhibit 11/20/25 UI Big Connect Expo Conference Exhibitor 2/2/26-2/4/26 Eversource DistribuTECH Conference Presenter 3/6/26 3/8/26 Eversource CT Home and Remodeling Show Conference Smart Energy Living Mobile Exhibit 3/8/26 UI Fairfield CT Better Home Show Community Exhibitor 3/22/26 Eversource Maker Fair, Farmington Library Community Smart Energy Living Mobile Exhibit 3/24/26 UI Town of Fairfield Community Exhibitor 4/4/26 Eversource Easter Festival Danbury Community Smart Energy Living Mobile Exhibit 4/18/26 UI Trumbull Nature & Arts Center Earth Day Community Smart Energy Living Mobile Exhibit 4/18/26 UI Town of North Haven Earth Day Community Exhibitor 4/22/26 UI EEB Meeting Bridgeport Community Smart Energy Living Mobile Exhibit
  5. Page 75 of 86

    75 4/25/26 UI Woodbridge Earth Day Event Community Smart Energy Living Mobile Exhibit 4/25/26 UI Bridgeport Party for the Planet Community Exhibitor 4/25/26 Eversource Bethel Earth Day Community Eversource Efficiency Experience 5/2/26 Eversource Simsbury Sustainability Fair Community Smart Energy Living Mobile Exhibit 5/2/26 UI Fairfield Earth Day Community Exhibitor 5/3/26 Eversource EcoFest Weston Community Smart Energy Living Mobile Exhibit 5/9/26 Eversource Southbury Energy Fair and Green Expo Community Smart Energy Living Mobile Exhibit 5/16/26 Eversource South Windsor Armed Forces Day Community Smart Energy Living Mobile Exhibit 5/19/26 Eversource Eversource Press Event, Berlin Community Eversource Efficiency Experience 5/31/26 Eversource New London County Strawberry Festival Community Smart Energy Living Mobile Exhibit 6/6/26 UI Stratford Main Street Festival Community Exhibitor 6/6/26 UI Hamden Fest Community Exhibitor 6/6/26 6/7/26 Eversource Celebrate West Hartford Community Smart Energy Living Mobile Exhibit 6/10/26 UI Resiliency Summit at Avangrid Conference Smart Energy Living Mobile Exhibit 6/11/26 Eversource Sustainable CT Spring into Summer Celebration Community Smart Energy Living Mobile Exhibit 6/13/26 Eversource CT Sustainability Expo Hartford Conference Eversource Efficiency Experience 6/14/26 Eversource Connecticut Bacon Festival Community Smart Energy Living Mobile Exhibit 6/18/26 UI Orange Artisan Festival & Business Expo Conference Smart Energy Living Mobile Exhibit 6/27/26 Eversource Litchfield Wellness Festival Community Smart Energy Living Mobile Exhibit 6/30/26 UI North Haven Summer Concert Series Community Exhibitor B. Paid Media The EDCs’ paid media strategy takes into account comprehensive data analysis from previous years of advertising campaigns alongside program performance, goals and budgets. Each channel execution employs advanced targeting techniques and sophisticated measurement tools to precisely identify and engage individuals with a high likelihood of interest in the EDCs’ program offerings. Targeting efforts are meticulously designed to identify users whose recent online behavior and expressed interests suggest a propensity for owning an electric vehicle
  6. Page 76 of 86

    76 (EV) and actively seeking EV charging solutions. By aligning the EDCs’ strategy with these insights, the EDCs’ aim to optimize engagement, drive higher conversion rates, and ultimately foster greater adoption of the EDCs’ programs. This data-driven, strategic focus not only enhances the efficiency of the EDCs’ advertising spend but also ensures that program messaging reaches the most relevant and receptive audiences. A pivotal metric for evaluating advertising success is impressions, which refers to the number of times an advertisement is displayed on a website or app. While this metric might appear straightforward, it plays a strategic role in gauging the potential reach and visibility of the EDCs’ campaigns. High impression counts indicate broad exposure, suggesting that the EDCs’ ads are effectively penetrating the target market. By analyzing impression data, the EDCs can assess the frequency and distribution of the ad placements, ensuring that program advertisements are seen by a substantial audience. Moreover, impressions serve as a foundational metric for more nuanced analyses, such as click-through rates (CTR) and conversion rates, enabling the EDCs to refine targeting strategies and optimize ad performance. This comprehensive understanding of impressions not only helps to validate the initial stages of program advertising efforts but also provides critical insights for future campaign enhancements, ultimately driving more impactful and efficient marketing initiatives. 1. Eversource The Eversource strategy for this report term focused on paid search. This form of paid media focuses on serving program ads to customers actively searching for EV solutions. This educational-focused approach results in fewer impressions with less spending, but higher quality engagements. For example, our top three keyword results for residential advertising were “ev charging station,” “ev charging program,” and “rebate for ev charger install.” Our top three keyword results for commercial advertising were “public ev charging,” “ev charging solutions,” and “city ev charging.” These results demonstrate how awareness of the rebate programs can be integrated into the customer journey, serving customers with information about the programs at the right point in their research. For the promotion of Managed Charging, Eversource also included paid social ads on Meta platforms. This efficient and historically effective channel messages those who may be interested in the offer. Table 19: Paid Media Spend Summary for Eversource Channel Spend Impressions Cost per Impression Cost per 1,000 Impressions Website Visits C&I $30,838 19,597 $1.57 $1,573.61 1,870 Managed Charging $929 3,760 $0.25 $247.07 814 Multi-Family $19,882 9,874 $2.01 $2,013.57 821 Paid Search
  7. Page 77 of 86

    77 Low Income $1,385 6,9874 $0.20 $199.74 1,267 Single Family $42,133 80,574 $0.52 $788.20 8,946 Paid Search Subtotal: $95,167 120,739 $0.79 $788.20 13,718 Managed Charging $7,523 472,089 $0.02 $15.94 17,568 Paid Social Subtotal: $7,523 472,089 $0.02 $15.94 17,568 TOTAL $102,690 592,828 $0.17 173.22 31,286 Paid Social 2. United Illuminating United Illuminating's paid media strategy leveraged historical campaign performance, audience insights, and advanced targeting capabilities to deliver relevant messaging to customers most likely to benefit from the Company's EV programs. Using a diversified media mix and measurement tools to track impressions, engagement, website traffic, and conversions, the Company continuously optimized campaign performance to ensure advertising investment remained efficient, data-driven, and results-focused. The Company's strategy combined paid search, programmatic display, programmatic digital video, paid social, streaming audio, and targeted industry publications to maximize awareness and engagement across residential and commercial audiences. Paid search reached customers actively researching EVs and charging solutions, while programmatic display, digital video, and paid social on Meta and LinkedIn expanded reach through behavioral and interest-based targeting. Additional tactics included Connecticut Business Journal print advertisements and sponsored email deployments, and a campaign promoting the pilot Multi-Unit Dwelling (MUD) managed charging offering through Meta, Nextdoor, and programmatic display advertising. Table 20: Paid Media Spend Summary for United Illuminating Channel Spend Impressions Cost per Impression Cost per 1,000 Impressions Website Visits Display Commercial $ 8,002.29 1,218,149 $ 0.01 $ 6.57 447 Single Family $ 12,269.23 1,884,421 $ 0.01 $ 6.51 498 Multi-Family $ 7,745.60 952,302 $ 0.01 $ 8.13 274 Display Subtotal $ 28,017.12 4,054,872 $ 0.01 $ 6.91 1,219 Commercial $ 4,522.34 2,525 $ 1.79 $ 1,791.03 158 Single Family $ 4,621.89 13,239 $ 0.35 $ 349.11 423 Paid Search Subtotal $ 9,144.23 15,764 $ 0.58 $ 580.07 581 Paid Search
  8. Page 78 of 86

    78 Paid Social Commercial $ 39,315.17 1,424,096 $ 0.03 $ 27.61 12,513 Single Family $ 15,786.19 1,326,661 $ 0.01 $ 11.90 16,130 Multi-Family $ 17,690.89 1,755,601 $ 0.01 $ 10.08 14,687 Paid Social Subtotal $ 72,792.25 4,506,358 $ 0.02 $ 16.15 43,330 Commercial $ 3,070.32 383,669 $ 0.01 $ 8.00 216 Single Family $ 15,838.00 834,429 $ 0.02 $ 18.98 16 Streaming Video Subtotal $ 18,908.32 1,218,098 $ 0.02 $ 15.52 232 Single Family $ 12,601.01 594,098 $ 0.02 $ 21.21 131 Streaming Audio Subtotal: $ 12,601.01 594,098 $ 0.02 $ 21.21 131 Commercial $ 34,940.00 107,573 $ 0.32 $ 324.80 31 Business Journals Subtotal $ 34,940.00 107,573 $ 0.32 $ 324.80 31 TOTAL $ 176,402.93 10,496,763 $ 0.02 $ 16.81 45,524 Streaming Video Streaming Audio Business Journals C. Website The EDCs’ web pages are strategically designed to fulfill three primary objectives: detail program offers, drive rebate applications and managed charging enrollments, and provide educational content for customers at different stages of their electric vehicle (EV) charger installation journey. These goals are integral to the overall mission of promoting EV adoption and supporting a diverse customer base. To achieve these objectives, the websites are regularly updated and optimized as a dynamic communication tool, ensuring content remains relevant and effective in engaging customers, business partners, and stakeholders. The structure of the program web pages is thoughtfully segmented to cater to distinct customer types, with dedicated sections for business customers and residential customers. This tailored approach allows the EDCs to deliver highly relevant content and resources, enhance user experience, and facilitate easier navigation. For business customers, the pages offer detailed insights into commercial rebate programs and benefits of EV infrastructure. Residential customers, on the other hand, are provided with comprehensive information on home charging solutions, step-by-step application processes for rebates, clear guidance on managed charging options and enrollment, and educational content to guide them through the decision-making process.
  9. Page 79 of 86

    79 The experience for business customers was further enhanced, specifically in UI, through a redesigned landing page that serves as a streamlined triage experience. Rather than presenting a single pathway for all commercial participants, the updated interface enables users to self-identify as contractors, property owners, business owners, or fleet operators, directing each audience to the program information and resources most relevant to their needs. This reflects a similar experience for Eversource customers, as well. The EDCs’ segmentation options on commercial webpages simplifies navigation, reduces customer confusion, and helps participants more quickly identify the appropriate participation pathway, ultimately supporting higher engagement and a more efficient customer experience. In late 2025, Eversource published Road to Recharge on their website. This engaging feature asks customers to make EV charging decisions along a family road trip and provides useful tips and information along the way. This educational resource lives on the EV information pages of the site. By maintaining a clear and user-friendly separation of content, the EDCs ensure that each customer type receives targeted information that addresses their unique needs and interests. This strategic alignment not only supports the EDCs’ immediate goals but also fosters long-term engagement and trust, positioning the EDCs’ webpages as a leading resource in the EV ecosystem. The main web pages for customers can be found at the following URLs: 1. Eversource • Business customer: i. https://www.eversource.com/content/business/save-money-energy/cleanenergy-options/electric-vehicles/business-ev-charging-rebates • Residential customer: i. https://www.eversource.com/content/residential/save-moneyenergy/clean-energy-options/electric-vehicles/charging-stations ii. https://www.eversource.com/content/residential/save-moneyenergy/clean-energy-options/electric-vehicles/charging-stations iii. https://www.eversource.com/residential/save-money-energy/cleanenergy-options/electric-vehicles 2. United Illuminating • Business customers: i. Programs for Your Business - UI (uinet.com) • Residential customers: i. Programs for Your Home - UI (uinet.com) Website visits for each EDC can be found in Table 21 and Table 22. Table 21: Eversource Website Visits Business Web Page Residential Web Page
  10. Page 80 of 86Match

    80 Total unique visits 4,525 84,799 Visits that engaged with content 78% 43% Visits to more than one EV web page 62% 31% Business Web Page Residential Web Page Total Page Views 21,144 35,827 Total (Unique) Users 17,079 24,697 Table 22: UI Website Visits D. Partner Engagement Collaboration and information sharing with business partners, professional associations, and industry groups continue to hold importance in the EDCs’ education and outreach efforts. These important partners can provide a bridge to potential program applicants as well as stakeholders who can provide industry and market insights to inform program implementation and the customer journey. The EDCs are also exploring opportunities to strengthen relationships with community partners, including Live Green CT and Connecticut Clean Cities and others, to leverage existing events and trusted community connections to broaden awareness of EV programs among prospective customers. 1. Partner Communications The EDCs continue to focus commercial marketing efforts around communications and training opportunities for our business partners and installers. Eversource specifically continues to feature training opportunities regarding PowerClerk portal functionality and increase visibility for partners regarding program requirements and project development. These communications are instrumental in supporting successful commercial project deployment and fostering market engagement with the EV programs. The EDCs also continue to coordinate where opportunities exist to streamline partner communications. For example, when updates to documents, such as the Qualified Products List, affect both operating companies, United Illuminating provides Eversource with relevant content and materials to support joint communications. Eversource typically distributes broader partner email communications, in addition to standard one-to-one partner communication, United Illuminating's formal outreach strategy emphasizes this style of targeted, one-to-one engagement with partners and contractors to provide tailored guidance and support. Table 23: Eversource Partner Communications Date Communication Open Rate 8/16/25 Important Changes to CT EV Charging Qualified Products List 53.3%

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2c #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2d #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Words on different pages

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 3 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 4 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 6 REDACTED #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 8 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Words on different pages

Text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 19) Exhibit B Public #25-08-03 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 18) Form of State Tariff Agreement Exhibit C2 #25-08-03 #26-08-01.pdf

Extracted from the file · 31 pages · 88,975 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 5) Attachment C Exhibit 1 #25-08-04 #26-08-01.pdf

Extracted from the file · 2 pages · 1,932 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 6) Attachment B #25-08-04 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment A #19-07-01, #25-08-04 #26-08-01.pdf

Extracted from the file · 9 pages · 13,682 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment C #19-07-01, #25-08-04 #26-08-01.pdf

Extracted from the file · 3 pages · 5,725 characters

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 1 - CT RRES Public #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 2 - CT RRES Public #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 3 – CT RRES Averaged _ Aggregated Data Year #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 4 - CT RRES Averaged _ Aggregated Data Town 1 #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 5 - CT RRES Application Data Fields #26-08-02 #26-08-01.pdf

Extracted from the file · 4 pages · 5,976 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / Annual Compliance Filings – Cross-Posted Compliance

This filing on the current system (opens in a new tab)